NeighborWorks Pocatello Bid Detail Sheet Trade: Cabinets & Countertops Location: 628 W Sherman Pocatello House Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace Notes & Special Instructions: Provide Labor costs for the following: Cost Option Install base and wall cabinets for the kitchen and both bathrooms - NeighborWorks Pocatello will supply cabinet material as well as vanity and sink tops for bathrooms Install laminate countertop. Cut out holes for kitchen sink (plumber to provide the template) Provide optional cost to install one row of tile backsplash above kitchen countertops (NWP will provide the material). TOTAL BID AMOUNT:

Provide Labor costs for the following: Cost Option TOTAL

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: Cabinets & CountertopsLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:

Provide Labor costs for the following: Cost Option

Install base and wall cabinets for the kitchen and both bathrooms - NeighborWorks Pocatello will supply cabinet material as well as vanity and sink tops for bathroomsInstall laminate countertop. Cut out holes for kitchen sink (plumber to provide the template)

Provide optional cost to install one row of tile backsplash above kitchen countertops (NWP will provide the material).

TOTAL BID AMOUNT:

Page 2: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: Drywall InstallLocation: 628 W Sherman Pocatello

House Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Contractor to supply all material, including 1/2" drywall for walls & ceiling, 1/2" Mold/Moisture drywall for bathroom, tape, screws, radius corner material and primer(2) 9-foot walls throughout home(3) There will be a square ceiling tray in living room(4) Use "Orange Peel" texturing(5) Bullnose all wall corners and windows(6)All walls to be primed for paint upon completion of texture. Primer is not to be mixed with texture material.

Provide labor AND MATERIAL COSTS for the following: Cost

Hang, tape and texture all interior sheetrock, including mechanical & laundry room

Prime all walls

TOTAL BID AMOUNT:

Page 3: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: ElectricalLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Service to be above ground(2) Receptacles, located per NEC, and Toggle Switches(3) 20 AMP circuits in kitchen, bathroom & exterior. Receptacle cover needed for both exterior outlets(4) Furnace will be gas and needs to be grounded(5) Do not drill holes in any micro-lams or glue-lams w/out prior permission(6) Water Heater to be Gas(7) Contractor shall provide for all permits, inspections and provide NWP with copies.(8) All electrical boxes will need to be set at 1/2" to allow for the 1/2" sheetrock on the ceilings(9)Ceiling fan grade gang boxes in bedrooms (3) and Living room (1) with dual switches (double gang) at each location for operating lights and fan separately, by-passing the pull chain(10) Temporary power needs to be set prior to commencing concrete!!

(11) Electrician will not receive final payment/retention until temporary power pole is removed for the building site

(12) The range outlet is needed for powering of the temporary stand-alone heater. Also, two other interior 20 amp outlets (one on main floor and the other upstairs) are needed prior to the rough-in phase of project.

Provide Labor and Material costs for the following: Cost

Idaho Electrical Inspection fees (if needed)

200 AMP Service Panel located in interior of home

Temporary power & pole for early construction process. Provide two (2) 20 amp circuits on power pole.

One (1) light and switch and one (1) plug for furnace

Install smoke alarms in each bedroom, hallway and living room and one carbon monoxide detector

One (1) 100 CFM 2 sones or less per bathroom (to be vented by others)

Page 4: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

One (1) 300 CFM 2.0 sones or less fan in kitchen for ventilation (vented by others)

Door bell and chime

Rough-In w/UL Listed Fan Box & Assembly of (4) ceiling fans

Range Outlet (please note above that this is needed prior to rough-in phase)

Dryer Outlet

Installation of Light Fixtures (fixtures provided by NWP)

Install Microwave Hood/Cover (appliance provided by NWP)

Electrical plug for Irrigation System will be needed (check w/NWP for location prior to install)

TOTAL BID AMOUNT:

Page 5: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: ExcavationLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Contractor to call DIG LINE for marking before excavation(2) Own permit must be provided(3) Contractor will be responsible for any damage to existing curb, gutter or sidewalk caused by heavy equipment

