1
01 - First Floor 100' - 0" 02 - Second Level 118' - 0" D E 1 1/2" SAN-V 8' - 6" 6' - 1 3/4" 3/4" AHP 3/4" AHP 2" SLEEVE 01 - First Floor 100' - 0" 02 - Second Level 118' - 0" 6 7 3" SCS 4" SCS 3" PW-DI-R 3/4" AHP 3/4" AHP 6" ALP 3' - 5 7/8" 4' - 2 1/4" 4' - 6 1/2" 5' - 2 1/2" 6' - 0 1/2" 8' - 6 1/2" 9' - 3 1/2" 10' - 2" 11' - 0 1/2" 0' - 5" 6" SLEEVE 4" SLEEVE (TYP. 3) 4" SLEEVE 8" SLEEVE 1" SLEEVE 6" SLEEVE (W/ 1" INSULATION) (W/ 2" INSULATION) (W/ 1" INSULATION) 3" OWS 01 - First Floor 100' - 0" 02 - Second Level 118' - 0" 03 - Third Level 136' - 0" D E F G 1 1/4" ALP 1 1/4" ALP 1" ALP 2" OWS 2" OWS 2" OWS 1 1/2" OWS 1 1/2" OWS 1 1/2" OWS 1 1/2" OWS 2" OWS 2" OWS 1/2" OWS 2" OWS 6" ALP 3" PW-DI-R 6" ALP 4" ALP 4" ALP 2" PW-DI-R 2" PW-DI-R 1" P-MDGS-N 1" P-MDGS-N 4" PW-DI-R 1" ALP 1" CD 2" ALP 2" ALP 4" ALP 2" PW-DI-R 2" PW-DI-R 10' - 11" 14' - 10" 3' - 8" 4' - 4" 5' - 0 1/8" 5' - 5 3/8" 5' - 0 3/4" 4' - 4 3/4" 5' - 9 7/8" 12' - 11 5/8" 10' - 3 1/2" 0' - 5 1/2" 7' - 10" 8' - 1" 8' - 9 3/8" 9' - 1 3/4" 7' - 6 1/4" 11' - 11" 7' - 5 1/2" 13' - 3 3/8" 0' - 1 7/8" 7' - 0 1/2" 7' - 1 1/8" 1' - 11 1/8" 4' - 0 1/8" 15' - 1 1/2" 1' - 2 1/4" 4' - 11 3/8" 5' - 0 5/8" 5' - 4 5/8" 5' - 6 1/2" 5' - 6 3/4" 8' - 8" 4' - 8 1/2" 5' - 2" 5' - 4 3/4" 5' - 5 1/8" 5' - 9 3/8" 0' - 5 7/8" 10' - 3 1/2" 6' - 5 1/4" 7' - 2" 0' - 8 1/2" 1' - 6 1/2" 1' - 11" 7' - 2" 1/2" OWS 0' - 2" 8' - 6" 8' - 9" 9' - 1" 9' - 5" 9' - 7 1/4" 10' - 0 1/2" 10' - 6" 8" SLEEVE 4" SLEEVE (4" SLEEVE TYP. 7) 2" SLEEVE 2" SLEEVE 2" SLEEVE 2" SLEEVE (4" SLEEVE TYP. 3) 2" SLEEVE 8" SLEEVE 6" SLEEVE 4" SLEEVE 6" SLEEVE 3" SLEEVE 2" SLEEVE 5" SLEEVE 3" SLEEVE 3" SLEEVE 6" SLEEVE 3" SLEEVE 3" SLEEVE 3" SLEEVE 2" SLEEVE (W/ 2" INSULATION) (W/ 1" INSULATION) (NO INSULATION) 10' - 8 1/4" 14' - 0" 2" POWS DATE: BELL CORP. 1340 LEXINGTON,AVE. ROCHESTER,N.Y 14606 PHONE:(585)-277-1000 FAX:(585)-277-1092 DRAWN BY: CHECKED BY: PROJECT NO. FILE NAME: PLOT BY: PLOT DATE: PURPOSE FOR SUBMITTAL RECORD OF TRADE COORDINATION TRADE COMPANY DATE AUTHORIZED SIGNATURE MECHANICAL PLUMBER SHEET METAL SPRINKLER ELECTRICIAN GC BELL BELL BELL C:\Users\jmayo\Documents\NPTU_2701_PROCESS_2015-4-1_jmayo.rvt 6/26/2015 10:38:47 AM CHARLESTON, SC BLDG 2701 NUCLEAR TRAINING FACILITIES PS-43 C-3265 CG 06/10/15 PROCESS PIPE SLEEVE ELEVATIONS JM JM PS-11 PS-43 SCALE: 1/4" = 1'-0" 3 PROCESS PIPE SECTION @ PURE WATER STORAGE TANK VENT THRU SOUTH WALL PS-11 PS-43 SCALE: 1/4" = 1'-0" 2 PROCESS PIPE SECTION LOOKING WEST @ PROJECT EAST EXTERIOR WALL PS-11 PS-43 SCALE: 1/4" = 1'-0" 1 PROCESS PIPE SECTION LOOKING NORTH @ PROJECT SOUTH EXTERIOR WALL REVISIONS NO. DESCR. DATE 1 ADDED INSULATION 6/25/15

PS-43-blurred

Embed Size (px)

Citation preview

Page 1: PS-43-blurred

01 - First Floor100' - 0"

02 - Second Level118' - 0"

D E

1 1/2" SAN-V

8' - 6

"

6' - 1 3/4"

