PROPOSED OUTAGE OF GENERATING STATIONS for the 138th
OCC MEETING ANNEXURE 1
NTPC-NCR
स्टेशन /
Station
इकाई
/ Unit
क्षमता / Capacity
(MW)
अवधि / Period दिन /
Days दटप्पणी / Remarks
से / From तक / To
दादरी गैस / Dadri-Gas
GT-2 130.19 08-09-2017 12-09-2017 5 4000 EOH inspection
GT-1 130.19 21-09-2017 27-09-2017 7 8000 EOH inspection
फरीदाबाद / Faridabad
GT-1 137.75 15-09-2017 19-09-2017 5 4000 EOH inspection
दादरीकोल 2 / Dadri-Coal-
1 #-4 210 17-08-2017 10-09-2017 25 Boiler O/H (already
approved in 137th OCC)
NTPC-NR
Station/Unit/Capacity Period Remarks
From To Schedule O/H Days
Rihand/U#3/500 MW 09.08.17 19.08.17 10 days Boiler +APH’s Seal setting+ Expansion Joint replacement. .
Rihand/U#2/500 MW 04.09.17 13.09.17 09 days Boiler over haul+ APH’s Seal +Expansion Joint replacement.
Unchahar/U#1/210 MW 20.09.17 14.10.17 25 Boiler + TG Bearing Inspection.
RRVUNL
Station/Unit/Capacity Period Remarks
From To Schedule O/H Days
KSTPS,KOTA/U#2/110 MW
7.9.17 21.9.17 10 days Annual overhaul
KSTPS,KOTA/U#7/195 MW
22.09.17 6.10.17 09 days Annual overhaul.
CTPP,CHHABRA/U#1/250 MW
16.09.17 11.10.17 25 Annual maintenance & overhaul& NFT & MPI of Turbine
PROPOSED OUTAGE OF LINES UNDER NLDC PERSPECTIVE OF THE MONTH OF 9/2017 FOR 138th OCC MEETING ANNEXURE 2A
Request By Element Name Owner Name
Mode Reasons From Date
From Time
To Date To
Time Remarks
Request Detail
1 SLDC_RAJASTHAN
[ RAJASTHAN ] ANTA-PHAGI-
1(765 kV) Rajasthan Daily stability test for spare reactor at Anta End 16-9-17 9:00 16-9-17 20:00 -
2 SLDC_RAJASTHAN
[ RAJASTHAN ] ANTA-PHAGI-
2(765 kV) Rajasthan Daily stability test for spare reactor at Anta End 20-9-17 09:00 20-9-17 20:00 -
3 POWERGRID
[ DELHI ] Balia-Patna Ckt-
3(400 kV) Power grid Daily
For Fire Fighting erection works of Line
Reactor , at Balia 20-9-17 09:00 22-9-17 17:00 -
4 POWERGRID
[ DELHI ] Balia-Patna Ckt-
4(400 kV) Power grid Daily
For Fire Fighting erection works of Line
Reactor, at Balia 25-9-17 09:00 27-9-17 17:00 -
5 POWERGRID
[ DELHI ] Agra – Fatehpur
Line 2(S/C) Power grid Cont.
For Diversion work due to DFCC work. at
Agra 25-9-17 09:00 30-9-17 18:00
6 POWERGRID
[ DELHI ]
800 kV HVDC Champa
Kurukshetra Pole -I Power grid Daily
1. For software integration & remaining Construction & Testing activities on Bi
pole. 2. DC Filter erection on
Pole 1 and Pole 2 & other construction related
activities.
5.09.2017 09:00 7.09.17 18:00
7
POWERGRID [ DELHI ]
Agra-VNC HVDC Pole-I(800 kV) Power grid Daily
Sealing work for Pole-4 DC Hall (Pole-2) , at
Agra HVDC 1-9-2017 08:00 1-9-17 18:00 -
REMARK S.N.
NAME OF
REQUESTING AGENC
Y
LINE DETAILS
DAILY/ CONTINUOUS
REASON
PROPOSED DATE AND TIME
VOLT LEVEL (KV)
FROM S/S TO S/S CKT
ID OWNER INTER/ INTRA REGIONAL
FROM TO
DATE TIME
DATE TIME
8 PGCIL 765 GWALIOR PHAGI I PGCIL Intra DAILY
S/D to attend CC ring. Spacer, Bird Guard & Jumper tightening etc
5-9-17 8:00 6-9-17 19:00
9 PGCIL 765 GWALIOR PHAGI II PGCIL Intra DAILY
S/D to attend CC ring. Spacer, Bird Guard & Jumper tightening etc
7-9-17 8:00 8-9-17 19:00
10 PGCIL 765 BHIWANI PHAGI I PGCIL Intra Daily
Commission--ing of CSD for L/ R & NGR Bypass scheme at Bhiwani. Radiator oil leakage at Phagi. CC ring, Spacer, BG, Jumper tightening. Rescheduled-137OCC.
11-9-17 8:00 12-9-17 19:00
11 PGCIL 765 BHIWANI PHAGI II PGCIL Intra Cont
Commission-ing of CSD for L/ R & NGR Bypass scheme at Bhiwani. CC ring, Spacer, BG, Jumper tightening. Rescheduled-137OCC.
14-9-17 8:00 15-09-17 19:00
12 PGCIL 765 AGRA JHATIKRA I PGCIL Intra Daily
S/D to attend CC ring. Spacer, Bird Guard & Jumper tightening etc
18-9-17 8:00 19-09-17 18:00
12** PGCIL 765 KANPUR JHATIKRA I PGCIL Intra Daily
S/D to attend CC ring. Spacer, Bird Guard & Jumper tightening etc
12-9-17 8:00 15-09-17 18:00
PROPOSED OUTAGE OF TRANSMISSION LINES FOR THE MONTH OF 9/2017 FOR 138th
OCC MEETING ANNEXURE 2B
SNO Request By Element Name Owner Name Mode Reasons From Date
From Time
To Date To
Time
Request Detail
1 POWERGRID [ DELHI ] Agra-Fatehpur (400 kV) Power grid Continuous For Diversion work due to DFCC work at Agra 25-9-17 09:00 30-09-17 18:00
2 POWERGRID [ DELHI ] Agra-Bhiwadi 1(400 kV) Power grid Continuous Retro fitment of PLCC panels at Both End, at
Agra
07-09-2017 09:00 08-09-17 18:00
3 POWERGRID [ DELHI ] Agra-Bhiwadi 2(400 kV) Power grid Continuous 09-09-2017 09:00 10-09-17 18:00
4 POWERGRID [ DELHI ] Fatehpur-Kanpur-1
(400 kV) Power grid Daily
For AMP of Line Side Equipments , at
Fatehpur 01-09-2017 09:30 01-09-17 18:00
5 POWERGRID [ DELHI ] Auraiya(NTPC)-
Sikandra(UP) 1 (220 kV) Power grid Continuous Retro fitment of PLCC panels at Both End at
Agra
04-09-2017 09:00 05-09-17 18:00
6 POWERGRID [ DELHI ] Auraiya(NTPC)-
Sikandra(UP) 2 (220 kV) Power grid Continuous 04-09-2017 09:00 05-09-17 18:00
7 POWERGRID [ DELHI ]
Agra(PG)-Auraiya(NTPC) 1
(400 kV) Power grid Daily Stringing for Crossing
of 765kV D/C Orai-Aligarh TL, TE07
between Towers Loc. Nos. AP 74-AP 75 at
Orai
20-09-2017 07:00 21-09-17 18:00
8 POWERGRID [ DELHI ]
Agra(PG)-Auraiya(NTPC) 2
(400 kV) Power grid Daily 20-09-2017 07:00 21-09-17 18:00
9 POWERGRID [ DELHI ] Fatehpur-Kanpur 2
(400 kV) Power grid Continuous
Isolator 40489L -replacement work under Add Cap.
Scheme at Kanpur 15-09-2017 09:00 19-09-17 17:00
10 POWERGRID [ DELHI ] Kanpur(PG)-Panki(UP)
2(400 kV) Power grid Continuous
Isolator 40689L and Line CVT replacement
work at both ends, under Add Cap. at
Kanpur 21-09-2017 09:00 27-09-17 17:00
11 POWERGRID [ DELHI ] Kishenpur-New Wanpoh
- 2 (400 kV) Power grid Daily
For erection of Dead End Tower of LILO
portion for making LILO of Kishenpur New. Wanpoh ckt-II at
Baglihar. Tower is falling in the induction
zone. 20-08-2017 08:00 30-08-17 19:00
12 POWERGRID [ DELHI ] Kanpur(PG)-Panki(UP)
1(400 kV) Power grid Continuous
Isolator 40389L and Line CVT replacement
work at both ends under Add Cap.
Scheme , at Kanpur 07-09-2017 09:00 13-09-17 17:00
13 POWERGRID [ DELHI ]
Salal(NHPC)-Kishenpur(PG) 2
(220 kV) Power grid Daily
For AMP Works and replacement of broken
Insulators. 08-09-2017 09:00 08-09-17 17:00
14 POWERGRID [ DELHI ] Fatehabad- Moga
(400 kV) Power grid Daily For AMP works. 13-09-2017 08:00 13-09-17 18:00
15 POWERGRID [ DELHI ]
Abdullapur-Karchamwangtoo 1
(400 kV) Jaiparkash Power Venture Limited Continuous
For carrying out balance stringing work for Loop in and Loop
out of 400 kV Karcham Wangtoo- Abdullapur ckt I at upcoming Kala
Amb Sub Station. 18-09-2017 07:00 20-09-17 18:00
16 POWERGRID [ DELHI ]
Abdullapur-Karchamwangtoo II
(400 kV) Jaiparkash Power Venture Limited Continuous
For carrying out modifications of cross
arms & balance stringing work for Loop in and Loop out of 400 kV Karcham Wangtoo-
Abdullapur ckt-II at upcoming Kala Amb
Sub Station. 21-09-2017 07:00 23-09-17 18:00
17 POWERGRID [ DELHI ] Varanasi-Sarnath(UP) 400 KV Power grid Daily
Providing of OPGW connectivity of Varanasi(S/S) (GIS) via Allahabad and Sasaram
22-9-17 9:00 22-9-17 15:00
18 POWERGRID [ DELHI ]
Lucknow-Kanpur Line-1(D/C) 400KV Power grid Daily
Completion of balance work of 400KV Lucknow(New)-Kanpur(GIS) Line-1&2 BAYS ,at Lucknow
4-9-17 9:00 5-9-17 17:00
19. POWERGRID [ DELHI ]
Lucknow-Kanpur Line-2(D/C) 400KV Power grid Daily 7-9-17 9:00 8-9-17 17:00
20 POWERGRID [ DELHI] 400KV BHIWADI-
HISAR-I Power grid Daily Amp Works 11-9-17 8:00 12.-9-17 8:00
21 POWERGRID [ DELHI] 400KV BASSI-SIKAR-I Power grid Daily . For CC ring. Spacer,
VD, Bird Guard & Jumper tightening etc.
18-9-17 8:00 19-9-17 19:00
22 POWERGRID [ DELHI ] 400KV BASSI-SIKAR-II Power grid Daily 20-9-17 8:00 21-9-17 19:00
23 POWERGRID [ DELHI ]
400KV BASSI-JAIPUR(S)-I Power grid Daily
For CC ring. Spacer, VD, Bird Guard &
Jumper tightening etc.
