69
UID No.: TRA/EIA/D19/2020/SOC-5(f)/EA6 DRAFT EIA REPORT FOR PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING UNIT [Total Production Capacity: - 920 TON/Month] OF M/S. R P POLYMER AT Survey No. 626, Village: Jornang, Taluka & District : Mehsana, Gujarat - 382732. Project Proponent’s Name : Shri Pankajbhai Patel – Partner CATEGORY: 5 (F) : A Baseline Monitoring Period [October 2020 To December 2020] Baseline Study Carried By: T. R. Associates Laboratory (NABL Certificate Number: Tc-7896) PREPARED BY : T. R. ASSOCIATES [NABET ACCREDITED EIA CONSULTANT] A-401, S. G. Business Hub, B/w sola Bhagwat & Gota Over Bridge, Near Umiya Campus, S. G. Highway, Ahmedabad – 380060 EMAIL: [email protected] CONTACT NO.: 09825371099 NABET Accreditation No.: NABET/EIA/1922/RA 0142 Dated 13/9/2019 Valid Upto 9/10/2022 February : 2021

PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

UID No.: TRA/EIA/D19/2020/SOC-5(f)/EA6

DRAFT EIA REPORT

FOR

PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING UNIT [Total Production Capacity: - 920 TON/Month]

OF

M/S. R P POLYMER AT

Survey No. 626, Village: Jornang, Taluka & District : Mehsana, Gujarat - 382732.

Project Proponent’s Name : Shri Pankajbhai Patel – Partner

CATEGORY: 5 (F) : A Baseline Monitoring Period [October 2020 To December 2020]

Baseline Study Carried By: T. R. Associates Laboratory (NABL Certificate Number: Tc-7896)

PREPARED BY :

T. R. ASSOCIATES [NABET ACCREDITED EIA CONSULTANT]

A-401, S. G. Business Hub, B/w sola Bhagwat & Gota Over Bridge,

Near Umiya Campus, S. G. Highway, Ahmedabad – 380060 EMAIL: [email protected]

CONTACT NO.: 09825371099

NABET Accreditation No.: NABET/EIA/1922/RA 0142 Dated 13/9/2019 Valid Upto 9/10/2022

February : 2021

Page 2: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 3: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 4: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad

NABET Accredited Abbreviations and Acronyms

Abbreviations and Acronyms

AAQ : Ambient Air Quality ATFD : Agitated Thin Film Dryer ALOHA : Areal Locations of Hazardous Atmospheres APCM : Air Pollution Control Mechanism APHA : American Public Health Association BLEVE : Boiling Liquid Expanding Vapor Explosion BOD : Biochemical Oxygen Demand BP : Boiling Point CC&A : Consolidated Consent & Authorization CEES : Centre for Environment and Explosive Safety CER : Corporate Environment Responsibility CETP : Common Effluent Treatment Plant CGWA : Central Ground Water Authority CHWIF : Common Hazardous Waste Incineration Facility COD : Chemical Oxygen Demand CPCB : Central Pollution Control Board CW : Cross Wind db : Decibel DEM : Digital Elevation Model DGFASLI : Directorate General Factory Advice Service and Labour Institutes DGFT : Directorate General of Foreign Trade DRDO : Defense Research and Development Organization DMP : Disaster Management Plan DTM : Digital Terrain Model DW : Down Wind GIS : Geographical Information System GPCB : Gujarat Pollution Control Board GOI : Government of India EAC : Environmental Appraisal Committee EC : Environmental Clearence EHS : Environmental Health & Safty EIA : Environmental Impact Assessment EMP : Environmental Management Plan EMS : Environmental Management Cell ERDAS : Earth Resources Data Analysis System ETP : Effluent Treatment Plant FP : Flash Point GLC : Ground Level Concentration GW : Ground Water HAZOP : Hazard and Operability Study HDPE : High Density Poly Ethylene HIRA : Hazard Identification and Risk Assessment HTL : High Tide Line IDLH : Immediately Dangerous to Life or Health IMD : Indian Meteorological Department IS : Indian Standards

Page 5: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad

NABET Accredited Abbreviations and Acronyms

KLD : Kilo Liters per Day Kcal/hr : Kilo Calories per Hour KVA : Kilo Volt Ampere LC : Lethal Concentration LD : Lethal Dose LDAR : Leak Detection and Repair LDO : Light Diesel Oil LEL : Lower Explosive Limit LuLc : Land Use Land Cover MAH : Major Accident Hazards MCA : Maximum Credible Accident MEE : Multiple Effect Evaporator M.F. : Melamine Formaldehyde mm : Millimeter MOC : Material of Construction MoEF & CC : Ministry of Environment, Forest & Climate Change MS : Mild Steel MSDS : Material Safety Data Sheet MSIHC : Manufacture, Storage and Import of Hazardous Chemicals MT : Metric Tons MTPM : Metric Tons per Month NA : Non Agricultural NAAQS : National Ambient Air Quality Standards NABET : National Accreditation Board for Education & Training NABL : National Accreditation Board for Laboratories NFPA : National Fire Protection Association NH : National Highway NOC : No Objection Certificate NRSC : National Remote Sensing Centre OSHA : Occupational Safety and Health Administration PCU : Passenger Car Unit PFR : Pre Feasibility Report P.F. : Phenol Formaldehyde PGVCL : Paschim Gujarat Vij Company Limited pH : Potential of Hydrogen Ion PM : Particulate Matter POP : Plaster of Peris PPE : Personal Protective Equipment PPM : Parts Per Million PUC : Pollution under Control PVC : Poly Vinyl Chloride QRA : Quantitative Risk Assessment RA : Risk Assessment RO : Reverse Osmosis RPM : Rotation Per Minute R&R : Rehabilitation & Resettlement SAR : Sodium Absorption Ratio SCBA : Self Contained Breathing Apparatus SH : State Highway

Page 6: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad

NABET Accredited Abbreviations and Acronyms

SOP : Standard Operating Procedure SPCB : State Pollution Control Board SPM : Suspended Particulate Matter STEL : Short Term Exposure Limit STP : Sewage Treatment Plant SW : Surface Water TDS : Total Dissolved Solids TFH : Thermic Fluid Heater TGM : Technical Guidance Manual TLV : Threshold Limit Value TOR : Terms of Reference TPH : Tons per Hour TR : Ton of Refrigeration TSDF : Treatment, Storage and Disposal Facility TSS : Total Suspended Solids TWA : Time-Weighted Average UEL : Upper Explosive Limit U.F. : Urea Formaldehyde UTM : Universal Transverse Mercator UTPCC : Union Territory Pollution Control Committee UW : Up Wind VHAP : Volatile Hazardous Air Pollutants VOCs : Volatile Organic Compounds w/w : wastewater ZLD : Zero Liquid Discharge

Page 7: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 8: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 9: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 10: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 11: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 12: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 13: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 14: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING
Page 15: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Executive Summary 9

EXECUTIVE SUMMARY – ENGLISH

1. INTRODUCTION

M/s. R P Polymer is a green field project for the proposed production of Phenol Formaldehyde

Resin, Urea Formaldehyde Resin and Melamine formaldehyde resin at Survey No. 626, Village:

Jornanag, Taluka & District : Mehsana, Gujarat – 382732.

Details of Proposed Products

Sr. No. Name of Product Capacity

Ton per Month CAS No.

1 Phenol Formaldehyde Resin 200 9003-35-4

2 Melamine Formaldehyde Resin 700 82115-62-6

3 Urea Formaldehyde Resin 20 9011-05-6

TOTAL 920 --

M/s. R P Polymer has a total land area of 3,612 m2. Out of the stated land area approximately

1215.10 m2 is green belt area (approx. 33.65 % of the total land area). Non Agriculture (NA)

permission has been already obtained by the land owner from the concerned authority.

Proposed manufacturing unit is a Small Scale Unit having total investment of about Rs. 100

Lakh. Approximately Rs. 16.65 Lakhs will be allocated towards environmental management

facilities.

M/s. T. R. Associates (NABET Accredited EIA Consultant) was appointed by M/s. R P

Polymer to carry out the Environmental Impact Assessment study for their proposed project.

The proposed products Phenol Formaldehyde Resin, Urea Formaldehyde Resin and Melamine

formaldehyde Resin (being synthetic organic chemicals) falls under Schedule 5(f), Category A as

stated in Environment Impact Assessment Notification Published on 14th September, 2006. As

per amendment to EIA Notification, 2006 vide SO 1599(E) dated 25.06.2014, R P Polymer will

not fall in small unit criteria. Water consumption for proposed project is 6.8 kl/day; Fuel

consumption less than 25 TPD; but due to formaldehyde storage more than 5 MT (i.e. 50 MT),

unit falls into MAH category of Manufacturing, Storage, Import of Hazardous Chemical Rules

(MSIHC Rules), 1989.

This study of Environment Impact assessment (EIA) is based on studies carried out during the

month of October, 2020 to December, 2020. The environmental parameters (ambient air, water,

soil, noise, flora and fauna) selected for study are those, which are likely to be most affected by

the proposed project. The study area is defined as an area within 10 km radius from center of

the proposed project site.

Page 16: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Executive Summary 10

Salient Features within 10 km radius surroundings area as follows:

Sr.

No. Important Features Description

1 Location of Proposed Project Survey No.: 626, Village: Jornang, Taluka & District:

Mehsana - 382732, Gujarat.

2 Mean Sea Level 93 m

3 Temperature range 21 C to 31 C

4 Annual Rain fall (30 yrs. Avg.) 740 mm

Dependable Rain fall 875 mm

5 Nearest Railway station Ambaliyasan Railway Station – 3.65 km in WNW direction

6 Nearest Air Port Mehsana Airport – 20.67 km in NNW direction

7 Nearest Sea Port Kandla Port – 232.97 km in West direction

8 Nearest Town Mehsana – 18.15 km in NNW direction

9 Nearest Village Jamnapur – 1.27 km in SE direction

10 Nearest National Highway NH 8C - 30 km in SSE direction

11 Nearest State Highway SH 217 – 4.1 km IN ENE direction

12 Nearest Surface water Body Sabarmati River – 27.80 km in E direction

13 Nearest Reserved Forest None within 10 km radius. Nearest Reserved forest is

Indroda Dinosaur & fossil park – 32.91 Km in SSE

direction

14 Nearest National Parks /

Sanctuary

None within 10 km radius. Nearest Sanctuary is Thol

Bird Sanctuary – 31.80 km in South direction.

15 Nearest school Jamnapur Primary School is approx. 1.20 km away in SE

direction from project site.

16 Nearest Hospital Shanku medicity is at Amipura village 8.5 km away in

NW direction from project site

17 Nearest historical place None within 10 km radius. Nearest historical place

Simandhar Swami Jain temple is at Mehsana, which is

19.50 km away from the project site in NNW direction

and Modhera Sun temple is 36.90 km away from the

project sitein NW direction.

18 Nearest place of worship Temple is at Jamnapur village which is 1.20 km away in

SE direction & Brahmani Mata temple at Jornang village

is 1.62 km away in NW direction from the project site.

Mosque is at Jornang village at 2.0 km away in NW

direction from the project site.

19 Nearest Fire station Mehsana fire station near RTO is 17.95 km away from

the project site in NW direction.

2. AIR ENVIRONMENT

The base line Ambient Air Quality (AAQ) status within 10 km study area has been assessed

through a monitoring network of 8 AAQ sampling stations during October 2020 to December,

Page 17: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Executive Summary 11

2020. Design of network for Ambient Air Quality monitoring locations were decided on

meteorology & available infrastructure facilities. The base-line Ambient Air Quality of the study

area was monitored for Particulate Matter (PM10 & PM2.5), Sulphur Dioxide (SO2) and Nitrogen

Dioxide (NO2), CO & VOC. The result for the same is given as below:

Location

Village

Results (98th Percentile)

PM2.5 PM10 SO2 NO2

Project Site 48.78 83.56 19.08 37.61

Jornang 47.52 81.45 15.70 30.10

Langhanaj 42.34 77.49 11.82 31.72

Balwantpura 34.75 64.43 9.66 20.60

Juni Shedhavi 37.17 71.60 13.81 27.61

Mandali 45.78 78.63 16.71 34.33

Chaluva 39.72 74.39 15.79 25.79

Jamnapur 40.16 68.52 9.57 24.58

Permissible limit

[NAAQ standards-

2009]

60 µg/m3 100 µg/m3 80 µg/m3 80 µg/m3

Note: CO: Below Detectable Limit; VOC: Below Detectable Limit

Analysis of ambient air samples revealed that the Air quality is found well within the prescribed

limits of National Ambient Air Quality standards.

The main source of gaseous emission is flue gas emission from stack attached to Steam boiler.

Briquettes will be used as a fuel & total fuel requirement for proposed project will be 1 MT/Day.

Adequate stack height will be provided for proper atmosphere dispersion of pollutants. The

probable emitted pollutants will be PM, SO2& NO2. Multicyclone separator followed by bag filter

will be provided with stack attached to boiler as an APCM. Since Diesel will be used as a fuel for

D. G. Set (back–up system) the flue gas emission will also be well within prescribed norms and

there will be no need of any air pollution control measures for D. G. Set.

3. WATER ENVIRONMENT

Analysis of ground water and surface water samples revealed that it is suitable for domestic

activity including agricultural activity. Ground water quality in the area meets the Water Quality

Standards (IS 10500) for drinking water whereas surface water quality in the area meets the

Water Quality Standards (IS 10500) for drinking water except for parameters like pH and TDS.

A. Water Requirement

The total fresh water requirement for the proposed project will be 6.8 kl/day. Out of this said

fresh water quantity 1 kl/day will be used for domestic purpose, 2.8 kl/day will be used for

industrial activities and 3.0 kl/day will be used for greenbelt development purpose. The

required water will be obtained through own borewell.

B. Wastewater Generation and its Disposal

The total generation of domestic wastewater will be 0.9 kl/day. The domestic wastewater

Page 18: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Executive Summary 12

generated will be sent to soak pit. The total industrial effluent generation will be 1.3 kl/day,

which will be from cooling tower, washing, Boiler & R.O. Industrial effluent will be collected in

Collection cum Neutralization tank and then it will be sent Filter press for sludge separation.

