LEVELLING – STUDENT ASSESSMENT ON SETTING THE LEVEL NSTRUMENT
NAME
REGISTRATION NUMBER
CODE & COURSE CC 103 – ENGINEERING SURVEY 1
A TEMPORARY LEVELLING FULL
MARKS MARKS
OBTAINED
i. Setting Up 2
ii. Levelling 3
B OBSERVATION AND BOOKING FULL
MARKS MARKS
OBTAINED
i. Reading of the back sight 2.5
ii. Reading of the intermediate sight 2.5
iii. Reading of the intermediate sight 2.5
iv. Reading of the intermediate sight 2.5
v. Reading of the intermediate sight 2.5
vi. Reading of the fore sight 2.5
C CALCULATION FULL
MARKS MARKS
OBTAINED
I. obtaining the reduced level and arithmetic check using rise and fall method
5
TOTAL MARKS 25
BS IS FS RISE FALL REDUCED LEVEL
REMARKS
TBM1 = 100.000M
Instructions: Students must take the reading and obtaining the reduced level and arithmetic
check using rise and fall method. Students must show the arithmetic check. Recommended time is 10 minutes