29
Protal Pipeline Coatings Protective Liquid Coatings Protal Pipeline Coatings Uses & Applications Liquid coating of girth welds and tie-ins Liquid coating of welds for boring applications Repairs to FBE, fittings and fabrication Rehabilitation of existing pipeline Coating of cadweld areas Line travel rehabilitation

Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Embed Size (px)

Citation preview

Page 1: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal Pipeline CoatingsProtective Liquid Coatings

Protal Pipeline Coatings

Uses & Applications

● Liquid coating of girthwelds and tie-ins

● Liquid coating of weldsfor boring applications

● Repairs to FBE, fittingsand fabrication

● Rehabilitation ofexisting pipeline

● Coating of cadweld areas

● Line travel rehabilitation

Page 2: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other
Page 3: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

For complete application instructions see Protal 7200 application specification.

Spray: Prepare surfaces by grit blasting to a clean near white finish, SSC-SP 10/ NACE No. 2. The equipment should be a plural component airless spray unit with a proportioning pump capable of a volume mixing ratio of 3:1. Standard ancillary equipment should include minimum 10 gallon hoppers, static mixers, whip hose, and mastic gun. (Applicator should consult with Denso regarding recommended equipment). A wet on wet spray technique should be used to achieve a minimum thickness of 500 microns. The coating thickness should be measured using a wet film thickness gauge.

Brush: Prepare surfaces by grit blasting to a clean near white finish, SSC-SP 10/ NACENo. 2. Initially stir the base and hardener. Add the hardener to base and mix until a constant color is achieved making sure all sides of container are scraped. Pour mixed material onto surface and brush, trowel or roll to required mil thickness. A wet film thickness gauge shall be used to measure microns thickness. If surface temperature falls below 50°F (10°C), surface must be preheated to achieve cure. Preheat may be achieved with a propane torch or induction coil. Resin and hardener component shall be kept warm, at a minimum of 68°F (20°C), to mix easily.

Application

• Fast touch dry and set times• High temperature resistance (up to 85°C) • High build (up to 1270 microns in one coat) • Excellent adhesion (compliments FBE coated pipe) • High abrasion resistance for drilling applications • Safe and environmentally friendly • Does not shield cathodic protection • Can be applied with brush, roller or spray • Available in a variety of packaging options

Features

On-site protection of girth welds, tie-ins, welds for boring applications, repairs to FBE, push-rack applications, station piping, fittings and fabrication. Also used for main line pipe coating, sacrificial coating for directional drill and road bore pipe, and rehabilitation of existing pipelines.

Uses

Description Protal 7200 is a VOC free, 100% solids epoxy coating specially formulated to compliment FBE coated pipe. It is a high build liquid coating that is brush or spray applied in one coat in the field or shop. It cures very fast to allow quick handling and backfill times.

PROTAL 7200 Fast Cure, High Build Pipeline Coating

P R O D U C T D A T A S H E E T

Page 4: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

.

Denso (Australia) Pty Ltd

411 – 413 Victoria StreetBrunswick VIC 3056

AUSTRALIA

Tel: 1300 658 590Fax: 1300 655 064

Email: [email protected]: www.densoaustralia.com.au

A Member of Winn & Coales International

STORAGE: Minimum 24 months when stored in originalcontainers @ 41°F (5°C) to 100°F (36°C). On job site wheretemperatures are below 68°F (20°C) product must be keptwarm to mix properly.

CLEANING: Clean equipment with solvent cleaner(Xylene 95%, Butanol 5%).

HEALTH AND SAFETY: Wear protective clothing andensure adequate ventilation. Avoid contact with skin andeyes. See material safety data sheet for further information.

PACKAGING: 1 litre kit and 205 litre drums standard. Otherkit sizes are available. Dual cartridge repair tubes (375 ml& 50 ml) and dispensing guns available for small repair areas.

504 3/03

Protal 7200

Technical DataPROPERTIES

Solids Content 100%Base Component (Unmixed) @ 77°F (25°C)

Specific Gravity 1.63Viscosity Soft GelColor White

Hardener Component (Unmixed) @ 77°F (25°C)

Specific Gravity 1.04Viscosity Liquid (400 cps)Color Forest Green

Mixed Material (Mixed) @ 77°F (25°C)

Specific Gravity 1.53Viscosity Light GelColor Forest Green

Mixing Ratio (A/B) by Volume 3 Parts Base: 1 Part Hardener

Cure TimesPot Life @ 77°F (25°C) 6 - 8 MinutesHandling Time @ 77°F (25°C) 60 - 90 Minutes

Theoretical Coverage 1.3m2/760 microns/litre

ThicknessMinimum 500 micronsRecommended 635 – 760 microns

Holiday Detection (Maximum) 2000 volts

Cathodic Disbondment Test (ASTM G95)

28 Days @ 77°F (25°C) 3 mm28 Days @ 150°F (65°C) 4 mm28 Days @ 175°F (80°C) 7 mm

Hardness (Shore D) ASTM D2240 85 +/-2

Impact Resistance Excellent

Application and Service Temperature -30° F (-34°C) to 185° F (85°C).Note: If temperature falls below 50°F (10°C),surface must be preheated.