Separated sludge will be collected, stored and disposed off at approved TSDF site. Filtrate water

from filter press will be taken in to holding tank and then effluent will be evaporated using

Evaporator followed by condenser through heat energy. Condensate from evaporator will be

reused in industrial activities. Therefore, no effluent will be generated and the stated process

would be called a zero discharge process.

4. LAND / SOIL ENVIRONMENT

During operation activity, minor impact of air, water and solid waste pollution on soil causes

direct / indirect effect on soil. As all necessary air pollution control steps will be provided and

based on the results of the dispersion model for the Ground Level Concentrations of various

pollutants after proposed project, there will not be any adverse impact of air pollution on soil. It

may be noted that there will be no disposal of untreated effluent on land. So, there will be no

adverse effect on land / soil due to water.

All necessary control steps will be provided for handling, storage and disposal of

solid/hazardous waste generated from the proposed plant. Thus, there will not be any

significant impact of solid/hazardous waste on the soil environment.

5. NOISE ENVIRONMENT

Noise level was recorded at 8 locations within the study area to provide the baseline data to

describe the existing situations.

Sr.

No. Location

Noise Level (Leq) in dBA

(Day Time)

Noise Level (Leq) in dBA

(Night Time)

Measured Permissible

Limit Measured

Permissible

Limit

1 Project site 73.6 75 57.2 70

2 Ambaliyasan 62.9 65 52.5 55

3 Jamnapur 48.9 50 36.5 40

4 Vadasma 63.7 65 51.3 55

5 Kaiyal 54.6 55 38.1 45

6 Jornang 54.3 55 40.2 45

7 Navi Sedhavi 49.3 50 39.3 40

8 Juni Sedhavi 48.6 50 36.9 40

The minimum noise level measured in the study area was 48.6 dB (A) in day time at Juni

Shedhavi village and 36.5 dB (A) at Jamnapur village in night time. The maximum noise level

measured in the study area was 73.6 dB (A) in daytime at Project Site and 57.2 dB (A) in night

time at Project site. The noise levels (Leq) of the residential area within the impact zone varied

from 54.3 - 54.6 dB (A) in the day time and 38.1- 40.2 dB (A) in the night time.

Page 19: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Executive Summary 13

6. SOCIO-ECONOMIC ENVIRONMENT

An assessment of socio-economic environment forms an integral part of an EIA study. Socio-

economic environment – demographic & related socio-economic data was collected from

District Census Handbook to assess socio-economic status of the study area. For proposed

project activity, total 8 nos. of skilled and unskilled employees/workers will be required. The

indirect employment will be generated by way of transportation, shopkeepers and other casual

employment for many people. Local people will be given preference wherever found suitable for

all the jobs in the plant. Economic status of the local people will improve due to the increased

business opportunities, thereby, making a positive impact. Educational, medical and housing

facilities in the study area will considerably improve.

7. ECOLOGY & BIODIVERSITY

EB study reported a total of 135 plant species, 9 Herpetofauna, 31 birds and 5 species of

mammals from the buffer zone of M/s. R P Polymer However, no threatened biodiversity

reported with highest density or richness from the core and buffer zones of the study area.

Schedule- 1 species peacock & shikra) was observed in buffer zone of the project site. However,

conservation plan of peacock & shikra is prepared in advance. In addition, no true multi species

forest type was recorded in the vicinity of the two-five kilometer radius in and around the

project site. It clearly indicates the low productive potential of the terrestrial ecosystem. Since

the project associated activities do not required any additional land, the terrestrial ecosystem is

considerably free from the project related impacts.

8. SOLID WASTE MANAGEMENT

The main hazardous waste generation will be ETP Sludge + Evaporation Residue, Process

Residue, Used Oil and Discarded Plastic Bags/Drums. ETP Sludge + Evaporation Residue will be

disposed off at approved TSDF site. Process Residue will be disposed off at approved CHWIF

site. Used Oil will be reused within premises as a lubricant or sold to registered recycler.

Discarded Plastic Bags/Drums will be returned to supplier or sold to authorized recycler.

The unit will provide isolated area for the storage of hazardous waste. Thus, hazardous waste

management system provided by the unit will be adequate and there will not be any major

impact on the environment due to hazardous waste.

9. ENVIRONMENTAL MANAGEMENT PLAN

An Environmental Management Plan has been prepared for mitigation of the adverse impacts.

The Environmental Management Plan describes in brief, the management’s plan for proper and

adequate implementation of treatment and control system for pollutants and for maintaining

the environment. It also include development of green belt, proper safety of workers,

environmental monitoring plan, rain water harvesting, fire protection system and measures etc.

An Environmental Management Cell will be formed for effective implementation of

Environmental Management Plan.

Page 20: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Executive Summary 14

10. ENVIRONMENT MONITORING PROGRAM

Monitoring of environmental factors will enable us to identify the changes in the environmental

impacts at various locations and their mitigate measures. To ensure the effective

implementation of the EMP, monitoring of ambient air quality, stack emissions, analysis &

monitoring of water environment and noise level will be carried out as required / specified by

statutory authority.

11. RISK ASSESSMENT

Risk analysis and study have been carried out for identification of hazards, selection of

maximum credible scenarios, risk mitigation measures etc. All the hazardous chemicals will be

stored and handled as per MSDS guidelines. Personal protective equipment’s will be provided to

the workers.

12. GREEN BELT DEVELOPMENT

A greenbelt of approximately 1215.10 m2 will be developed within the project site to minimize

the air pollution, noise pollution, balancing eco-environment, soil erosion / protection etc.

Greenbelt area is 33.65 % of the total plot area.

13. PROJECT BENEFITS

The proposed project will become beneficial to the surrounding area or community in terms of

infrastructural development, social development, employment and other benefits.

The proposed project has a potential for employment of skilled, semi-skilled and unskilled

employees during operation phase. A total of 8 persons are likely to get employment due to the

proposed project. The project gives 2% of project cost for socio-economic development

activities in surrounding villages which will be continued further.

14. CONCLUSION

Negligible impacts will occur on air quality. However, all the necessary air pollution

control measures will be provided.

No ecological damage will occur.

No adverse impacts will occur on water environment.

Local employment opportunities will increase.

Various other environment parameters like Forest/ National Park/ Sanctuary and

Religious / Historical Places will not be affected.

Environment Management Plan has been formulated to control all the pollutant

parameters and Environment Management Cell will be set-up to ensure that these

parameters do not exceed the norms set out by the concerned authorities.

After commissioning of the proposed project, the Environmental Management Cell will

take care of all the pollution control measures.

It can be concluded on a positive note that after the implementation of the mitigation measures

and environmental management plan during the construction & operational phase, there will be

Page 21: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Executive Summary 15

negligible impact on the environment due to the proposed project.

Page 22: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

15

EXECUTIVE SUMMARY – GUJARATI

સકં્ષીપ્ત અહળેા

૧. પ્રસ્તાળના:-

ભેવવસ અય ી ોરીભય વલે નફંય: ૬૨૬, ગાભ - જોયણાગં, તાલકુો ને જજલ્રો: ભશવેાણા - ૩૮૨૭૩૨, ગજુયાત યાજ્મ ખાતે વીન્થેટીક ઓગેનનક કેનભકર (ફપનોર પોભાસલ્લ્િશાઆિ યેઝઝન , ભેરાભાઆન પોભાસલ્લ્િશાઆિ યેઝઝન ને યફુયમા પોભાસલ્લ્િશાઆિ યેઝઝન) નુ ંઈત્ાદન કયલા ભાટેની દયખાસ્ત કયેર છે.

પ્રસ્તાવળત ઉત્ાદનની વળગત

ક્રમાકં ઉત્ાદનન ંનામ ઉત્ાદન ક્ષમતા

મેટ્રિક ટન/માસ

૧ ફપનોર પોભાસલ્લ્િશાઆિ યેઝઝન ૨૦૦ ૯003-3૫-૪

૨ ભેરાભાઆન પોભાસલ્લ્િશાઆિ યેઝઝન ૭૦૦ ૮૨૧૧૫-૬૨-૬

૩ યફુયમા પોભાસલ્લ્િશાઆિ યેઝઝન ૨૦ ૯૦૧૧-૦૫-૬

કુર ઈત્ાદન ક્ષભતા ૯૨૦

પ્રસ્તાનલત ભેવવસ અય ી ોરીભય એકભનો કુર નલસ્તાય અળયે ૩,૬૧૨ ભી૨ છે. જેભાથંી

૧,૨૧૫ ભી૨ (અળયે કુર નલસ્તાયના ૩૩.૬૫%) જભીન ગ્રીનફેલ્ટ ભાટે પાલલાભા ંઅલળે.

ફીનખેતી ભાટેની ભજૂંયી ગાઈથી વફંનધત વત્તા ાવેથી જભીન ભાઝરક દ્વાયા ભેલેર છે.

પ્રસ્તાનલત એકભ સ્ભોર સ્કેર એકભ છે. પ્રસ્તાનલત એકભને પ્રસ્થાનત કયલાની ફકિંભત રૂનમા

૧૦૦ રાખ થળે. જેભાથંી માસલયણીમ વ્મલસ્થાન ધ્ધનત ભાટે અળયે રૂનમા ૧૬.૬૫ રાખ

પાલલાભા ંઅલળ.ે

ભેવવસ અય ી ોરીભય દ્વાયા ભેવવસ ટી. અય. એવોવીએટ્વની પ્રસ્તાનલત એકભનો

માસલયણીમ વય અકાયણી ભ્માવ (EIA) કયલા ભાટે નનભણ ૂકં કયલાભા ંઅલેર છે.

Page 23: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

16

તે્ર નોંધનીમ છે કે ફપનોર પોભાસલ્લ્િશાઇિ યેઝઝન, ભેરેભાઆન પોભાસલ્લ્િશાઇિ યેઝઝન ને યફુયમા

પોભાસલ્લ્િશાઇિ યેઝઝન ઈત્ાદનો (વીન્થેટીક ઓગેનીક કેનભકલ્વ) નુ ં પ્રસ્તાનલત ઈત્ાદન EIA નોટીપીકેળન-૧૪ વપ્ટેમ્ફય,૨૦૦૬ના નલબાગ-૫(એપ), કેટેગરી - ‘એ’ ભા ં અલે છે. સઝૂિત

યીમોજના ૨૫ જૂન ૨૦૧૪ના નોટીપીકેળન સિૂનાના ફયત્ર મજુફ SO ૧૫૯૯(ઇ) પ્રભાણે

ભેવવસ અય ી ોરીભય નાના એકભના ભાદંિભા ંઅલળે નશીં. તેથી MoEF&CC (Ministry

of Environment, Forest & Climate Change), નલી ફદલ્શી ાવેથી માસલયણીમ ભજૂંયી

(Environmental Clearance) ભેલલાની જરૂયીમાત યશરે છે. અ પ્રકીમાના બાગ રૂે

માસલયણીમ રોકસનુાલણી એ જાશયેનાભા પ્રભાણે તથા એક્ષ્ટસ એપ્રાઇઝર કભીટી (આન્િસ્રી-૨)

એ યનુનટને અેરા TOR પ્રભાણે કયલાભા ંઅલળે. અ એકભ ભા ંાણી નો લયાળ ( ૬.૮

ફકરોઝરટય/ ફદલવ) છે; ફતણ નો લયાળ ૨૫ ટન/ફદલવ કયતા ઓછો છે; યંત ુ

પોભાસલ્લ્િશાઆિના ૫ ભેફરક ટન (I.e. ૫૦ ભેફરક ટન) કયતા ંલધ ુવગં્રશને કાયણે ભેનપેુકિફયિંગ,

સ્ટોયેજ, ઇમ્ોટસ શઝેાર્્સવ કેનભકર નનમભો (MSIHC નનમભો), ૧૯૮૯ મજુફ એભએએિ(MAH)

શે્રણીભા ંઅલે છે.

માસલયણ પ્રથૃ્થકયણ વય ભ્માવ (Environmental Impact Assessment Study) ઓક્ટોફય

૨૦૨૦ થી ફિવેમ્ફય ૨૦૨૦ દયનભમાન કયલાભા ં અલેર છે. માસલયણીમ ઘટકો જેલા કે

(અવાવ ની શલા, ાણી, જભીન, ધ્લનન, લનસ્નતઓ ને પ્રાણીઓ) જે પ્રસ્તાનલત એકભથી

વય ાભી ળકે તેભ છે, તેનો ભ્માવ કયલાભા ંઅવ્મો છે. પ્રસ્તાનલત એકભને કેન્રભા ંરઇને

૧૦ ફકભી. નત્રજ્માના લત ુસાકાય નલસ્તાયને ભ્માનવત કે્ષત્ર તયીકે નક્કી કયલાભા ંઅલેર છે.

અવાવના ૧૦ ફકભી નત્રજ્માના નલસ્તાયની મખુ્મ રાક્ષઝણકતાઓ નીિે પ્રભાણે છે.

Page 24: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

17

ક્રમાકં મ ખ્ય ાક્ષણણક્તાઓ ળણણન ૧ પ્રસ્તાનલત એકભનુ ંસ્થાન વલે નફંય: ૬૨૬, ગાભ - જોયણાગં, તાલકુો ને

જજલ્રો: ભશવેાણા - ૩૮૨૭૩૨, ગજુયાત યાજ્મ ૨ વમરુી સ્તયના વયેયાળ ૯૩ ભીટય ૩ તાભાન ૨૧° C થી ૩૧° C ૪ લાનિક લયવાદ

(૩૦ લસ વયેયાળ) ૭૪૦ એભએભ

૫ નજીક નુ ંયેલ્લે સ્ટેળન આંફઝરમાવણ યેલ્લે સ્ટેળન- ૩.૬૫ ફકભી WNW ફદળાભા ં૬ નજીક નુ ંએયોટસ ભશવેાણા એયોટસ – ૨૦.૬૭ ફક.ભી. NNW ફદળા ભા ં૭ નજીક નુ ંફદંય કંિરા ફદંય- ૨૩૨.૯૭ ફકભી નિભ ફદળાભા ં ૮ નજીક નુ ંળશયે ભશવેાણા – ૧૮.૧૫ ફક.ભી. NNW ફદળા ભા ં૯ નજીક નુ ંગાભ જભનાયુ – ૧.૨૭ ફકભી SE ફદળા ભા ં૧0 નજીકનો યાષ્ટ્રીમ ધોયીભાગસ નેળનર શાઇલે ૮-વી – ૩૦ ફક.ભી. SSE ફદળા ભા ં ૧૧ નજીકનો સ્ટેટ શાઆલે એવએિ ૨૧૭ – ૪.૧ ફક.ભી ENE ફદળાભા ં૧૨ નજીકની નદી / જ સ્ત્રોત વાફયભતી નદી- ૨૭.૮૦ ફક.ભી. E ફદળાભા ં૧૩ નજીકનુ ંનાભત લન ૧૦ ફક.ભી. નત્રજ્માની અંદય કોઇ નથી. નજીકનુ ં

અયઝક્ષત જગંર એ આન્રોિા િામનાવોય ન ે પોનવર ાકસ છે – ૩૨.૯૧ ફક.ભી. SSE ફદળાભા ં

૧૪ નજીકનુ ં યાષ્ટ્રીમ ઈદ્યાનો / બમાયણ્મ

૧૦ ફક.ભી. નત્રજ્માની અંદય કોઇ નથી. નજીકનુ ંબમાયણ્મ થોર ક્ષી બમાયણ્મ છે - ૩૧.૮૦ ફક.ભી. દઝક્ષણ ફદળાભા ં

૧૫ નજીકની ળાા અળયે જભનાયુ પ્રાથનભક ળાા છે. પ્રોજેક્ટ વાઆટથી SE ફદળાભા ં૧.૨૦ ફક.ભી.