3/4" AHP

3/4" AHP

2" SLEEVE

01 - First Floor100' - 0"

02 - Second Level118' - 0"

67

3" SCS

4" SCS

3" OWS3" OWS 3" PW-DI-R3/4" AHP3/4" AHP

6" ALP

3' - 5 7/8"

4' - 2 1/4"

4' - 6 1/2"

5' - 2 1/2"

6' - 0 1/2"

8' - 6 1/2"

9' - 3 1/2"

10' - 2"

11' - 0 1/2"

0' - 5

"

6" SLEEVE

4" SLEEVE (TYP. 3)4" SLEEVE

8" SLEEVE

1" SLEEVE6" SLEEVE

(W/ 1" INSULATION)

(W/ 2" INSULATION)

(W/ 1" INSULATION)3" OWS

01 - First Floor100' - 0"

02 - Second Level118' - 0"

03 - Third Level136' - 0"

D E F G

1 1/4" ALP

1 1/4" ALP1" ALP

2" OWS2" OWS2" OWS

1 1/2" OWS1 1/2" OWS1 1/2" OWS1 1/2" OWS

2" OWS

2" OWS

1/2" OWS

2" OWS

6" ALP

3" PW-DI-R

6" ALP

4" ALP

4" ALP

2" PW-DI-R2" PW-DI-R

1" P-MDGS-N1" P-MDGS-N

4" PW-DI-R4" PW-DI-R

1" ALP

1" CD

2" ALP

2" ALP

4" ALP

2" PW-DI-R

2" PW-DI-R

10' -

11"

14' -

10"

3' - 8"

4' - 4"

5' - 0 1/8"

5' - 5 3/8"

5' - 0

3/4

"

4' - 4 3/4"

5' - 9 7/8"

12' - 11 5/8"

10' -

3 1/

2"

0' - 5

1/2

"

7' - 1

0"

8' - 1

"

8' - 9

3/8

"

9' - 1

3/4

"

7' - 6

1/4

"

11' -

11"

7' - 5 1/2"

13' - 3 3/8"

0' - 1 7/8"

7' - 0 1/2"

7' - 1 1/8"

1' - 11 1/8"

4' - 0 1/8"

15' - 1 1/2"

1' - 2 1/4"

4' - 11 3/8"

5' - 0 5/8"

5' - 4 5/8"

5' - 6 1/2"

5' - 6 3/4"

8' - 8"

4' - 8 1/2"5' - 2"

5' - 4 3/4"5' - 5 1/8"

5' - 9 3/8"

0' - 5 7/8"

10' -

3 1/

2"

6' - 5

1/4

"

7' - 2

"

0' - 8

1/2

"1'

- 6 1

/2"

1' - 1

1"7'

- 2"

1/2" OWS0'

- 2"

8' - 6

"

8' - 9

"

9' - 1

"

9' - 5

"

9' - 7

1/4

"

10' -

0 1/

2"

10' -

6"

8" SLEEVE

4" SLEEVE

(4" SLEEVE TYP. 7)

2" SLEEVE

2" SLEEVE

2" SLEEVE

2" SLEEVE

(4" SLEEVE TYP. 3)

2" SLEEVE

8" SLEEVE

6" SLEEVE

4" SLEEVE

6" SLEEVE

3" SLEEVE

2" SLEEVE

5" SLEEVE3" SLEEVE

3" SLEEVE

6" SLEEVE3" SLEEVE

3" SLEEVE

3" SLEEVE

2" SLEEVE

(W/ 2" INSULATION)

(W/ 1" INSULATION)

(NO INSULATION)

10' - 8 1/4"

14' -

0"

2" POWS

DATE:

BELL CORP.1340 LEXINGTON,AVE.ROCHESTER,N.Y 14606PHONE:(585)-277-1000 FAX:(585)-277-1092

DRAWN BY:

CHECKED BY:

PROJECT NO. FILE

NA

ME:

PLO

T BY

:P

LOT

DAT

E:

PUR

POSE

FOR

SU

BMIT

TAL

RECORD OF TRADE COORDINATION

TRADE COMPANY DATE AUTHORIZED SIGNATURE

MECHANICAL

PLUMBER

SHEET METAL

SPRINKLER

ELECTRICIAN

GC

BELL

BELL

BELL

C:\U

sers

\jmay

o\D

ocum

ents

\NP

TU_2

701_

PR

OC

ES

S_20

15-4

-1_j

may

o.rv

t6/

26/2

015

10:3

8:47

AM

CHAR

LEST

ON, S

C

BLDG

270

1NU

CLEA

R TR

AINI

NG F

ACIL

ITIE

S

PS-43

C-3265

CG

06/10/15

PROCESS PIPESLEEVE

ELEVATIONS

JM

JM

PS-11 PS-43 SCALE: 1/4" = 1'-0" 3 PROCESS PIPE SECTION @ PURE WATER STORAGE TANK VENT THRU SOUTH WALL

PS-11 PS-43 SCALE: 1/4" = 1'-0" 2 PROCESS PIPE SECTION LOOKING WEST @ PROJECT EAST EXTERIOR WALL

PS-11 PS-43 SCALE: 1/4" = 1'-0" 1 PROCESS PIPE SECTION LOOKING NORTH @ PROJECT SOUTH EXTERIOR WALL

REVISIONSNO. DESCR. DATE

1 ADDEDINSULATION 6/25/15

jmayo
Line
jmayo
Line
jmayo
Line
jmayo
Line
jmayo
Line
jmayo
Line
jmayo
Line
jmayo
Line