Proposed ODOT Construction Projects 1/1/18 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2018 83147 CUY IR 090 04.90 NOISE WALL 600 feet west of the Westlake/Rocky River corporation line
to the Rocky River
Construct Type II Noise Barrier at spot locations in the Cities of
Westlake and Rocky River.Includes sections not built under
PID 75314. o Moved to SFY 2018 fro 2015PROJECT CANCELLED
PER CO REQUEST
$1,500,000
1/1/2018 85525 CUY IR 077 00.00 Brecksville; County Line to Oakes PM resurfacing from the county line to Oaks Rd in Brecksville $0
1/1/2018 106826 CUY Broadview Hts TLCI Broadview Hts: Broadview Rd and Oakes Rd intersection NOACA TLCI Implementation Project: The addition of a left-
turn lane to Broadview Road (SR-176) at the Oakes Road
intersection in the City of Broadview Heights as part of the
City Campus Roadway Pedestrian Access and Safety
Improvements.
$182,500
1/11/2018 93607 CUY SR 091 02.50 Intersection Solon: SR-91 (S.O.M. Center Road) and SR-43 (Aurora Road) 2015 Safety Project: Improve the intersection capacity by
widening the intersection of S.O.M. Center Road (SR-91) and
Aurora Road (SR-43) in the City of Solon.
$3,329,562
1/11/2018 98550 CUY MLK BLVD 5:055M Cleveland: MLK Blvd over Doan Brook creek Municipal Bridge Project along Martin Luther King Jr Blvd to
replace a concrete filled arch structure over Doan Brook creek
just south of Jeptha Drive intersection in the City of Cleveland.
$1,166,838
1/11/2018 106827 D12 MNT FY2018 Tree Removal Various General tree and brush clearing along the freeway corridors. $448,385
1/16/2018 103929 CUY Lee Road Shaker Hts: Various local routes Restripe Lee Road as a 3-lane roadway (one lane each
direction with a center turn lane) between North Park and City
Hall and between Lomond and Scottsdale. The existing
roadway configuration between City Hall and Lomond will
remain. The proposed bicycle f
$120,012
1/25/2018 80963 GEA US 422 13.04 Intersection Troy Township; At SR-700 Safety improvements at intersection of US-422 and SR-700 in
Troy Twp. SAFETEA-LU Earmark
$708,400
1/25/2018 89246 CUY SR 176 12.83 Cleveland; Denison to IR-90 PM resurfacing on SR-176 from Denison Ave to merge with IR-
71 near IR-90 in Cleveland.
$1,239,870
1/25/2018 94539 LAK SR 608 00.85 Slope Concord Hambden Road near Big Creek in Concord
Township.
GSM Project: The proposed repair is to construct a retaining
wall or grade the existing slope in order to maintain proper
drainage along the ditch line in the road which will minimize
any R/W impacts.
$439,001
1/25/2018 99593 CUY IR 090 16.45 Cleveland; I-77 to SR-2 Resurfacing I-90 from I-77 to SR-2 in Cleveland. $2,707,279
1/25/2018 99627 GEA SR 306 00.00 Bainbridge Twp; County Line to Washington St Resurfacing for SR-306 from the County Line to Washington St
in Bainbridge Twp.
$947,574
1/25/2018 99629 GEA SR 700 02.71 Troy, Burton Twps; US-422 to SR-168 Resurfacing of SR-700 from US-422 to SR-168 in Troy and
Burton Twps.
$561,606
1/25/2018 99697 LAK SR 086 05.49 LeRoy Twp; Vrooman Rd to the Cnty Ln Resurfacing from Vrooman Rd to the Lake County Line in
LeRoy Township.
$496,810
10year_Jan2018thruJan2028 1 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/25/2018 104933 CUY Detroit Ave Streetscape II Cleveland: West 78th ST to West 73rd St NOACA TAP Project: Detroit Avenue streetscape improvement
from West 78th Street to West 73rd Street including 480-feet
on Lake Ave from West 78th Street to Detroit Avenue and
from West 58th Street to West 52nd Street in the City of
Cleveland. The improve
$1,348,533
1/31/2018 105721 CUY Wallings Rd Broadview Road to Broadview Heights ECL Resurface Wallings Road from Broadview Road to Broadview
Heights ECL in the City of Broadview Heights.
