Upload
jawedakhtar
View
89
Download
3
Embed Size (px)
DESCRIPTION
Proto Tech Pack Assessment of Orient Craft Ltd.
Citation preview
FASHION MERCHANDISING
Orient Craft Limited, Manesar Proto Tech Pack
Assessment
By
Akhil Tyagi (2)Haqiqat Ali (12)
Md. Jawed Akhtar (15)Sumit Sinha (27)
DFT - 5
Under the guidance of
V. PriyadarshiniAssociate ProfessorDFT
Introduction Established in 1978 One of the largest Export House in India Turnover of around 725 crores Deal with US and European buyers 21 manufacturing units in and around Delhi .strength of 25000 workers.Major clients- Tommy Hilfiger, Gap, Macy's,
Dillards, Marks and Spencer, Esprit, Armani, DKNY, Ann Taylor, United Colors of Benetton, LEVIS and Debenhams.
Process flow of Merchandising
1. Tech pack received consisting of GSS (Graded Spec Sheet) and all the details of the style e.g., trim & construction details
2. Tech pack sent to the sampling department for development of the proto sample
3. Fabric consumption along with mini markers from CAD
4. Cost calculation/ Final Costing.
5. Confirming Purchase Order (PO) and receival
6. Bulk fabric and trims ordered based on PO quantity.
7. Getting fit sample approved
8. Fabric Performance Testing (FPT) to conform to buyer standards
9. Getting size set samples approved
10. Preparing the cutting ticket in PPC and handing it over to Cutting department
11. Pilot run 12. Bulk Production begins
13. Getting Top of Production (TOP) samples approved
1.5 Order shipment
14. Follow up/ Regular tracking and update
Sampling flow
Proto Tech pack – The initial informative sheet
which encompasses all specifications required for
the development of a proto sample
Proto sample :- made on substitute fabrics, using
available accessories and then checked on the
dress form. Further the quality checker checks the
sample, and makes the necessary changes
pertaining to the fit, the drape, the style details
etc.
Fit sample : fit of the garment assumes importance
here. It is usually done on actual fabrics and
substitute trims and accessories and sent to the buyer
for necessary alterations to be made.
Size set samples : Size Set Sample - done as per the
buyer requests and equivalent to the pre production
sample except that it is done in all the sizes.
Top of Production (TOP) samples : done on the
actual fabric using the actual trims and the fit has to
be perfect. It is simply a example to the actual
production.
Time and action plan
1. Proto Tech pack Received form the buyers
2. Proto sample
2-3 days for domestic buyers and 5-6 days for foreign buyers 2 samples
3. Fit sample
Starts after 1-2 days, takes 2-3 days for domestic buyers and 5-6 days for foreign buyers
1-2 samples
4. Size set samples 1-2 days 1 from each size
5. Top of Production (TOP) samples
1 day.Approved in a day
8-10 and best 2 are sent
Proto tech pack
Proto tech pack.xls
Thank
You