Glass Transition 185° F (85°C)

The information given on this sheet is intended as a general guide only and should not be used for specification purposes. We believe the information to be accurate and reliable but do not guarantee it. We assumeno responsibility for the use of this information. Users must, by their own tests, determine the suitability of the products and information supplied by us for their own particular purposes. No patent liability can be assumed.

Page 5: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

P

PC

Desc

Uses

Feat

Appl

R O D U C T D A T A S H E E T

ROTAL 7200 REPAIRF

riptionProtal 7ing dampackagsepara

Repairas coa

uresExcel FastHighHighDoes

icationRepairsandpapatchinand miapplieddepend

ast Cure Epoxy Repair Coating

200 Repair Cartridges are specially formulated for patching and repair-aged FBE and other liquid coated pipelines. The repair cartridges areed in 2-component tubes that are applied with a dispensing gun (soldtely). Two convenient sizes (400 ml and 50 ml) are available.

coating for damaged FBE and other liquid coated pipelines. Also usedting of cadweld areas.

lent adhesion (compliments FBE coated pipe)curebuild (in one coat)abrasion resistance for drilling applicationsnot shield cathodic protection

areas shall be roughened using Carborundum cloth or 80 gritper and wiped clean with an isopropyl alcohol soaked cloth prior tog. Material can be applied by injecting material into a small containerxing until a uniform color is achieved. Material can then be brushto specified mil thickness (minimum 500 microns). Cure times areent on temperature and will be extended at cooler temperatures.

400 ml gun 50 ml gun

Page 6: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

502 4/06

Protal 7200 Repair Cartridge

Technical Data

PROPERTIES

Solids Content/Percent Reactive 100%

Mixed Material (Mixed) @ 77°F (25°C)

Specific Gravity 1.53Viscosity Thixotropic Liquid

Color GreenMixing Ratio (A/B) by Volume 3 parts base:1 part hardener

Handling Times

Ambient & Substrate Temp. @ 90°F (35°C) 30 - 45 minutesAmbient & Substrate Temp. @ 70°F (25°C) 90 - 120 minutesAmbient & Substrate Temp. @ 50°F (10°C) 4 - 6 hours

Recommended Thickness 635 – 760 microns

Cathodic Disbondment28 Days @ 77°F (25°C) 3 mm28 Days @ 150° F (65°C) 4 mm

Adhesion to Steel 17.9 MPa

Adhesion to FBE 7.6 MPa

Hardness (ASTM 2240) D2240 Shore D 85 min.

Gouge Resistance 3 Passes = 0 Fail @ 50 kg

Application Temperatures* -30° F to 185° F (-34°C to 85°C)

Service Temperature -40° F to 185° F (-40°C to 85°C)

Holiday Detection (Maximum) 2000 volts

*If temperature falls below 50°F (10°C), surface must be preheated.

STORAGE: Minimum 24 months whenstored in original containers between 40°Fand 80°F (4°C and 30°C).

CLEANING: Clean equipment with solvent cleaner(Xylene 95%, Butanol 5%) or approved solvent.

HEALTH AND SAFETY: Apply under well venti-lated conditions. Wear suitable protective clothingand glasses. See material safety data sheets.

PACKAGING: 400 ml and 50 ml dual cartridges.

Dispensing guns sold separately.

Denso (Australia) Pty Ltd

411 – 413 Victoria StreetBrunswick VIC 3056

AUSTRALIA

Tel: 1300 658 590Fax: 1300 655 064

Email: [email protected]: www.densoaustralia.com.au

A Member of Winn & Coales International

The information given on this sheet is intended as a general guide only and should not be used for specification purposes. We believe the information to be accurate and reliable but do not guarantee it. We assume noresponsibility for the use of this information. Users must, by their own tests, determine the suitability of the products and information supplied by us for their own particular purposes. No patent liability can be assumed.

Page 7: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal 7000 and 7200

Hand Application Specifications1.0 Scope

1.1 This specification covers the external surface preparationand coating of pipeline applications such as weld joints,special pipe sections, fittings and fabrication.

2.0 Material and Storage

2.1 Material shall be Denso Protal liquid coating systemas manufactured by Denso North America Inc. 18211Chisholm Trail, Houston, TX 77060 (Tel) 281-821-3355(Fax) 281-821-0304 or 90 Ironside Crescent Unit 12,Toronto, Ontario, Canada M1X1M3 (Tel) 416-291-3435(Fax) 416-291-0898. E-mail: [email protected]

2.2 Material shall meet the physical properties of theattached product data sheet.

2.3 Storage: Material shall be stored in a warm, dry place.Care shall be taken to insure the material is stored upright (arrows on boxes facing up). Note: Ii the material iskept cold, it will become very viscous.