$1,673,116
2/1/2018 78343 GEA US 422 17.35 Intersection Intersection of US-422 and SR-88/SR-528 in Parkman
Township
Improve geometrics and capacity at the intersection of US-422
and SR-88/SR-528 in Parkman Twp.
$470,000
2/1/2018 80974 CUY IR 480/Transportation Blvd Garfield Hts; IR-480 interchange to SR-17 Transportation Boulevard Improvements consists of the
following: 1) widen the pavement, 2) widen the
Transportation Blvd bridge over IR-480, 3) minor IR-480 WB
ramp modification at the intersection, 4) improve the
boulevard's traffic signal coordination
$5,247,255
2/1/2018 88352 LAK SR 002 14.28 Painesville Twp; Newell St Over SR-2 Replace the deck of the Newell Street bridge over SR-2 in
Painesville Township.
$1,700,000
2/1/2018 89168 CUY IR 480 22.41 EB Maple Hts, Cleveland, Warrensville Hts; Cambden Rd to I-
480WB bridge
Reconfigure the EB I-480 lane assignments through the
Warrensville Center Rd interchange to provide 3 lanes of
traffic to IR-480N utilizing the Practical Design criteria
established by the Department. Work will be loosely based on
the 12/22/08 TransSyste
$6,720,000
2/1/2018 90909 GEA US 006 00.00 Chardon Twp; County Line to Chardon WCL Resurface Chardon Rd (US-6) from the Lake County Line to the
Chardon WCL in Chardon Twp.
$770,000
2/1/2018 96574 FACD12 Cleveland FSMF N/A Construct a new maintenance facility located west of IR-77,
just south of Pershing Avenue in the City of Cleveland that will
eventually merge Cleveland and Independence yards. Selling
as Multi Prime delivery.
$16,576,234
2/5/2018 103631 CUY Euclid Ave/E. 260th St US-20 and SR-175 intersection Improvement to the crosswalk markings and signals, lighting
and transit waiting areas at the intersection of Euclid Avenue
(US-20) and E. 260th Street (SR-175) in the City of Euclid. Work
will include landscaping, new benches and trash receptacles.
$136,192
2/15/2018 80966 CUY NORTH COAST HARBOR PED BR N/A Construct a movable pedestrian bridge from east of Dock 32
to Voinovich Park southwest corner in the City
Cleveland.SAFETEA-LU Earmark + OH313FFY 05 Appropriation
OH140 - Preliminary Development
$7,022,122
2/15/2018 80997 CUY CLEVELAND TOWPATH TRAIL Ph 1Cleveland; Harvard Ave to Steelyard Commons. Construct the Cleveland Towpath Trail in the City of Cleveland
from Harvard Avenue to Steelyard Commons.o Related PIDs:
84112, 87075
$3,161,173
2/15/2018 85530 CUY IR 480 19.21 Garfield Hts, Maple Hts; Bridge to Lee Road PM resurfacing of IR-480 from the Valleyview Bridge to Lee
Road in Garfield Hts and Maple Hts. Includes lighting upgrade.
$3,785,000
10year_Jan2018thruJan2028 2 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
2/15/2018 92071 GEA US 422 16.38 Parkman Twp; Over the Grand River Replace the top of the concrete frame bridge over the Grand
River located west of SR-88 in Parkman Twp.
$1,490,000
2/23/2018 106001 CUY North Park Blvd MLK Blvd to Lee Road NOACA TLCI Implementation Project: Create a buffer between
the bike path and the vehicle lanes on North Park Blvd
between Martin Luther King Jr. Drive and Lee Road in the City
of Cleveland Heights.
$32,174
2/28/2018 80960 CUY INDEPENDENCE ALL-PURPOSE TRLN/A Construct an all-purpose trail from Brecksville Road to Canal
Road in the City of Independence.SAFETEA-LU Earmark
$2,638,192
2/28/2018 102013 CUY SR 087 10.58 Beachwood; SR-87 to US-422 Repair and resurface northbound Richmond Rd (SR-87/SR-175)
from Shaker Blvd (SR-87) to Chagrin Blvd (US-422) in
Beachwood. ODOT's participation will be the equivalent of an
Urban Paving treatment.
