Providing a MultiState GIS Based Cost Estimate System for Building the
Appalachian Development Highway System
Jason Wang, ARC Sang Hong Yoo, RTI for GIST Symposium
March 27, 2007
l Purpose: – Create economic opportunities and jobs. – Close gaps from the interstate highways. – Provide access to economic centers and global markets – Improve quality of life for the people of Appalachia
l Characteristics: – 3,090 miles of highway system. – 31 corridors – Mostly 4lane highways – Initial Construction only
The Appalachian Development Highway System (ADHS)
Before the ADHS
After the ADHS
Kentucky
Corridor B
ADHS GIS PROJECT
l Costsharing partner between ARC and RTI
l Involving 13 State DOTs and FHWA Divisions covering Appalachia
l First phase completed July 2004
l Second phase completed Dec 2005
Before the GIS
After the GIS
State Map
West Virginia
Before the GIS
After the GIS
Corridor D Strip Map Scale 1 inch = 1 mile
West Virginia
Purpose of the ADHS Cost to Complete Estimate Report
l Establish new funding levels l Determine the apportionment factor l Shape new legislation
l Objective – To develop a WebBased GIS system that will help State DOTs and FHWA to complete 2007 ADHS Cost to Complete Estimate.
l Expected Functions – Regional and State ADHS maps – Corridor ADHS strip maps – Data & geometry editing – Abilities to view, print, inquire and update ADHS data – Document Management System (DMS) – Project cost monitoring system – Analysis tool
ADHS Cost Estimate GIS Initiative
l Challenges – Data from 13 States DOTs – Different GIS capabilities in State DOTs – Project level details through GIS system – Different user backgrounds – Development and operation
ADHS Cost Estimate GIS Initiative
Project Approach
l Establish ADHS Cost Estimate GIS advisory group involving State DOTs, FHWA Division offices, ARC and RTI
l Identify major functions and design system architecture
l Migrate from desktop to webbased system l Develop user manual and guidelines
EADHS.ORG
l Web portal for ADHS l Cost to Complete
– Internet Map – ESRI ArcGIS Server
– Cost Estimate Tables – Project Cost Monitoring System
Cost To Complete Estimate
Cost To Complete Estimate
Next Steps
l Develop analysis tool l Project tracking l Upgrade to ArcGIS 9.2 l Improve efficiency of the system