25-9-17 8:00 25-9-17 19:00
24 POWERGRID [ DELHI ]
400KV BASSI-JAIPUR(S)-II Power grid Daily 27-9-17 8:00 27-9-17 19:00
25 POWERGRID [ DELHI ] 400KV BASSI-
KOTPUTLI Power grid Daily
For CC ring. Spacer ,VD, Bird Guard &
Jumper tightening etc 28-9-17 8:00 28-9-17 19:00
26 POWERGRID [ DELHI ] 400KV GURGAON-
MANESAR-I Power grid Daily AMP line work & bays 5-9-17 8:00 5-9-17 18:00
27 POWERGRID
[ DELHI ] 400KV GURGAON-
MANESAR-II Power grid Daily AMP line work & bays 9-9-17 8:00 9-9-17 18:00
28 POWERGRID [ DELHI ] 400KV KANKROLI-
BHINMAL Power grid Daily
For End to end testing of PLCC after retro
fitment. 13-9-17 9:00 13-9-17 18:00
29 POWERGRID [ DELHI ] 400KV KANKROLI-
JODHPUR Power grid Daily
Replacement of Disc insulators with polymer insulators in complete
line 15-9-17 8:00 15-9-17 18:00
30 POWERGRID [ DELHI ] '400KV AGRA-BLBGRH Power grid Cont.
For Line diversion work under DFCC. During S/D,
02 No’s tower to be erected out of 03 No’s
tower after that stringing of the new section shall
be taken up Date
Rescheduled from
137OCC. 25-8-17 9:00 3-9-17 18:00
31 POWERGRID [ DELHI ] 400KV BLBGRH-
MAINPURI-I Power grid Cont.
For Line diversion work under DFCC. During S/D, 02 No’s tower to be erected out of 04
No’s tower after stringing of the new
section shall be taken up. Date Rescheduled
from 137OCC.
8-9-17 9:00 22-9-17 18:00
32 POWERGRID [ DELHI ] 400KV BLBGRH-
MAINPURI-II Power grid Cont.
For Line diversion work under DFCC. During S/D, 02 No’s tower to be erected out of 04
No’s tower after stringing of the new
section shall be taken up. Date Rescheduled
from 137OCC.
8-9-17 9:00 22-9-17 18:00
33 POWERGRID [ DELHI ] 400 KV BAWANA-
MANDOLA-II Power grid Daily
For excavation of foundation for Series reactor Bay equipments.
1-9-17 8:00 1-9-17 17:00
34 POWERGRID [ DELHI ]
'400KV MURADNAGAR-
DADRI-I Power grid Daily
For replacement of R-phase jack bus jumper
to attend hot spot in yoke plate at
Muradnagar end.
12-9-17 9:30 12-9-17 17:30
35 POWERGRID [ DELHI ]
400KV GURGAON-DAULTABAD-II
(with associated bay (409) at Gurgaon)
HVPNL Daily AMP works 4-9-17 9:30 4-9-17 18:00
36 POWERGRID [ DELHI ]
220KV SIKAR-RATANGARH-I
Power grid Daily
Erection of Structure/Equipment/Al.
Bus pipe under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays
at Sikar. Date
resceduled-137OCC
1-9-17 9:00 3-9-17 17:00
37 POWERGRID [ DELHI ]
220KV SIKAR-SIKAR(RJ)-I
Power grid Daily 5-9-17 9:00 9-9-17 17:00
38 POWERGRID [ DELHI ]
220KV JAIPUR(S)-CHAKSU-II
RRVPNL Daily For CT oil Sampling 11-9-17 10:00 11-9-17 14:00
39 POWERGRID [ DELHI ]
220KV JAIPUR(S)-VATIKA-I
RRVPNL Daily For CT oil Sampling 11-9-17 14:00 11-9-17 17:00
40 POWERGRID [ DELHI ]
220KV JAIPUR(S)-VATIKA-II
RRVPNL Daily For CT oil Sampling 12-9-17 10:00 12-9-17 14:00
41 POWERGRID [ DELHI ]
220KV JAIPUR(S)-SEZ
RRVPNL Daily For CT oil Sampling 12-9-17 14:00 12-9-17 17:00
42 POWERGRID [ DELHI ]
220KV JAIPUR(S)-DOONI
RRVPNL Daily For CT oil Sampling 13-9-17 10:00 13-9-17 14:00
43 POWERGRID [ DELHI ] Kishenpur(PG)-
Udampur(JK) 2(220 kV) Power grid Daily
For replacement of CT at Udhampur end due to Tan Delta violation. 05-09-2017 09:00 05-09-17 17:00
44 POWERGRID [ DELHI ] Kanpur-PANKI 400KV
Line II (S/C) Power grid Daily
400 KV S/c Kanpur - Panki Line-II is
merging with other line after Tower no.15 and forming double circuit
line due to which one of the earth wire needs to be disconnected This earth wire between
T15-T16 is been clamped with another
earth wire, OPGW laying could be done only after cutting this
clamped earth wire for which shutdown is
necessary
25-8-17 10:00 25-8-17 15:00
45 SLDC_HARYANA
[ HARYANA ]
400kV G.Noida(UP)-Nawada(HVPNL)
(400 kV) Power grid Daily
Tightening of 400KV Nawada-G.Noida BPI &
Bus and General Maintenance 08-09-2017 09:00 8-9-2017 14:00
46 SLDC_RAJASTHAN
[ RAJASTHAN ] Anta-Lalsot(220 kV) Rajasthan Daily Routine maintenance at
Lolsot end 07-09-2017 09:00 7-09-17 12:00
47 SLDC_RAJASTHAN
[ RAJASTHAN ] Bikaner-Suratgarh
(400 kV) Rajasthan Daily
Routine bay maintenance at Bikaner
end 06-09-2017 10:00 6-9-2017 17:00
48 SLDC_RAJASTHAN
[ RAJASTHAN ] Hisar-Chirawa(220 kV) Rajasthan Daily
For replacement of porcelain disc
insulators by silicon rubber housed
composite polymer insulators from tower
loc No. 01 to 81 of 220 KV Chirawa-Hissar S/C
inter-state lines at Chirawa end. 07-09-2017 08:00 25-9-17 19:00
49 SLDC_RAJASTHAN
[ RAJASTHAN ] Heerapura-Hindaun
II(400 kV) Rajasthan Daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura End and Half yearly
maintenance at Hindaun end. 08-09-2017 10:00 08-09-17 17:00
50 SLDC_RAJASTHAN
[ RAJASTHAN ] Heerapura-Merta
(220 kV) Rajasthan Daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura End 11-09-2017 10:00 11-9-17 17:00
51 SLDC_RAJASTHAN
[ RAJASTHAN ] Barmer-Rajwest 1
(400 kV) Rajasthan Daily Quarterly Maintenance
at Barmer end 22-09-2017 10:00 22-9-17 18:00
52 SLDC_RAJASTHAN
[ RAJASTHAN ] RAPP (A )-KOTA-3
D/C(220 kV) Rajasthan Continuous
For replacement of severely detoraited Bus
Conductor & Clamp connector OF 220 KV BUS B and quarterly
bay maintenance of the equipments at Kota end 07-09-2017 07:00 08-9-17 18:00
53 SLDC_RAJASTHAN
[ RAJASTHAN ] RAPP (B )-KOTA-2
S/C(220 kV) Rajasthan Daily
For carry out the Quarterly Maintenance of the Bay Equipments
at Kota end 15-09-2017 07:00 15-09-17 18:00
54 SLDC_RAJASTHAN
[ RAJASTHAN ] RAPP (A )-DEBARI
(220 kV) Rajasthan Daily For Line Maintenance at Debari(Udaipur) end 14-09-2017 09:00 14-09-17 18:00
55 SLDC_RAJASTHAN
[ RAJASTHAN ] Jodhpur II-Merta 1(400
kV) Rajasthan Daily
3rd Quarterly maintenance work at
Jodhpur end 07-09-2017 10:00 07-09-17 18:00
56 SLDC_RAJASTHAN
[ RAJASTHAN ] Jodhpur II-Merta 2(400
kV) Rajasthan Daily
3rd Quarterly maintenance work at
Jodhpur end 08-09-2017 10:00 08-09-17 18:00
57 SLDC_RAJASTHAN
[ RAJASTHAN ] Jodhpur II-Rajwest
1(400 kV) Rajasthan Daily
3rd Quarterly maintenance work at
Jodhpur end 19-09-2017 10:00 19-09-17 18:00
58 SLDC_RAJASTHAN
[ RAJASTHAN ] Jodhpur II-Rajwest
2(220 kV) Rajasthan Daily
3rd Quarterly maintenance work at
Jodhpur end 20-09-2017 10:00 20-09-17 18:00
59 SLDC_RAJASTHAN
[ RAJASTHAN ] Merta-Ratangarh
(220 kV) Rajasthan Daily
Maintenance work of line & bay equipment at
Ratangarh End 06-09-2017 10:00 06-09-17 20:00
60 SLDC_RAJASTHAN
[ RAJASTHAN ] Ratangarh-Suratgarh
2(220 kV) Rajasthan Daily
Maintenance work of line & bay equipment at
Ratangarh End 07-09-2017 10:00 07-09-17 20:00
61 SLDC_RAJASTHAN
[ RAJASTHAN ] Akal-Jodhpur II(400 kV) Rajasthan Continuous
Sifting of 400 KV Jodhpur line from old
bay to new bay by m/s TATA projects at
Jaisalmer(Akal) and Quarterly maintenance work on 06.09.2017 at
Jodhpur end 04-09-2017 10:00 08-09-17 18:00
62 SLDC_RAJASTHAN
[ RAJASTHAN ] Akal-Barmer 1(400 kV) Rajasthan Continuous
Quarterly Maintenance work at Jaisalmer(Akal) end and maintenance work on 12.09.2017 at
Barmer end. 11-09-2017 10:00 14-09-17 18:00
63 SLDC_RAJASTHAN
[ RAJASTHAN ]
Bassi(PG)-Heerapura(RVPNL)
1(400 kV) Power grid Daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura End 04-09-2017 10:00 04-09-17 17:00
64 SLDC_RAJASTHAN [
RAJASTHAN ]
Bassi(PG)-Heerapura(RVPNL)
2(400 kV) Power grid Daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura End 05-09-2017 10:00 05-09-17 17:00
65 SLDC_RAJASTHAN
[ RAJASTHAN ] Jodhpur II(RVPNL)-
Kankroli(PG) 1(400 kV) Power grid Daily
3rd Quarterly maintenance work at
Jodhpur end 05-09-2017 10:00 05-09-17 18:00
66 SLDC_RAJASTHAN
[ RAJASTHAN ]
Shree Cement(CSL)-Merta(RRVPNL)
(400 kV) Power grid Daily
II nd QUARTERLY MAINT.WORK OF BAY
& EQUIPMENTS at Merta end 14-09-2017 09:00 14-09-17 17:00
67 SLDC_RAJASTHAN
[ RAJASTHAN ]
Kota(PG)-Merta(RVPNL) 1
(400 kV) Power grid Daily
II nd QUARTERLY MAINT.WORK OF BAY
& EQUIPMENTS at Merta end 07-09-2017 09:00 07-09-17 17:00
68 SLDC_RAJASTHAN
[ RAJASTHAN ]
132 KV Hissar -Amarpurathedi line
Rajasthan Daily
For Quarterly Maintenance of 132 Hissar -APT BAY at
Amrapurthedi
15-9-17 9:00 15-9-17 13:00
69 SLDC_RAJASTHAN
[ RAJASTHAN ]
400 KV Heerapura-Phagi CKT-1
Rajasthan Daily
3rd Quarterly maintenance of 400 KV side bay Equipments at Heerapura End
6-9-17 10:00 6-9-17 17:00
70 SLDC_RAJASTHAN
[ RAJASTHAN ]
400 KV Heerapura-Phagi CKT-2
Rajasthan Daily
3rd Quarterly maintenance of 400 KV side bay Equipments at Heerapura End
7-9-17 10:00 7-9-17 17:00
71 BBMB
[ CHANDIGARGH ] Panipat-Narela 1
(220 kV) BBMB Daily
Replacement of conventional disc
insulators of 55 Nos. towers with polymer
insulators. 01-09-2017 08:00 10-09-17 17:00
72 BBMB
[ CHANDIGARGH ] Panipat-Dhulkote 2
(220 kV) BBMB Daily
Replacement of conventional disc
insulators with polymer insulators. 16-09-2017 08:00 30-09-17 17:00
73 BBMB
[ CHANDIGARGH ] Bhiwani - Charkhi Dadri ( BBMB) Ckt-I (220 kV) BBMB Daily
For half yearly maintenance. 18-09-2017 08:00 18-09-17 17:00
74 BBMB
[ CHANDIGARGH ] Bhiwani - Charkhi Dadri ( BBMB) Ckt-II(220 kV) BBMB Daily
For half yearly maintenance. 19-09-2017 08:00 19-09-17 17:00
75 BBMB
[ CHANDIGARGH ] Bhiwani - Charkhi Dadri ( BBMB) Ckt-III(220 kV) BBMB Daily
For half yearly maintenance. 20-09-2017 08:00 20-09-17 17:00
76 BBMB
[ CHANDIGARGH ] Bhiwani - Charkhi Dadri
( BBMB) -IV(220 kV) BBMB Daily For half yearly maintenance. 21-09-2017 08:00 21-09-17 17:00
77 BBMB
[ CHANDIGARGH ]
220 kV Hisar- Sangrur -I & II
BBMB Cont.