$1,933,851
3/1/2018 85358 CUY SR 003 05.30 Parma; SCL to Pleasant Valley Resurface Ridge Road (SR-3) from the south corp. line to
Pleasant Valley Rd in Parma.
$683,279
3/8/2018 81552 CUY IR 071 17.95L Cleveland; SR-176SB over IR-71SB Replace the deck of the SR-176SB bridge over IR-71SB in
Cleveland. Includes painting the structural steel.
$3,565,000
3/8/2018 85217 GEA SR 528 16.48 Montville Twp, Thompson Twp; US-6 to County Line Resurface Madison Rd (SR-528) from the GAR Highway (US-6)
to the Lake County Line in Montville and Thompson Twps.
$2,500,000
3/8/2018 99634 GEA SR 166 00.00/VAR Hambden, Montville, Thompson Twps; US-6 to SR-
86/Hambden Twp; Claridon-Troy to US-6
Resurfacing Rock Creek Rd (SR-166) from US-6 to SR-86 in
Hambden, Montville, and Thompson Twps; and Old State Rd
(SR-608) from Claridon-Troy Rd to US-6 in Hambden Twp.
$780,000
3/9/2018 80961 CUY SR 082 04.83 Widening North Royalton; WCL to York Road Reconstruct and widen Royalton Road (SR-82) from the WCL
(W.130th) to York Road in the City of North Royalton.o
SAFETEA-LU Earmarks OH169 + OH323o ODOT urban paving
funds
$12,873,193
3/22/2018 85394 CUY SR 091 07.73 Pepper Pike, Hunting Valley; SCL to NCL Resurface SOM Center Rd (SR-91) from the SCL to the NCL in
Hunting Valley and Pepper Pike.
$935,397
3/22/2018 99645 LAK SR 528 00.00/04.21 Madison, Madison Twp; Cnty Ln to US-20 Resurfacing from the Geauga County Line to North Ridge Rd
(US-20) in Madison Twp and Madison. Includes work on 3
culverts: 1877075 - old 4352800151877076 - old
4352800201878024 - old 435280178
$1,040,000
3/22/2018 105881 CUY US 042 16.62 Utility Part 2 Cleveland; W.25th over IR-90 Part 2 to complete the relocation of the CPP lines off of the
West 25th St bridge over I-90 in Cleveland. Work will include
placing duct banks along Wade Avenue and Vega Avenue and
running the power cables through the duct banks. This work
will be compl
$800,000
10year_Jan2018thruJan2028 3 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
3/23/2018 105029 LAK VROOMAN ROAD LeRoy, Perry Twps; IR-90 to SR-84 Upgrade and relocate Vrooman Rd from IR-90 to SR-84 in
LeRoy and Perry Townships. The work in PIDs 5669 and 85131
will be incorporated into this project.o $150,000 for Arch
Study set up in 1997 as federal.o Plans by Lake County.o Fund
sources: MPO STP, C
$22,199,672
3/29/2018 104938 CUY Wendy Park Bridge N/A Re-Connecting Cleveland: Pathways To Opportunity project to
construct a bridge linking the Cleveland Foundation
Centennial Trail to Wendy Park on Whiskey Island in the City
of Cleveland.o Related projects: 104804, 104937, 104939
$6,000,000
4/1/2018 96348 CUY SRTS FY2015 South Euclid N/A o SRTS Infrastructure Project to improve crosswalks, sidewalk,
bike paths, and drop-off areas to service four South Euclid
schools in the City of South Euclid.o SRTS Infrastructure
Project to improve crosswalks, ADA ramps, school flashers and
sidewalks at
$357,260
4/1/2018 104802 LAK CR GR VAR FY 2018 N/A CEAO HSIP Project: Lake County will install new and upgrade
existing guardrail on various county routes.
$93,183
4/1/2018 106663 CUY Olmsted Falls TLCI Columbia Road to Orchard Road NOACA TLCI Implementation Project: Enhance the pedestrian
access in downtown Olmsted Falls
$169,000
4/1/2018 106748 CUY North Royalton TLCI N Royalton: Memorial Park to Trumpeter Blvd NOACA TLCI Implementation Project: Construct sidewalks on
the west side of State Road (SR-94) to connect Memorial Park
north towards Royalton Road (SR-82) in the City of North
Royalton.