(4) Contractor to correct any settling around foundation, sewer/water lines or damage caused to sidewalks or driveways due to settling for a period of 1 year

(5) Storm Water/Erosion Control will be enforced. Gravel driveway is required and silt fence may be needed. Only one (1) access point in and out of project

(6) Rocks, debris piles, forms and any silt fences must be removed at the end of project. Final retention payment will not be paid until this is completed(7) Verify with NWP's Construction Manager/Consultant to confirm that placement of staking is accurate

(8) Contractor responsible for dust control during excavation and backfill process

(9) Contractor to inform NWP of the date of backfill activity so its Construction Consultant can be on site

(10) Sewer cleanout to have threaded screw cap

Excavation: Cost Option

Excavate for foundation and footings (verify depth requirements prior to digging). Home will have a crawl space and no basement

Provide total haul-off expense (Owner will not pay extra for underestimating # of loads)

Provide total haul-on expense; Owner will not pay extra for underestimating # of loads.

Provide cost per dump truck load in "Option" column

Provide cost per dump truck load in "Option" column for hauling away rocks that are greater than 24" in diameter

Provide cost for silt fence for entire property in "Option" column

Rock Driveway

Page 6: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Finish Grade - To be of "landscape ready" quality as NWP will not hire a separate landscaper. The following will be required: (1) Ground sloped away from foundation and the remainder level compacted; (2) at least a 2" layer of rock-free and debris-free topsoil will need to be spread throughout the lot, which means topsoil will likely be needed from the outside source and/or you may need to subcontract with a landscaping company; (3) Finish grading must be 1.5" below the top of the driveway, side & service walks.

Backfill around foundation placed in 18" lifts and mechanically compacted to 95% using DAMP SOIL (hose bib to be provided by plumber before backfill process begins). Backfill material to contain no concrete or waste material.

Backfill and compact inside porch wall(s) before concrete slab is poured. Cover any wood with metal that might come in contact w/concrete

Crawlspace to be backfilled with 3/4' crushed gravel to top of footing

Excavate for sewer lines from foundation to city utility, clean out riser outside foundation with cap

Provide cost for Sewer Line Bedding in "Option" column

Provide cost for Sand Bedding in "Option" column

Backfill sewer lines with the backfill placed in 18" lifts and compacted mechanically to 95% using damp soil

Excavate water line to city utility and run line to mechanical room

TOTAL BID AMOUNT:

Sewer Line:

Water Line:

Backfill:

Page 7: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: Finish WorkLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) NeighborWorks Pocatello to provide all the material

Provide Labor for the following: Cost

Install interior doors prior to painting

Install base & casing trim

Furnish & install expandable foam at bottom of base to floor on exterior walls & trim excess foam when completed

Install locksets on all interior doors - privacy locksets on bathroom and master bedroom

Install MDF sill on windows

Reinstall doors and lock sets when painting is completed, including deadbolts

Shelving in pantry, all closets, and laundry room. NeighborWorks Pocatello will provide the material for the pantry and linen closets to make shelves adjustable

Install closet rodsInstall bath accessories, towel bar, TP holder, medicine cabinet or mirror and towel ring

Install door stoppers on all interior and exterior doorsRe-key locks and deadbolts on exterior doors when construction of the home is completed

TOTAL BID AMOUNT:

Page 8: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: FlatworkLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) 2" conduit is needed under service walks to accommodate future sprinkler system and will need to be marked(2) If cold temperatures exist, NWP will not pay extra expense for covering (3) 4" of 3/4" crushed gravel base required under flatwork

Provide Labor and Material costs for the following: Cost Option

7' x 4' service walk (Note: This is a ramping sidewalk to accommodate zero-step front entrance as shown on elevation plan)

Provide per square foot unit cost for service walks in "Option" column.

