Nicolas GILBERT (AB-ABP) 1 January 18th, 2006 PS - SPS days 18th January 2006 SPS Activities & Hardware Commissioning

PS - SPS days 18th January 2006

  • Upload
    mizell

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

PS - SPS days 18th January 2006. SPS Activities & Hardware Commissioning. Table of content. Short summary main activities 2005 Planning review : Remaining site activities Hardware tests Start up organisation SPS team Some pictures Final words…. Completed activities 2005. Magnets - PowerPoint PPT Presentation

Citation preview

Page 1: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 1January 18th, 2006

PS - SPS days18th January 2006

PS - SPS days18th January 2006

SPS Activities&

Hardware Commissioning

Page 2: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 2January 18th, 2006

Table of contentTable of content

Short summary main activities 2005

Planning review :– Remaining site activities

– Hardware tests

Start up organisation SPS team

Some pictures

Final words…

Page 3: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 3January 18th, 2006

Completed activities 2005Completed activities 2005

Magnets– Replacement quadrupole jacks (ring magnets)

Beam transfer– LSS4 : replacement MSE protection element (TPSG4 beam diluter)

– LSS6 : major upgrade extraction channel (fast extraction to LHC), including new

septa protection (TPSG6) and 4 MKEs

– New bumper configuration in LSS6

– New transfer line configuration for TI2 (+ old T1 removed)

Beam instrumentation (mainly SPS points 4, 5 and 6)– New BIPMH in LSS5

– Instrumentation moves (BSHV, BPSM, BRCV, …)

– Removal all BI monitors in TT60 (obsolete slow extraction to West Area)

Page 4: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 4January 18th, 2006

Completed activities 2005Completed activities 2005

RF : Upgrade of SPS damper in LSS2

Experiment : Removal of the 2 Roman Pots in LSS5 (LHC experiment

TOTEM)

Civil Engineering : Vault repair in LSS3 (lots of contributions !)

Support– AT/VAC : frequent interventions (beam line configurations, access,

removal TAL 11431, …)

– SC/RP : control during access to tunnel

– TS/SU : general check alignments, altimetry, …

– TS/CV : various interventions on cooling networks & ventilation ducts

– TS/EL : change of irradiated cables in LSS6, as well as in TDC2 including removal of PVC cables

– TS/IC – HM : involved in all transport issues

Page 5: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 5January 18th, 2006

SPS planningSPS planning

patrols

Page 6: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 6January 18th, 2006

Start up organisationStart up organisation

Weekly SPS coordination meetings from January

Short daily coordination meeting once SPS access

restricted (from feb.) with directly concerned people

Regular SPS planning update, available under

Web/EDMS

Major update of SPS drawings (more than 250 updated layout

drawings up to now by TS/MME) available soon in CDD

Page 7: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 7January 18th, 2006

Some pictures …Some pictures …

TIDVG : upgraded version to be installed in LSS1

Page 8: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 8January 18th, 2006

Some pictures …Some pictures …

The Roman Pot set- up during test beam in the SPS in summer 2004

Now removed from ECX5

Page 9: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 9January 18th, 2006

Some pictures …Some pictures …

TPSG6/MST

(July 2005)

TPSG4

TPSG6/MST

(Jan 2006)

SPS Extraction line

Page 10: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 10January 18th, 2006

Some pictures …Some pictures …

MOPOS consolidation : Passive RC component in original adapter replaced by PCB

About 250 adaptors (=125 MOPOS) to be replaced early 2006

Page 11: PS - SPS days 18th January 2006

Nicolas GILBERT (AB-ABP) 11January 18th, 2006

Final words…Final words…

Useful info :– BT & BI contribution to SLI project see EDMS see EDMS

624554624554– MOPOS activities see EDMS 679896see EDMS 679896 – LSS3 vault repair see EDMS 675246 see EDMS 675246 – SPS detailed planning see EDMS 476624see EDMS 476624

Specials Thanks to :– Alan Spinks (SPS technical coordination)

– Jose Monteiro (SPS planning)

– SPS team (AB & AT divisions)