$150,400
4/5/2018 85401 CUY US 322 03.82/04.90 Cleveland; Chester Ave from East 93rd to US-20/ Mayfield
Rd from US-20 to ECL
Resurfacing Chester Avenue from East 93rd Street to Euclid
Avenue (US-20) in Cleveland/Mayfield Road from Euclid
Avenue (US-20) to the Cleveland Corp. limit in Cleveland
$1,480,000
4/5/2018 97717 GEA AUBURN ROAD (D-E) Auburn Twp: Bainbridge Rd to Franks Rd NOACA STP Project to resurface Auburn Road (CH 4) sections
D-E from Bainbridge Road to Franks Road in Auburn Township.
$735,000
4/5/2018 97718 GEA CLARIDON TROY ROAD (A-C) Burton Twp: Burton Village North Corp to Taylor Well Rd NOACA STP Project to resurface Claridon Troy Road (CH 3)
Sections A-C from the Burton Village north corporation line to
Taylor Wells Road.
$430,000
4/19/2018 84405 LAK SR 283/535 16.19/00.00 Painesville; WCL to US-20/SR-283 to ECL Resurface Richmond St (SR-283) from the WCL to Erie St (US-
20), and Richmond St (SR-535) from SR-283 to the ECL in
Painesville and Painesville Twp. Includes work from PID 89270
$975,000
4/19/2018 98600 D12 BH FY2018 Misc Various routes & sections Miscellaneous bridges repairs to Ford Rd and Morley Rd over
IR-90, Granger Rd (SR-17) over IR-480, and SR-44 over Kellogg
Creek.
$2,500,000
4/19/2018 99995 D12 BH FY2018 Deck Sealing Various Seal the decks of 46 mainline structures along the I-90 corridor
from Bradley Rd in Westlake to the NS railroad in Euclid.
$715,000
10year_Jan2018thruJan2028 4 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
4/19/2018 99999 D12 CU FY2018 Various Culvert replacement. Right-of-way requiredCUY-252-02.66;
replace mishmash culvertGEA-087-08.62; replace 54" CMPLAK-
307-02.30; replace 12" pipe
$340,000
4/19/2018 106690 CUY IR 480 25.03 Bedford Hts; Over SR-17 Convert the I-480 bridge over Bartlett Road (SR-17) to semi-
integral abutments including replacing the approach slabs and
converting to elastomeric bearings. This project is approved
for an expedited sale.
$1,120,000
4/20/2018 105716 CUY Pleasant Valley Rd State Road to Broadview Road Resurface Pleasant Valley Road from 0.08 mile east of State
Road to Broadview Road in the City of Parma.
$4,795,680
5/1/2018 84401 LAK SR 306 00.00 Kirtland; SCL to south of Kirtland Rd Resurfacing SR 306 from SCL to south of Kirtland Rd. (the
existing concrete section) in the City of Kirtland.
$1,700,000
5/1/2018 85393 CUY US 020 08.01/VAR Rocky River; Center Ridge to Detroit / WCL to US-20 Resurface Wooster Road from Center Ridge to Detroit; and
Detroit Road from the West corp. line to Wooster Rd (US-20)
all in Rocky River.
$3,432,000
5/1/2018 104803 LAK CR PM/RPM VAR FY2018 N/A CEAO HSIP Project: Lake County will upgrade existing
pavement markings and install new raised pavement marker
on various county routes.
$148,325
5/1/2018 105223 CUY University Hts TLCI Fairmount Blvd to Hillbrook Rd NOACA TLCI Implementation Project: Improve the multimodal
transportation of Warrensville Center Road in the City of
University Heights using complete street concepts that
includes mid-block crosswalks between Fairmount Blvd and
Meadowbrook Blvd, mid-bloc
$125,000
5/3/2018 97322 CUY US 322 05.78 Signals Kenilworth to Warrensville Center Rd Cleveland Heights' Mayfield Road Signal project will replace
the existing signals on Mayfield Road with new fiber
interconnected signals, pre-empt and ADA ramps.o Federal
HSIP and NOACA MPO CMAQ project
$3,160,686
5/3/2018 98814 D12 GR FY2018 Various routes & sections Upgrade the guardrail along IR-90 from SR-2 to East 55th St
and at US-6 and SR-307. Includes the yearly ding-and-dent
repair contract.