Shifting/raising of height between
different locations of 220 kV Hisar-Sangrur
D/C Line due to electrification of Railway line and Replacement of
conventional disc insulators of 36 nos. tower with polymer
insulators
1-9-17 08:00 7-09-17 17:00
78 BBMB
[ CHANDIGARGH ]
220 kV Ch. Dadri -Lula Ahir
HVPNL Daily
For half yearly maintenance
29-9-17 08:00 29-09-17 17:00
79 BBMB
[ CHANDIGARGH ]
220 kV Samaypur-FGPP -I
HVPNL Daily
For yearly maintenance
15-9-17 08:00 15-09-17 17:00
80 BBMB
[ CHANDIGARGH ]
220 kV Samaypur-FGPP-II
HVPNL Daily
For yearly maintenance
16-9-17 08:00 16-09-17 17:00
81 BBMB
[ CHANDIGARGH ]
220 kV Samaypur-Palli -I&II
HVPNL Short period
To remove the sub bus jumper from spare bay
No. 16&17 as per observation of third
party protection audit team. 18-9-17 8:00 18-9-17 11:00
82 BBMB
[ CHANDIGARGH ]
220 kV Samaypur-Badashapur -I&II
HVPNL Short period
To remove the sub bus jumper from spare bay
No. 16&17 as per observation of third
party protection audit team.
18-9-17 8:00 18-9-17 11:00
83 BBMB
[ CHANDIGARGH ]
220 kV Samaypur-Palwal -I&II
HVPNL Short period 18-9-17 8:00 18-9-17 11:00
84 NTPC [ DELHI ] Auraiya(NTPC)-
Kanpur(PG) 1(400 kV) Power grid Continuous
Maintenance and Testing of CTs, CVTs, LAs and main and tie
breakers. 01-09-2017 08:00 02-09-17 18:00
85 NTPC [ DELHI ]
Allahabad(PG)-Rihand(NTPC) 1
(400 kV) Power grid Daily
Maintenance of bay equipments and testing
of relays. 14-09-2017 08:00 14-09-17 18:00
86 NTPC [ DELHI ]
Allahabad(PG)-Rihand(NTPC) 2
(400 kV) Powergrid Daily
Maintenance of bay equipments and testing
of relays. 15-09-2017 08:00 15-09-17 18:00
87 SLDC_DELHI [ DELHI ] Bawana(DTL)-
Mandola(PG) 1(400 kV) Delhi Daily
TO CARRY OUT TAN DELTA TESTING AND
OTHER MAINTENANCE OF BAY EQUIPMENTS
AND LINE AS PER OS MANUAL. 18-09-2017 07:00 18-09-17 17:00
88 SLDC_DELHI [ DELHI ] Bawana(DTL)-
Mandola(PG) 2(400 kV) Delhi Daily
TO CARRY OUT TAN DELTA TESTING AND
OTHER MAINTENANCE OF BAY EQUIPMENTS
AND LINE AS PER OS MANUAL. 19-09-2017 07:00 19-09-17 17:00
89 SLDC_DELHI [ DELHI ]
Ballabgarh(PG)-Bamnauli(DTL) 1
(400 kV) Delhi Daily
TO CARRY OUT TAN DELTA TESTING OF CB, CVT AND CT AS
PER PMS AND GENERAL
MAINTENANCE. 20-09-2017 09:30 20-09-17 17:00
90 SLDC_DELHI [ DELHI ]
Ballabgarh(PG)-Bamnauli(DTL) 2
(400 kV) Delhi Daily
TO CARRY OUT TAN DELTA TESTING OF CB, CVT AND CT AS
PER PMS AND GENERAL
MAINTENANCE. 21-09-2017 09:30 21-09-17 17:00
91 SLDC_UP
[ UTTAR PRADESH ] Muradnagar-
Muzaffarnagar(400 kV) Uttar Pradesh Continuous
Charging of WUPPTCL 400/220/33kV Ataur Substation through LILO of 400kV S/C
Muradnagar-Muzaffarnagar Line. 04-09-2017 09:00 06-09-17 17:00
92 SLDC_UP
[ UTTAR PRADESH ] Anpara-Sarnath 1
(400 kV) Uttar Pradesh Continuous General Maintenance 26-09-2017 08:00 26-09-17 18:00
93 SLDC_UP
[ UTTAR PRADESH ] Azamgarh-
Sultanpur(400 kV) Uttar Pradesh Daily Routine protection
testing 07-09-2017 08:00 07-09-17 18:00
94 SLDC_UP
[ UTTAR PRADESH ] Lucknow-Unnao
(400 kV) Uttar Pradesh Daily Tree cutting, Jumper
tightening, 09-09-2017 08:00 09-09-17 18:00
95 SLDC_UP [ UTTAR
PRADESH ] Lucknow(PG)-
Lucknow(UP)(400 kV) Power grid Daily Tree cutting, Jumper
tightening, 10-09-2017 08:00 10-09-17 18:00
96 SLDC_UP [ UTTAR
PRADESH ]
Bareilly(UP)-Pantnaggar(UTT)
(220 kV) Uttar Pradesh Daily
Stringing of Line Conductors of 220 KV S. C. Roza - C.B.Ganj
Line (Under Construction) between Loc. 39 to 40. Above Line is crossing over
220 KV Bareilly (400) - C.B.Ganj & 220 KV Bareilly (400) - Pant
Nagar Lines on same D. C. Towers. 10-09-2017 08:00 10-09-17 18:00
97 SLDC_UP [ UTTAR
PRADESH ]
Khodri(UPCL)-Saharnpur(UPPCL)-
2(220 kV) Uttar Pradesh Daily
For Tree cutting, repairing of conductor, Inspection of Insulators & other maintenance
work of line. 10-09-2017 08:00 12-09-17 18:00
98 SLDC_UP [ UTTAR
PRADESH ] Kanpur(PG)-Panki(UP)
2(400 kV) Powergrid Daily
For replacement of damage jumper &
tightening of clamps. 13-09-2017 08:00 13-09-17 18:00
99 SLDC_UP [ UTTAR
PRADESH ] Napp(NPC)-
Simbholi(UP)(220 kV) Uttar Pradesh Daily
Line maintenance & Tree cutting and to check the A/R at Simbhaoli End. 15-09-2017 08:00 16-09-17 18:00
100 SLDC_UP [ UTTAR PRADESH ]
Agra-Unnao(400 kV) Uttar Pradesh Continuous 1. For diversion of line b/w location no. 661 & 664 near tudla by pass for DFCC. 2. (From 18.09.17 to 18.09.17) For opening of IPS tube of LSI & crane movement for dismantling CB no. 96 for under taking complete overhauling of 400kv CB no. 96 of Agra- Unnao line thereafter this line will be charged by 400kv transfer bus CB no. 90 after returning of shut down. (From 24.09.17 to 24.09.17) For connecting of IPS tube of LSI & crane movement for assembling CB no. 96 after complete overhauling of 400kv CB no. 96 of Agra- nao line thereafter this line will be charged by 400kv main Circuit Breaker no. 94 after returning of shut down
18-09-2017 08:00 30-09-17 18:00
101 SLDC_UP [ UTTAR
PRADESH ] Lucknow(PG)-
Unnao(UP) 1(400 kV) Powergrid Daily
Annual Routine protection testing and
other maintenance works of complete bay 18-09-2017 08:00 18-09-17 18:00
102 SLDC_UP [ UTTAR
PRADESH ] Anpara-Sarnath 2(400
kV) Uttar Pradesh Continuous General Maintenance 23-09-2017 08:00 23-09-17 18:00
103 SLDC_UP [ UTTAR
PRADESH ] Azamgarh-Sarnath
1(400 kV) Uttar Pradesh Continuous General Maintenance 24-09-2017 08:00 24-09-17 18:00
104 SLDC_UP [ UTTAR
PRADESH ] 400kv Panki Aligarh Uttar Pradesh Continuous
For diversion of line due to construction
of NTPC plant in Bilhaur between 1
no. 92 to 104 & general
maintenance. 5-09-2017 08:00 14-09-17 18:00
105 SLDC_UP [ UTTAR
PRADESH ] 400 kV Nehtaur-
Mataur Line Uttar Pradesh Daily
1. For replacement of Main-I, Main-2 relay panel. 2. For raising ground clearance by erection of A type tower between location No. 27A-28C & other maintenance works. 10-09-2017 08:00 11-09-17 18:00
106 SLDC_UP [ UTTAR
PRADESH ]
400kv Aligarh Sikandrabad ckt-1
Uttar Pradesh Daily
After first line charging tightening of jumper, chopping of tree branches &
other general maintenance. 11-09-2017 08:00 14-09-17 18:00
107 SLDC_UP [ UTTAR
PRADESH ]
400kv Aligarh Sikandrabad ckt-2
Uttar Pradesh Daily
After first line charging tightening of jumper, chopping of tree branches &
other general maintenance. 15-09-2017 08:00 18-09-17 18:00
108 SLDC_UP [ UTTAR
PRADESH ]
400kv Fatehabad (765kv-UP)-
Muradnager line Uttar Pradesh Daily
Replacement of jumper & fixing of pilot string copper
bond, bull dog clamp and other line
maintenance work 11-09-2017 08:00 15-09-17 18:00
109 SLDC_UP [ UTTAR
PRADESH ]
132KV Dhampur-Kalagarh Line (D/C) (UK interstate line) along with 132KV
Afzalgarh-Kalagarh
Uttar Pradesh Daily
For line maintenance
works.
6-09-2017 08:00 6-09-17 18:00
110 SLDC_UP [ UTTAR
PRADESH ]
400KV Moradabad-Kashipur
Uttar Pradesh Daily
Replacement of 400KV
CT under PSDF scheme.