3.0 Equipment

3.1 For mixing, use strong wooden stir sticks, or power drillswith mixing paddle.

3.2 For application use 100mm wide brushes or Densoapplicator pads for small diameter pipe and/or 6mmnap rollers for large diameter applications.

3.3 Wet film thickness gauges.

4.0 Surface Preparation

4.1 Material for abrasive cleaning shall be the appropriateblend of grit to produce an angular surface profile of2-4 mils (0.050 - 0.10 mm).

4.2 All surfaces to be coated shall be grit blasted to anear-white finish (SSPC SP-10, NACE No. 2 or

Sa 2 1/2). Note: Near-white finish is interpreted to meanthat all metal surfaces shall be blast cleaned to removeall dirt, mill scale, rust, corrosion products, oxides, paintand other foreign matter. Very light shadow, very lightstreaks or slight discolorations shall be acceptable;

however, at least 95% of the surface shall have theuniform gray appearance of a white metal blast-cleanedsurface as defined by Swedish Pictorial SurfacePreparation Standard Sa 2 1/2 or SSPC VIS-1.

4.3 Edges of the existing coating shall be roughened bypower brushingor by sweep blasting thecoating foradistance of 25 mm minimum.

4.4 All contaminants shall be removed from the steelsurfaceto be coated. Oil and grease should be removed inaccordance with SSPC SP-1 using non-oily solventcleaner (i.e., Xylene, MEK, ethanol, etc.).

4.5 The Contractor shall check the surface profile depth byusing a suitable surface profile gauge (Press-O-FilmGauge or equal).

4.6 Metal areas that develop flash rust due to exposure torain or moisture shall be given a sweep blast to returnthem to their originally blasted condition.

5.0 Application

5.1 The surface shall have no condensation, precipitationor any other forms of contamination on the blastedsurface prior to coating.

5.2 The substrate temperature range for application ofProtal is 50°F (10°C) to 185°F (85°C). The substratetemperature must be a minimum of 5°F (3°C) above thedewpoint temperature beforeproceedingwith thecoatingoperation. Ambient temperature may be lower than 50°F(10°C) if the substrate is heated. Preheating may beaccomplishedwith propane torch or inductioncoil prior toblasting.

5.3 Protal shall be applied to the specified Dry FilmThickness (DFT) up to 1000 microns using a brush, Densoapplicator pad or roller. Wet film measurements shall becontinuously performed to ensure closeadherence to thethickness specification.

5.4 Mixing: Make sure the part A (Resin) and Part B(Hardener) components match in both material andsize as specified on the containers. Mix the Bcomponent.

Page 8: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

of the completed application. Notification of all defectsmust be made within a reasonable time frame fromcompletion of the work to allow for all repairs within theallowed time frame for the project.

7.0 Repairs

7.1 Pinhole repairs may be accomplished by using ProtalCartridge Packs or an approved epoxy hot melt patchstick. Repair areas shall be roughened usingCarborundum cloth or 80 grit sandpaper and wipedclean with a Xylene soaked cloth prior topatching.

7.2 Areas larger than 1 sq. cm, but less than 100 sq.cm. shall be repaired using Protal Cartridge Pack.Prepare surfaces with 80 grit sand paper and applyusing a brush or trowel. Preheat using propane maybeusedupto180°F(82°C).

8.0 Safety Precautions

8.1 Follow the guidelines detailed in the Material SafetyData Sheets (MSDS).

8.2 The contractor shall provide safe and secure access toapplication site.

8.3 Keep containers closed when not in use. In caseof spillage, absorb with inert material and dispose of inaccordance with applicable regulations.

first, independent of the resin. Pour the contents into thepart A (Resin) component. Mix until a uniform color isachieved making sure to scrape the bottom and sides ofthe container (approximately 2 minutes). No streaks shallbe visible.

5.5 APPLICATION SHALL TAKE PLACE IMMEDIATELYAFTER MIXING. Pour the product onto the surfaceand spread down and around the surface in bandsbeginning from the leading edge of the material to as farunder the pipe as can be reached. Overlap the bandsand onto the existing coating a minimum of 25mm.Applicators shall use a brush to smooth out any obvioussags or rough edges, valleys, or drips. Special attentionshall be given to weld buttons and bottom surfaces.

5.6 The thickness of Protal shall be checked periodically bywet film gauge to achieve the minimum wet film thicknessspecified. After the Protal has cured to a tack-freecondition, the owner’s representative and/or contractor’sinspector should measure the film thickness by magneticgauge and notify the applicator of their acceptance.Notification to the applicator of any inadequately coatedsections must be made immediately.

5.7 Over-coating, when necessary, shall take placewithin 2 hours. The surface shall be roughed prior toapplication of the topcoat using 80 grit sand paper orby sand blasting.

