EQUIPMENT DATA
The plotted data in the fgure below shows that the x-mas tree was
located at the TVD (true vertical depth) o 0 eet which is lie on the
surace. The -mas tree was installed prior in controlling the !ow o the oil
and gas out o the well. "eside -mas tree other subs#stem o $$$V
(subsurace saet# valve was installed. This s#stem or device used in order
to provide remote sub-surace isolation in the event o a catastrophic
ailure o -mas tree or as a ailsae shutdown s#stem. This drilled well use
a casing o % inch internal diameter with &0'0 eet or well isolation while
the ran tubing with '.% inch internal diameter o &000 eet long. The
designed casing must have the abilit# to withstand a several against a
several whole problems li*e collapse+ burst+ tensile ailure and a corrosion
rom the chemical brines. ,asing usuall# built rom plain carbon steel with
a minimum o '0 eet each.
8/18/2019 Prosper (Ipr)
2/4
igure & "ottom /hole /ell ,ompletion Design
Equipment Summary
True Tubing Tubing Tubing Tubing ,asing
,asing
ate 1easured Vertical 2ipe 3nside 3nside 4utside 4utside
3nside 3nside
T#pe 5abel 1ultiplier Depth Depth 5ength Diameter oughness Diameter
oughness Diameter oughness
(eet) (eet) (eet) (inches) (inches) (inches) (inches)
(inches) (inches)
--------- ----- ---------- -------- -------- ------ -------- --------- -------- --------- -------- ---------
mas Tree & 0 0
8/18/2019 Prosper (Ipr)
3/4
Tubing & &000.0 '.6 &000.0 '.% 0.000%
$$$V & '.6 '.00
Tubing & '00.0 76'.0 ''00.0 '.% 0.000%
Tubing & %00.0 879.0 '00.0 '.% 0.000%
Tubing & 00.0 900.0 '00.0 '.% 0.000%
Tubing & &&000.0 &009.9 %&00.0 '.% 0.000%
,asing & &&'00.0 &0'80.0 '00.0 %.00
0.000%
,asing & &&00.0 &0'0.0 &00.0 %.00
0.000%
IPR DATA
The 3n!ow 2erormance ,urve ,artesian plot o a bottom hole
!owing pressure versus surace !ow rate is a diagnostic tools that is used
b# the 2etroleum engineer to evaluate the perormance o a !owing well.
This plot used to determine whether the drilled well is perorming as
expected or not. The plotted data is determine or calculate theoreticall# or
empiricall# b# using the mathematical tools or relationship+ which called
as 3n!ow 2erormance elationship (32). 32 o the well is the relationship
between the !ow rate o the well : and the !owing pressure o the well
2w.
;longside all o the anal#ticall# derived 3n!ow 2erormance
elationships available in 24$2ones. This is the most advanced anal#tical 32 that exists in
the industr# toda# and can onl# be ound in 24$2
8/18/2019 Prosper (Ipr)
4/4
rom the fgure below+ it can be seen that when the rate is 0 the pressure
is approximatel# 8000 psig. /hen the pressure is 0 the rate is
approximatel# 76000 $T"?da#.
REFERENCES
1ohamed+ ;. 1. (70&). ontal /ell @eometr#. Scholars' mine+
&-&69.