20' x 20' driveway

Curb cut and approach to accommodate 20' x 20' driveway

10' x 8' landing pad and steps for rear entrance

Provide unit cost (per square foot) for driveway and rear concrete landing pad in "Option" column in case extra is necessary

In case 50' of City Sidewalk needs to be replaced, include price in "Option" Column. Be sure to include demo expense of old sidewalk

TOTAL BID AMOUNT:

Page 9: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: FlooringLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) After installation of carpet, vacuum all rooms and remove any threads and scraps

(2) NWP will have option of selecting carpet and vinyl color/style. Contractor will need to provide the appropriately priced material samples to NWP prior to install.

Provide Labor and Material costs for the following: Cost Unit Price

Carpet grade, 45 oz., continuous filament polyester for Living Room, Hall, Bedrooms

7 lb. pad on all carpeted areas

Vinyl grade 12 mil (congolum or equal with sub-floor) for Kitchen, Dining Room, Bath, and Entrance/Exit doorways

TOTAL BID AMOUNT:

Page 10: Provide Labor costs for the following: Cost Option TOTAL
Page 11: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: FoundationLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Concrete will be placed in no more than 2-foot lifts and will be vibrated with electric vibrator on every lift(2) If applicable (only on homes with basements) take care around window buck units to ensure concrete fills channels of the buck unit(3) On all exposed concrete after snap ties are removed every snap tie hole exposed to be patched with sand/cement mixture or 5-star grout before foundation coating is applied (if applicable)

(4) All concrete ties on exterior will be removed and patched with plastic cement before waterproofing, all concrete ties on interior walls will be removed

(5) Crawl space 8" thick, 1/2" rebar reinforcing, wallks to be square and top level

(6) Ufer ground to be installed per IBC/NEC code (7) Exterior wall to be waterproofed.

(8) Use gravel parking pad for access in and out of the property. Mud and concrete must be cleaned up from City roadway on a daily basis(9) Anchor Bolts to be set 2-1/2" in from outside edge and 2-1/2" above top of concrete finished grade. Anchor bolt nuts are to be left on bolts(10) For Front Porch - Form and pour all footings; form walls at 8" and include rebar; dowel rebar into foundation; install metal over any wood that concrete will be poured against; pour top slab with slope away from house. Tie porch walls into foundation with rebar spaced 1'0" apart. Porch to be poured upon completion of general foundation. Porch "cap" to be poured immediately upon completion of framing.

Provide Labor and Material costs for the following: Cost

Footings, floors and walls according to drawings and city code with 2" x 2" footing keyway. Main floor should be flush with the top of the foundation to keep the walkway rise to a minimum

Provide cost for Concrete Pumping if needed. NeighborWorks Pocatello will not pay extra for underestimating

Provide cost for Front Porch

TOTAL BID AMOUNT:

Page 12: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: FramingLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Contractor responsible for cost of the crane to set Trusses(2) All materials furnished by NWP except fasteners

(3) Cleanup any dirt, gravel, mud and other debris that are left in City right of way(4) Assure that Ufer ground is bent to interior side to insure that electrical connection can be made

(5) Structural Information: Floor joists JI, 11 7/8" TJI; Subfloor 3/4" T&G waferwood set with construction adhesive; Exterior walls main floor - 2' x 6' construction 16" on center; Sheeting 7/16" OSB; Interior Wall 2' x 4' constrution 16" on center; Roof Framing: (1) Engineered Trusses; (b) Sheeting 7/16" OSB

(6) Frame out linen closet shelves and kitchen pantry according to plan

(7) All walls, doors, and window openings to be plumb within 1/8" per 8' of rise.

Provide Labor for the following: Cost Option

Wall framing, interior and exterior walls, setting trusses and roof

Setting of all exterior doors true and level and installation of permanent door lock set including deadbolts.

Blocking in bathroom for towel bars and accessories

Installation of House Wrap on exterior, gable ends, doors and windows

Installation of window units; windows will be set in silicone and have 6" vicor around exterior fins (supplied by NWP). Windows to be hand nailed and not stapled.