8-9-17 9:00 8-9-17 17:00
111 SLDC_UP [ UTTAR
PRADESH ]
400 KV Transmission line from 765 KV
Greater Noida to 400 KV Greater Noida Uttar Pradesh Daily
For jumper tightening of the line 16-09-2017 08:00 17-09-17 19:00
112 SLDC_PUNJAB Talwandi Sabo - Dhuri
Ckt-I (400 kV) Punjab Daily
Testing of Line & Line Breaker protection
Relay
4.9.17 08:00 5.9.17 20:00
113 SLDC_PUNJAB Talwandi Sabo - Dhuri
Ckt-II (400 kV) Punjab Daily 06.09.17 08:00 07.09.17 20:00
114 SLDC_PUNJAB Talwandi Sabo - Nakodar(400 kV) Punjab Daily
Testing of Line & Line Breaker protection
Relay
08.09.17 08:00 09.09.17 20:00
115 SLDC_PUNJAB Talwandi Sabo - Moga
(PG) (400 kV) Punjab Daily 11.09.17 08:00 12.09.17 20:00
116 SLDC_PUNJAB Talwandi Sabo -
Muktsar Ckt-I (400 kV) Punjab Daily 13.09.17 08:00 14.09.17 20:00
117 SLDC_PUNJAB
Talwandi Sabo - Muktsar Ckt-II (400
kV) Punjab Daily
Testing of Line & Line Breaker protection
Relay 15.09.17 08:00 16.09.17 20:00
118 SLDC_PUNJAB Rajpura - Nakodar
PSTCL Ckt-I (400 kV) Punjab Daily General Maintenance 04.09.17 10.00 04.09.17 16.00
119 SLDC_PUNJAB Rajpura - Nakodar
PSTCL Ckt-II (400 kV) Punjab Daily General Maintenance 06.09.17 10.00 06.09.17 16.00
120 SLDC_PUNJAB Kangra-Pathankot
Ckt-I(132 kV) Punjab Daily Maintenance. of line 06.09.17 10.00 06.09.17 16.00
121 SLDC_PUNJAB Kangra-Pathankot
Ckt-II(132 kV) Punjab Daily Maintenance of line 07.09.17 10.00 07.09.17 16.00
122 SLDC_PUNJAB Rajpura Thermal-
Rajpura Ckt-II (400 kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers ,
suspension clamps and cleaning of Disc
insulators of Tower No 01 to 15 07.09.17 10.00 07.09.17 17.00
123 SLDC_PUNJAB Dhuri-Rajpura Ckt-I
(400 kV) Punjab Daily General Maintenance 07.09.17 9.00 07.09.17 17.00
124 SLDC_PUNJAB Kangra-Pathankot
Ckt-I(132 kV) Punjab Daily Maintenance of line 08.09.17 10.00 08.09.17 16.00
125 SLDC_PUNJAB Dhuri-Rajpura Ckt-II
(400 kV) Punjab Daily General Maintenance 08.09.17 9.00 08.09.17 17.00
126 SLDC_PUNJAB Nakodar - Moga (PG)
(400 kV) Punjab Daily General Maintenance 13.09.17 10:00 13.09.17 16.00
127 SLDC_PUNJAB Nakodar - Moga (PG)
(400 kV) Punjab Daily General Maintenance 15.09.17 10:00 13.05.17 16.00
128 SLDC_PUNJAB Shanan-Kangra Ckt-I
(132 kV) Punjab Daily Maintenance of line 13.09.17 10.00 13.09.17 16.00
129 SLDC_PUNJAB Shanan-Kangra Ckt-II
(132 kV) Punjab Daily Maintenance. of line 15.09.17 10.00 15.09.17 16.00
130 SLDC_PUNJAB Dhuri-Rajpura Ckt-I
(400 kV) Punjab Daily Line -Jumper/ Nut Bolt
Tightening 18.09.17 9.00 18.09.17 17.00
131 SLDC_PUNJAB Hamirpur-Chohal (132
kV) Punjab Daily
Tightening of Jumpers of Dead end Towers, Disc Cleaning & Tree
Cutting 18.09.17 9.00 18.09.17 17.00
132 SLDC_PUNJAB Talwandi Sabo - Nakodar(400 kV) Punjab Daily General Maintenance 18.09.17 10:00 18.09.17 16.00
133 SLDC_PUNJAB Dhuri-Rajpura Ckt-II
(400 kV) Punjab Daily Line -Jumper/ Nut Bolt
Tightening 20.09.17 9.00 20.09.17 17.00
134 SLDC_PUNJAB Dhuri-Rajpura Ckt-I
(400 kV) Punjab Daily Line -Jumper/ Nut Bolt
Tightening 22.09.17 9.00 22.09.17 17.00
135 SLDC_PUNJAB Dhuri-Rajpura Ckt-II
(400 kV) Punjab Daily Line -Jumper/ Nut Bolt
Tightening 25.09.17 9.00 25.09.17 17.00
136 SLDC_PUNJAB Nakodar - Makhu Ckt-
I (400 kV) Punjab Daily General Maintenance 25.09.17 10.00 25.09.17 16.00
137 SLDC_PUNJAB Shanan-Kangra Ckt-I
(132 kV) Punjab Daily Maintenance of line 25.09.17 10.00 25.09.17 16.00
138 SLDC_PUNJAB Nakodar - Makhu Ckt-
II (400 kV) Punjab Daily General Maintenance 27.09.17 10.00 27.09.17 16.00
139 SLDC_PUNJAB Dhuri-Rajpura Ckt-II
(400 kV) Punjab Daily Line -Jumper/ Nut Bolt
Tightening 29.09.17 9.00 29.09.17 17.00
PROPOSED OUTAGE OF NLDC TRANSMISSION ELEMENTS FOR THE MONTH OF 9/17 FOR THE 138th
OCC METING ANNEXURE 3 A
UPPTCL
Sl. No.
Detail of Transmission element Date Timings
Reason Remark Voltage
level
Name of Transmission Elements
From To From To
1 765 KV 765KV MAIN BUS-I Unnao 05.09.17 05.09.17 08:00 18.00
For erection & commissioning of new 765KV Mainpuri bay with 3X50 MVAR line reactor. Power Flow remain intact through 765 KV Main Bus-II
DAILY BASIS
2 765 KV 1000 MVA ICT-III Unnao 07.09.17 07.09.17 08:00 18.00 For changing CT polarity to correct the sign of MW reading.
DAILY BASIS
3 765 KV 1000 MVA ICT-I Unnao 11.09.17 12.09.17 08:00 18.00 For Routine Protection Testing & Tightening DAILY BASIS
4 765 KV 1000 MVA ICT-II Unnao 13.09.17 14.09.17 08:00 18.00 For Routine Protection Testing & Tightening DAILY BASIS
RRVPNL
S.No. Details of Transmission element/line Date Timings Type of
Shutdown Daily/
Continuous
Purpose Remark Voltage Level Name Category From To From To
1 765 KV 400/765 KV ,3X500 MVA ICT Bank -III at 765 GSS Anta
A 06.09.2017 08.09.2017 09.00 Hrs.
20.00 Hrs. Continuous
Synchronisation of 400/765 KV ICT Bank-
III with spare ICT
During Shut down 400/ 765 KV ICT Bank I & II will be available in circuit.
2 765 KV 400/765 KV ,3X500 MVA ICT Bank -II at 765 GSS Anta
A 11.09.2017 13.09.2017 09.00 Hrs.
20.00 Hrs. Continuous
Synchronisation of 400/765 KV ICT Bank-II
with spare ICT
During Shut down 400/ 765 KV ICT Bank I & III will be available in circuit.
3 765 KV
765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - I at 765 GSS Anta
A 14.09.2017 16.09.2017 09.00 Hrs.
20.00 Hrs. Continuous
For synchronisation and commissioning of 765 KV Anta-Phagi ckt-I
Line Reactor Bank with spare Reactor
During Shut down of 765 KV Anta-Phagi Ckt-I &II and Reactor Bank-II will be available in circuit.
4 765 KV
765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - II at 765 GSS Anta
A 18.09.2017 20.09.2017 09.00 Hrs.
20.00 Hrs. Continuous
For synchronisation and commissioning of 765 KV Anta-Phagi ckt-I I
Line Reactor Bank with spare Reactor
During Shut down of 765 KV Anta-Phagi Ckt-I &II and Reactor Bank-I will be available in circuit.
5 765 KV 400/765 KV ,3X500 MVA ICT Bank -I at 765 GSS Anta
A 25.09.2017 25.09.2017 09.00 Hrs.
20.00 Hrs. daily RPH 2 relay, 02 no’s
commissioning
During Shut down 400/ 765 KV ICT Bank II & III will be available in circuit.
6 765KV 800 KV Tie CB (707-52T) of 765KV Dia.07. at 765GSS Phagi
A 07.09.2017 08.09.2017 10.00Hrs 18.00Hrs Daily
1. Measurement of tan-delta of CTs 2.
Maintenance of CB & CTs. 3. Tightening of clamps & connectors.
There will be no power interruption during shut-down period as the 765KV Phagi-Gwalior-2 line & 765 KV Phagi-Anta-2 line will be remained connected to 765KV Bus-A, & 765KV Bus-B respectively through 800KV CB (707-52A), and 800 KV CB(707-52B)
7 765KV
800 KV CB (706-52B) of 765 KV Phagi-Anta-1 line. at 765GSS Phagi
A 11.09.2017 12.09.2017 10.00 Hrs. 18.00Hrs. Daily
1. Measurement of tan-delta of CTs 2.
Maintenance of CB & CTs. 3. Tightening of clamps & connectors.
There will be no interruption during shut-down period as the 765 KV Phagi-Anta-1 line will be remained connected to 765 KV Bus-A through 800 KV Tie CB (706-52T) & 800 KV CB (706-52A).
8 765KV 800 KV CB(702-52B) of 3X500 MVA ICT-2. at 765GSS Phagi
A 14.09.2017 15.09.2017 10.00Hrs. 18.00Hr. Daily
1.Measurement of tan-delta of CTs 2.
Maintenance of CB & CTs. 3. Tightening of clamps & connectors.
There will be no power interruption during shut-down period as the ICT-2 will be remained connected to 765KV Bus-A through 800 KV Tie CB (702-52T), & 800 KV CB (702-52A).
9 765KV 3 X 500 MVA ICT-2 at 765GSS Phagi A 19.09.2017 20.09.2017 9.00Hrs. 18.00Hr. Daily
1.To check the air leakage from air cell of R-Phase Tr. as the air has been observed in the conservator tank.
2.To check the tripping of CBs through Main & auxiliary protection. 3. Measurement of Tan-
delta of Bushings. 4. To get replaced neutral
Bus dropper of single moose conductor of B-
phase Transformer.
There will be no power interruption during shut-down period as the 3X 500 MVA ICT-1 will be remained energized to evacuate the power.
10 765KV 765KV Bus-B at 765GSS Phagi A 22.09.2017 22.09.2017 10.00Hrs. 18.00Hrs Daily
For the tightening of clamps & connectors of droppers from main Bus to isolators of different
765 KV bays connected to 765KV Bus-B.
There will be no interruption during shut-down period as all the 765 KV lines, ICT-1, ICT-2 & 3X80 MVAr Bus Reactor bank will be remained connected to 765KV Bus-A.
11 765KV 3X500 MVA ICT-1 at 765GSS Phagi A 25.09.2017 26.09.2017 10.00Hrs 18.00Hrs Daily
1. To replace the damaged conductors of
dropper of quad Bull from high bus to
switching isolator (701-89BT-R). 2. Tightening of clamps & connectors
of Bushings. 3. Measurements of Tan
delta of Bushings. 4. To check the tripping of
CBs through auxiliary & main protection of
Transformers.
There will be no power interruption during shut-down period as the 3X 500 MVA ICT-2 will be remained energized to evacuate the power.
INDENTING AGENCY
PGCIL, CPCC (NR-
III), LUCKNOW
FOR THE MONTH Sep-17
Remarks
S.N NAME OF
REQUESTING AGENCY
EQUIPMENT DETAILS
DAILY/ CONTINUOUS
Reason
PROPOSED DATE AND TIME
VOLT LEVEL
(KV)
NAME OF ELEMENTS (ICT, B/R,
SVC, Bays, etc)
OWNER INTER/ INTRA
REGION
FROM TO
DATE TIME DATE TIME
1 PGCIL 765KV ICT-I Tie
Bay(702) ,at Agra
PGCIL Intra Daily AMP work.at Agra 06-09-17 09:30 06-09-17 18:00
2 PGCIL 765KV
Agra-Fatehpur-I
Main Bay(707) ,at
Agra
PGCIL Intra Daily AMP work.at Agra 07-09-17 09:30 07-09-17 18:00
3 PGCIL 765KV
Agra-Fatehpur-1 ,707 main
bay at Agra HVDC
PGCIL Intra Daily
Operation of these bays is being shifted to HVDC Control Room.
Integration work and point to point testing with HVDC Control Room, at
Agra HVDC
01-09-17 08:00 02-09-17 18:00
4 PGCIL 765KV
Agra-Fatehpur-1 ,708 tie bay
,at Agra HVDC
PGCIL Intra Daily
Operations of these bays are being shifted to HVDC Control Room.
Integration work and point to point testing with HVDC Control Room , at
Agra HVDC
03-09-17 08:00 04-09-17 18:00
5 PGCIL 765KV
Agra-Future ,709 Future
Bay , at Agra HVDC
PGCIL Intra Daily
Operations of these bays are being shifted to HVDC Control Room.
Integration work and point to point testing with HVDC Control Room , at
Agra HVDC
05-09-17 08:00 06-09-17 18:00
6 PGCIL 765KV
Agra-Fatehpur-2, 710 main
bay ,at Agra HVDC
PGCIL Intra Daily
Operation of these bays are being shifted to HVDC Control Room.
Integration work and point to point testing with HVDC Control Room , at
Agra HVDC
07-09-17 08:00 08-09-17 18:00
7 PGCIL 765KV
Agra- Fatehpur-2 , 711 tie bay
at agra HVDC
PGCIL Intra Daily
Operation of these bays are being shifted to HVDC Control Room.
Integration work and point to point testing with HVDC Control Room , at
Agra HVDC
09-09-17 08:00 10-09-17 18:00
8 PGCIL 765KV
Agra- Fatehpur-2 , 712 tie bay
at agra HVDC
PGCIL Intra Daily
Operation of these bays are being shifted to HVDC Control Room.
Integration work and point to point testing with HVDC Control Room , at
Agra HVDC
11-09-17 08:00 12-09-17 18:00
9 PGCIL 765KV
Bus Reactor TIE bay (Bay No 705) ,at
Bareily
PGCIL Intra Daily AMP of bay equipments ,at Bareily 05-09-17 10:00 05-09-17 17:30
10 PGCIL 765KV
ICT-2 Main Bay (Bay No
712) ,at Bareily
PGCIL Intra Daily AMP of bay equipments ,at Bareily 06-09-17 10:00 06-09-17 17:30
11 PGCIL 765KV
ICT-1 Main Bay (Bay No
709), at Bareily
PGCIL Intra Daily AMP of bay equipments ,at Bareily 07-09-17 10:00 07-09-17 17:30
12 PGCIL 765KV
702- 765kV Balia Line Tie Bay, at Lucknow
PGCIL Intra Daily Testing of Circuit Breaker ,at Lucknow 04-09-17 09:00 05-09-17 18:00
13 PGCIL 765KV
703- 765kV ICT1 Main
Bay ,at Lucknow
PGCIL Intra Daily Testing of Circuit Breaker ,at Lucknow 06-09-17 09:00 07-09-17 18:00
14 PGCIL 765KV
709-765kV Bus Reactor Main Bay, at
Lucknow
PGCIL Intra Daily AMP Work, at Lucknow 10-09-17 09:00 11-09-17 18:00
15 PGCIL 765KV 765kV Bus Reactor, at Lucknow
PGCIL Intra Daily AMP Work, at Lucknow 13-09-17 09:00 13-09-17 18:00
16 PGCIL 765KV
707 R-765kV
Bareilly Line Reactor Bay ,at Lucknow
PGCIL Intra Daily AMP Work, at Lucknow 14-09-17 09:00 16-09-17 18:00
17 PGCIL 765KV 765kV Bus1 , at Lucknow PGCIL Intra Daily AMP Work, at Lucknow 18-09-17 09:00 19-09-17 18:00
18 PGCIL 765KV 765kV Bus2 ,at Lucknow PGCIL Intra Daily AMP Work, at Lucknow 20-09-17 09:00 21-09-17 18:00
19 PGCIL 765KV
705- 765kV ICT2 Tie Bay ,at
Lucknow
PGCIL Intra Daily AMP Work, at Lucknow 27-09-17 09:00 28-09-17 18:00
20 PGCIL 765KV
706- 765kV ICT2 Main
Bay, at Lucknow
PGCIL Intra Daily AMP Work, at Lucknow 29-09-17 09:00 30-09-17 18:00
INDENTING AGENCY
PGCIL, (NR-I) FOR THE MONTH Sept
REMARKS
S.N. NAME OF
REQUESTING AGENCY
EQUIPEMENT DETAILS DAILY/
CONTINUOUS
REASON
PROPOSED DATE AND TIME
VOLT LEVEL (KV)
NAME OF THE ELEMENT OWNER INTER/ INTRA
REGIONAL FROM TO
DATE TIME DATE TIME
1 PGCIL 765kV ICT-I at Jhatikra PGCIL INTRA DAILY AMP WORK 8-09-17 09:00 8-09-17 17:00
2 PGCIL 765kV Bus-I at Jhatikra PGCIL INTRA DAILY AMP WORK 01-09-17 09:00 1-09-17 17:00
3 PGCIL 765kV 765 kV Bus-I at Meerut PGCIL INTRA DAILY
Construction work Erection of
Earth wire & aluminium Tube
Etc.
25-09-17 08:00 27-9-17 18:00
4 PGCIL 765kV 765 kV Bus-II at Meerut PGCIL INTRA DAILY
Construction work Erection of
Earth wire & aluminium Tube
Etc.
28-09-17 08:00 30-9-17 18:00
5 PGCIL 765kV BUS Reactor-2 at Jhatikra PGCIL INTRA DAILY AMP WORK 06-09-17 09:00 06-9-17 17:00
6 PGCIL 765kV BUS Reactor-2 Main Bay-703 at Jhatikra PGCIL INTRA DAILY AMP WORK 18-09-17 09:00 18-9-17 17:00
7 PGCIL 765kV Bus Reactor-I Main Bay-706 at Jhatikra PGCIL INTRA DAILY AMP WORK 22-09-17 09:00 22-9-17 17:00
8 PGCIL 765kV BUS Reactor-2 Tie Bay-710 at Jhatikra PGCIL INTRA DAILY AMP WORK 04-09-17 09:00 04-9-17 17:00
9 PGCIL 765kV Agra /B/R-I Tie Bay-705 at Jhatikra PGCIL INTRA DAILY AMP WORK 20-09-17 09:00 20-9-17 17:00
10 PGCIL 765kV Bhiwani /Tie Bay-708 at Jhatikra PGCIL INTRA DAILY AMP WORK 25-09-17 09:00 25-9-17 17:00
11 PGCIL 765kV 710 - Tie Bay of 765KV Future/ ICT 1 Bay at Meerut PGCIL INTRA Daily AMP Work 14-09-17 08:00 14-9-17 18:00
12 PGCIL 765kV 712 - 765KV Bhiwani Main Bay at Meerut PGCIL INTRA Daily AMP Work 07-09-17 08:00 7-09-17 18:00
13 PGCIL 765kV 704 - 765KV Bus Reactor Main Bay at Meerut PGCIL INTRA Daily AMP Work 21-09-17 08:00 21-9-17 18:00
14 PGCIL 765kV 765kv Gr. Noida Line Reactor at Meerut PGCIL INTRA Daily AMP Work of
Reactor 01-09-17 08:00 1-09-17 18:00
OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF SEPTEMBER 2017 for 138TH OCC MEETING Annexure 3B
HVPNL
Sno
Details of Transmission
element Name of S/Stn
Name of transmission
elements
Date
Daily basis
Timings
Purpose/ Reasons
Voltage level From To From (Hrs.)
To (Hrs.)
1 400kV 400kV Dhanoda
400/220KV, 315MVA ICT-3 01.09.17 01.09.17 D 10:00 16:00 For General maintenance of
ICT & Allied equipment.
2 400kV 400kV Nawada
400/220KV, 250MVA ICT-2, TIE-2 With Bus-
2
15.09.17 15.09.17 D 09:00 14:00 For General maintenance of ICT & Allied equipment.
DTL
S.
No
Shut
down
Type
From To Work to be Carried Remarks
Name Date Time Date Time
1 400kV BUS-I at Tikrikalan
Daily basis 04.09.2017 10:00Hrs. 04.09.2017 17:00 Hrs
Testing of Breakers (Tan Delta, Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by Bus-II
2 400kV BUS-I at Tikrikalan
Daily basis 05.09.2017 10:00Hrs. 05.09.2017 17:00 Hrs
Testing of Breakers (Tan Delta, Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by Bus-II
3 400kV BUS-I at Tikrikalan
Daily basis 06.09.2017 10:00Hrs. 06.09.2017 17:00 Hrs
Testing of Breakers (Tan Delta, Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by Bus-II
4 400kV BUS-II at Tikrikalan
Daily basis 07.09.2018 10:00Hrs. 07.09.2018 17:00 Hrs
Testing of Breakers (Tan Delta, Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by Bus-I
5 400kV BUS-II at Tikrikalan
Daily basis 08.09.2019 10:00Hrs. 08.09.2019 17:00 Hrs
Testing of Breakers (Tan Delta , Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by Bus-I
6 400kV BUS-II at Tikrikalan
Daily basis 09.09.2017 10:00Hrs. 09.09.2017 17:00 Hrs
Testing of Breakers (Tan Delta , Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by Bus-I
7 400kV Bay -412 (Tie Breaker) at Tikrikalan
Daily basis 10.09.2017 10:00 Hrs 10.09.2017 13:00 Hrs
Testing of Breakers (Tan Delta, Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by main breaker
8 400kV Bay -415 (Tie Breaker) at Tikrikalan
Daily basis 10.09.2017 13:30 Hrs 10.09.2017 17:30 Hrs
Testing of Breakers (Tan Delta, Timing & DCRM), Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by main breaker
9 315 MVA Transformer-II at Tikrikalan
Daily basis 11.09.2017 10:00 Hrs 11.09.2017 17:30 Hrs
C & Tan Delta & routine testing of Transformer, Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by alternate ICT
10 315 MVA Transformer -III at Tikrikalan
Daily basis 12.09.2017 10:00 Hrs 12.09.2017 17:30 Hrs
C & Tan Delta & routine testing of Transformer, Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by alternate ICT
11 315 MVA Transformer -IV at Tikrikalan
Daily basis 13.09.2017 10:00 Hrs 13.09.2017 17:30 Hrs
C & Tan Delta & routine testing of Transformer, Bay Maintenance as per PMS schedule of DTL.
Load shall be shared by alternate ICT
12 400kV Bus-I at Bawana
Daily Basis 14.09.2017 07:00 Hrs 14.09.2017 17:00 To carryout Tan delta testing and other
maintenance of the as per OS manual
Load will be run through 400kV BUS-I. The interconnector 423-52 required to isolate from PPCL for DTL 400kV Bus-II
13 400kV Bus-II at Bawana
Daily Basis 15.09.2017 07:00 Hrs 15.09.2017 17:00 To carryout Tan delta testing and other
maintenance of the as per OS manual
Load will be run through 400kV BUS-I. The interconnector 423-52 required to isolate from PPCL for DTL 400kV Bus-II
14 400KV Bus-1 CVT at Bamnauli
Daily basis 22.09.2017 09:30hrs 22.09.2017 17:00hrs For Tan Delta testing of CVT as per PMS
and general maintenance load will be shared BUS-II, no load will be effected
NTPC : (Dadri Coal ) - Maintenance Program of Transmission Elements for approval in OCC
S.No.
Detail of Transmission Element Category* (A/B/C/D)
Duration Mode Reason Voltage
Level Name Date Time Daily / Continuous From To From To
1 400 KV 400 KV ICT#01 A 01.09.2017 08.09.2017 9:00 AM
5:00 PM Continous Annual Maintenance
2 400 KV 400 KV DadriLoni#02 Line A 11.09.2017 1.09.2017 9:00
AM 5:00 PM Daily
Annual Maintenance & Main#02 Relay replacement
3 400 KV 401 KV DadriLoni#01 Line A 18.09.2017 23.09.2017 9:00
AM 5:00 PM Daily Annual Maintenance
INDENTING AGENCY PGCIL (NR-III),
LUCKNOW FOR THE MONTH Sep-17
Remarks
S.N NAME OF
REQUESTING AGENCY
EQUIPMENT DETAILS
DAILY/ CONTINUOUS
Reason
PROPOSED DATE AND TIME
VOLT LEVEL
(KV)
NAME OF ELEMENTS (ICT, B/R,
SVC, Bays, etc)
OWNER INTER/ INTRA
REGION
FROM TO
DATE TIME DATE TIME
1 PGCIL 400 KV Bus Rector-1
Main Bay(432) , at Agra
PGCIL Intra Daily AMP work. At Agra 14-09-17 09:30 14-09-17 18:00
2 PGCIL 400 KV Bus Rector-2 Main Bay(435)
,at Agra PGCIL Intra Daily AMP work. At Agra 15-09-17 09:30 15-09-17 18:00
3 PGCIL 400 KV
Agra-Ballabgarh
Main Bay(410) ,at Agra
PGCIL Intra Daily AMP work. At Agra 20-09-17 09:30 20-09-17 18:00
4 PGCIL 400 KV Bus Reactor-2 ,at Agra PGCIL Intra Daily AMP work. At Agra 01-09-17 09:30 01-09-17 18:00
5 PGCIL 400 KV
Agra-Auriya-1 , 406 Main Bay (Auriya-1) ,at AgraHVDC
PGCIL Intra Conti.
Retrofitting of C&P of 406 main bay Auriya-1 to take
the operation to HVDC Control room; work involved:
1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
02-09-17 08:00 11-09-17 18:00
6 PGCIL 400 KV Agra-Auriya-1 405 Tie Bay,at
Agra HVDC PGCIL Intra Conti.
Retrofitting of C&P of 405 tie bay Auriya-1 to take the operation to HVDC Control
room; work involved:
1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
10-09-17 08:00 17-09-17 18:00
7 PGCIL 400 KV
Agra-Ballabhgarh
,410 Main Bay (Ballabhgarh), at Agra HVDC
PGCIL Intra Conti.
Retrofitting of C&P of 410 main bay Auriya-1 to take
the operation to HVDC Control room; work involved:
1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
15-09-17 08:00 25-09-17 18:00
8 PGCIL 400 KV
Agra-Ballabhgarh ,411 Tie Bay
,at Agra HVDC
PGCIL Intra Conti.
Retrofitting of C&P of 411 tie bay to take the
operation to HVDC Control room;
work involved: 1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
22-09-17 08:00 28-09-17 18:00
9 PGCIL 400 KV
Agra-Bassi ,412 Main Bay
(Bassi) , at Agra HVDC
PGCIL Intra Conti.
Retrofitting of C&P of 410 main bay Auriya-1 to take
the operation to HVDC Control room; work involved:
1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
28-09-17 08:00 05-10-17 18:00
10 PGCIL 400 KV
Agra-Kanpur , 407 (Main Bay
) ,at Agra HVDC
PGCIL Intra Conti.
Retrofitting of C&P of 407 main bay to take the
operation to HVDC Control room;
work involved: 1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
08-09-17 08:00 16-09-17 18:00
11 PGCIL 400 KV Agra-Kanpur ,408 Tie Bay
,at Agra HVDC PGCIL Intra Conti.
Retrofitting of C&P of 408 tie bay to take the
operation to HVDC Control room;
work involved: 1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
15-09-17 08:00 22-09-17 18:00
12 PGCIL 400 KV Agra-Auriya
409 Main Bay ,at Agra HVDC
PGCIL Intra Conti.
Retrofitting of C&P of 409 main bay Auriya-2 to take
the operation to HVDC Control room; work involved:
1. Cable dismantling of main bay equipments, 2.new cable laying and connections at both end
3.Green lining, 4. C&P testing, at Agra
HVDC
23-09-17 08:00 30-09-17 18:00
13 PGCIL 400 KV
Bareily-2 & Muradabad-1 Tie Bay (402
Bay) ,at Bareily
PGCIL Intra Daily Bay AMP Work ,at Bareily 22-09-17 09:00 22-09-17 17:00
14 PGCIL 400 KV
Meerut-2 & Shahjanhapur-1 Tie Bay (411 Bay) ,at Bareily
PGCIL Intra Daily Bay AMP Work ,at Bareily 27-09-17 09:00 27-09-17 17:00
15 PGCIL 400 KV
402 Meerut-1 Line Reactor
(407 R) KV-2at 400KV Bareily
S/S. (407 R Bay)
PGCIL Intra Daily Bay AMP Work ,at Bareily 29-09-17 09:00 29-09-17 17:00
16 PGCIL 400 KV
414 Bay (Tie bay of 400 KV
Mainpuri-1 Line) ,at Fatehpur
PGCIL Intra Daily AMP work , at Fatehpur 05-09-17 09:30 05-09-17 18:00
17 PGCIL 400 KV
415 Bay (Main bay of 400 KV
Mainpuri-1 Line) , at Fatehpur
PGCIL Intra Daily AMP work , at Fatehpur 07-09-17 09:30 07-09-17 18:00
18 PGCIL 400 KV
417 Bay (Tie bay of 400 KV
Manipuri-2 Line) , at Fatehpur
PGCIL Intra Daily AMP work , at Fatehpur 12-09-17 09:30 12-09-17 18:00
19 PGCIL 400 KV
418 Bay (Main bay of 400 KV
Mainpuri-2 Line), at Fatehpur
PGCIL Intra Daily AMP work , at Fatehpur 14-09-17 09:30 14-09-17 18:00
20 PGCIL 400 KV
420 Bay (Tie bay of 400
KV Singrauli Line), at Fatehpur
PGCIL Intra Daily AMP work , at Fatehpur 19-09-17 09:30 19-09-17 18:00
21 PGCIL 400 KV
421 Bay (Main bay of 400 KV Singrauli Line) , at Fatehpur
PGCIL Intra Daily AMP work , at Fatehpur 21-09-17 09:30 21-09-17 18:00
22 PGCIL 400 KV
422 Bay (Main bay of 400 kV Allahabad-3
Line) ,at Fatehpur
PGCIL Intra Daily AMP work , at Fatehpur 26-09-17 09:30 26-09-17 18:00
23 PGCIL 400 KV ICT-II Bay ,at Kanpur PGCIL Intra Daily AMP work , at Kanpur 28-09-17 09:00 28-09-17 17:00
24 PGCIL 400 KV 80Mvar Bus Reactor , at
Lucknow PGCIL Intra Daily AMP work, at Lucknow 01-09-17 09:00 01-09-17 18:00
25 PGCIL 400 KV Bus1 , at Lucknow PGCIL Intra Daily AMP work, at Lucknow 22-09-17 09:00 23-09-17 18:00
26 PGCIL 400 KV Bus2 , at Lucknow PGCIL Intra Daily AMP work, at Lucknow 25-09-17 09:00 26-09-17 18:00
27 PGCIL 400 KV 400kV Bus
Bar-I ,at Lucknow
PGCIL Intra Daily AMP of Bus, at Lucknow 22-08-17 10:00 22-08-17 17:00
28 PGCIL 400 KV 400kV Bus Bar-II ,at Lucknow
PGCIL Intra Daily AMP of Bus ,at Lucknow 24-08-17 10:00 24-08-17 17:00
29 PGCIL 400 KV
400 KV Lucknow (PG)-
1 Bay at Unnao, at Lucknow
PGCIL Intra Daily
Overhauling of Pneumatic drive in 400 KV ABB CB at Unnao substation. Line will be charged through TBC
bay, at Lucknow
04-08-17 10:00 06-08-17 18:00
30 PGCIL 400 KV
400 KV Lucknow (PG)-
2 Bay at Unnao, at Lucknow
PGCIL Intra Daily
Overhauling of Pneumatic drive in 400 KV ABB CB at Unnao substation. Line will be charged through TBC
bay, at Lucknow
07-08-17 10:00 09-08-17 18:00
31 PGCIL 400 KV
400 KV Singrauli Bay at Snagar, at
Lucknow
PGCIL Intra Daily
Overhauling of Pneumatic drive in 400 KV ABB CB at Sarojininagar (Lucknow) substation. Line will be
charged through TBC bay, at Lucknow
11-08-17 10:00 13-08-17 18:00
32 PGCIL 220 KV ICT-II Bay ,at Kanpur PGCIL Intra Daily AMP work ,at Kanpur 14-09-17 09:00 14-09-17 17:00
33
PGCIL-Sohawal
400KV Bus-2 at Sohawal PGCIL Intra Daily
1. CONNECTING DROPPERS FOR BUS
REACTOR-2. (2) Integration of 415 bay MAIN-1& Main-2 LBB
Relay with Main-1 & Main-2 Bus Bar-2 protection
relay, associated testing and communication from Remote end system(FOR
CHARGING OF BUS REACTOR-2) REQUIRED
FOR CHARGING OF BUS
REACTOR-2
25-8-17 9:30 25-8-17 17:30
34 PGCIL 220 KV Naubasta Bay , at Kanpur PGCIL Intra Daily AMP work ,at Kanpur 29-09-17 09:00 29-09-17 17:00
POWERGRID NORTHERN REGION-II S.N. Details of Transmission
Element DURATION Daily/
Continuous Reason
Voltage level (KV)
NAME OF THE ELEMENT AND SUBSTATION
FROM TO
DATE TIME DATE TIME
X-2 For construction activity
1 400 kV 400KV GIS BUS SECTION-3 at Kurukshetra
04.09.2017 09:00 10.09.2017 18:00 Continuous For the coupling and testing of exsitnig GIS Bus and future GIS Bus section for Jind D/C bays.
2 400 kV 400KV GIS BUS SECTION-4 at Kurukshetra
11.09.2017 09:00 17.09.2017 18:00 Continuous For the coupling and testing of exsitnig GIS Bus and future GIS Bus section for Jind D/C bays.
3 220 kV 220kV BUS-1 at Wagoora 04.09.2017 09:00 04.09.2017 18:00 Daily For Construction work of Kishenganga Bays
4 220 kV 220kV BUS-2 at Wagoora 05.09.2017 09:00 05.09.2017 18:00 Daily For Construction work of Kishenganga Bays
X-3 For O&M activity
1 400 kV 315 MVA ICT-4 at Abdullapur 12.09.2017 08:00 12.09.2017 17:00 Daily For AMP Works
2 400 kV 315 MVA ICT-1 Bank at Chamba 06.09.2017 10:00 06.09.2017 17:00 Daily For AMP Works
3 400 kV 400KV Bus -I at Fatehabad. 05.09.2017 10:00 05.09.2017 18:00 Daily For AMP Works
4 400 kV 400KV Bus -II at Fatehabad. 08.09.2017 10:00 08.09.2017 18:00 Daily For AMP Works
5 220 kV 220KV Bus -I at Fatehabad. 12.09.2017 10:00 12.09.2017 18:00 Daily For AMP Works
6 220 kV 220KV Bus -II at Fatehabad. 15.09.2017 10:00 15.09.2017 18:00 Daily For AMP Works
7 400 kV 315 MVA ICT-1 at Ludhiana 04.09.2017 09:00 04.09.2017 18:00 Daily For AMP Works
8 400 kV 315 MVA ICT-2 at Ludhiana 06.09.2017 09:00 06.09.2017 18:00 Daily For AMP Works
9 220 kV 220 KV Bus-1 at Ludhiana 11.09.2017 09:00 11.09.2017 18:00 Daily For AMP Works 10 220 kV 220 KV Bus-2 at Ludhiana 12.09.2017 09:00 12.09.2017 18:00 Daily For AMP Works
11 400 kV 400 KV Bus-1 at Patiala 12.09.2017 09:30 12.09.2017 12:30 Daily
For replacing existing T connector (small which caused bus tripping) with new Large connector & providing spacer near to Jack bus on Line isolator dropper of Bus Reactor.
12 400 kV 315 MVA ICT-1 BANK at Wagoora 07.09.2017 10:00 07.09.2017 17:00 Daily For AMP Works
13 400 kV 315 MVA ICT-2 BANK at Wagoora 18.09.2017 10:00 18.09.2017 17:00 Daily For AMP Works
14 400 kV 315 MVA ICT-3 BANK at Wagoora 19.09.2017 10:00 19.09.2017 17:00 Daily For AMP Works
15 400 kV 400kV Bus-1 at Wagoora 21.09.2017 10:00 21.09.2017 17:00 Daily For AMP Works 16 400 kV 400kV Bus-2 at Wagoora 26.09.2017 10:00 26.09.2017 17:00 Daily For AMP Works 17 400 kV 315 MVA ICT-I at Malerkotla 07.09.2017 09:00 07.09.2017 18:30 Daily For AMP work and attending hot spot.
18 400 kV 500 MVA ICT-III at Malerkotla
18.08.2017 09:00 18.08.2017 18:00 Daily For AMP work and attending hot spot.
POWER GRID NR I
S.N.
LINE/EQUIPT OWNER
DURATION
PURPOSE MODE FROM TO
DATE TIME DATE TIME
1 315MVA ICT-3 at Bhiwadi
A Daily 06-09-17 09:30 06-09-17 18:30 AMP work of ICT and associated equipments
2 315MVA ICT-2 at Bhiwadi
A Daily 07-09-17 09:30 07-09-17 18:30 AMP work of ICT and associated equipments
3 315MVA ICT-1 at Bhiwadi
A Daily 08-09-17 09:30 08-09-17 18:30 AMP work
4 315 MVA ICT-3 at Hissar A Daily 05-09-17 09:30 08-09-17 17:00 AMP work
5 315 MVA ICT-1 at Hissar A Daily 08-09-17 09::00 08-09-17 17:00 AMP work
6 315 MVA ICT-2 at Hissar
A Daily 12-09-17 09::00 08-09-17 17:00 AMP work
7 315 MVA ICT-1 at Bassi A Daily 01-09-17 09::00 01-09-17 17:30 AMP work
8 315 MVA ICT-2 at Bassi A Daily 02-09-17 09::00 02-09-17 17:30 AMP work
9 315 MVA ICT-1 at Manesar A Daily 12-09-17 09::00 12-09-17 17:30 AMP work
10
315 MVA ICT-2 at Manesar
A Cont… 22-09-17 09::00 29-09-17 17:30
For Extension work of 400 KV Manesar and Energisation of 125 MVAR Bus Reactor at Manesar GIS sub-station
11 315 MVA,ICT-1 at Gurgaon
A Daily 13-09-17 09:30 04-09-17 18:00 AMP work of 315 MVA ICT-1 and its associated 400 & 220 kV bays
12 315 MVA ICT-3 at Kankroli A Daily 06-09-17 09:00 06-09-17 18:00 For yearly maintenance work.
13
315 MVA ICT-I at Meerut
A Cont… 26-09-17 09:00 30-09-17 18:00
Replacement of all the three nos. 400 kV BHEL make bushing by CGL make Bushing
14 500 MVA ICT-2 at Ballabhgarh A Daily 02-09-17 10::00 02-09-17 18:00 AMP WORK
15 315 MVA ICT-II at Maharanibagh A Daily 20-09-17 09:00 20-09-17 18:00 ICT and 400kv and 220KV bay AMP
16 400KV Bus-I at Jhatikra A Daily 11-09-17 09:00 11-09-17 17:00 AMP Work
17 400KV Bus-2 at Jhatikra A Daily 12-09-17 09:00 12-09-17 17:00 AMP Work
18 400KV Bus-3 at Jhatikra A Daily 13-09-17 09:00 13-09-17 17:00 AMP Work
19 400KV Bus-4 at Jhatikra A Daily 14-09-17 09:00 14-09-17 17:00 AMP Work
20
400 KV BUS-1 at Manesar
A Cont… 22-09-17 09:00 25-09-17 17:30
For Extension work of 400 KV Manesar and Energisation of 125 MVAR Bus Reactor at Manesar GIS sub-station
21
400 KV BUS-2 at Manesar
A Cont… 26-09-17 09:00 29-09-17 17:30
For Extension work of 400 KV Manesar and Energisation of 125 MVAR Bus Reactor at Manesar GIS sub-station
22
400KV Bus-I at Jaipur(S)
A Daily 07-09-17 09:00 07-09-17 17:00 Bus Bar stability testing for RAPP and Kota Bay extension works.Approved in 137 OCC
23 400KV Bus-II at Jaipur(S) A Daily 08-09-17 08:00 08-09-17 17:00 Bus Bar stability testing for RAPP and Kota Bay extension works.Approved in 137 OCC
24 400KV Bus-I at Sikar A Daily 01-09-17 09:00 04-09-17 17:00
Erection of Structure/ Equipment/ Jack Bus stringing under Construction of 400 kV Bikaner-1&2 Line bays at Sikar S/s
25 400KV Bus-II at Sikar A Daily 04-09-17 09:00 07-09-17 17:00
Erection of Structure/ Equipment/ Jack Bus stringing under Construction of 400 kV Bikaner-1&2 Line bays at Sikar S/s
26 400KV Bus-I at Mandola A Daily 25-09-17 09::00 25-09-17 14:00
For removal of jumpers from Bus-1 of of 410-89 ( ICT-4 main bay bus isolator) & 416-89 (Dadri-2 main bay bus isolator) for retrofitment of existing RK isolators with S&S Isolators
27 400KV Bus-I at Mandola A Daily 29-09-17 10:00 29-09-17 17:30
For Jumpering of 410-89 ( ICT-4 main bay bus isolator) & 416-89 (Dadri-2 main bay bus isolator) and removal of jumpers of 413-89 ( ICT-3 main bay Bus Isolator) & 419-89 (Meerut-2 main bay bus isolator) for retrofitment of existing RK isolators with S&S Isolators
28 400KV Bus-I at Mandola A Daily 03-10-17 12:00 03-10-17 17:30
For Jumpering of of 413-89 ( ICT-3 main bay Bus Isolator) & 419-89 (Meerut-2 main bay bus isolator)
29 220KV Bus-I at Sikar D Daily 08-09-17 09:00 11-09-17 17:00
Erection of Structure/Equipment/Al. Bus pipe/Bus stringing under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar s/S
30 220KV Bus-II at Sikar D Daily 12-09-17 09:00 15-09-17 17:00
Erection of Structure/Equipment/Al. Bus pipe/Bus stringing under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar s/S
31 400 kV ICT-1 (401) bay at Gurgaon A Daily 13-09-17 09:30 04-09-17 18:00 AMP work of 315 MVA ICT-1 and its associated 400 & 220 kV bays
32 220 kV ICT-1 (206) bay at Gurgaon A Daily 13-09-17 09:30 04-09-17 18:00 AMP work of 315 MVA ICT-1 and its associated 400 & 220 kV bays
33 220 केवी आईसीटी-1 वे (बे सखं्या 202)
बस्सी A Daily 15-09-17 09::00 15-09-17 17:30 AMP work
34 220 केवी आईसीटी-2 वे (बे सखं्या 204)बस्सी A Daily 16-09-17 09::00 16-09-17 17:30 AMP work
35 220 केवी आईसीटी-3 वे (बे सखं्या 207)बस्सी A Daily 20-09-17 09::00 20-09-17 17:30 AMP work
36 220 kV ICT-1 M/ Bay No-208 at Roorkee A Daily 29-08-17 09:00 29-08-17 17:00 CB AMP
37 400KV Mainpuri-2 Main Bay at Ballabhagrh A Daily 24-09-17 10::00 24-09-17 18:00 AMP WORK
38 400KV Nawada-Mbagh-Tie bay at Ballabhgarh A Daily 26-09-17 10::00 26-09-17 18:00 AMP WORK
39 400 kV Agra-Sikar ckt-1 TIE BAY (411) at Sikar A Cont. 01-09-17 09::00 30-09-17 17:00
Erection of Structure/Equipment/Al. Bus pipe under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar
40 220 kV Ramnagar Line M/Bay -207 at Roorkee A Daily 22-08-17 09:00 22-08-17 13:00
CT AMP, Protection System AMP, Line Isolator Jumper Tightening.
41 220 kV SIDCUL Line M/Bay -206 at Roorkee A Daily 26-08-17 09:00 26-08-17 13:00
CT AMP, Protection System AMP, Line Isolator Jumper Tightening.
42 220 केवी दौसा-1 वे (बे संख्या 208)बस्सी A Daily 21-09-17 09::00 21-09-17 17:30 AMP work
43 220 केवी दौसा-2 वे (बे संख्या 209)बस्सी A Daily 22-09-17 09::00 22-09-17 17:30 AMP work
44 220 केवी बगरू वे (बे संख्या 212)बस्सी A Daily 23-09-17 09::00 23-09-17 17:30 AMP work
45 220 केवी आई.जी.नगर वे (बे संख्या 213)बस्सी A Daily 24-09-17 09::00 24-09-17 17:30 AMP work
46 220 kV Bus-Coupler (204) bay at Gurgaon A Daily 07-09-17 09:30 07-09-17 18:00 AMP work of 220 kV Bus-coupler bay
47 220 केवी ट्ांसफर बस कप्लर बे (बे संख्या 205)बस्सी A Daily 18-09-17 09::00 18-09-17 17:30 AMP work
48 220 केवी बस कप्लर बे (बे सखं्या 206)बस्सी A Daily 19-09-17 09::00 19-09-17 17:30 AMP work
49 50MVAR MOGA -1 L/R at Hissar A Daily 15-09-17 09::00 15-09-17 17:00 AMP work
50 400KV Dadri-2 main bay ( Bay no 416)at Mandola A Cont. 25-09-17 09::00 29-09-17 17:30
Retro fitment of Bus isolator (RK make) with S&S Make Isolator (new)
51 400KV Meerut-2 main bay ( Bay no 419) at Mandola A Cont. 29-09-17 09::00 03-10-17 17:30
Retro fitment of Bus isolator (RK make) with S&S Make Isolator (new)
52 400KV Z33 FILTER SUB BANK AT DADRI A Cont… 16-08-17 09::00 23-08-17 18:00 CB RETROFITMENT.
53 400KV Z22 FILTER SUB BANK AT DADRI A Cont… 24-08-17 09::00 31-08-17 18:00 CB RETROFITMENT.
54 400KV Z12 FILTER SUB BANK AT DADRI A Cont… 01-09-17 09::00 08-09-17 18:00 CB RETROFITMENT.
55 400KV Z32FILTER SUB BANK AT DADRI A Cont… 09-09-17 09::00 16-09-17 18:00 CB RETROFITMENT.
56 400KV Z21 FILTER SUB BANK AT DADRI A Cont… 17-09-17 09::00 23-09-17 18:00 CB RETROFITMENT.
57 400KV Z11 FILTER SUB BANK AT DADRI A Cont… 24-09-17 09::00 30-09-17 18:00 CB RETROFITMENT.
58 400KV Z31 FILTER SUB BANK AT DADRI A Cont… 01-10-17 09::00 07-10-17 18:00 CB RETROFITMENT.
RRVPNL
S.No. Details of Transmission element
Date Timings Type of
Shutdown Daily/
Continuous
Purpose Remark Voltage Level Name From To From To
1 400 KV 400 KV Main Bus-II at 765kV GSS Anta 26.09.2017 27.09.2017 09.00
Hrs. 18.00 Hrs. daily
For the tightening of clamps & connectors of dropper from main Bus to isolators of different 400 KV Bays connected to 400 KV Main Bus -II
During Shut down 400 KV Main Bus-I will be available in circuit.
2 400 KV 400/220/33 KV 315 MVA ICT-I & bays at 400kV GSS Bikaner
07.09.2017 07.09.2017 10:00 HRs 17:00Hrs daily Routine Bay Maintenance Work
3 400 KV 400/220/33 KV 315 MVA ICT-II & bays at 400kV GSS Bikaner
08.09.2017 08.09.2017 10:00 HRs 17:00Hrs daily Routine Bay Maintenance Work
4 400 KV 400/220/33 KV,250 MVA, ILT-1 at 400kV GSS Heerapura
12.09.2017 12.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura end
5 400 KV 400/220/33 KV,250MVA, ILT-2 at 400kV GSS Heerapura
13.09.2017 13.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura end
6 400 KV 400/220/33 KV,250 MVA, ILT-3 at 400kV GSS Heerapura
14.09.2017 14.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura end
7 400 KV 400/220/33 KV,315MVA, ILT-4 at 400kV GSS Heerapura
15.09.2017 15.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura end
8 400 KV 400/220/33 KV,250 MVA, ILT-1 at 400kV GSS Heerapura
18.09.2017 18.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 220 KV side bay Equipments at
Heerapura end
9 400 KV 400/220/33 KV,250MVA, ILT-2 at 400kV GSS Heerapura
19.09.2017 19.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 220 KV side bay Equipments at
Heerapura end
10 400 KV 400/220/33 KV,250 MVA, ILT-3 at 400kV GSS Heerapura
20.09.2017 20.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 220 KV side bay Equipments at
Heerapura end
11 400 KV 400/220/33 KV,315MVA, ILT-4 at 400kV GSS Heerapura
22.09.2017 22.09.2017 10:00 Hrs
17:00 Hrs daily
3rd Quarterly maintenance of 220 KV side bay Equipments at
Heerapura end
12 400 KV
400 KV Circuit Breaker No. 152 B(Main CB of future Jaipur North) at 400kV GSS Heerapura
25.09.2017 25.09.2017 10:00 Hrs
14:00 Hrs daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura end
13 400 KV
400 KV Circuit Breaker No. 652 B(Main CB of future Hindaun II) at 400kV GSS Heerapura
25.09.2017 25.09.2017 14:00 Hrs
18:00 Hrs daily
3rd Quarterly maintenance of 400 KV side bay Equipments at
Heerapura end
14 400 KV 400/220 KV 315 MVA CG TRF-II at 400kV GSS Barmer
14.09.2017 14.09.2017 10:00 Hrs
18:00 Hrs daily Quarterly Maintenance
15 400 KV 400/220 KV 315 MVA TELK TRF-I at 400kV GSS Barmer
28.09.2017 28.09.2017 10:00 Hrs
18:00 Hrs daily Quarterly Maintenance
16 400 KV 400kV Main Bus-II at 400kV GSS Hindaun 19.07.2017 19.07.2017 10:00
Hrs 16:00 Hrs daily Half yearly Maintenance
17 400 KV 400kV Main Bus-I at 400kV GSS Hindaun 27.09.2017 27.09.2017 10:00
Hrs 16:00 Hrs daily Half yearly Maintenance
18 400 KV 400 KV ICT-I Bay and 315MVA TR-1 at 400kV GSS Bhilwara
18.09.2017 19.09.2017 09:00 HRS.
17:00 HRS. Continuous
Half Yearly maintenance of 400KV ICT-I Bay , 315MVA TR-I and
associated Equipments & testing of Transformer
19 400 KV 400 KV ICT-II Bay and 315MVA TR-2 at 400kV GSS Bhilwara
20.09.2017 20.09.2017 09:00 HRS.
17:00 HRS. daily
Half Yearly maintenance of 400KV ICT-II Bay , 315MVA TR-II and
associated Equipments
20 400KV MAIN BUS A at 400kV GSS Jodhpur 14.09.2017 14.09.2017 10:00
Hrs 18:00 Hrs daily 3rd Quarterly maintenance work
21 400KV MAIN BUS B 400kV GSS Jodhpur 15.09.2017 15.09.2017 10:00
Hrs 18:00 Hrs daily 3rd Quarterly maintenance work
22 400KV 315 MVA ILT-I 400kV GSS Jodhpur 28.09.2017 28.09.2017 10:00
Hrs 18:00 Hrs daily 3rd Quarterly maintenance work
23 400KV
50MVAR REACTOR-II at 400KV MERTA-KOTA (PGCIL)LINE at 400kV GSS Merta
07.09.2017 07.09.2017 09:00Hrs 17:00 Hrs Daily
II nd QUARTERLY MAINT.WORK OF BAY &
EQUIPMENTS
24 400 KV 400 KV 50MVAR LINE REACTOR at 400kV GSS Jaisalmer
04.09.2017 08.09.2017 10:00 Hrs
18:00 Hrs Daily
Sifting of 400 KV Jodhpur line from old bay to new bay by m/s
TATA projects
25 400 KV Tie CB of 400KV ICT-IV at 400kV GSS Jaisalmer 18.09.2017 18.09.2017 10:00
Hrs 18:00 Hrs Daily Quarterly Maintenance
26 400 KV 400KV ICT-I 315 MVA at 400kV GSS Jaisalmer 19.09.2017 19.09.2017 10:00
Hrs 18:00 Hrs Daily Quarterly Maintenance
27 400 KV 400KV ICT-II 315 MVA at 400kV GSS Jaisalmer 22.09.2017 22.09.2017 10:00
Hrs 18:00 Hrs Daily Quarterly Maintenance
28 400 KV 400KV Main Bus-I at 400kV GSS Jaisalmer 12.09.2017 13.09.2017 08:00
Hrs 18:00 Hrs Daily Augmentation work by M/s
Techno
29 400 KV 400KV Main Bus-II at 400kV GSS Jaisalmer 19.09.2017 20.09.2017 08:00
Hrs 18:00 Hrs Daily Augmentation work by M/s
Techno UPPTCL
Sl. No.
Detail of Transmission element Date Timings
Reason Remark Voltage
level
Name of Transmission Elements
From To From To
1 400 KV 400 KV Main Bus-I along with 400 KV Bus Coupler Sarojaninagar
01.09.17 15.09.17 09:00 16:00
FOR RETROFITTING WORK OF BUS-I PANTOGRAPH ISOLATOR OF FOLLOWING BAYS: - 1. 400 KV SAROJININAGAR-KURSI ROAD LINE. 2. 315 MVA 400/220 KV ICT-I.
CONTINUOUS BASIS
2 400 kV 400/220 KV 315 MVA ICT –II at 400KV S/S Gr. Noida
03.09.17 03.09.17 07:00 11:00 For General maintenance of T/F & its bay Daily Basis
3 400KV 400/220KV 240MVA ICT-I at Sultanpur 04.09.17 30.09.17 08:00 18:00
For replacement from 240MVA to 315MVA Transformer and 220KV bay strengthening
continuous basis
4 400 KV 400kv 240MVA ICT-1 at Panki 05.09.17 05.09.17 08:00 18:00
For replacement of damage jumper & other maintenance work.
daily basis
5 400 kV 400/220/33 KV 240 MVA ICT-II at 400KV S/S Murdnagar-II
06.09.17 06.09.17 10:00 15:00 For routine protection testing and other maintenance work.
Daily Basis
6 400 kV 240MVA ICT-II at 400KV S/S Muradnagar-II 08.09.17 13.09.17 08:00 17:00 Centrifuging of Transformer
oil Continuous Basis
7 400KV 500MVA ICT - II bay at 400 KV S/s Sarnath 06.09.17 08.09.17 08:00 18:00
Commissioning of newly replaced Aircell by M/S ABB.
Continuous basis. During shut down load will be taken by both ICTs (315 MVA ICT - I & III) under the total load availability of 520 MW (260 MW on each ICT)
8 400 kV 400/220 KV 500 MVA ICT –IV at 400KV S/S Greater Noida
10.09.17 10.09.17 07:00 11:00 For General maintenance of T/F & its bay Daily Basis
9 400 KV 400kv Agra Fatehabad line-1 at 400kv S/S Agra (UPPTCL)
10.09.17 10.09.17 09:00 17:00
For opening of IPS tube of LSI & crane movement for dismantling CB no. 94 for under taking complete overhauling of 400kv CB no. 94 of Agra- Fatehabad I line thereafter this line will be charged by 400kv transfer bus CB no. 90 after returning of shut down
daily basis
10 400KV 315 MVA ICT - III bay at 400 KV S/s Sarnath 11.09.17 12.09.17 08:00 18:00
Attending oil seepage from various points by M/s EMCO service engineer
During shut down load will be taken by both ICTs (315 MVA ICT - I & 500 MVA ICT - II)
11 400 KV 400kv, 500MVA ICT-II at 400kv S/S Aligarh 11.09.17 15.09.17 08:00 18:00 Attending various leakage
points in transformer. continuous basis
12 400 KV 400kv Agra fatehabad line-1 at 400kv S/S Agra (UPPTCL)
16.09.17 16.09.17 09:00 17:00
For connecting of IPS tube of LSI & crane movement for assembling CB no. 94 after complete overhauling of 400kv CB no. 94 of Agra- Fatehabad I line thereafter this line will be charged by 400kv main Circuit Breaker no. 94 after returning of shut down
daily basis
13 400KV 315 MVA ICT - II Bareilly 17.09.17 20.09.17 08:00 18:00 For Replacement of Damaged Conductors of Jack Bus of L.V. side.
CONTINUOUS BASIS
14 400KV 400 KV Main Bus - II at 400 KV S/s Sarnath 18.09.17 30.09.17 08:00 18:00 Repairing, Strengthening of
400 KV Main Bus - II
No supply shall be dislocated during shut down. All load shall be fed through Main Bus - I
15 400 KV 400kv A BUS at 400kv S/S Panki 20.09.17 24.09.17 08:00 18:00
For replacement of A-BUS pantograph isolator of 400/220kv 240 MVA ICT-II.
continuous basis
16 400KV 315 MVA ICT - I Bareilly 21.09.17 23.09.17 08:00 18:00
For Replacement of Damaged Conductors of Jack Bus of L.V. side.
CONTINUOUS BASIS
17 400KV 400 KV Sarnath - Varanasi - II Line at 400 KV S/s Sarnath
25.09.17 25.09.17 08:00 18:00 General Maintenance Continuous basis
18 400 KV 400kv 315 MVA ICT-III at 400kv S/S agra (UPPTCL)
26.09.17 26.09.17 09:00 16:00 For routine testing & M&R of bay and control relay panel.
daily basis
19 400KV 315 MVA ICT - I bay at 400 KV S/s Sarnath 27.09.17 27.09.17 08:00 18:00 General Maintenance Continuous basis
20 400KV 400 KV Sarnath - Varanasi - I Line at 400 KV S/s Sarnath
28.09.17 28.09.17 08:00 18:00 General Maintenance Continuous basis
BBMB
Sr. No. Element Name Owner Name
Mode (Daily/Conti.)
Reasons From To
Date Time Date Time
O&M Circle, BBM, Bhiwani 400 kV Substation Bhiwani.
1. 500 MVA 400/220 kV ICT BBMB Daily To tightening the loose joints of 33 kV teriary bus and other maintenance work.
15.9.2017 8.00 15.9.2017 17.00
220 KV S/Stn Ch. Dadri 1 220/132 kV 100 MVA Transformer T-1 HVPNL Continue
basis Replacement of Isolators Shut down approved during Aug, 2017 has not been availed due to heavy rain.
25.9.2017 8.00 27.9.2017 17.00
2 220/132 kV 100 MVA Transformer T-2 HVPNL Daily For half yearly maintenance 28.09.2017 8.00 28.09.2017 17.00 3 220 kV Bus-I BBMB Daily For half yearly maintenance 15.9.2017 8.00 15.09.2017 17.00 4 220 kV Bus-II along with Bus Coupler BBMB Daily For half yearly maintenance 16.9.2017 8.00 16.09.2017 17.00 220 kV S/Stn Samaypur 1 220 kV Bus Coupler-II BBMB Short period To remove the sub bus jumper from spare
bay No. 16&17 as per observation of third party protection audit team.
18.9.2017 8.00 18.9.2017 11.00 2 220 kV Bus Sectionalizer BBMB Short period 18.9.2017 8.00 18.9.2017 11.00 3 ICT Bank-I&II PGCIL Short period 18.9.2017 8.00 18.9.2017 11.00
HP LOAD DESPATCH SOCIETY
1. 220 KV Pong- Jassure bay 12.9.17 10:00 Hrs -18 Hrs 2. 220 KV Bairasuil- Jassure bay 14.9.17 10:00 Hrs -18 Hrs 3. 220 KV RSD- Jassure bay 16.9.17 10:00 Hrs -18 Hrs
All the above outages are required for the replacement of old CT s at Jaasure end
Indenting Agency For the Month Date
Line Details Proposed Date and Time
S No.
Name of the Requesting agency
Voltage Level (KV)
Name of the Element
Owner
Daily /Continous
Reason From Date From Time
To Date To time
Remarks
1 P&M Org. 400
500 MVA 400/220KV ,ICT-4 at 400kV
Rajpura (Bay no. 411, 412)
PSTCL Daily
Annual protection testing/ Annual
Periodical maintennace
05.09.2017 10:00 05.09.2017 17:00
2 P&M Org. 400 400 KV Rajpura-NPL ckt 2(Bay No 414,415) PSTCL Daily
Annual protection testing/ Annual
Periodical maintennace
07.09.2017 10:00 07.09.2017 17:00
3 P&M Org. 400 400 KV Rajpura-
Dhurickt 2( Bay No 413, 414)
PSTCL Daily
Annual protection testing/ Annual
Periodical maintennace
08.09.2017 10:00 08.09.2017 17:00