PROJECT BACKGROUND PURPOSE: » To create a new ATV trail that will connect five communies (Ely, Babbi, Embarrass, Soudan and Tower, MN), two state parks (Bear Head Lake State Park and Lake Vermilion State Park) and Lake County Regional ATV Trail. » The Prospectors Trail Alliance considers the availability of desnaon travel routes throughout the northland, a key consideraon in providing public access through ATV use to many desired locaons. Connecng communies with such features as Soudan Underground Mine State Park, Lake Vermilion State Park, Bear Head Lake State Park and a variety of other features within the Superior Naonal Forest is a key component to enabling the use and access of these wonderful aributes that Minnesota has to offer. CURRENT STATUS: » The Trail Prospectors Alliance has already met with the DNR and the U.S. Forest Service to discuss the plan, evaluate route alternaves and engage perming enes with review of the conceptual design. Both enes are in favor of this project and eager for it to start. » Wetland delineaons for the proposed trail area have been completed and approved. » Field review of routes completed with U.S. Army Corps of Engineers, U.S. Forest Service, Minnesota Board of Soil and Water Resources, Minnesota DNR, North St. Louis and Lake County Soil and Water Conservaon Districts. » Ely and Babbi have already passed resoluons in support of the Prospectors Loop. » Plans and maps have been reviewed with DNR. TRAIL SYSTEM INFORMATION: » 130-mile loop will connect the communies of Ely, Babbi, Embarrass and Tower plus the Bear Head Lake and Lake Vermilion State Parks. » Will e in with Lake County Regional ATV trail system that connects to the North Shore, which includes the Red Dot and Moose Walk Trails. » Trail will be open to both Class 1 and 2 ATVs, off-highway motorcycles and some segments open to off-road vehicles as well as equestrians. » A secon of the loop will ulize the Taconite snowmobile trail that heads west from Ely to Murray Road. Currently working with the DNR to change the master plan for this snowmobile trail to allow for addional use. » Will connect to the new Lake Vermilion State Park which has a planned motorized campground for ATVs and snowmobiles. ESTIMATED COST BREAKDOWN DESCRIPTION ESTIMATED CONSTRUCTION UNIT COST LENGTH ESTIMATED COST PROPOSED TRAIL ON EXISTING ROADS OR TRAILS Many miles of the proposed trail will be located on exisng roads or exisng logging roads that will require very limited effort to construct. $1,000/ mile 200 miles $200,000 NEW TRAIL CONSTRUCTION Unit costs for this segment of the trail have been provided by Prospectors Trail Alliance with cooperaon from local trail clubs providing as- built costs for similar trail secons. Esmated costs do not include permits or engineering. $20,000/ mile 21 miles $420,000 NEW TRAIL CONSTRUCTION OVER WETLANDS An esmate to use three feet of granular fill on geotexle fabric with gravel surface and cross culverts was used to generate this esmate. The esmated cost does not include permits, migaon or engineering $238,000/ mile 3.25 miles $773,500 TRAIL RATED BRIDGES, FORDINGS AND BRIDGE REDECKING An esmate of 375 lineal feet of new bridges are required to construct the proposed project. The minimum live load requirements are assumed to be 85 pounds per square foot. The esmated cost does not include permits, engineering, or bridge plans. $2,800/ foot 375 feet $1,050,000 HIGHWAY RATED BRIDGE One bridge has been requested to accommodate logging truck equipment and highway loading. The bridge is proposed to cross the waterway at Owen Creek. The esmated cost does not include permits, engineering, or bridge plans. $5,300/ foot 30 feet $159,000 WETLAND MITIGATION Wetland migaon for impacts minimized through selecve corridor alignment are required as a condion of project perming and planning/land use department with verbal approval of conceptual plans. $0.75/SF in Bank Service Area 2 $1.50/SF in Bank Service Area 1 175,000 SF 75,000 SF $131,250 $112,500 EAW FUNDING & NEW TRAIL CONSTRUCTION Funding for the DNR to complete environmental review and construcon of route from Ely to Tower. 40 miles $400,000 Totals 280 miles Total $3,246,250 CONTACT: Jeff Anderson, PE p: (218) 499-3175 e: [email protected] w: www.msa-ps.com PROSPECTORS TRAIL SYSTEM LAKE COUNTY REGIONAL ATV TRAIL ELY BABBITT EMBARRASS SOUDAN TOWER, MN www.atvriders.com www.atvriders.com www.atvtrails.org maineequestriantrails.typepad.com/ CONTACT: Ron Poer, Trail Administrator p: (218) 235-0382 e: [email protected] w: www.prospectorsloop.com TRAIL PROSPECTORS ALLIANCE: » Is leading this project. » Consists of the following individuals: » Nick Wognum » Ron Poer » Dave Soular » Jerome Weiner » Have met over the last 18 months reviewing maps to find the best routes for ATVs to travel between the communies. » Coordinang efforts with clubs in Ely, Babbi, Tower and Isabella/ Finland to gain area trail and ATV insight and knowledge. » Has located trail routes that avoid wetlands as much as possible and conceptual design has incorporated environmentally friendly concepts to minimize overall impacts to the landscape and surrounding scenic features. » Is looking at various funding sources that are available for this project. » Dan Broten » Gary Skogman » Mike Meskill » Elroy Kuehl » Gene Wright » Larry Favet » Neil Olson