૧૬ નજીકની શોસ્સ્ટર ળકું ભેફિનવટી પ્રોજેક્ટ વાઆટથી NW ફદળાભા ં૮.૫ ફકભી દૂય ભીયુા ગાભભા ંછે

૧૭ નજીકનુ ંઐનતશાનવક સ્થ ૧૦ ફક.ભી. નત્રજ્માની અંદય કોઇ નથી. નજીકનુ ંઐનતશાનવક સ્થ વીભધંય સ્લાભી જૈન ભફંદય ભશવેાણા ખાતે છે, જે NNW ફદળાભા ં પ્રોજેક્ટ સ્થથી ૧૯.૫૦ ફકભી દૂય છે ને ભોઢેયા સમૂસભફંદય, પ્રોજેક્ટ વાઆટથી NW ફદળાભા ં૩૬.૯૦ ફકભી દૂય છે.

Page 25: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

18

ક્રમાકં મ ખ્ય ાક્ષણણક્તાઓ ળણણન ૧૮ નજીકનુ ંજૂન સ્થ ભફંદય જભનાયુ ગાભભા ં છે જે SE ફદળાભા ં ૧.૨૦

ફક.ભી. દૂય છે ને જોયણાગં ગાભભા ં બ્રહ્માણીભાતા ભફંદય, પ્રોજેક્ટ વાઆટથી NW ફદળાભા ં ૧.6૨ ફક.ભી . ભસ્સ્જદ પ્રોજેક્ટ વાઆટથી NW ફદળાભા ં ૨.૦ ફકભી દૂય જોયણાગં ગાભભા ંછે.

૧૯ નજીકનુ ંપામય સ્ટેળન અય.ટી.ઓ ાવે ભશવેાણા પામય સ્ટેળન, NW ફદળાભા ંપ્રોજેક્ટ વાઆટથી ૧૭.૯૫ ફકભી દૂય છે.

૨. હળાન ંયાણળરણ (Air Environment) :- પ્રલતસભાન અવાવની શલાની (Ambient Air) ગણુલત્તા જાણલા ભાટે પ્રસ્તાનલત એકભના

સ્થથી ૧૦ ફકભી નત્રજ્માના લત ુસાકાય નલસ્તાયભા ં૮ રગ રગ સ્થેથી ઓક્ટોફય ૨૦૨૦

થી ફિવેમ્ફય ૨૦૨૦ દયનભમાન નમનૂા રઇને તેની િકાવણી કયલાભા ં અલી શતી. શલાની

ગણુલત્તા નક્કી કયલા ભાટેના સ્થની વદંગી લાયળુાસ્ત્ર, CPCB ની ભાગસદનળિકા ને નજીકની

પ્રાપ્તસનુલધાઓના અધાયે નક્કી કયેર શતી. શલાની ગણુલત્તા નક્કી કયલા ભાટે ાફટિકર ભેટય

(PM10& PM2.5), વલ્પય િામોકવાઇિ (SO2),નાઇરોજન િામોકવાઇિ(NO2),CO ને VOC ની

િકાવણી કયલાભા ંઅલી શતી.

તેના ભાટેનુ ંફયણાભ નીિે અેર છે.

સ્થલ ટ્રરણામ (98thટકાળારી)

PM2.5 µg/m3 PM10 µg/m3 SO2 µg/m3 NO2 µg/m3 પ્રોજેક્ટ સાઇટ ૪૮.૭૮ ૮૩.૫૬ ૧૯.૦૮ ૩૭.૬૧

જોરણાગં ૪૭.૫૨ ૮૧.૪૫ ૧૫.૭૦ ૩૦.૧૦

ાઘંણજ ૪૨.૩૪ ૭૭.૪૯ ૧૧.૮૨ ૩૧.૭૨

બલળતંપ રા ૩૪.૭૫ ૬૪.૪૩ ૯.૬૬ ૨૦.૬૦

જૂની ેઢાળી ૩૭.૧૭ ૭૧.૬૦ ૧૩.૮૧ ૨૭.૬૧

મડંાી ૪૫.૭૮ ૭૮.૬૩ ૧૬.૭૧ ૩૪.૩૩

Page 26: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

19

સ્થલ ટ્રરણામ (98thટકાળારી)

PM2.5 µg/m3 PM10 µg/m3 SO2 µg/m3 NO2 µg/m3 ચલ ળા ૩૯.૭૨ ૭૪.૩૯ ૧૫.૭૯ ૨૫.૭૯

જમનાપ ર ૪૦.૧૬ ૬૮.૫૨ ૯.૫૭ ૨૪.૫૮

અન મવત મયાણદા [NAAQ ધોરણો -

2009 ૬૦ µg/m

3 ૧૦૦ µg/m3 ૮૦ µg/m

3 ૮૦ µg/m3

નોંધ: CO: below Detected limit ; VOC: below Detected limit

અવાવની શલાના ફયણાભ યથી તાયણ કાઢી ળકામ કે શલાની ગણુલતા નેળનર એમ્ફીમટં

એયક્લોરીટીના ધાયાધોયણ મજુફ છે.

લાયયુકુ્ત ઈત્વજૉનનો મખુ્મ સ્રોત સ્ટીભ ફોઆરય વાથે જોિામેરા િીભનીભાથંી થત ુ ફ્લગુેવ ઈત્વજૉન છે.બ્રીકેટવનો ઈમોગ ફતણ તયીકે કયલાભા ંઅલળે ને સઝૂિત પ્રોજેક્ટ ભાટે કુર ફતણની અલશ્મકતા ૧ ભેફરક ટન / ફદલવ શળે. પ્રદૂકોના મોગ્મ પેરાલભાટે ઝિભની ની માસપ્ત ઉંિાઇ યાખલાભા ંઅલળે. સઝૂિત એકભભા ંફોઆરય દ્વાયા ઈત્વજીત પ્રદૂકો PM, SO2, NO2 શળે.જેને નનમતં્રણભા ં યાખલા ભાટે શલા પ્રદૂણ નનમતં્રણ મતં્ર તયીકે ભલ્ટી વામકરોન વેયેટય ને ફેગ ફપલ્ટય રગાલલાભા ંઅલળે. િી.જી. વેટ ાલય પેરમય લખતે લાયલાભા ંઅલળે તેભા ંફતણ તયીકે િીઝરનો ઈમોગ કયલાભા ંઅલળે, જેથી ઈત્વજીત થતા પ્રદૂકો નનમત ભાત્રા ભા ંજ યશળેે. અભ કોઇ ણ શલા પ્રદૂણ નનમતં્રણ મતં્રની જરૂય તેના ભાટે યશતેી નથી. ૩. જલ યાણળરણ (Water Environment):-

ભગૂબસ જ તેભજ જભીન યના ાણીના નમનૂાઓની ગણુલત્તા યીક્ષણ યથી તાયણ કાઢી

ળકામ કે ભ્માનવત નલસ્તાય નુ ં ભગૂબસ જ તેભજ જભીન યનુ ં ાણી કૃન પ્રવનૃત્ત વફશત

સ્થાનનક પ્રવનૃત્ત ભાટે મોગ્મ છે.

ીલાના ાણી ભાટે અ નલસ્તાયની ભગૂબસ જ ગણુલત્તા લોટય ક્લોઝરટી સ્ટાન્િર્્સવ

(IS ૧૦૫૦૦) ને ણૂસ કયે છે જ્માયે ીએિ ને ટીિીએવ જેલા ફયભાણો નવલામ ીલાના

Page 27: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

20

ાણી ભાટે અ નલસ્તાયની વાટીની ાણીની ગણુલત્તા જ ગણુલત્તા ધોયણોને (IS ૧૦૫૦૦)

યૂી કયે છે.

ાણીની જરૂરીયાત:-

પ્રસ્તાનલત યીમોજના ભાટે ાણીનો કુર લયાળ ૬.૮ ફકરોરીટય / ફદલવ યશળેે, જેભાથંી

ઘયગથ્થ ુલયાળ ભાટે ૧ ફકરોરીટય/ ફદલવ જેટલુ ંાણી લયાળે જ્માયે ઓદ્યોઝગક લયાળ

ભાટે ૨.૮ ફકરોરીટય/ ફદલવ જેટલુ ંાણી તેભજ ગ્રીન ફેલ્ટ િેલરોભેન્ટ ભાટે ૩ ફકરોરીટય/

ફદલવ જેટલુ ં ાણી લયાળે. પ્રસ્તાનલત યીમોજના ભાટે જરૂયી ાણી ફોયલેર દ્વાયા

ભેલલાભા ંઅલળે.

ગદંાાણીનો ઉદભળ અને ગદંાાણીનો વનકા:-

પ્રસ્તાનલત યીમોજના ભાથંી ૧.૩ ફકરોરીટય/ફદલવ જેટલુ ંકુર ગદું ાણી ઈદબલળે. અ ૈકી

ઘયગથ્થ ુ ગદંા ાણીનો (૦.૯ ફકરોરીટય/ફદલવ) નનકાર વોક્ીટ વીસ્ટભ દ્વાયા કયલાભા ં

અલળે.

પ્રસ્તાનલત યીમોજનાભા ં કુર ૧.૩ ફકરોરીટય/ફદલવ જેટલુ ં ઓદ્યોઝગક ગદું ાણી ફોઇરય

બ્રોિાઈન, કુરીંગ ટાલય જૉ, અય.ઓ. યીજેકટ તથા લોળીંગ જેલી પ્રફકમાઓ ભાથંી નનકળે.

ગદંા ાણીને કરેક્ળન / ન્યરુરાઇઝેળન ટેન્ક ભા ંએકઠું કયી, તેન ેત્માયફાદ ફપલ્ટય પ્રેવ ભા ં

ભોકરલાભા ંઅલળે. તેભાથી ઘન કિયો રગ કયલાભા ંઅલળે. અ ઘન કિયાને બેગો કયી,

વગં્રશ કયી ભાન્મ TSDF વાઆટભા ંનનકાર કયલાભા ંઅલળે. ફપલ્ટય પ્રેવ ભાથંી નનકતા ાણી ન ે

વગં્રશટાકંી ભા ં રઇ જલાભા ં અલળે.અંતભા ં અ ગદંા ાણીને ઇલોયેટય/કન્િેન્વયભા ં

ફાષ્ટ્ીબલન કયલાભા ં અલળે ને કન્િેન્વેટને ઓદ્યોઝગક પ્રવ્રનુતઓભા ં યીવામકર કયલાભા ંઅલળે જેથી એકભ ઝીયો િીસ્િાજૉ યશળેે.

૪. જમીન યાણળરણ કાભગીયી તફક્કા દયમ્માન શલા, ાણી, ઘનકિયાના પ્રદૂણથી જભીન ય વીધી થલા

અિકતયી વયો થામ છે. શલાના પ્રદૂણને યોકલા ભાટે જરૂયી ફધાજ ગરા રેલાભા ંઅલળે

જેથી જભીન ય કોઇ જ અિવય થળે નફશિં. પ્રાન્ટના કાભગીયી તફક્કા દયમ્માન જભીનની

વાટી ય શલાના નલનલધ પ્રદૂકોની ભાત્રા (Ground Level Concentration)યીણાભોની

Page 28: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

21

િકાવણી યથી કશી ળકામ કે જભીન ય કોઇ નોંધનીમ અિવય થળે નફશિં. ત્રે નોંધનીમ

છે કે ગદું ાણી જભીન ય છોિલાભા ંઅલતુ ંનથી જેથી જભીન ય કોઇ અિવય થળે નફશિં.

પ્રાન્ટભાથંી ઈત્ન્ન થમેર ઘન કિયાને વબંાલા, વગં્રશ કયલા ને તેના નનકાર ભાટેના દયેક

નનમતં્રીત ગરાઓ રેલાભા ંઅલળે જેથી ઘન કિયાને કાયણે જભીન ય કોઇ અિવય થળે

નફશિં.

૫. ધ્ળવન યાણળરણ :-

ભ્માવીત કે્ષત્રભા ંપ્રલતસભાન ધ્લનનનુ ંભાદંિ કાઢલા ભાટે ૮ રગ- રગ સ્થે ઘોંઘાટની

િકાવણી કયલાભા ંઅલી શતી. જેના યીણાભો નીિે પ્રભાણે છે.