Install blocking for sheetrock installationProvide temporary stairs (according to code) if needed at one access using structurally appropriate material

In case gas meter is not installed "on rake wall", provide cost in "Option" column of constructing a shelter over the meter. Design specs can be found at https://www.intgas.com/safety-education/meter-location-guidelines

TOTAL BID AMOUNT:

Page 13: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: HVACLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Make sure and cleanup any debris, wood chips, and metal shavings on a daily basis

(2) Any framing that is cut for duct work will be repaired by HVAC contractor(3) Do not drill or cut any Microlam or Glulam without prior permission(4) All intake and venting needs to be equal to or greater than 1-foot above grade level.

(5) Dryer needs to be vented to outside wall or through soffit (not through roof)

(6) If crawlspace foundation has no vents, crawlspace will be "conditioned space"

Provide Labor & Material for the following: Cost

Gas furnace with intake and exhaust vented to outside; filters are to be MERV 6 - MERV 10

Supplies for all floors and rooms

Returns for all floors and rooms

Gas piping - Appliances to meter. NOTE: Use 3/4 inch Black pipe for trunk line. 1/2" Csst from shut offs to Appliances.

Thermostat w/basic program for heat and future cooling

Dryer, bath and kitchen vents and fans - vented to exterior

TOTAL BID AMOUNT:

Page 14: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: InsulationLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Sign & date insulation card located on electrical panel door

(2) Seal all penetrations on exterior walls and all penetrations from basement (if applicable) to main floor and main floor to attic, around windows and doors

Provide Labor & Material for the following: Cost

Above grade walls R23 with net and blown-in insulation

Attic R50

Crawlspace walls R19 batts and plastic are 16" on center; gravel floor in crawlspace to be covered with plastic sheeting

Pony wall in C.S. walls R21 batts and plastic are on 24" center

TOTAL BID AMOUNT:

Page 15: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: PaintingLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Paint must be purchased at Sherwin Williams, if any other is used, NWP will need to approve it in advance. Colors will be determined by NWP. The homeowner is responsible (as part of their sweat-equity component) for painting all bedrooms and the living room. Contractor does not need to supply the paint for the bedrooms and living room.

(2) Contractor to return after all is complete for touch-up

(3) All paper, tape, and debris to be removed when painting completed

(4) Paint all six sides of exterior and interior doors(5) Ceilings to be painted with white "ceiling" paint. Trim and doors to be painted white, semi-gloss. Walls to be painted with Sherman Williams "Sure Scrub" eggshell type paint.

Provide Labor and Material for the following: Cost

Paint interior of home (including doors). No Priming needed on interior walls as this will be completed by the Drywall Contractor

TOTAL BID AMOUNT:

Page 16: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: PlumbingLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Clean up all debris and wood chips on a daily basis and at end of project

(2) No holes to be drilled into micro-lams or glue-lams w/out prior permission(3) All fixtures to be "Water-Sense". Check with NeighborWorks Pocatello if a listing of approved WaterSense fixtures is needed(4) Contractor shall provide for all city permits and inspections and provide copy to NWP

Provide Labor & Material for the following: Cost

Supply and install PEX Branch System - all conduits, piping and flashing for complete plumbing system

Drain, waste and vent piping system (to be all ABS or PVC)

Two frost-free hose bibs. Lines for hosebibs to be installed between meter and regulator (to allow for adquate pressure at hosebib)

Moen single handle faucets - Must be WaterSense rated

Stainless steel kitchen sink, 8" deep

1 Toilet - White & American Standard Colony (or equivalent)

Deep style tub - one-piece deep Sterling unitLavatory - American Standard oval 19" x 16" china, white or equivalent, self-rimming with mixing faucet

Laundry - box with shut-off and drain

Plumb loop for Water Softener

Sprinkler loop with shut-off and drain inside

Supply & install Gas Water Heater

Garbage Disposal - Badger V or equivalent

Plumb for Ice Maker

Install and hook up Dishwasher (Dishwasher supplied by NWP)

Page 17: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Provide Pipe Jacks

During the "ground work" phase of the project, install a hose bib (put on blue pipe) that can be accessed by the excavation contractor during backfill process.