$785,000
5/3/2018 101971 CUY SR 010 08.69 Fence Fairview Park, Cleveland; SR-10 over the Rocky River Add VPF to the Lorain Rd bridge over the Rocky River in
Fairview Park and Cleveland.
$930,000
5/3/2018 105933 CUY Prospect Ave East 22nd St to Carnegie Avenue Resurface Prospect Avenue from East 22nd Street to Carnegie
Avenue in the City of Cleveland.
$1,545,000
5/3/2018 106729 CUY Olmsted Twp TLCI Cook Road/Fitch Road in Olmsted Township NOACA TLCI Implementation Project: Construct new sidewalk
on the north side of Cook Road between Timber Lane and
Fitch Road(approximately 732 linear feet), construct new
sidewalk on the south side of Cook Road east of Fitch Road
(approximately 429 linear
$227,273
5/15/2018 106723 CUY Strongsville TLCI N/A NOACA TLCI Implementation Project: Strongsville Town
Center District project to upgrade all pedestrian signals, install
pedestrian refuge islands, upgrade all curb ramps to ADA
stances, and replace traffic detectors capable of bicycle
detection.
$324,000
10year_Jan2018thruJan2028 5 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
5/17/2018 98604 D12 PPM FY2018 Various routes & sections Pavement PM project on various routes throughout the
district. Includes the Unionville facility.
$1,800,000
5/17/2018 98816 D12 LG FY2018 Various routes & sections Lighting upgrade $1,200,000
5/17/2018 98830 D12 SIGN FY2018 Various routes & sections Sign structure upgrade contract $440,000
5/17/2018 99202 GEA SR 528/608 04.39/0.00 Safety Middlefield Twp: SR-528/SR-608 intersection Highway Safety Improvement Project: Create SR-528 left-turn
lanes from the existing pavement and shoulder, improve the
right-turn radius for large vehicles and rebuild the signal
installation to improve signal head placement.
$833,000
5/30/2018 106746 GEA Newcomb Rd TLCI Middlefield Twp: Shedd Rd to Georgia Rd NOACA TLCI Implementation Project: Provide additional
paved shoulder to Newcomb Road from Shedd Road to
Georgia Road in Middlefield Township as outlined in the
Amish Safety Strategic Plan (2016).
$1,000,000
6/7/2018 98831 D12 TSG FY2018 Various routes & sections Traffic signal upgrade: install signal at SR-306 and Taylor May,
improve signal head configuration at SR-306 and Pettibone,
construct 2 pedestrian refuge islands with RRFB's for midblock
crossings of SR-283 Lakeshore Blvd near East 242nd Street
(Euclid.)
$223,000
7/16/2018 100251 CUY Cedar Road Green Road to IR-271 Cuyahoga County project to rehabilitate Cedar Road from
Green Road to IR-271 within the Cities of University Heights,
South Euclid, Beachwood and Lyndhurst.
$4,365,000
7/23/2018 91829 LAK STANTON PARK SHORE Madison Township: Stanton Park along the Lake Erie
shoreline
Protect the Lake Erie shoreline from erosion and preserve
green space in Stanton Park.OH062 also used on PIDs 18895 &
23409.
$464,545
8/20/2018 80987 CUY Dock Rehab N/A Repair and replace 1,185 linear feet of sheet pile bulkhead at
the Cleveland Bulk Terminal facility and include the
installation of storm water improvements adjacent to the
bulkhead.o Earmarks: OH351, OH360
$7,340,990
8/23/2018 22213 CUY IR 077 12.12 Newburgh Hts; Harvard over IR-77 Replace the Harvard Avenue bridge over I-77 in the Village of
Newburgh Heights. Work includes removing the center pier,
raising the profile for vertical clearance, and upgrading the
traffic signals.