ક્રભાકં સ્થ

ઘોંઘાટન ુસ્તય (Leq) in dB A

( ફદલવ દયમ્માન )

ઘોંઘાટન ુસ્તય (Leq) in dB A

( યાત્રી દયમ્માન )

ભાન સ્લીકામસ ભમાસદા ભાન સ્લીકામસ ભમાસદા

૧ પ્રોજેક્ટ સાઈટ ૭૩.૬ ૭૫ ૫૭.૨ ૭૦

૨ આંબીયાસણ ૬૨.૯ ૬૫ ૫૨.૫ ૫૫

૩ જમનાપ ર ૪૮.૯ ૫૦ ૩૬.૫ ૪૦

૪ ળડસમા ૬૩.૭ ૬૫ ૫૧.૩ ૫૫

૫ કૈયા ૫૪.૬ ૫૫ ૩૮.૧ ૪૫

૬ જોરણાગં ૫૪.૩ ૫૫ ૪૦.૨ ૪૫

૭ નળી ેઢાળી ૪૯.૩ ૫૦ ૩૯.૩ ૪૦

૮ જૂની ેઢાળી ૪૮.૬ ૫૦ ૩૬.૯ ૪૦

ભ્માવ કે્ષતે્ર ભાેર ન્યનૂતભ લાજનુ ં સ્તય જૂની ળેઢાલી ગાભભા ં ફદલવના વભમે ૪૮.૬ િીફી (એ) ને યાનત્રના વભમે જમનાપ ર ગાભભા ં૩૬.૫ િીફી (એ) શત ુ.ં ભ્માવ કે્ષતે્ર ભાેર

ભશત્તભ લાજનુ ં સ્તય પ્રોજેક્ટ વાઆટ ય ફદલવના વભમે ૭૩.૬ િીફી (એ) ને પ્રોજેક્ટ

વાઆટ ય યાનત્રના વભમે ૫૭.૨ િીફી (એ) શત ુ.ં આપેક્ટ ઝોનભા ંયશણેાકં નલસ્તાયના લાજનુ ં

Page 29: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

22

સ્તય (Leq) ફદલવના વભમગાાભા ં૫૪.૩ – ૫૪.૬ િીફી (એ) ને યાતના વભમે ૩૮.૧ –

૪૦.૨ િીફી (એ) થી ફદરામ છે.

૬. સામાજીક-આવથિક યાણળરણ:-

વાભાજીક થસવ્મવ્સ્થાનો ભ્માવ એ માસલયણ વયઅકાયણી ભ્માવ ભાટેની ખફૂજ

ભશત્લની નલગત છે. અ કાયણવય ભ્માનવત કે્ષત્રભા ંવાભાજીક થસવ્મવ્સ્થાની ભાફશતી જેલી કે

લસ્તીનુ ંપ્રભાણ, કાભગીયીનો પ્રકાય લગેયે જીલ્રા લસ્તીગણતયી સુ્સ્તકાભાથંી ભેલેર છે.

પ્રસ્તાનલત યીમોજનાને કાયણે કુર ૮ જેટરા કુળ ને ઝફન-કુળકાયીગયોને વીધી યીતે

યોજગાયી પ્રાપ્ત થળે. પ્રસ્તાનલત યીમોજનાને કાયણે અિકતયી યીતે જેલીકે લાશનવ્્લશાય,

દુકાનોભા ંલગેયેભા ંયોજગાયીની તકો ઈબી થળે.

અ પ્રાન્ટની કાભગીયી ભાટે જરૂય રાગે ત્મા ં સ્થાનનક રોકોની તેભની કુળતાના અધાયે

વદંગી કયલાભા ં અલળે.અજુફાજુના નલસ્તાયભા ં ધધંાની ઈજ્જ્લ તકોને કાયણે ત્માનંા

સ્થાનનક રોકોની અનથિક ફયસ્સ્થતી સધુયળે ને તેથી એકભને કાયણે શકાયાત્ભક વય થળે.

અજુફાજુના નલસ્તાયભા ંવાક્ષયતા, અયોગ્મ ને યશણેીકયણીભા ંસધુાયો થળે.

૭. જૈળ ટ્રરસ્સ્થતી અને જૈળ વળવળધતા ાસ્ત્ર:- EB ભ્માવભા ં અય ી ોરીભય ના ફપય ઝોનભાથંી કુર ૧૩૫ લનસ્નત પ્રજાનતઓ, ૯

શેટોપોના, ૩૧ ક્ષીઓ ને વસ્તન પ્રાણીઓની ૫ પ્રજાનતઓ શલેાર અપ્મો છે. જો કે,

ભ્માવ નલસ્તાયના મખુ્મ ને ફપય ઝોનભાથંી ઈચ્િ ઘનતા થલા વમદૃ્ધતા વાથે કોઇ ણ

જીલરેણ નલનલધતાની જાણ કયલાભા ંઅલી નથી.

નળપરરુ-૧ પ્રજાનતઓ (ભોય, નળકયા) ફપય નલસ્તાયભા ંભી અલી શતી. ભોય ને નળકયા ભાટે

વયંક્ષણ પ્રાન શરેેથી જ તૈમાય કયલાભા ંઅલેર છે. અ ઈયાતં, પ્રોજેક્ટ વાઇટના ાિં

ફકરોભીટય નત્રજ્માભા ંવાિી ભલ્ટી પ્રજાનતઓ લન પ્રકાયનો યેકોિસ કયલાભા ંઅવ્મો નથી. પ્રોજેક્ટ

સ્થાન યના ઈત્ાદનને કાયણે કોઇ વીધી થલા અિકતયી ધભકીઓની અગાશી નથી.

ાનથિલ આકોનવસ્ટભ પ્રોજેક્ટ વફંનંધત વયોથી નોંધાત્ર યીતે મકુ્ત છે કાયણ કે પ્રોજેક્ટ વાથે

વકંામેર પ્રવનૃત્તઓને કોઇ લધાયાની જભીનની જરૂય નથી.

Page 30: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

23

૮. સોીડ ળેસ્ટ મેનેજમેન્ટ :- મખુ્મ શઝેાિસવ લેસ્ટભા ં ઇટીી કિયો+ઇલેોયેળન યેવીિય,ુ લયામેલુ ં ઓઇર ને નકાભી

થેરીઓ ને ડ્રમ્વનો વભાલેળ થામ છે.

ઇટીી કિયાનો+ઇલેોયેળન યેવીિયનુો ભજુંય થમેર TSDF Site ભા ંનનકાર કયલાભા ંઅલળે. પ્રફક્રમા લળેો નો ભજુંય થમેર CHWIF Site ભા ં નનકાર કયલાભા ં અલળે. લયામેલુ ંઓઇર લ્યબુ્રીકેન્ટ તયીકે નુઃ લયાળે થલા યીવાઇકરયને લેિાળે, નકાભી થેરીઓ ને ડ્રભ વપ્રામય ને ાછા અલાભા ંઅલળ ેથલા ભજૂંય થમેર લેન્િય ને લેિાળે. એકભ શઝેાિસવ લેસ્ટના વગં્રશ ભાટે છત ધયાલતી રગથી જગ્મા પાલળે જેભા ંરીિેટથી થતા

જભીનના પ્રદૂણને ટકાલલા ભાટે ક્કા ફ્રોયીંગ કયલાભા ંઅલળે, અ રીિેટને કરેક્ટ કયી

તેના શધુ્ધ્ધકયણ ભાટે તેને ઇટીીભા ં ભોકરલાભા ં અલળે. સઝૂિત યીમોજના પ્રાયંબ છી

એકભ દ્વાયા TSDF વાઇટનુ ંવભ્મદ ભેલલાભા ંઅલળે.

અથી એકભ દ્વાયા ામેરી શઝેાિસવ લેસ્ટ ભેનેજભેન્ટ ધ્ધ્ધ્ત યૂતી શળે ને શઝાિસવ લેસ્ટ

ભેનેજભેન્ટના રીધે માસલયણ ય કોઇ અિવય થળે નશી.

૯. યાણળરણીય વ્યળસ્થાન યોજના:- માસલયણ ય થતી અિવયોને યોકલા/નાથલા ભાટે માસલયણીમવ્મલસ્થાન મોજના

ફનાલલાભા ં અલેર છે. અ માસલયણીમ વ્મલસ્થાન મોજનાભા ં માસલયણને મથાલત

જાલલા ભાટે ને પ્રદૂકોને નનમતં્રીત ભાત્રાભા ં યાખલા ભાટે જરૂયી ને મોગ્મ ગરાઓં

જેલાકે ગ્રીન ફેલ્ટ િેલર કયલો ને તેનુ ં જતન કયવુ,ં કાભદાયોની મોગ્મ

વરાભતી,માસલયણીમ ઘટકોની િકવણી મોજનાનો ભર કયલો, લયવાદના ાણીનો વગં્રશ

કયલો, અગ ન રાગે તેલા તકેદાયીના ગરા રેલા ને અગ નાથલાના વાધનો યાખલા

લગેયેનો વભાલેળ કયલાભા ંઅલે છે.

અ માસલયણીમ વ્મવ્સ્થાન મોજનાના વયકાયક ભરીકયણ ભાટે માસલયણીમ વ્મવ્સ્થાન

એકભની યિના કયલાભા ંઅલળે.

૧૦. યાણળરણીય ચકાસણી યોજના:-

Page 31: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

24

માસલયણીમ ફયફોની િકાવણી નલનલધ સ્થોએ માસલયણીમ વયો તથા તેના પેયપાયો

ઓખલા ભાટે ભદદરૂ થળે.

અ શતેથુી માસલયણીમ વ્મલસ્થાન મોજનાના ારન ભાટે અવાવની શલાની ગણુલત્તાની

િકાવણી, િીભનીભાથંી નનકતા પ્રદૂકો તથા ાણીનુ ંમાસલયણની િકાવણી તેભજ ધ્લનન

ભાદંિની િકાવણી કામદાભા ંજણાવ્મા મજુફ કયલાભા ંઅલળે.

૧૧. જોખમની આકારણી:- જોખભ અકાયણીનો ભ્માવ દ્વાયા એકભભા ંકાભ કયતા રોકો ભાટે નીિે મજુફના સયુક્ષાત્ભક

ગરા ંરેલાભા ંઅલળે. વ્મસ્ક્તગત યક્ષાત્ભક વાધનો (વસનર પ્રોટેક્ટીલ ઇક્લીભેન્ટ) જેલા કે

ઇય પ્રગ (જ્મા ંધ્લની પ્રદૂણ ૮૦ dB(A) થી લધ ુશોમ),વેફ્ટી સઝૂ,વેફ્ટી ગ્રવ્વ, શરેભેટ

લગેયે ની સનુલધા યૂી ાિલાભા ંઅલળે. કાયીગયો ભાટે નનમભીત સ્લાસ્થ્મ િેક-, ામાની

જરૂયીમાતો જેભકે ીલાનુ ં ાણી, ળૌિારમ, પ્રાથનભક વાયલાય અલાભા ં અલળે. વસનર

પ્રોટેક્ટીલ ઇક્લીભેન્ટનો ઈમોગ ઇટીી, જોખભી કિયાના નનકાર તથા કેભીકર શેંડ્રીંગભા ં

કયાલલાભા ંઅલળે.

૧૨. ગ્રીન બેલ્ટ ડળેમેન્ટ :- અળયે કુર ૧૨૧૫.૧૦ િો.ભી. (૩૩.૬૫%) જેટરો ગ્રીન ફેલ્ટ નલસ્તાય પ્રોજેક્ટ વાઇટની અંદય િેલરો કયલાભા ં અલળે. અ ગ્રીન ફેલ્ટભા ં ભ્માવીત કે્ષત્ર ભા ં ભી અલતી સ્થાનનક લનસ્નત પ્રજાતીઓ ઈગાિલાભા ંઅલળે કે જે શલા પ્રદૂણ ને વશન કયી ળકળે ને ધ્લનન પ્રદૂણ ને ળોી ળકળે. ગ્રીન ફેલ્ટ જૈલ ફયસ્સ્થતને રગતી વભસ્માનુ ંળભન કયલાની વાથે એકભની સુદંયતાભા ંલધાયો કયળે તથા ક્ષીઓ, નાના વસ્તન પ્રાણી, જતંઓુ લગેયેને અકીત કયીને જૈલ ફયસ્સ્થતીનુ ંવતંરુન જાલલાભા ંણ ભદદરૂ થળે.

૧૩. પ્રોજેક્ટ થી થતા ાભો :-

સઝૂિત પ્રોજેક્ટ અવાવના નલસ્તાયના વમદુામના થલા ભાખાકીમ નલકાવ,વાભાજીક નલકાવ, યોજગાય ને ન્મ પામદાઓની રલ્ષ્ટ્ટએ રાબદામી ફનળે. સઝૂિત પ્રોજેક્ટ કુળ,ધસકુળ ને ઝફનકુળ કાયીગયોને ફાધંકાભ તફક્કા ને કાભગીયી તફક્કા દયનભમાન યોજગાયી અલાની ક્ષભતા ધયાલે છે. કુર ૮ જેટરા વ્મસ્ક્તઓને સઝૂિત

Page 32: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad)

NABET Accredited

Executive Summary – Gujarati

25

પ્રોજેક્ટ દ્વાયા યોજગાય ભી ળકે છે.અ પ્રોજેકટ તેના કરૂ મિૂી યોકાણના ૨.0% જેટરો ખિસ અજુ ફાજુના ગાભોભા ંવાભાજીક તેભજ અનથિક નલકાવ (CER) ભાટે કયાળે.

૧૪. ઉસહંાર :-

અ માસલયણ વય થૃ્થકયણ ભ્માવ યથી કશી ળકામ કે... શલાની ગણુલત્તા ય કોઇ પ્રનતકૂ વય થળે નફશ. કોઇ ઇકોરોજીકર નકુળાન થળે નફશ. જ માસલયણ ય કોઇ પ્રનતકૂ વય થળે નફશ. સ્થાનનક યોજગાયીની તકો લધળે. નલનલધ માસલયણીમ ફયભાણો જેલા કે જગંર, યાષ્ટ્રીમ ફગીિા, ભ્માયણ્મ ન ે

ધાભીકતથા ઐતીશાનવક સ્થો ય કોઇ વય થળે નફશ. માસલયણીમ વ્મલસ્થાન મોજના ફધા પ્રદૂણ ફયભાણોને નનમનંત્રત કયલા ભાટે

ઘિલાભા ં અલી છે. ને અ ફયણાભો વફંનધત વત્તાનધકાયો દ્વાયા સ્થામેર ધાયાધોયણ કયતા લધી ના જામ એ ભાટેમાસલયણ વ્મવ્સ્થાન એકભ દ્વાયા સનુનનિતકયલાભાઅંલળે.

માસલયણ વ્મવ્સ્થાન એકભ સઝૂિત પ્રોજેકટની ળરૂઅત છી પ્રદૂણ નનમતં્રણના ંગરા ંરેળે.