Tie line to water meter

Provide water pipe with water line placed in a straight line from structure to mainline. Field verify location and elevation of water service line prior to construction

Install 1" water line for Sprinkler System from mechanical room to exterior. Provide sealed cap for Sprinkler System

Provide sewer pipe and tie into city mainline. Sewer line shall be placed in a straight line from structure to mainline. Field verify location and elevation of sewer service line prior to construction

TOTAL BID AMOUNT:

Water Line:

Sewer:

Page 18: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: Rain GuttersLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Cleanup of trade related debris on a daily basis

Provide Labor & Material for the following: Cost

Seamless gutters and downspouts on front and back of home (if home has a bay window, it must be included)

TOTAL BID AMOUNT:

Page 19: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: RoofingLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:(1) Cleanup any debris, dirt, gravel or mud you or delivery trucks may get on City Right of Way

(2) Cleanup of trade related debris on a daily basis including nails on the ground

(3) No fasteners accepted other than nails and minimum of 6 nails per shingle(4) Pipe jacks will be provided by plumbing contractor(5) Shingle color to be determined by NWP(6) Underlayment to be installed to current code

Provide Labor & Material for the following: Cost

Provide material and labor cost to install 30 year architectural grade shingles, (Tamko, IKO or GAF) including Energy Star type shielding paper. Ice Shield underlay to be installed on all eaves and valleys. Roof vents, D-Style metal and valley flashings or wall flashings as needed.

TOTAL BID AMOUNT:

Page 20: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: Sprinkler SystemLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:

(1) Contractor shall provide for Backflow Test(2) Go over initial system operation with new home owner & provide them a schematic

(3) At end of season, turn off system, drain and blow-out lines

(4) Provide 2-year warranty on sprinkler system

Provide Labor & Material for the following: CostProvide all material and install automatic, self-draining Sprinkler System in both front and back yards to ensure 100% coverage (two completely separate sprinkler systems are needed - one for each living unit)

Provide and install all regulators, valve & control boxes and make level; install 6"of gravel under all control boxes

Provide and install backflow preventer and complete backflow test

TOTAL BID AMOUNT:

Page 21: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: SidingLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:

(1) Cleanup of trade related debris on a daily basis(2) Final cleanup needs to be performed with no scraps of metal or siding left in window wells

(3) All siding to be hand nailed with aluminum or galvanized, not stapled(4) All wraps around windows to be installed according to window detail A200 & A201, all materials must be factory supplied, including J-channel, starter stip and all boxes and vents and covers.

(5) Aluminum soffit and steel fascia

(6) Siding color to be selected by NeighborWorks Pocatello

(7) All penetrations, including in roof, need to be sealed with silicone!

Provide Labor and Material for the following: Cost Option

2 x 4/2x6 subfascia

Vinyl siding .044 mil thickness, Heartland, Mastic or equal, factory corners and misc boxes.

Install octagon gable vents on house and covered porches

TOTAL BID AMOUNT:

Page 22: Provide Labor costs for the following: Cost Option TOTAL

NeighborWorks Pocatello Bid Detail Sheet

Trade: WindowsLocation: 628 W Sherman PocatelloHouse Details: 1,172 Sq ft; 3 bedrooms/1 bath with crawlspace

Notes & Special Instructions:

(1) Windows to be set in clear silicone and attached according to manufacturer recommendations

(2) Any windows within 2 feet of door will need to be tempered glass

(3) Windows to be hand nailed and not stapled

Provide Labor & Material for the following: Cost

Furnish windows according to architectural plan - all windows to be BELOW .30 with Low-E/Argon

Supply clear 100% silicone for setting windows

Supply 6" vycor by Grace for window wrap for exterior flange

TOTAL BID AMOUNT: