Providing a Multi­State GIS Based Cost Estimate System for Building the 

Appalachian Development Highway System 

Jason Wang, ARC Sang Hong Yoo, RTI for GIS­T Symposium 

March 27, 2007

Page 2: Providing a MultiState GIS Based Cost Estimate System for

l  Purpose: –  Create economic opportunities and jobs. –  Close gaps from the interstate highways. –  Provide access to economic centers and global markets –  Improve quality of life for the people of Appalachia 

l  Characteristics: –  3,090 miles of highway system. –  31 corridors –  Mostly 4­lane highways –  Initial Construction only 

The Appalachian Development Highway System (ADHS)

Page 3: Providing a MultiState GIS Based Cost Estimate System for
Page 4: Providing a MultiState GIS Based Cost Estimate System for

Before the ADHS

After the ADHS 

Kentucky 

Corridor B

Page 5: Providing a MultiState GIS Based Cost Estimate System for

ADHS GIS PROJECT 

l  Cost­sharing partner between ARC and RTI 

l  Involving 13 State DOTs and FHWA Divisions covering Appalachia 

l  First phase completed July 2004 

l  Second phase completed Dec 2005

Page 6: Providing a MultiState GIS Based Cost Estimate System for

Before the GIS

After the GIS 

State Map 

West Virginia

Page 7: Providing a MultiState GIS Based Cost Estimate System for

Before the GIS

After the GIS 

Corridor D Strip Map Scale 1 inch = 1 mile 

West Virginia

Page 8: Providing a MultiState GIS Based Cost Estimate System for
Page 9: Providing a MultiState GIS Based Cost Estimate System for

Purpose of the ADHS Cost to Complete Estimate Report 

l  Establish new funding levels l  Determine the apportionment factor l  Shape new legislation

Page 10: Providing a MultiState GIS Based Cost Estimate System for

l  Objective –  To develop a Web­Based GIS system that will help State DOTs and FHWA to complete 2007 ADHS Cost to Complete Estimate. 

l  Expected Functions –  Regional and State ADHS maps –  Corridor ADHS strip maps –  Data & geometry editing –  Abilities to view, print, inquire and update ADHS data –  Document Management System (DMS) –  Project cost monitoring system –  Analysis tool 

ADHS Cost Estimate GIS Initiative

Page 11: Providing a MultiState GIS Based Cost Estimate System for

l  Challenges –  Data from 13 States DOTs –  Different GIS capabilities in State DOTs –  Project level details through GIS system –  Different user backgrounds –  Development and operation 

ADHS Cost Estimate GIS Initiative

Page 12: Providing a MultiState GIS Based Cost Estimate System for

Project Approach 

l  Establish ADHS Cost Estimate GIS advisory group involving State DOTs, FHWA Division offices, ARC and RTI 

l  Identify major functions and design system architecture 

l  Migrate from desktop to web­based system l  Develop user manual and guidelines

Page 13: Providing a MultiState GIS Based Cost Estimate System for

EADHS.ORG 

l  Web portal for ADHS l  Cost to Complete 

–  Internet Map – ESRI ArcGIS Server 

–  Cost Estimate Tables –  Project Cost Monitoring System

Page 14: Providing a MultiState GIS Based Cost Estimate System for

Cost To Complete Estimate

Page 15: Providing a MultiState GIS Based Cost Estimate System for

Cost To Complete Estimate

Page 16: Providing a MultiState GIS Based Cost Estimate System for

Next Steps 

l  Develop analysis tool l  Project tracking l  Upgrade to ArcGIS 9.2 l  Improve efficiency of the system