PROSPECTORS TRAIL SYSTEM LAKE COUNTY REGIONAL ATV … · routes for ATVs to travel between the communities. » Coordinating efforts with clubs in Ely, Babbitt, Tower and Isabella

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROSPECTORS TRAIL SYSTEM LAKE COUNTY REGIONAL ATV … · routes for ATVs to travel between the communities. » Coordinating efforts with clubs in Ely, Babbitt, Tower and Isabella

PROJECT BACKGROUNDPURPOSE: » To create a new ATV trail that will connect five communities (Ely, Babbitt,

Embarrass, Soudan and Tower, MN), two state parks (Bear Head Lake State Park and Lake Vermilion State Park) and Lake County Regional ATV Trail.

» The Prospectors Trail Alliance considers the availability of destination travel routes throughout the northland, a key consideration in providing public access through ATV use to many desired locations. Connecting communities with such features as Soudan Underground Mine State Park, Lake Vermilion State Park, Bear Head Lake State Park and a variety of other features within the Superior National Forest is a key component to enabling the use and access of these wonderful attributes that Minnesota has to offer.

CURRENT STATUS: » The Trail Prospectors Alliance has already met with the DNR and the U.S. Forest

Service to discuss the plan, evaluate route alternatives and engage permitting entities with review of the conceptual design. Both entities are in favor of this project and eager for it to start.

» Wetland delineations for the proposed trail area have been completed and approved.

» Field review of routes completed with U.S. Army Corps of Engineers, U.S. Forest Service, Minnesota Board of Soil and Water Resources, Minnesota DNR, North St. Louis and Lake County Soil and Water Conservation Districts.

» Ely and Babbitt have already passed resolutions in support of the Prospectors Loop.

» Plans and maps have been reviewed with DNR.

TRAIL SYSTEMINFORMATION: » 130-mile loop will connect the communities of Ely, Babbitt, Embarrass and Tower

plus the Bear Head Lake and Lake Vermilion State Parks. » Will tie in with Lake County Regional ATV trail system that connects to the North

Shore, which includes the Red Dot and Moose Walk Trails. » Trail will be open to both Class 1 and 2 ATVs, off-highway motorcycles and some

segments open to off-road vehicles as well as equestrians. » A section of the loop will utilize the Taconite snowmobile trail that heads west

from Ely to Murray Road. Currently working with the DNR to change the master plan for this snowmobile trail to allow for additional use.

» Will connect to the new Lake Vermilion State Park which has a planned motorized campground for ATVs and snowmobiles.

ESTIMATED COST BREAKDOWN

DESCRIPTION ESTI

MAT

ED

CON

STR

UCT

ION

UN

IT C

OST

LEN

GTH

ESTI

MAT

ED

COST

PROPOSED TRAIL ON EXISTING ROADS OR TRAILSMany miles of the proposed trail will be located on existing roads or existing logging roads that will require very limited effort to construct.

$1,000/mile

200 miles $200,000

NEW TRAIL CONSTRUCTIONUnit costs for this segment of the trail have been provided by Prospectors Trail Alliance with cooperation from local trail clubs providing as-built costs for similar trail sections. Estimated costs do not include permits or engineering.

$20,000/mile

21 miles $420,000

NEW TRAIL CONSTRUCTION OVER WETLANDSAn estimate to use three feet of granular fill on geotextile fabric with gravel surface and cross culverts was used to generate this estimate. The estimated cost does not include permits, mitigation or engineering

$238,000/mile

3.25 miles $773,500

TRAIL RATED BRIDGES, FORDINGS AND BRIDGE REDECKINGAn estimate of 375 lineal feet of new bridges are required to construct the proposed project. The minimum live load requirements are assumed to be 85 pounds per square foot. The estimated cost does not include permits, engineering, or bridge plans.

$2,800/foot

375 feet $1,050,000

HIGHWAY RATED BRIDGEOne bridge has been requested to accommodate logging truck equipment and highway loading. The bridge is proposed to cross the waterway at Owen Creek. The estimated cost does not include permits, engineering, or bridge plans.

$5,300/foot

30 feet $159,000

WETLAND MITIGATIONWetland mitigation for impacts minimized through selective corridor alignment are required as a condition of project permitting and planning/land use department with verbal approval of conceptual plans.

$0.75/SFin Bank Service Area 2

$1.50/SF in Bank Service Area 1

175,000 SF75,000 SF

$131,250$112,500

EAW FUNDING & NEW TRAIL CONSTRUCTIONFunding for the DNR to complete environmental review and construction of route from Ely to Tower.

40 miles $400,000

Totals 280 miles

Total $3,246,250

CONTACT:Jeff Anderson, PE p: (218) 499-3175e: [email protected]: www.msa-ps.com

PROSPECTORS TRAIL SYSTEMLAKE COUNTY REGIONAL ATV TRAILELYBABBITTEMBARRASSSOUDANTOWER, MN

www.atvriders.com

www.atvriders.comwww.atvtrails.org

maineequestriantrails.typepad.com/

CONTACT:Ron Potter, Trail Administratorp: (218) 235-0382e: [email protected]: www.prospectorsloop.com

TRAIL PROSPECTORS ALLIANCE: » Is leading this project. » Consists of the following individuals:

» Nick Wognum » Ron Potter » Dave Soular » Jerome Weiner

» Have met over the last 18 months reviewing maps to find the best routes for ATVs to travel between the communities.

» Coordinating efforts with clubs in Ely, Babbitt, Tower and Isabella/Finland to gain area trail and ATV insight and knowledge.

» Has located trail routes that avoid wetlands as much as possible and conceptual design has incorporated environmentally friendly concepts to minimize overall impacts to the landscape and surrounding scenic features.

» Is looking at various funding sources that are available for this project.

» Dan Broten » Gary Skogman » Mike Meskill » Elroy Kuehl

» Gene Wright » Larry Favet » Neil Olson

Page 2: PROSPECTORS TRAIL SYSTEM LAKE COUNTY REGIONAL ATV … · routes for ATVs to travel between the communities. » Coordinating efforts with clubs in Ely, Babbitt, Tower and Isabella

PROSPECTORS TRAIL SYSTEMLAKE COUNTY REGIONAL ATV TRAIL, ELY, BABBITT, EMBARRASS, SOUDAN AND TOWER, MN

Printed By: crooyakkers, File: P:\16600s\16620s\16620\16620000\CADD\Prospector.mxd

DP-1

WE TL AN D 1TYP E 7 WE TLA N D(BL AC K S PR U CE SWA MP )

DP-2

DP-4DP-3

DP-8

DP-7

DP-5

DP-1 0DP-9

DP-1 1DP-1 2

DP-1 6DP-1 5

DP-1 3DP-1 4

DP-1 7DP-1 8

DP-1 9DP-2 0

DP-6DP-5

DP-1DP-2

DP-3DP-3 DP-4

DP-2DP-1

DP-3DP-4

DP-6DP-5

DP-8DP-7

DP-9DP-1 0

DP-1 1DP-1 2

DP-1 6DP-1 5

DP-1 3DP-1 4

DP-6

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia,© OpenStreetMap contributors, and the GIS User Community

E

0 5 102.5Miles

LegendExisiting Taconite State Trail

Proposed Prospector Trail

Embarrass

SOUDAN UNDERGROUND MINE STATE PARKLAKE VERMILION STATE PARK

Isabella

Finland

Babbitt

Aurora

Tower Soudan

WintonEly

Tettegouche State Park

Hoyt Lakes

Silver Bay

Beaver BayBrimson

BEAR HEAD LAKE STATE PARK