અથી નભુાન કયી ળકામ કે ફાધંકાભ ને કાભગીયી તફક્કા દયનભમાન મકૂલાભા ંઅલેર માસલયણીમ વ્મવ્સ્થાન મોજના ન ેળભનના ગરાનંા શકાયાત્ભક ભરીકયણથી માસલયણ ય થતી વયોને ઘટાિી ળકાળે.

Page 33: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 26

TERMS OF REFERENCE (TOR) COMPLIANCE

Compliance statement is prepared for Terms of Reference received wide letter no.:- IA-J-11011/93/2020-IA-II(I) dated 19th May 2020 (Attached as Annexure–1) for proposed project to manufacture Phenol Formaldehyde Resin, Urea Formaldehyde Resin and Melamine formaldehyde Resin. TOR. No.

TOR Condition Compliance status Page No.

A STANDARD TERMS OF REFERENCE 1 Executive Summary Executive summary in English and

Vernacular language (Gujarati) is given in EIA report before ToR compliance.

--

2 Introduction I Details of the EIA

Consultant including NABET accreditation.

T. R. Associates is NABET accredited consultant. (Certificate no. NABET/EIA/1922/RA0142) dated 1309/2019 valid upto 9/10/2022. Accreditation certificate is given in Annexure - 7.

--

II Information about the project proponent.

Pankajbhai D. Patel & Rohitbhai C. Rathod are two partners, for more details refer section 1.3 of Chapter – 1

1.2

III Importance and benefits of the project.

Social development is the main benefits of the project. For details please refer section 1.4 of Chapter – 1

1.2

3 Project Description I Cost of project & time of

completion. Total cost of project is 100 lakh; the break-up of cost and time duration is given in Table 2.3 and section 2.6.1 of Chapter – 2.

2.11

II Products with capacities for the proposed project.

P. F. resin – 200 Ton/Month M.F. Resin – 700 Ton/Month, U.F. Resin – 20 Ton/Month, total – 920 Ton/Month. Refer section 2.1 of Chapter – 2.

2.1

III If expansion project, details of existing products with capacities and whether adequate land is available for expansion, reference of earlier EC if any.

Not Applicable --

IV List of raw materials required and their source along with mode of transportation.

Raw materials will be purchased from local Traders and mode of transport will be road and rail. The details of the raw material required are given in Table 2-4. Storage detail of raw materials and products are given in Table 2-4 and 2-5.

2.18

V Other chemicals & materials required with quantities and storage

Page 34: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 27

TOR. No.

TOR Condition Compliance status Page No.

capacities. VI Details of Emission,

effluents, hazardous waste generation and their management.

Details of air emission are given in Section – 2.11.2 of Chapter - 2.

2.26

Details of effluent are given in Section – 2.11.1.1, 2.11.1.2 of Chapter - 2.

2.24

Details of hazardous waste generation & their management are given in Section- 2.11.3 of Chapter - 2.

2.28

VII Requirement of water, power, with source of supply, status of approval, water balance diagram, man-power requirement (regular and contract).

Water requirement (6.8 KLD) is given in Section 2.11.1 of Chapter – 2. The unit has already made application for obtaining permission from CGWA and received NOC from CGWA & that is attached as Annexure – 3. Water balance diagram is shown in Figure 2.10.

2.21 & 2.23

Power consumption with source of supply – 30 KW from UGVCL.

--

8 persons, skilled & unskilled --

VIII Process description along with major equipments and machineries, process flow sheet (quantitative) from raw material to products to be provided.

Process description along with chemical reaction, material balance, and process flow diagram is given in Section–2.7 of Chapter – 2.

2.11

Details of plant machineries are given in section – 2.9.5 of Chapter – 2.

2.20

IX Hazard identification and details of proposed safety systems.

Refer Section 7.3 and Table 7.4 7.2 & 7.8

X Expansion/modernization proposals: Copy of all the Environmental Clearance(s) including Amendments thereto obtained for the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment and Forest as per circular dated 30th May, 2012 on the status of

NA

Page 35: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 28

TOR. No.

TOR Condition Compliance status Page No.

compliance of conditions stipulated in all the existing environmental clearances including Amendments shall be provided. In addition, status of compliance of Consent to Operate for the ongoing/existing operation of the project from SPCB shall be attached with the EIA-EMP report. In case the existing project has not obtained environmental clearance, reasons for not taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification 2006 shall be provided. Copies of Consent to Establish/No Objection Certificate and Consent to Operate ( in case of units operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents form the SPCB shall be submitted.

4 Site Details I Location of the project

site covering village, Taluka/Tehsil, District and State, Justification for selecting the site, whether other sites were considered.

Details regarding location of the project site covering village, Taluka/Tehsil, District and State etc. is given in section 2.3 of Chapter - 2.

2.1

Justification of site selection is given in Section – 2.3.2 of Chapter – 2.

2.5

Page 36: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 29

TOR. No.

TOR Condition Compliance status Page No.

II A toposheet of the study area of radius of 10km and site location on 1:50,000/1:25,000 scale on an A3/A2 sheet. (Including all eco-sensitive areas and environmentally sensitive places).

Survey of India Toposheet is given wide Figure 2.4.

2.4

III Details w.r.t. option analysis for selection of site.

Refer Section 1.5 of chapter -1 & section 5.3 of chapter - 5

1.3 & 5.1

IV Co-ordinates (lat-long) of all four corners of the site.

NODE LATTITUDE LONGITUDE

A 23°25' 52.36"N 72°27'20.64"E

B 23°25'53.42"N 72°27'19.23"E

C 23°25'52.45"N 72°27'17.31"E

D 23°25'51.05"N 72°27'18.34"E

E 23°25'51.13"N 72°27'18.76"E

--

V Google map-Earth downloaded of the project site.

Google image showing nearby facilities in 1,5,10 km Radius study area of project site is given in Figure 2.2, 2.3, 2.6, 2.7

2.3, 2.8

VI Layout maps indicating existing unit as well as proposed unit indicating storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate.

Layout map showing location and size of proposed infrastructure facilities such as production area, raw material & product storage area, utilities & ETP area etc. is given wide Figure 2.9.

2.10

VII Photographs of the proposed and existing (if applicable) plant site. If existing, show photographs of plantation/greenbelt, in particular.

Refer Figure 2.5 of Chapter-2 for photographs of proposed plant site.

2.5

VIII Land use break-up of total land of the

Land use break-up of total land for proposed project site is given in Table 2-2.

2.9

Page 37: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 30

TOR. No.

TOR Condition Compliance status Page No.

project site (identified and acquired), government/private- agricultural, forest, wasteland, water bodies, settlements, etc shall be included. (Not required for industrial area).

Project site is an open area which is presently not being used for any purposes. N.A permission is attached as Annexure -2.

--

IX A list of major industries with name and type within study area (10km radius) shall be incorporated. Land use details of the study area.

List of major industries with type of production is given in Table 2.0.

2.6

Land use details of study area are given wide Table 3.26 & Figure 3.13.

3.56 to 3.57

X Geological features and Geo-hydrological status of the study area shall be included.

Refer Section 3.6 of Chapter – 3. 3.47

XI Details of Drainage of the project up to 5 km radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the project site and maximum Flood Level of the river shall also be provided. (mega green field projects).

There is no river in the near vicinity of project site. For drainage pattern please Refer Section 3.6 of Chapter – 3.

3.47

XII Status of acquisition of land. If acquisition is not complete, stage of the acquisition process and expected time of complete possession of the land.

Land is already acquired. Land documents attached as Annexure – 2.

--

XIII R&R details in respect of land in line with state Government policy.

Not applicable as this project is to be established on a non-agricultural land and no R&R is involved.

--

5 Forest and wildlife related issues (if applicable):

Page 38: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 31

TOR. No.

TOR Condition Compliance status Page No.

I Permission and approval for the use of forest land (forestry clearance), if any, and recommendations of the State Forest Department. (if applicable)

Not applicable as there is no forest land in 10 km study area.

--

II Land use map based on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha).

Land use details of the study area are given in Figure 3.13. There is no forest land involved in proposed project.

3.57

III Status of Application submitted for obtaining the stage I forestry clearance along with latest status shall be submitted.

Not applicable as there is no forest land in 10 km study area.

--

IV The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon.

Not applicable as there is no National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals in 10 km study area. Nearest Reserved forest is Indroda Dinosaur & fossil park – 32.91 Km in SSE direction. Nearest Sanctuary is Thol Bird Sanctuary – 31.80 km in South direction.

--

V Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of

Yes, Indian peafowl & Shikra are observed and conservation plan of the same & submission proof of CWLW is attached as Annexure – 9.

--

Page 39: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 32

TOR. No.

TOR Condition Compliance status Page No.

Schedule I fauna, if any exists in the study area.

VI Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the Standing Committee of the National Board for Wildlife

Not applicable -

6 Environmental Status I Determination of

atmospheric inversion level at the project site and site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall.

Site-specific primary meteorological data is attached as Annexure -4.

--

II AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant wind direction, population zone and sensitive receptors including reserved forests.

Baseline methodology for selection of ambient air quality monitoring locations is given in Section 3.1.3. Ambient air monitoring Locations are shown in table 3.4 and figure 3.3 of chapter – 3.

3.2, 3.9, 3.10

III Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM Notification of Nov. 2009 along with – min., max., average and 98% values for each of the AAQ parameters from data of all AAQ

Raw data of all AAQ measurement for 12 weeks of all stations along with – min., max., average and 98% values is given in Annexure –5 and table 3.8 of chapter – 3.

3.12

Page 40: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 33

TOR. No.

TOR Condition Compliance status Page No.

stations should be provided as an annexure to the EIA Report.

IV Surface water quality of nearby River (100 m upstream and downstream of discharge point) and other surface drains at eight locations as per CPCB/MoEF & CC guidelines.

It may be noted that there is no river in nearby vicinity. Refer Table 3.16, figure 3.9 and table 3.18 of Chapter – 3 for surface water quality monitoring locations and results.

3.27 3.31

V Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF & CC, if yes give details.

There is no such polluted stretch of river identified by the CPCB /MoEF & CC in study area of project site.

--

VI Ground water monitoring at minimum at 8 locations shall be included.

Refer Table 3.15, figure 3.8 and table 3.17 of Chapter – 3 for ground water quality monitoring locations & results.

3.26 3.28

VII Noise levels monitoring at 8 locations within the study area.

Noise level monitoring at 8 locations is given in Section –3.3.1.

3.18

VIII Soil Characteristic as per CPCB guidelines.

Soil characteristics are given in table 3.23 3.45

IX Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials, additional traffic due to proposed project, parking arrangement etc.

Existing traffic counts measured at a state highway – 41 within the study area is given in Section- 3.10 & 4.8

3.93, 4.27

X Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special reference to rare, endemic and endangered species. If Schedule-I fauna are found within the study area, a Wildlife Conservation Plan shall

Detailed description of flora and fauna is given in Section- 3.8 and wildlife conservation plan for Schedule-I fauna is attaché as Annexure - 9.

3.63

Page 41: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 34

TOR. No.

TOR Condition Compliance status Page No.

be prepared and furnished.

XI Socio-economic status of the study area.

Socio-economic status of study area is given in Section – 3.9.

3.75

7 Impact and Environment Management Plan I Assessment of ground

level concentration of pollutants from the stack emission based on site-specific meteorological features. In case the project is located on a hilly terrain, the AQIP Modelling shall be done using inputs of the specific terrain characteristics for determining the potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be assessed. Details of the model used and the input data used for modelling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any.

AQIP Modelling is not applicable as proposed unit is located in flat terrain. The input data for air quality model used are given in Section 4.5. Ground level concentrations plots (air quality contours) for PM10, SO2, NO2, using AERMOD View-9.0 is given wide Figure 4.1, 4.2 and 4.3 respectively. The predicted 24 hourly short term incremental concentrations for PM10, SO2

& NO2 are given wide Table 4.8, 4.9 and 4.10 respectively.

4.15

4.17

4.20

II Water Quality modelling – in case of discharge in water body

No wastewater will be discharged in surface water streams as ETP is zero liquid discharge; hence not applicable.

--

III Impact of the transport of the raw materials and end products on the surrounding environment shall be

Impact of air quality due to transportation of raw material is included in air quality modelling. For all the raw material and products road

Page 42: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 35

TOR. No.

TOR Condition Compliance status Page No.

assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor-cum-rail transport shall be examined.

transportation will be proposed, hence expansion on traffic load on SH-41 is assessed. Proposed expansion in traffic load on SH-41 is given in section 4.8.

4.27

IV A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment. Characteristics of untreated and treated effluent to meet the prescribed standards of discharge under E(P) Rules.

Water requirement, wastewater generation, waste water treatment, characteristics of untreated and treated effluent, and schematic diagram of effluent treatment scheme is given in Section 2.11.1 of Chapter 2.

2.21

V Details of stack emission and action plan for control of emissions to meet standards.

Details of flue gas stack along with details of measures proposed to meet emission standard are given in section 2.11.2.1 of Chapter - 2

2.26

VI Measures for fugitive emission control

Fugitive emission control measures are given in section 2.11.2.2 of Chapter - 2

2.28

VII Details of hazardous waste generation and their storage, utilization and management. Copies of MOU regarding utilization of solid and hazardous waste in cement plant shall also be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover techniques, Energy conservation, and

Details of hazardous waste generation and their storage, utilization and management is given wide Table 2-15 of Chapter – 2.

2.29

Page 43: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 36

TOR. No.

TOR Condition Compliance status Page No.

natural resource conservation.

VIII Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided.

Fly ash will be generated due to burning of fuel in steam boiler. It will be collected & sold to brick manufacturer units. The details are shown in section 2.11.3.1 of chapter - 2

2.29

IX Action plan for the green belt development plan in 33 % area i.e. land with not less than 1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a scheme for greening of the roads used for the project shall also be incorporated.

Approximately 300 nos. of trees will be planted in 1215.10 sq. mt. green belt area. For details please refer Section - 10.5 for Green Belt Development Plan.

10.10

X Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater from the roof tops and storm water drains to recharge the ground water and also to use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources.

Action plan for rainwater harvesting is given in Section - 10.6.

10.11

XI Total capital cost and recurring cost/annum for environmental pollution control measures shall be included.

Capital cost for Environment management will be 16.65 lakhs and recurring cost for Environment Protection per annum will be 25.62 lakhs Rs. The details are given in Table 10.3, 10.3A & 10.4.

10.15

XII Action plan for post-project environmental monitoring shall be submitted.

Action plan for post-project environmental monitoring is given in Table 6.1.

6.2

Page 44: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 37

TOR. No.

TOR Condition Compliance status Page No.

XIII Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan.

Refer Section 7.7.4 & 7.7.5 of Chapter – 7. 7.40 & 7.53

8 Occupational health I Plan and fund allocation

to ensure the occupational health & safety of all contract and casual workers

Plan to ensure occupational health & safety of all contract and casual workers is given in section 10.7. Fund allocation for occupational health & safety will be 1.06 lakhs. The detail is shown in table 10.3 A of Chapter - 10

10.12, 10.17

II Details of exposure specific health status evaluation of worker. If the workers’ health is being evaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG, during pre-placement and periodical examinations give the details of the same. Details regarding last month analysed data of above mentioned parameters as per age, sex, duration of exposure and department wise.

Unit will regularly carry out medical checkup

of the workers and will maintain records for

the same.

-

III Details of existing Occupational & Safety Hazards. What are the exposure levels of hazards and whether

There are no existing Occupational & Safety hazards as unit is still proposed. However, safety hazard is described in Table 7.4 of chapter 7 and Table 7.1 of chapter 7

7.8 7.3

Page 45: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 38

TOR. No.

TOR Condition Compliance status Page No.

they are within Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers can be preserved,

IV Annual report of health status of workers with special reference to Occupational Health and Safety.

Will be maintained. -

9 Corporate Environment Policy

I Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report.

At present, we have not laid down

environment policy. We will certainly lay

down such a policy.

--

II Does the Environment Policy prescribe for standard operating process /procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions? If so, it may be detailed in the EIA.

Our unit has yet not started production.

Nevertheless, we shall see to it that

Environmental Policy that we have frozen will

bring things into focus and any future issues

related to the environment.

--

III What is the hierarchical system or Administrative order of the company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system may be given.

Please refer in Section 10.3.3 of Chapter – 10.

10.2

IV Does the company have At present, we have not set-up such --

Page 46: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 39

TOR. No.

TOR Condition Compliance status Page No.

system of reporting of non-compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report

system. However, we shall definitely set up a system to report such issues to board of directors, shareholders as well as stakeholders.

10 Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase.

Workers including casual workers such as truck drivers will be provided with basic amenities like water supply, sanitation facilities, first aid, personal protective equipments, approach roads, communication etc.

--

11 Enterprise Social Commitment (ESC) I Adequate funds (at least

2.5 % of the project cost) shall be earmarked towards the Enterprise Social Commitment based on Public Hearing issues and item-wise details along with time bound action plan shall be included. Socio-economic development activities need to be elaborated upon.

As per MoEF&CC Office Memorandum F.NO. 22-67/2017-IA III, MoEF&CC, New

Delhi, dated on 1st May 2018 project proponent will earmark 2 % of capital investment (i.e., 2 % of 100 lakhs = Rs. 2 Lakh), towards the Corporate Environment Responsibility. For details of CER activities please refer Section 8.5.

8.2

12 Any litigation pending against the project and/or any direction/order passed by any Court of Law against the project, if so, details thereof shall also be included. Has the unit received any notice under the Section 5 of

Not Applicable. --

Page 47: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 40

TOR. No.

TOR Condition Compliance status Page No.

Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, details thereof and compliance/ATR to the notice(s) and present status of the case.

13 A tabular chart with index for point wise compliance of above TORs.

Complied. --

B SPECIFIC TERMS OF REFERENCE 1 Details on solvents to be

used, measures for solvent recovery and for emissions control

Not applicable as there will be no solvents used within premises.

--

2 Details of process emissions from the proposed unit and its arrangement to control

There will be no process gas emissions from the proposed unit.

--

3 Ambient air quality data should include VOC, other process-specific pollutants* like NH3*, Chlorine*, HCl*, HBr*, H2S*, HF*, etc. (* as applicable)

PM10, PM2.5, SO2, NO2, CO & VOCs have been monitored and results are presented in Table 3.8 of Chapter-3. Other pollutants are not applicable to this project.

3.12

4 Work zone monitoring arrangements for hazardous chemicals.

Register (Form no.37) for work zone air

monitoring will be done regularly after

getting the EC from concern authority.

--

5 Detailed effluent treatment scheme including segregation of effluent streams for units adopting ‘Zero’ liquid discharge

The proposed treatment scheme for industrial effluent is given in section 2.11.1.2 of Chapter - 2.

2.24

6 Action plan for odour control to be submitted

Refer section 10.4.2 of Chapter – 10 for requisite details.

10.5

7 A copy of the Memorandum of Understanding signed with cement manufacturers indicating clearly that

Not Applicable as there is no any organic hazardous waste will be generated from proposed project.

--

Page 48: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

TOR Compliance 41

TOR. No.

TOR Condition Compliance status Page No.

they co-process organic solid/hazardous waste generated

8 Authorization/Membership for the disposal of liquid effluent in CETP and solid/hazardous waste in TSDF, if any

Proposed unit will be “Zero” discharge unit.

So, CETP membership is not required and unit

will obtain member ship of SEPPL (Bhachau)

for hazardous waste disposal after getting EC

from concern authority.

9 Action plan for utilization of MEE/dryers salts

Not Applicable as unit will not propose MEE /

Spray dryer.

10 Material Safety Data Sheet for all chemicals that are being used/will be used

Attached as Annexure – 6. --

11 Authorization/Membership for the disposal of solid/hazardous waste in TSDF.

Unit will obtain member ship of SEPPL

(Bhachau) for hazardous waste disposal after

getting EC from concern authority.

--

12 Details of incinerator if to be installed.

Not applicable. --

13 Risk assessment for storage and handling of hazardous chemicals/solvents. Action plan for handling & safety system to be incorporated.

Please refer table 7-4 in Chapter 7. 7.8

14 Arrangements for ensuring health and safety of workers engaged in handling of toxic materials.

Please refer table 7-4 in Chapter 7. 7.8

Page 49: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 38

INDEX

CHAPTER

NO. CONTENT

PAGE

NO.

1 INTRODUCTION 1.1- 1.8

1.1 Preamble 1.1

1.2 Purpose of the EIA report 1.1

1.3 Promoters and their back ground 1.2

1.4 Need of the project and its importance in the country 1.2

1.5 Location of the proposed project and siting criteria 1.3

1.6 Scope of EIA study 1.6

1.7 Regulatory frame work 1.7

2 PROJECT DESCRIPTION 2.1-2.58

2.1 Preamble 2.1

2.2 Site History 2.1

2.3 Project Location 2.1

2.3.1. Photographs of Proposed Project Site 2.5

2.3.2. Justification of Site Selection 2.5

2.4 Salient features of the proposed project site 2.6

2.5 Proposed project land & plant lay-out 2.8

2.6 Capital cost of the proposed project 2.11

2.6.1 Schedule for approval & implementation 2.11

2.7 Manufacturing Process 2.11

2.7.1 Phenol Formaldehyde Resin 2.12

2.7.2 Urea Formaldehyde Resin 2.14

2.7.3 Melamine Formaldehyde Resin 2.16

2.8 Storage details of Raw Materials & Products 2.18

2.9 Requirement of Resources 2.19

2.9.1. Electricity / Power 2.19

2.9.2. Manpower 2.19

2.9.3. Water 2.19

2.9.4. Fuel 2.20

2.9.5. Plant, Machineries & Utilities 2.20

2.10 Energy Balance 2.20

2.11 Pollution Potential And Mitigation Measures 2.21

2.11.1 Water Pollution 2.21

Page 50: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 39

CHAPTER

NO. CONTENT

PAGE

NO.

2.11.1.1 Domestic wastewater (Sewage) Treatment and Disposal 2.24

2.11.1.2 Industrial wastewater Treatment and Disposal 2.24

2.11.2 Air Pollution 2.19

2.11.2.1 Flue Gas Emission 2.26

2.11.2.2 Fugitive Emission 2.28

2.11.3 Solid / Hazardous Waste 2.28

2.11.3.1 Fly Ash Management 2.29

2.11.4 Noise & Vibration 2.30

2.11.5 Potential Impacts & Mitigation Measures 2.30`

3 DESCRIPTION OF ENVIRONMENT 3.1-3.63

3.1 Introduction 3.1

3.1.1 Baseline Study Period 3.1

3.1.2 Baseline Study Area 3.2

3.1.3 Baseline Study Methodology 3.2

3.2 Air Environment 3.3

3.2.1 Micrometeorological Data 3.3

3.2.1.1 Meteorological Data from Secondary Sources 3.4

3.2.1.2 Primary Meteorology Data 3.7

3.2.2 Selection of AAQ Stations 3.9

3.2.2.1 Existing AAQ Status 3.9

3.2.2.2 Baseline Data Interpretation of AAQ of Study Area 3.12

3.2.3 Air Quality Index: 3.13

3.2.3.1 Objective of Air Quality Index: 3.13

3.2.3.2 Interpretation of Air Quality Index 3.13

3.3 Noise Environment 3.17

3.3.1 Existing Noise Levels 3.18

3.3.2 Baseline Status of Ambient Noise Quality 3.20

3.3.3 Baseline Data Interpretation of Ambient Noise Quality (Day

and Night Time)

3.21

3.4 Water Environment 3.22

3.4.1 Water Quality 3.22

3.4.1.1 Sample Collection and Analysis 3.22

3.4.1.2 Data Analysis 3.28

Page 51: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 40

CHAPTER

NO. CONTENT

PAGE

NO.

3.4.1.3 Baseline Data Interpretation of Ground Water Analysis 3.30

3.4.1.4 Baseline Data Interpretation of Surface Water Analysis 3.33

3.4.1.5 Water Quality Index 3.34

3.5 Soil Environment 3.42

3.5.1 Methodology of Sample Collection and Analysis 3.42

3.5.2 Baseline Data Interpretation of Soil Analysis 3.44

3.6 Geo-Hydrological Features 3.47

3.7 Land Use Status 3.53

(A) Data Used 3.53

(B) Methodology 3.54

(C) Interpretation of Remote Sensing Data 3.54

3.7.1 Topography 3.60

3.8 Ecology & Biodiversity 3.63

3.8.1 Collection of Secondary Data from EIA Coordinator and

Team

3.63

3.8.2 Primary and Field Data Collection with associate team 3.63

3.8.2.1 Vegetation and habitat survey 3.64

3.8.2.2 Wild animals, reptiles and bird’s population:

Assessment and Survey

3.64

3.8.3 Biodiversity Status 3.65

3.8.4 Biodiversity Status-Flora 3.65

3.8.4.1 Taxonomical Status 3.65

3.8.4.2 Status of Life Form 3.65

3.8.4.3 Common / Domestic Tree Species 3.67

3.8.4.4 Wild / Forest Tree Species 3.67

3.8.4.5 Status of Agriculture Crops 3.67

3.8.5 Biodiversity- Status of Fauna 3.68

3.8.5.1 Herpetofauna 3.68

3.8.5.2 Birds (Terrestrial and Aquatic) 3.69

3.8.5.3 Status of mammals 3.71

3.8.6 Threatened Plants and Animals and Conclusion Note 3.72

3.8.6.1 Conservation of Indian Peafowl 3.72

3.8.6.2 Conservation of Shikra 3.73

3.9 Socio Economic Environment 3.75

3.9.1 Introduction 3.75

3.9.2 Objective of the study 3.75

Page 52: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 41

CHAPTER

NO. CONTENT

PAGE

NO.

3.10 Traffic Survey 3.93

4 ENVIRONMENTAL IMPACTS & MITIGATION MAESURES 4.1- 4.19

4.1 Introduction 4.1

4.2 Impact Identification 4.2

4.3 Assessment of Impacts 4.5

4.4 Quantification of Impacts 4.8

4.4.1 Environmental Attributes & Relative Importance 4.8

4.4.2 Magnitude Criteria 4.9

4.4.3 Matrix Development 4.9

4.5 Air Quality Modelling 4.15

4.6 Mitigation Measures for Impacts on Environment during

Construction Phase

4.22

4.7 Mitigation Measure for Impacts on Environmental during

Operation Phase

4.23

4.8 Existing Traffic & Vehicular Pollution 4.26

5 ANALYSIS OF ALTERNATIVES 5.1-5.3

5.1 Preamble 5.1

5.2 Project Details 5.1

5.3 Site Alternatives 5.1

5.4 Alternative for Technologies 5.3

6 ENVIRONMENT MONITORING PROGRAM 6.1-6.3

6.1 Preamble 6.1

6.2 Environment Monitoring Program 6.1

6.3 Budget for Implementation of Environmental Monitoring Plan 6.2

6.4 Infrastructural Requirements 6.3

6.5 Documentation and Reporting 6.3

6.6 Corporate Environment Policy 6.4

7 ADDITIONAL STUDIES 7.1-7.42

A Public Consultation 7.1

B Risk Assessment Study 7.1

C Social Impact Assessment, R & R Action Plan 7.1

7.1 Risk Assessment 7.2

Page 53: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 42

CHAPTER

NO. CONTENT

PAGE

NO.

7.2 Risk Assessment Methodology 7.2

7.3 Hazard Identification and Risk Assessment (HIRA) 7.2

7.3.1 Hazard Identification Methods 7.3

7.3.2 Identification of Hazardous Chemicals used within

Premises

7.3

7.3.3 Storage Details of Raw Material and Products 7.6

7.3.4 Credible Accident Source/ Worst Case Scenarios 7.17

7.4 Consequence Modeling 7.17

7.4.1 Damage Criteria 7.17

7.4.2 Details of Model Used for Consequence Analysis 7.20

7.5 Estimation of Effect of Damage / Impact Identification 7.32

7.6 Summary 7.32

Proposed Risk Reduction Measures 7.33

7.7 Occupational Health Surveillance Program 7.35

7.7.1 Treatment Facilities Provided to Workers affected by

accidental Spillage of Chemicals

7.36

7.7.2 Minimization of the manual handling of hazardous

substance

7.37

7.7.3 DO’S and DON’T’S 7.37

7.7.4 Disaster Management Plan 7.39

7.7.4.1 Disaster 7.39

7.7.4.2 On-Site Emergency Plan 7.39

7.7.4.3 Site Plan of the Factory and Surrounding 7.40

7.7.4.4 Types of Overall Emergencies 7.40

7.7.4.5 Assessment of In-plant Hazards 7.41

7.7.4.6 Emergency Control System 7.42

7.7.5 Offsite Emergency Preparedness Plan 7.52

LDAR (Leak Detection and Repair) 7.58

8 PROJECT BENEFITS 8.1-8.3

8.1 Preamble 8.1

8.2 Employment Potential 8.1

8.3 Improvement in Physical & Social Infrastructure 8.1

8.4 Other Tangible Benefits 8.2

8.5 Corporate Environment Responsibility (CER) 8.2

Page 54: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 43

CHAPTER

NO. CONTENT

PAGE

NO.

9 ENVIRONMENTAL COST BENEFIT ANALYSIS 9.1

9.1 Environmental cost benefit analysis 9.1

10 ENVIRONMENTAL MANAGEMENT PLAN 10.1-10.13

10.1 Introduction 10.1

10.2 Objectives of Environmental Management Plan 10.1

10.3 Components of Environmental Management Plan 10.2

10.3.1 Environment Management System (EMS) 10.2

10.3.2 Environmental Health & Safety (EHS) 10.2

10.3.3 Environmental Management Cell (EMC) 10.2

10.4 Environmental Management Plan for Proposed Project 10.4

10.4.1 Environmental Management during Construction Phase 10.5

10.4.2 Environmental Management during Operation Phase 10.5

10.5 Greenbelt Development Plan 10.10

10.6 Rain Water Harvesting Scheme 10.11

10.7 Occupational Health Management Plan 10.12

10.8 Fire & Safety Management Plan 10.13

10.9 Cleaner Production Technologies 10.13

10.10 Budget for Environment Protection Measures 10.14

11 SUMMARY & CONCLUSION 11.1–11.4

11.1 Introduction 11.1

11.2 Air Environment 11.1

11.3 Water Environment 11.2

11.4 Noise Environment 11.2

11.5 Land/Soil Environment 11.2

11.6 Ecology & Biodiversity 11.3

11.7 Socio-Economic Environment 11.3

11.8 Conclusion 11.4

12 DISCLOSURE OF CONSULTANT ORGANIZATION 12.1-12.2

12.1 Declaration for Involvement in EIA study 12.1

12.2 Company Profile 12.2

Page 55: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 44

LIST OF TABLES

TABLE

NO. LIST OF TABLES

PAGE

NO.

1.1 Details of Proposed Product 1.1

1.2 Promoters and their Background 1.2

1.3 Sitting Criteria 1.5

1.4 Scope of the Study 1.6

1.6 Regulatory Frame Work 1.6

2.0 List of Major Industries near Project Site 2.6

2.1 Salient Features of the Proposed Project Site 2.6

2.2 Area Break-up of Project Site 2.8

2.3 Break-up of capital cost for Proposed Project 2.11

2.4 Details of Proposed Raw Material 2.18

2.5 Details of Proposed Products 2.19

2.6 Fuel Requirement 2.20

2.7 List of Plant, Machineries and Utilities 2.20

2.8 Energy Balance 2.21

2.9 Stream-wise Water Requirement & Wastewater Generation 2.22

2.10 Details of Effluent Treatment Plant Units 2.24

2.11 Technical details of Single Stage Forced Circulation Evaporator 2.24

2.12 Stream-wise Quality of Effluent 2.25

2.13 Details of Flue Gas Emissions 2.26

2.14 Details of Air Pollution Control System 2.26

2.15 Details of Hazardous waste Management 2.28

2.16 Portable Environmental Impacts and Mitigation Measure 2.29

3.1 Brief Baseline Planning 3.2

3.2 Meteorological Data Collection Period 3.4

3.3 Monthly Mean values of Meteorological Data (Secondary Data) 3.4

3.4 Ambient Air Monitoring Locations 3.10

3.5 Air – Parameters Analyzed and Sampling Duration 3.11

3.6 Ambient Air Quality – Methodology 3.11

3.7 Preservation Methods of Samples of Ambient Air 3.11

Page 56: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 45

TABLE

NO. LIST OF TABLES

PAGE

NO.

3.8 Ambient Air Monitoring Results (Baseline Period: (14-10-2020 to 4-

1-2021) 3.12

3.9 Rating of Ambient Air Quality 3.15

3.10 Baseline Status of Ambient Air Quality 3.16

3.11 Noise Monitoring Locations 3.19

3.12 Noise Level Monitoring Data (Day timings in Leq dB (A)) 3.20

3.13 Hourly Noise Data (Night timings in Leq dB (A)) 3.21

3.14 Preservation Chart for different parameters 3.23

3.15 Ground Water Monitoring Locations 3.26

3.16 Surface Water Monitoring Locations 3.27

3.17 Water Quality – Physio-chemical Analysis of Ground Water 3.28

3.18 Water Quality – Physio-chemical Analysis of Surface Water 3.31

3.19 Water Quality Index for Ground Water 3.34

3.20 Water quality classification based on WQI 3.37

3.21 Water Quality Index for Surface Water 3.38

3.22 Soil Sampling Location 3.44

3.23 Phsiochemical Parameters of the soil 3.45

3.24 General Geological Succession of the Basin Established by the ONGC 3.48

3.25 District wise status of ground water development in Gujarat(2011) 3.50

3.26 Land Use Land Cover Classification 3.56

3.27 Information of Field Survey 3.63

3.28 Taxanomic Status of plant species: M/s R P Polymer 3.65

3.29 A Life form Status of plant species: M/s R P Polymer 3.65

3.29 B Habitat-wise life form status of plant species: M/s R P Polymer 3.66

3.30 Common Tree Species: M/s R P Polymer 3.67

3.31 Wild/Forest Tree Species: M/s R P Polymer 3.67

3.32 List of Agriculture and Commercial Crop Species Recorded: M/s R P

Polymer

3.68

3.33 Taxanomical Status of Herpetofauna: M/s R P Polymer 3.68

3.34 Overall Status of Terrestrial and Aquatic Birds: M/s R P Polymer 3.69

3.35 Overall Status of Mammals: M/s R P Polymer 3.71

3.36 List of villages in 10 km radius of project site area 3.76

3.37 List of villages surveyed for primary data collection 3.79

3.38 Population Distribution in the Study Area 3.81

3.39 Literacy Status in the Study Area 3.84

3.40 Occupational Structure of the nearby villages of project site area 3.86

Page 57: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 46

TABLE

NO. LIST OF TABLES

PAGE

NO.

3.41 Basic amenities detail for study villages covered in 5 km radius 3.89

3.42 List of Abbreviations 3.91

3.43 Traffic Count Data 3.95

4.1 Impact Identification Matrix (Construction & Operation and Post

Operation Phase) 4.3

4.2 Assessment of Impacts 4.6

4.3 Environmental Attributes 4.8

4.4 The Activity-Impact Evaluation Matrix 4.10

4.5 Cumulative Impact Matrix 4.14

4.6 Details of Flue Gas Stacks 4.15

4.7 Expected Pollutants and its Emission Rate 4.15

4.8 Predicted 24 hourly short term incremental concentration of PM10 4.20

4.9 Predicted 24 hourly short term incremental Concentrations of SO2 4.20

4.10 Predicted 24 hourly short term incremental Concentrations of NO2 4.21

4.11 Construction Phase: Impacts & its Mitigation Measures 4.22

4.12 Operation Phase: Impacts & its Mitigation Measures 4.23

4.13 Assessment of Proposed Traffic Load 4.27

5.1 Proposed Technology Alternatives 5.3

6.1 Environmental Monitoring Program 6.2

6.2 Budget for Implementation of Environmental Monitoring Plan 6.3

7.1 Chemical and Physical Properties of Hazardous Chemicals and

products 7.3

7.2 Toxicity of Chemicals capable of producing MAHs [1] 7.6

7.3(A) Storage details of Raw Materials 7.6

7.3(B) Storage Details of Products 7.7

7.4 Identification of Hazards associated with Storage of Raw Materials 7.8

7.5 Identification of Process Hazards 7.14

7.6 Scenarios Considered for MCA Analysis (FOR ALOHA RUN

CHEMICAL)

7.17

7.7 Damage Due to Incident Radiation Intensities[2] 7.18

7.8 Radiation Exposure and Lethality 7.19

Page 58: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 47

TABLE

NO. LIST OF TABLES

PAGE

NO.

7.9 Consequence analysis and Damage Distance (Failure of raw material

storage tanks) 7.22

7.10 Types of Emergencies 7.40

7.11 Fire and Safety Equipment’s & its Cost 7.48

7.12 Off-site Action Plan 7.56

7.13 List of compounds applicable for LDAR 7.58

7.14 LDAR Compound 7.60

7.15 Equipment Component Counts & Uncontrolled VOC Emissions 7.61

7.16 Frequency of monitoring of leaks & schedule for repair of leaks 7.63

8.1 Action Plan for Corporate Environment Responsibility Activities 8.3

10.1 Details of Plant Species in Greenbelt 10.10

10.2 Details of Rain Water Harvesting 10.12

10.3 Budgetary allocation towards Environmental Management 10.14

Page 59: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 48

LIST OF FIGURES FIGURE

NO. LIST OF FIGURES

PAGE

NO.

1.1 Location of the project site 1.3

2.1 Index Map 2.2

2.2 Google Image showing surrounding 1,5,10 km radius area from the

project site

2.3

2.3 Google Image showing surrounding 500 m radius area from the

project site

2.3

2.4 Topo sheet showing surrounding 10 km radius area from the

project site

2.4

2.5 Photograph of the site visit 2.5

2.6 Key Plan & Plant Lay-out 2.7

2.7 Water Balance Diagram 2.17

2.8 Schematic Flow Diagram of Effluent Treatment Plant 2.18

3.1 Wind Rose Diagram of Entire Year (Secondary Source) 3.5

3.2 Photograph showing Automatic Weather Station installed near

project site

3.6

3.3 Map showing Ambient Air Quality Locations 3.7

3.4 Photograph showing Ambient Air Monitoring 3.8

3.5 Map Showing Noise Sampling Locations 3.14

3.6 Photograph showing Noise Measurement 3.14

3.7 Map showing ground water quality monitoring locations 3.17

3.8 Photograph showing ground water sample collection 3.17

3.9 Map showing surface water quality monitoring locations 3.20

3.10 Photograph showing surface water sample collection 3.20

3.11 Map showing Soil Sampling Locations 3.25

3.12 Photograph showing Soil Sample Collection 3.26

3.13 Ground Water Prospect Map 3.31

Page 60: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 49

FIGURE

NO. LIST OF FIGURES

PAGE

NO.

3.14 Land use and Land cover map of the 10 km radius study area 3.35

3.15 Satellite Image of the 10 km radius study area 3.36

3.16 Infrastructure Map of the 10 km radius study area 3.37

3.17 Topography Map of the 10 km radius study area 3.39

3.18 Photographs showing biodiversity status 3.41

3.19 Villages covered in 10 km Radius Area 3.52

3.20 Villages covered in Primary data collection 3.53

3.21 Photograph showing Socio-Economic Data Collection 3.53

3.22 Percentage of total population distribution 3.54

3.23 Percentage Distribution of Workers 3.56

3.24 Percentage Distribution of Literacy Levels 3.58

3.25 Image showing Traffic Surveying Location 3.62

3.26 Photograph showing Traffic Data Collection 3.62

4.1 Ground Level Concentration of PM10 4.15

4.2 Ground Level Concentration of SO2 4.16

4.3 Ground Level Concentration of NO2 4.17

7.1 Formaldehyde Toxic Dispersion (Threat Zone)

Weather Condition: Wind speed: 5 m/sec, stability class: D

7.17

7.2 Formaldehyde Toxic Dispersion (Threat Zone)

Weather Condition: Wind speed: 1.5 m/sec, stability class: f

7.17

7.3 Off-Site Emergency Plan 7.34

10.1 Environmental Management Cell 10.3

Page 61: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 50

LIST OF ANNEXURES

ANNEXURE

NO.

LIST OF ANNEXURES

1 TOR Letter issued by MoEF&CC, New Delhi

2 Land possession document including NA permission

3 CGWA Permission

4 Meteorological data

5 Baseline Monitoring Reports

6 MSDS of Raw materials & Products

7 NABET Accredited certificate

8 NABL Accredited certificate

9 CWLW submission proof & Schedule – 1 conservation plan

10

11

12

13

Ecology Annexure

Baseline Network design

Socio ecology datasheet

EC- NOC

Page 62: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.1

CHAPTER - 1 INTRODUCTION

1.1 Preamble

MM//ss.. RR PP PPoollyymmeerr is a proposed unit which wants to manufacture Resins (Phenol

Formaldehyde Resin, Melamine Formaldehyde Resin & Urea Formaldehyde Resin) at Survey No.

626, Village: Jornanag, Taluka & District : Mehsana, Gujarat – 382732. Production details of the

proposed project are given below;

Table 1.1 Proposed Product Details

Sr. No. Name of Product Capacity

MT per Month CAS No.

1 Phenol Formaldehyde Resin 200 9003-35-4

2 Melamine Formaldehyde Resin 700 82115-62-6

3 Urea Formaldehyde Resin 20 9011-05-6

TOTAL 920 --

1.2 Purpose of the EIA Report

Development of industry in India has increased economic growth and improved living

standards of people. The economic growths are achieved through industrialization,

infrastructure development. Industrialization has played a major role in country development.

Industrialization has many other advantages. Although the development of industry leads to

rapid consumption of natural resources, fuel etc. in day to day operational activity. These will

deteriorate resources and increase emissions of waste in terms of solid, liquid and gas. To

control the environment pollution from industrial activity, the Government has framed

regulations which are governed by MOEF&CC in India.

It may be noted that the proposed products (Resins) namely Phenol Formaldehyde Resin,

Melamine Formaldehyde Resin and Urea Formaldehyde Resin (being synthetic organic

chemicals) falls under Category 5(f) as stated in Environment Impact Assessment Notification

Published on 14th September, 2006 and not fall into Small Industrial Unit criteria as per the

Notification dated 25th June 2014. Further, the proposed project location is outside the notified

industrial estate. So, project proponent has to obtain the Environmental Clearance from the

Ministry of Environment & Forests & Climate Change, New Delhi.

As per requirements of the notification, an application was submitted to MoEF&CC on 30th

March, 2020 along with Form-1, PFR and draft TOR. Subsequently the Committee has issued the

Page 63: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.2

Standard TOR wide letter No. IA-J-11011/93/2020-IA II (I) dated 19th May, 2020. Basis on the

TOR points issued by MoEF&CC, an Environmental Impact Assessment (EIA) report has been

prepared covering all aspects of the TOR points.

The purpose of the preparation of Environment Impact Assessment (EIA) report is to obtain

Environment Clearance from Ministry of Environment & Forests & Climate change, Govt. of

India, New Delhi and to understand the present environment of the project site along with its

surroundings and to provide Environment Protection measures to the likely impacts during

construction of the project and after commissioning of the project.

1.3 Promoters and their background [Ans to TOR no.2 (II)]

Table 1.2 Promoters and their background

1.4 Need of the Project & Its Importance to the Country. [Ans. to TOR no.2 (III)]

The cost of proposed project is approximately Rs. 1 Crore. Proposed project will manufacture

synthetic organic chemicals (resins) namely Phenol Formaldehyde Resin, Melamine

Formaldehyde Resin and Urea Formaldehyde Resin with total production of 920 MT/Month

which will be manufactured within the industry for sale purposes.

Phenol Formaldehyde resin is used in many of the industrial products. Phenolic laminates are

made by impregnating one or more layers of a base material such as paper, fiberglass or cotton

with Phenol Formaldehyde resin and laminating the resin-saturated base material under heat as

well as pressure.

Melamine Formaldehyde resin is a hard, thermosetting plastic material which is made from

Melamine and Formaldehyde by polymerization. It is then used to cross-link with alkyd, epoxy,

acrylic, and polyester resins used for surface coatings. Melamine resin is often used to saturate

decorative paper that is laminated under heat and pressure and then pasted onto particle board;

the resulting panel is often called melamine and commonly used in ready-to-assemble furniture

and kitchen cabinets.

Urea Formaldehyde resin is used in many manufacturing processes like decorative laminates,

cotton blends, foundry sand molds, textiles, paper wrinkle resistant fabrics and rayon due to its

useful properties. It is used to glue wood together. Urea formaldehyde resin was commonly used

to produce electrical appliances casing.

Sr. No.

Name of the Proponent Age

(yrs.) Mobile No.

Educational qualification

Experience Yrs.

1 Pankajbhai Dahyabhai

Patel 35 9726060505 12th Pass

18 years Industrial

experience

2 Rohitsinh Chanduji

Rathod 45 8160167421 12th Pass

10 years Industrial

experience

Page 64: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.3

In India, particularly in Gujarat good quality raw materials are available at cheap rates, enabling

the manufacturing process at low cost. This increases the margin of profit as compared to other

manufacturers in the world. The project proponent intends to establish the new unit to meet the

current and future market demand.

The proposed unit will contribute revenue to the State & Central exchequer in the form of GST for

inter-state movement, corporate taxes etc. Indirect contribution to the Central & State exchequer

will be there due to Income by way of registration of trucks, income tax from individual as well as

taxes from associated units. Thus, the proposed unit will help the Government by paying different

taxes from time to time, which is a part of revenue and thus, will help to develop the area. In the

foreign market demand of the products is also significant, which will boost the export potential of

the company as well as the country. Export oriented units plays vital role in economy

development and local physical infrastructure for further boosting of industrial development

with sustainable approach as the industries need to maintain good environment & safety

condition to get better foreign market.

1.5 Location of the Proposed Project & Siting Criteria Ans. to TOR no.4 (III) & (IV)

The proposed project site is located at Survey No. 626, Village: Jornang, Taluka & District :

Mehsana, Gujarat - 382732.

Fig. 1.1 Location of the Project site

Source: Satellite Image (Google Earth)

N

Page 65: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.4

Bounded Latitude & Longitude :

A 23°25' 52.36"N to C 23°25'52.45"N

E 23°25'51.13"N to B 23°25'53.42"N

The proposed project site falls in the Mehsana District of Gujarat State and Project proponent is

very well familiar with the surrounding environment & manufacturing of resin products;

therefore, it becomes easy for the project to set up the proposed project on the above said

location. The proposed project, apart from direct and indirect employment generation and

various business opportunities will bring an overall up-liftment of the area and will ultimately

result in complete socio-economic and infrastructure development. The other features are

briefly summarized hereunder:

Total availability of adequate land is 3,612 m2.

All basic facilities like infrastructure, communication, transportation, medical facilities,

fuel, power, water, unskilled, raw materials, skilled manpower and road network etc.

Market is nearby;

Nearest city Mehsana is 18.15 km away from the project site and well connected with

other parts of the state by road & rail;

Raw materials, consumer centers and infrastructure facilities like power, water,

communication facilities are nearby;

Rehabilitation & Resettlement will not be required;

No national park or wildlife Habitats falls within 10 km radial distance from project site.

The location of project is best suited to start the proposed activities of manufacturing resin.

Hence no alternative for site is analyzed.

The sitting criteria of the project as per the guidelines are given in the Table 1.3;

NODE LATTITUDE LONGITUDE

A 23°25' 52.36"N 72°27'20.64"E

B 23°25'53.42"N 72°27'19.23"E

C 23°25'52.45"N 72°27'17.31"E

D 23°25'51.05"N 72°27'18.34"E

E 23°25'51.13"N 72°27'18.76"E

Page 66: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.5

Table 1.3 Sitting Criteria

Details Requirement Compliance

Forest No forest land shall be converted into non-forest activity for the sustenance of the industry (Ref: Forest Conservation Act, 1980).

Forest land is not involved in the proposed project site and details of environmental sensitive receptor given in section 2.4 of chapter 2.

Agricultural land No prime agricultural land shall be converted into industrial site.

Proposed project site is utilizing for manufacturing of Resins. NA permission is obtained and is attached as Annexure – 2.

Layout Enough space should be provided for storage area, plant area, greenbelt area, Utilities, Raw material storage, Fly ash, other storage like solid wastes so that these could be available for possible reuse.

The total acquired land is 3,612 m2. There will be provision of enough space according to the requirement. Area can be verified from the plant lay-out given in Chapter-2.

Major settlements (3,00,000 population):

At the time of siting of the industry, if the notified limit of any major settlement is found to be within 50 km from the project boundary, the spatial direction of growth of the settlement for at least a decade must be assessed.

Nearest Major habitation is Mehsana which is about 18.15 km away from the project site in NNW direction. Mehsana population is 1.85 Lakhs.

Ecologically / Sensitive zones

Preferably 5 km depending on the geo-climatic conditions the requisite distance may be decided appropriately by the Environmental agency.

None within 10 km radius. Thol bird sanctuary is 31.80 km away from the project site in South direction

Transport/ Communication System

Preferably 0.5 km. away from highway and railway line.

National Highway 8C is at 30 km distance from the project site in SSE direction. State highway 217 is at 4.1 km distance from the project site in ENE direction. Ambaliyasan railway station is 3.65 km in WNW direction from the project site.

Coastal areas Preferably ½ km away from high tide line (HTL).

There is no coastal area within 10 km radius from the project site

Flood plain of the river line system

Preferably ½ km away from flood plain or modified flood plain affected by dam in upstream or flood control system.

There is no river within 10 km radius from the project site

Page 67: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.6

1.6 Scope of the EIA Study

The scope of the EIA study is based on the guideline provided by Ministry of Environment,

Forests & Climate Change (MoEF & CC), Government of India for structure of environmental

impact assessment document. The scope of the study broadly includes:

Field sampling of environmental attributes at various representative locations in the

study area to establish the baseline status.

Collect, compile & assess secondary data including socioeconomic data.

Identification, assessment and evaluation of the beneficial and adverse impacts on

surrounding environment due to proposed project activities considering the existing

baseline status along with compilation of other information.

Analysis of project proposal and data analysis.

Assessment of pollution potential due to proposed project.

Predict the incremental levels of pollutants in the study area due to the proposed project.

Evaluate the predicted impacts on the various environmental attributes by using

scientifically developed and widely accepted models.

Identification and assessment of risks associated with the proposed project and their

appropriate management through proper Risk Assessment (RA) and Disaster

Management Plan (DMP).

Prepare an Environmental Management Plan (EMP) to mitigate the predicted impacts.

Identify critical environmental attributes required to be monitored during the project

execution and to suggest post project monitoring.

As per the guidelines, the Generic structure of EIA given in EIA notification dated 14th

September, 2006 and subsequent amendments are maintained. The scope of baseline

environment study based on MoEF&CC / CPCB guidelines is tabulated below;

Table 1.4 Scope of the Study

Environmental

Attributes No. of

Locations Observations

Meteorology 1 Hourly observations for Temperature, Relative Humidity, Wind direction, wind speed & Rain fall during 3 month study period using Automatic Weather Station nearby project site.

AAQ 8 AAQ parameters PM10, PM2.5, SO2, NO2, CO and VOC have been monitored at 8 locations within 10 km radius of the project site.

Water 8 (GW) & 8 (SW)

Surface water samples were collected from 8 locations like juni shedhavi, navi shedhavi, dangarva pond, vadasma pond, langhanaj pond, akhaj pond, chaluva pond and dhanpura pond. Ground water samples were collected from 8 locations like Nearby project site, juni shedhavi, navi shedhavi, Dangarva, Vadasma, Langhnaj, Karjisan and mandali. Samples have been analyzed for Parameters as per IS: 10500:2012, Water Quality Criteria prescribed by CPCB.

Page 68: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.7

Noise 8 Day time and night time noise levels were measured once at each location

Soil 8 Soil samples were taken from all the 8 locations and have been analyzed for pH, EC & other parameters

Ecology Flora-Fauna & Ecosystem

Major flora was enumerated and the possibility habitation for important species in the site. Fauna was listed based on the primary & secondary information.

Socio-economic data

Demography & Occupational details

Primary data was collected within 5 km study area during baseline monitoring. Secondary data for demography, Occupation, literacy and amenities have been considered for villages covered in the 10 km radius study area from the project site and the secondary data has been taken from Census 2011.

1.7 Regulatory Frame Work The proposed project is of synthetic organic chemical manufacturing unit; so the regulatory

framework related with the hazardous or toxic chemicals as well as regulatory provision of risk,

emergency & safety management are applicable to the proposed project. The regulatory

provision related to the hazardous chemical handling, manufacturing, storage & transportation

are also applicable to the proposed project. The project will have potential of pollution and also

attracts the provisions of EIA notifications 2006 - SO 1533 (as amended). So, the proposed

project may be required to comply with many regulatory provisions.

The project proponent shall follow the regulatory frame work as listed below and additional

applicable provision shall also be referred timely as cited as mandatory provision for proposed

unit. In any case, proponent shall comply with the regulatory provision as directed through

particular regulatory provision. The major regulatory provisions applicable to the proposed

project are shown here:

Sr. No. Legal Instrument (Type, Ref., Year)

Concern Authority or Bodies Applicability

1 Air (Prevention and Control of Pollution) Act, 1981 and its subsequent amendments

CPCB and SPCB Air emission from stack attached

to Boiler. The project proponent will obtain CC& A after obtaining EC from concern authority.

2 Water (Prevention and Control of Pollution) Act, 1974 and its subsequent amendments

CPCB and SPCB Wastewater generation from industrial activities and from domestic activities. The project proponent will obtain CC& A after obtaining EC from concern authority.

4 The Environment (Protection) Act, 1986 & Environmental (Protection) Rules, 1986 and their subsequent amendments

Ministry of Environment and Forests, & Climate Change (MoEF&CC), CPCB and SPCB.

Production of Synthetic Organic Chemicals (P. F., M. F. & U. F. Resin). The project proponent will obtain CC& A after obtaining EC from concern authority.

5 Hazardous and Other MoEF&CC, CPCB, SPCB, DGFT, Generation of Solid & Hazardous

Page 69: PROPOSED SYNTHETIC ORGANIC CHEMICALS (RESIN) MANUFACTURING

Environmental Impact Assessment Report for Proposed Manufacturing Unit

M/s. R P Polymer Survey No.: 626, Village: Jornang;

Taluka & District: Mehsana, Gujarat – 382732.

T. R. Associates, Ahmedabad NABET Accredited

Chapter - 1: Introduction 1.8

Sr. No. Legal Instrument (Type, Ref., Year)

Concern Authority or Bodies Applicability

Wastes (Management and Transboundary Movement) Rules, 2016

Port Authority and Customs Authority

Wastes from industrial activities.

6 Manufacture Storage and Import of Hazardous Chemicals Rules, 1989 amended 2000

MoEF&CC, Chief Controller of Imports and Exports, CPCB, SPCB, Chief Inspector of Factories, Chief Inspector of Dock Safety, Chief Inspector of Mines, AERB, Chief Controller of Explosives, District Collector or District Emergency Authority, CEES under DRDO

Unit will take safety precautions for storage of hazardous chemicals identified under MSIHC Rules 1989. And the safety aspects are considered during Plant layout. It can be seen in Plant layout shown in Chapter 2.

7 Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996

Ministry of Environment & Forests & Climate Change, Chief Controller of Imports and Exports, CPCB, SPCB/UTPCC, Chief Inspector of Factories, Chief Inspector of Dock Safety, Chief Inspector of Mines, AERB, Chief Controller of Explosives, District Collector or District Emergency Authority, CEES under DRDO.

Storage of hazardous chemicals within the project premises.

8 EIA Notification, 2006 and its subsequent amendments

MoEF&CC, SPCB Production of Synthetic Organic Chemicals (P. F., M. F. & U. F. Resin)

9 Public Liability Insurance Act, 1991 amended 1992 & Public Liability Insurance Rules, 1991 and its subsequent amendments

MoEF&CC, District Collector Industrial unit will manufacture chemical products and employment of 10 workers

10 The Factories Act, 1948 Ministry of Labor, DGFASLI and Directorate of Industrial Safety and Health/Factories Inspectorate

Industrial unit will apply to DISH (Director industrial Safety and Health), Gujarat after getting Environmental Clearance.

11 The Explosive Act ,1884 Ministry of Commerce and Industry (Department of Explosives)

Not Applicable

12 Noise Pollution (Regulation and Control) Rules, 2000 and its amendments

CPCB and SPCB Noise may be generated due to industrial activities

T. R. Associates – NABET Accredited Consultant was appointed by M/s. R P Polymer to

carry out the Environmental Impact Assessment study for their proposed project.