6.0 Inspection/Testing for Backfill

6.1 The finished coating shall be generally smooth andfree of protuberances or holidays. All surfaces shall havethe required minimum DFT. Inspection of hand applicationis best performed immediately after application.

6.2 Backfill time shall be determined by the “thumb nail test”.The thumb nail test is defined by when one can no longermake a permanent indention in the coating with his or herthumb nail. Note: A full and/or chemical cure may not beachieved by backfill time. Therefore, in wet soils or waterthe coating will need a full chemical cure. (refer toSection 6.3 for acceptable field test for chemical cure)

6.3 An acceptable field test to check to see if the coating hasa full chemical cure, a solvent such as Xylene, MEK orToluene can be rubbed on to the coating. If the gloss/sheen is removed the coating is not fully cured.

6.4 Spark testing shall be performed to ensure proper filmthickness and for holiday inspection. The voltage usedfor testing weld joints and field applications shall be equalto that used for testing the mainline coating in the fieldnot to exceed 100 volts per Protal 25 microns or amaximum of 2000 volts for the typical 500 micronminimum requirements.

6.5 Denso and/or the owner’s representative immediatelyupon completion of the work shall make final inspection

Denso (Australia) Pty Ltd

411 – 413 Victoria StreetBrunswick VIC 3056

AUSTRALIA

Tel: 1300 658 590Fax: 1300 655 064

Email: [email protected]: www.densoaustralia.com.au

A Member of Winn & Coales International

HAS 3/03

Page 9: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal Liquid Coatings

Spray Application Specifications1.0 Scope

1.1 This specification covers the external surface preparationand coating of pipelines for rehabilitation, welds,directional drill, fittings and fabrication.

2.0 Material and Storage

2.1 Material shall be Denso Protal liquid coating systemas manufactured by Denso North America Inc. 18211Chisholm Trail, Houston, TX 77060 (Tel) 281-821-3355(Fax) 281-821-0304 or 90 Ironside Crescent Unit 12,Toronto, Ontario, Canada M1X1M3 (Tel) 416-291-3435(Fax) 416-291-0898. E-mail: [email protected].

2.2 Material shall meet the physical properties of theattached product data sheet.

2.3 Storage of the material shall be in a warm dry place.The containers shall be stored up right.

3.0 Equipment

3.1 Equipment shall be a plural component airless orhydraulic spray unit capable of pumping at the correctratio for the specified Protal coating (see product datasheet). Heated hoppers, manifolds, and hoses arerecommended in most cases. A Graco mastic gun,used with a 23 thou to 31 thou tip size, is recommended.

3.2 A solvent such as Xylene, MEK, Toluene, or acombination of the three is recommended to cleanthe equipment.

3.3 Wet film thickness gauges.

4.0 Surface Preparation

4.1 Material for abrasive cleaning shall be the appropriateblend of grit to produce an angular surface profileof 2-4 mils (0.050 - 0.10 mm).

4.2 All surfaces to be coated shall be grit blasted to anear-white finish (SSPC SP-10 or SIS 05 59 00-1 967Sa 2 1/2). Note: Near-white finish is interpreted to meanthat all metal surfaces shall be blasted clean to removeall dirt, mill scale, rust, corrosion products, oxides,paintand other foreign matter. Very light shadow, verylight streaks or slight discoloration’s shall be acceptable;

however, at least 95% of the surface shall have theuniform gray appearance of a white metal blast-cleanedsurface as defined by Swedish Pictorial SurfacePreparation Standard Sa 2 1/2 or SSPC VIS-1.

4.3 All contaminants shall be removed from the steelsurfaceto be coated. Oil and grease should be removed inaccordance with SSPC SP-1 using the solvent Xylene.

4.4 Edges of the existing coating shall be roughened bypower brushingor by sweep blasting thecoating foradistance of 1" (25 mm) minimum.

4.5 The Contractor shall check the surface profile depth byusing a suitable surface profile gauge (Press-O-FilmGauge or equal).

4.6 Metal areas that develop flash rust due to exposure torain or moisture shall be given a sweep blast to returnthem to their original blasted condition.

4.7 The quality of the blasted surfaces, including cleaning ofblast grit from these surfaces, will be inspected by theowner’s appointed representative prior to theapplication of Protal. Acceptance to be given by saidrepresentative to the owner and contractor’srepresentative.

5.0 Application

5.1 The surface shall have no condensation, precipitationor any other forms of contamination on the blastedsurface prior to coating.

5.2 The substrate temperature range for application ofProtalis 50°F (10°C) to 185°F (85°C). The substratetemperaturemust be aminimum of5°F (3°C) above thedewpoint temperature before proceeding with thecoating operation. Ambient temperature can be lower ifthe substrate is heated. Preheating may beaccomplished by either flame heating the surfacewith a propane torch or induction coil.

5.3 Using the prescribed equipment (Sect. 3.0), Protal shallbe applied using a wet on wet spray technique to thespecified Dry Film Thickness (DFT) up to1000microns inone application. Runs, sags, and drips shall be kept to aminimum. Owner may allow these imperfections to bebrushed out while wet or sanded out when dry.

Page 10: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

5.4 The thickness of Protal should be checked continuouslyby wet film gauge to achieve the minimum filmthickness specified. Notification to the applicator ofany inadequately coated sections must be madeimmediately and repaired.

7.1 Adhesion Test: Apply three (3) tensile adhesion dollies tothe plate sample with epoxy adhesive and cure for 24hours at 68°F (20°C). Pull the dollies at a controlled ratewith an elcometer adhesion tester or equal (approxi-mately 25 mm per minute). The minimum averageadhesion should be 13.8 MPa or glue failure.

8.0 Repairs6.0 Inspection

6.1 The finished coating shall be generally smooth and freeof protuberances or holidays. All surfaces shall have therequired minimum DFT. In general, the surface of thecoating shall be no rougher than the base or substratematerial.

6.2 After the Protal has cured to a hard cure condition, theowner’s representative and/or contractor’s inspectorshould measure the film thickness by magnetic gaugeand notify the applicator of their acceptance.

6.3 Backfill time shall be determined by the “thumb nail test”.The thumb nail test is defined by when one can no longermake a permanent indention in the coating using one’sthumb nail. Note: A full and/or chemical cure may not beachieved by backfill time. For burying in wet soils or waterthe coating will need a full chemical cure.

8.1 Pinhole repairs may be accomplished by using anapproved epoxy hot melt patch stick. Repair areasshall be roughened using Carborundum cloth orsandpaper and wiped clean with a Xylene soakedcloth prior to patching.

8.2 Areas larger than 1 sq. cm., but less than 100 sq. cm.shall be repaired using the brush grade version of Protalbeing applied. The surface to be coated shall be clean anddry prior to applying the coating. Surfaces below 50°F(10°C) shall be pre-heated in accordance with Section5.2. Areas requiring repair shall be prepared with asurface grinder or by grit blasting prior to application ofthe coating. All edges of the surrounding area shouldbe feathered prior to performing the repair.

9.0 Safety Precautions

9.1 Follow the guidelines detailed in the Material SafetyData Sheets (MSDS).

9.2 Keep containers closed when not in use. In case ofspillage, absorb with inert material and dispose of inaccordance with applicable regulations.

9.3 No open flames, smoking or welding will be allowed inthe immediate vicinity during the spray application ofProtal liquid coatings.

Denso (Australia) Pty Ltd

411 – 413 Victoria StreetBrunswick VIC 3056

AUSTRALIA

Tel: 1300 658 590Fax: 1300 655 064

Email: [email protected]: www.densoaustralia.com.au

A Member of Winn & Coales International

6.4 An acceptable field test to check to see if the coating hasa full chemical cure, a solvent such as Xylene, MEK orToluene can be rubbed on to the coating. If the gloss/sheen is removed the coating is not fully cured.

6.5 Holiday testing of the finished coating film shall beperformed to ensure adequate thickness and to locatepossible holidays. The voltage used for this testing shallnot exceed 2000 volts for a specified minimum thicknessof 500 microns.

6.6 Denso and/or the owner’s representative immediatelyupon completion of the work shall make final inspectionof the completed application. Notification of all defectsmust be made within a reasonable time frame fromcompletion of the work to allow for all repairs within theallowed time frame for the project.

6.7 Recoating: if a second coat is required and passes thecure test as described in section 6.3, the surfaces shallbe roughened by sweep blasting. If the coating is soft, nosurface preparation is required.

7.0 Testing (Optional)

7.1 For each spray application a minimum of one platesample coated to the specified DFT and one free filmsample sprayed to a minimum DFT of 100 mils (4 mm)shall be taken. The plate size should beapproximately 4" x 6" x .375" (100 mm x 150 mm x 9.5mm). The plate must be cleaned in accordance withsection 4.0. Both samples should be cured for aminimum of four (4) days at 68°F (20° C) prior totesting.

PSAS 3/03

Page 11: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal 7000 & 7200

Field Application Instructions

1. Clean exposed steel and adjacent pipe coating with

non-oily solvent cleaner (i.e., ethanol, MEK, etc.)

2. The substrate temperature range for application of

Protal 7000 or 7200 is 50ºF (10

ºC) to 185

ºF (85

ºC).

The substrate temperature must be a minimum of

5ºF (3

ºC) above the dew point temperature before

proceeding with the coating operation. If the

ambient temperature is below 50ºF (10

ºC) the

substrate shall be heated.

PRE-HEATING:

Propane Heating: All surfaces to be coated shall

be grit blasted to a near white finish (SSPC SP-10,

NACE 2 or Sa 21/2). Edges of the existing coating

shall be roughened by sweep blasting the coating

for a distance of 25 mm minimum. Preheat the pipe

with a propane tiger torch up to 200ºF (93

ºC) or the

desired temperature. The temperature can be

checked with a magnet thermometer or Raytek

Temperature Gun. Hot sticks are not recommended

and shall not be used to check the temperature of

the substrate. Once the desired temperature is

achieved, the surface to be coated shall be sweep

blasted to remove any contaminants.

Induction Coil Heating: All surfaces to be coated

shall be grit blasted to a near white finish (SSPC

SP-10, NACE 2 or Sa 21/2). Edges of the existing

coating shall be roughened by sweep blasting the

coating for a distance of 25 mm minimum. Place

the induction coil around the pipe and heat to 185ºF

(85ºC) or the desired temperature.

3. Wipe clean with a lint-free cloth or air blast the

substrate. Surface must be clean and dry prior to

the application of the Protal coating.

4. Mix separately with a stir stick Part A and B prior to

mixing products together. Pour contents of Part B

Hardener (small container) into Part A Resin (large

container). Scrape walls and bottom of Part B to

ensure all hardener has been used. All kits are pre-

measured quantities therefore do not add additional

Part B Hardener as this will effect the quality of the

mixed coating. At no time shall thinner be added.

MIXING:

Stir Stick: Begin mixing Part A and B together until

a uniform color mix is achieved (approximately two

minutes). During mixing, careful attention should be

made to ensure the walls and bottom are scraped

and mixed thoroughly. No streaks should be visible.

Power Mixer: Begin mixing Part A and B together

at a speed that ensures a uniform color is achieved

(approximately two minutes). Avoid moving paddle/

mixing tip in an up and down motion, as this will

introduce air into the product. During mixing, careful

attention should be made to ensure the walls and

bottom are scraped and mixed thoroughly. No

streaks should be visible.

5. Application shall take place immediately after

mixing. POUR the product onto the surface and

spread down and around with a brush, 6mm nap

roller or Denso applicator pad. DO NOT APPLY

THE PRODUCT BY DIPPING THE BRUSH OR

APPLICATOR INTO THE BUCKET. Spread the

coating in bands beginning from twelve o’clock to

six o’clock on each side of the pipe while overlap-

ping strokes at both top and bottom. The Protal

coating shall be applied at the specified Dry Film

Thickness (DFT) up to 1000 microns. The

average wet film thickness is typically applied 635-

760 microns in one coat. Wet film measurements

shall be taken during application to ensure close

adherence to the specified thickness.

For detailed instructions please see “Protal Hand

Application Specifications”.

Denso (Australia) Pty Ltd

411 – 413 Victoria StreetBrunswick VIC 3056

AUSTRALIA

Tel: 1300 658 590Fax: 1300 655 064

Email: [email protected]: www.densoaustralia.com.au

A Member of Winn & Coales International

Page 12: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal 7200 Cure Times

Pipe Surface Temp. Tack-Free Time Backfill Time

0°C 6 to 8 hours 18 to 24 hours

5°C 4 to 5 hours 12 to 15 hours

10°C` 2 to 3 hours 6 to 9 hours

15°C 60 to 90 minutes 3 to 4.5 hours

20°C 30 to 45 minutes 1.5 to 2 hours

25°C 20 to 30 minutes 1 to 1.5 hours

30°C 15 to 20 minutes 45 to 60 minutes

45°C 12 to 15 minutes 30 to 45 minutes

55°C 9 to 12 minutes 25 to 30 minutes

65° C 7 to 9 minutes 20 to 25 minutes

75°C to 100°C 5 to 7 minutes 15 to 20 minutes

Please note that cure times are approximate and may vary depending on actual product and ambient temperatures. If product temperature is not the same as pipe surface temperature, the backfill/directional drill time will vary.

Denso (Australia) Pty Ltd

411 – 413 Victoria Street

Brunswick VIC 3056 AUST ALIA R

Tel: 1300 658 590 Fax: 1300 655 064

Email: [email protected] Website: www.densoaustralia.com.au

A Member of Winn & Coales International

Rev.4/06

Page 13: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

QESP 3/03

Quantity Estimate Sheet

Protal Liquid Pipel ine CoatingsWeld Joints

PipeDiameter (mm)

Weldsper Litre

100 9

150 6

200 4.5

250 3.6

300 3

400 2.25

500 1.8

600 1.5

750 1.2

900 1

1050 0.86

1200 0.75

Note: Estimates are based on field experience on weld joints with50mm to 75mm cut-back and applied at 500 to 750 microns average.Actual coverage may vary depending on cut-back and mil thickness. N

Denso (Australia) Pt

411 – 413 Victoria StBrunswick VIC 305

AUSTRALIA

Tel: 1300 658 590Fax: 1300 655 06

Email: denso@densoaustraWebsite: www.densoaustra

A Member of Winn & Coales I

ote

y Ltd

reet6

4

lia.clia.c

ntern

T

Ti

Pipe (Hand Applied)

Pi

hicknessin

microns

TheoreticalCoverageper Litre

ActualCoverageper Litre

625 1.50m2

1.10m2

750 1.30m2

0.9m2

875 1.102

0.7m2

pe (Spray Applied)

hicknessn microns

Theoretical Coverageper Litre

: Actual coverage to be determined by applicator.

om.auom.au

ational

500

625

750

875

1.9m2

1.50 m2

1.30 m2

1.10 m2

Page 14: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal PackagingProtal Packaging

Page 15: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal Features/BenefitsProtal Features/Benefits Primarily Protal 7200Primarily Protal 7200

Fast Cure (1.5 hours at 25Fast Cure (1.5 hours at 25°°C)C)High Build (up to 1270 microns in one coat)High Build (up to 1270 microns in one coat)Applied by hand or sprayApplied by hand or sprayPlastic containers easy to mix & easy to disposePlastic containers easy to mix & easy to disposeOutstanding Physical Properties:Outstanding Physical Properties:-- Excellent CDExcellent CD’’s (4 mm at 65s (4 mm at 65°°C)C)-- High abrasion/gouge resistance for drilling appHigh abrasion/gouge resistance for drilling app’’ss-- Outstanding adhesion characteristicsOutstanding adhesion characteristicsDoes not shield cathodic protectionDoes not shield cathodic protectionSafe & environmentally responsible (100% solids)Safe & environmentally responsible (100% solids)

Page 16: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal Applications/UsesProtal Applications/UsesOnOn--site liquid coating of girth welds, tiesite liquid coating of girth welds, tie--ins, ins, welds for boring applicationswelds for boring applicationsRehabilitation of existing pipelinesRehabilitation of existing pipelinesSoilSoil--toto--Air interface areasAir interface areasDitch spans/crossingsDitch spans/crossingsFittings and fabricationFittings and fabricationRepairs to FBE/HolidaysRepairs to FBE/HolidaysCompressor Station WorkCompressor Station Work

Page 17: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Pipeline RehabilitationPipeline RehabilitationProtal 7200 applied with Protal 7200 applied with

Plural Component Spray EquipmentPlural Component Spray Equipment

Page 18: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Pipe Excavated in Pipe Excavated in ““BellBell--HolesHoles””

Page 19: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Removal of Old CoatingRemoval of Old Coating

Page 20: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Pipe Pipe ready for ready for grit blast grit blast

after after removal removal of old of old

coatingcoating

Page 21: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Grit Blasted Pipe Ready for CoatingGrit Blasted Pipe Ready for Coating

Page 22: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Plural spray equipment.Plural spray equipment.Plural spray equipment.

Page 23: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal 7200 Spray ApplicationProtal 7200 Spray Application

Page 24: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal 7200 applied to girth welds – exhibits excellent CD results 7mm disbondment at 80°C.

Protal 7200Protal 7200 applied to applied to girth welds girth welds –– exhibits exhibits excellent CD results excellent CD results 7mm disbondment at 7mm disbondment at 8080°°C.C.

Protal 7200 Hand ApplicationProtal 7200 Hand ApplicationProtal 7200 Hand Application

Page 25: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal 7200 being applied with Denso applicator pad. Protal 7200Protal 7200 being applied with being applied with Denso applicator pad.Denso applicator pad.

Page 26: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

the pipe was ready for backfill within 2 hours.

Protal 7200 is a VOC free, 100% solids epoxy that exhibits excellent cathodic disbondment results (4 mm at 150°F (65°C). In addition, the coating offers high impact resistance, fast cure, high abrasion resistance, high build (up to 1270 microns in

Pipeline Integrity is rapidly becoming a major factor for pipeline companies in North America. Pipeline companies, by law, must operate safe pipelines and provide documentation to prove that all external corrosion defects are controlled from adversely impacting structural integrity. The cost impact due to a failure is not an option.

Protal 7200 Used For PipelineRehabilitation

Corrosion Prevention - Buried Pipeline

Top: Removal of old coal tar enamel coating.

Above: Pipe spray coating utilising Protal 7200.

Left: Completed section of pipe.

coat), and is environmentally safe.Denso manufactures a full line

of Protal liquid coatings to meet the demand of the pipeline industry. Protal liquid coatings are the coatings of choice by owners, oil and gas specifiers and contractors across North America.

With thousands of miles of buried pipelines constructed and coated well over 50 years ago, in many instances, the old coating has gone well past its useful service life. Denso’s Protal 7200 is fast becoming the product of choice for recoating these pipelines in the field.

Recently, Columbia Gulf Transmission selected the Protal 7200 to recoat approximately 2.4 kms of 75 and 90 cm diameter pipe. The project consisted of excavating and exposing the pipe in the ditch and removing the original coal tar epoxy coating. Prior to recoating, the pipe was sandblasted to a near white metal finish, SSPC SP-10 or NACE No. 2 standard. After the surface was prepared, the Protal 7200 was applied using plural component spray equipment. The coating was applied by the Mears Group at an average thickness of 685 – 865 microns in one coat. The tack-free time was approximately 30 minutes

7

United States of America

Page 27: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal History Denso has been developing and manufacturing pipeline coatings since 1929. In 1990 Denso pioneered the first 100% solids epoxy used for girth welds and rehabilitation of pipelines in North America. Protal 5900 was the first high build, fast cure and environmentally safe coating available in the market. In 1994, continued research and development lead to the introduction of the Protal 7000 Series. This product series featured higher build and faster curing characteristics. Our most recent development is our Protal 7200 Series, which leads the industry in cathodic disbondment results and curing times. Since the introduction of our Protal Liquid Coatings, Denso has sold over 1,000,000 litres of coating.

The following is a partial list of Protal 7200 customers.

Customer Qty Litres Year

Alliance Pipeline 160,400 1999 Canada & USA

AEC Pipeline 3,520 2000 Calgary, Alberta

Simmons Pipeline 800 2001 Calgary, Alberta

Tejas Pipeline 1,260 2001 Texas City, TX

TransCanada 4,560 2001 Calgary, Alberta

El Paso Corp. 3,000 2001 Denver, CO

Foothills Pipeline 2,000 2001 Calgary, Alberta

AEC Pipeline 21,450 2001 Calgary, Alberta

Enterprise Pipeline 3,460 2001 St. Martinville, LA

Iroqois Gas 1,380 2001 New Iberia, LA

Customer Qty Litres Year

Enbridge Pipeline 10,000 2002 Edmonton, Alberta

PG&E 2,000 2002 Tulelake, CA

Kinder-Morgan 3,000 2002 Greenville, TX

Foothills Pipeline 2,000 2002 Calgary, Alberta

Tuscarora Pipeline 500 2002 Litchfield , CA

Marathon Pipeline 2,190 2002 Clinton, OH

Shell Pipeline 3,000 2003 Houston, TX

Consumers Energy 3500 2003 Rochester, MI

Marathon Pipeline 7500 2003 Cardinal Project

BP Pipeline 1500 2003 Chicago, IL

Shell Pipeline 500 2002 Kinder Morgan 5500 2003 Baytown, TX South Texas locations

Page 28: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Customer Qty Litres Year

Williams Pipeline 25,000 2006 Houston, TX

Enbridge 4000 2006 Houston, TX

Columbia Gas 3000 2006 Washington, VA

Sempra 2100 2006 Los Angels, CA

CrossTex Pipeline 1500 2006 Dallas, TX

Denso (Australia) Pty Ltd

411 – 413 Victoria Street

Brunswick VIC 3056 AUSTRALIA

Tel: 1300 658 590 Fax: 1300 655 064

Email: [email protected] Website: www.densoaustralia.com.au

A Member of Winn & Coales International

Customer Qty Litres Year

Columbia Gas 3500 2003Virginia locations

El Paso Field Services 500 2003Houston, TX

WE Energies 5000 2004Port Washington, WI

El Paso Field Services 4500 2004Houston, TX

Valero 3500 2004San Antonio, TX

Enbridge 6000 2004Houston, TX

Kinder Morgan 8600 2004Houston, TX

PG&E 3000 2004San Francisco, CA

Columbia Gas 3400 2004Staunton, WI

Valero 3700 2005San Antonio, TX

Sempra 5300 2005Los Angles, CA

Shell Pipeline 12,000 2005Houston, TX

Energy Transfer 5300 2005Houston, TX

PG&E 13,100 2005San Francisco, CA

Kinder Morgan 5900 2005West Texas

CrossTex Pipeline 3300 2005Dallas, TX

Enbridge 8500 2005Houston, TX

Columbia Gulf 7500 2005Inverness, MS

Page 29: Protective Liquid Coatings - Denso Australia · Protal Pipeline Coatings Protective Liquid Coatings ... sacrificial coating for directional drill and road bore pipe, ... or any other

Protal Pipeline Coatings

FeaturesProtal applicator pad application.

Easy toapply (brush, rollerorspray)

Fastcure Protal hand application.

Highbuild(upto1000microns inone coat)

Outstanding cathodic dispond-mentresults(3mm@65°C)

Excellent adhesion (compli-mentsFBEcoatedpipe)

Highabrasionresistancefordrilling applications

Unaffectedby light rain3 to4minutes after application

100% solids (no solvents)

Safeandenvironmentallyresponsible

Does not shield cathodicprotection

Protal cartridge pack application. Protal being poured onto pipe.

Denso (Australia) Pty Ltd

411 – 413 Victoria StreetBrunswick VIC 3056

AUSTRALIA

Tel: 1300 658 590Fax: 1300 655 064

Email: [email protected]: www.densoaustralia.com.au

A Member of Winn & Coales International