$6,000,000
9/3/2018 88032 CUY SR 010 06.00 Streetscape Fairview Park: WCL to West 223rd Street Streetscape improvements along Lorain Road (SR-10) from
Fairview Park west corporation line to West 223rd Street in
the city of Fairview Park.o extend tree plantings started
further east on Lorain Roado include brick panel associated
with the tree and tre
$1,199,860
9/13/2018 107329 D12 MNT FY2019 Tree Removal Various General tree and brush clearing along the freeway corridors. $500,000
9/27/2018 98834 D12 MOW FY2019 Various routes & sections Mowing $800,000
10year_Jan2018thruJan2028 6 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
10/25/2018 101106 LAK SRTS FY2019 Willowick N/A SRTS Infrastructure Project to improve crosswalks at Ronald
Drive, Pendley Road, and East 305th Street with the
installation of curb ramps, signage, warning signs and
crosswalk markings for students attending the Willowick
Middle School in the City of Wil
$71,000
10/25/2018 101112 CUY SRTS FY2019 Cleveland Hts N/A SRTS Infrastructure Project to reconstruct the traffic signal
with pedestrian crossing facilities at the Noble Road and
Quilliams Road to improve the safety of students crossing the
intersection that attend Oxford Elementary and Monticello
Middle schools
$114,000
11/1/2018 106749 CUY Edgehill Rd/Overlook Rd TLCI Cleveland Hts: Edgehill Rd/Overlook Rd NOACA TLCI Implementation Project: Reduce the width of the
Edgehill Road and Overlook Road intersection to calm traffic
and make it friendlier for pedestrians and bicyclist in the City
of Cleveland Heights
$125,000
11/15/2018 100257 CUY Lakewood Heights Blvd Alger Rd to Chesterland Ave Rehabilitate Lakewood Heights Boulevard (CR-297) from Alger
Road to Chesterland Avenue in the City of Lakewood.
$1,911,241
12/13/2018 103195 D12 PM FY2019 Various routes & sections Pavement marking contract for D-12 $2,200,000
1/1/2019 96188 CUY Riveredge Garage FY2019 Riveredge Garage Construct a cold storage building at Riveredge garage in
Cuyahoga county.
$30,000
1/1/2019 100288 CUY Pearl Road State Rd to Wildlife Way Modify the existing Pearl Road (US-42) roadway between
State Road and Wildlife Way to accomodate a five-lane road
section with two five-foot bike lanes and streetscaping which
includes new curbing, sidewalks, drive access, landscaping,
decorative colored
$1,818,750
1/1/2019 104937 CUY Lakefront/Canal Basin Links N/A Re-Connecting Cleveland: Pathways To Opportunity project:o
Cleveland Lakefront Bikeway Connector - link the CFCT to the
Cleveland Lakefront Bikeway.o Canal Basin Park Connector -
links the CFCT to Canal Basin Park, Rivergate Park, GCRTA
Waterfront Line Ra
$700,000
1/1/2019 104939 CUY Whiskey Island Connector N/A Re-Connecting Cleveland: Pathways To Opportunity project to
construct the Whiskey Island Connector linking Wendy Park
Bridge to Edgewater Park, three pedestrian tunnels and the
Cleveland Lakefront bikeway in the City of Cleveland.o Related
projects: 10480
$2,900,000
1/1/2019 106784 CUY Prospect Ave Cleveland: E. 22nd to Carnegie Ave Repair and resurface Prospect Avenue from East 22nd Street
to Carnegie Avenue in the City of Cleveland.
$2,446,402
1/10/2019 102054 CUY 17/94/480 10.78/10.05/13.96 Cleveland/Parma: SR-17 to IR-480 Highway Safety Improvement Project to improve traffic flow
and reduce crashes on State Road (SR 94) by adding a WB
right-turn only lane to Brookpark Road (SR 17), lengthening
turn-slot storage on the I-480 WB exit to State Road, and
reconfiguring travel l
$2,264,000
10year_Jan2018thruJan2028 7 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/10/2019 103480 CUY Queenswood Drive Bay Village Municipal Bridge Project for SFY 2019 to replace the
Queenswood Drive bridge over Sperry Creek in Bay Village.
$1,408,262
1/11/2019 87075 CUY CLEVELAND TOWPATH TRAIL Ph 4N/A o Construct Stage 4 of the Cleveland Towpath Trail from
Tremont/Literary Trailhead to Canal Basin Park.o SAFETEA-LU
Earmarks: OH-214 and OH-322o FY 2006 Appropriation
Earmark: OH-370 in PE Envo Related PIDs: 80997, 84112
$12,000,000
1/15/2019 85387 CUY SR 176 07.87 Parma; Ridgewood to SR-17 Resurface Broadview Rd (SR-176) from Ridgewood Drive to
Brookpark Road (SR-17) in Parma.
$1,550,000
1/24/2019 85400 CUY SR 175 09.83 Richmond Hts; SCL to NCL Resurface Richmond Rd (SR-175) from the SCL to the NCL in
Richmond Hts.
$1,710,000
1/24/2019 85634 LAK SR 002 00.00 Wickliffe, Willowick, Eastlake; County Line to E of SR-91 PM resurfacing of the Lakeland Freeway (SR-2) from the
Cuyahoga County Line to approx. SR-91 in Wickliffe, Willowick,
and Eastlake.
$3,300,000
1/24/2019 93467 LAK SR 002 03.03 L&R Eastlake; Over a stream west of SR-91 Replace the twin SR-2 bridges over a stream just west of SR-91
in Eastlake. Work will include installing a 4-sided box
structure thru the existing bridges.
$1,070,000
1/24/2019 99681 GEA SR 044 13.15 Munson Twp; US-322 to Chardon SCL Resurface Ravenna Rd (SR-44) from Mayfield Rd (US-322) to
the Chardon SCL in Munson Twp.
$640,000
1/24/2019 102301 D12 CU FY2019 Various Culvert rehab/replacement: GEA-088-04.79; replace 48x36
concrete boxGEA-088-05.57; replace 60x30 concrete boxGEA-
088-05.95; replace 36x36 concrete boxGEA-528-14.34; replace
inlet pipes
$400,000
1/24/2019 104324 CUY SR 252 02.26 Olmsted Twp; SCL to NCL Resurface Columbia Rd (SR-252) from the Olmsted Falls NCL to
the North Olmsted SCL in Olmsted Twp
$400,000
1/31/2019 8743 CUY US 006 02.57 Bay Village; 1.29 mi W of SR-252 Replace the 85' Lake Rd (US-6) bridge over Cahoon Creek
located west of SR-252 in Bay Village. Repairs were done in
2002.
$2,900,000
1/31/2019 85369 CUY SR 082 06.58 North Royalton; York Rd to ECL Resurface Royalton Rd (SR-82) from York Road to the ECL in
North Royalton.
$1,170,000
1/31/2019 99535 CUY IR 480N 00.00 I-480 to US-422 Resurfacing from I-480 to US-422E/I-271N. $2,200,000
1/31/2019 102438 CUY IR 271 12.74/VAR Paint Various Paint the structural steel of the I-271 mainline bridges over
Marsol and US-322.
$3,000,000
1/31/2019 103482 CUY East 116th Street Cleveland Municipal Bridge Project for SFY 2019 to rehabilitate East
116th Street bridge over GCRTA in the City of Cleveland.
Includes FTA 5337 State of Good Repair funds of $528,000
from PID 106782 which was deleted in Ellis. FHWA will be the
primary federal age
$1,412,640
10year_Jan2018thruJan2028 8 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
2/21/2019 23414 CUY US 042 16.62 Cleveland; West 25th over IR-90 Replace the superstructure of the West 25th St (US-42) bridge
over IR-90 in the City of Cleveland. Work will include installing
shallower beams to gain vertical clearance on IR-90. See PID
101856 and PID 105881 for utility relocation. CUY-090-1435
$4,300,000
2/21/2019 91605 LAK IR 090 01.88 Rockefeller to W of SR-306 Resurface IR-90 from approximately Rockefeller Rd to the
concrete section west of SR-306 in Willoughby Hills, Waite Hill,
and Willoughby.
$6,720,000
2/21/2019 96673 CUY IR 090 09.70 L&R Cleveland; I-90 over GCRTA Painting structural steel. $3,700,000
2/21/2019 96986 CUY SR 010 16.13 Steel Cleveland; Over the Cuyahoga River Structural steel repair/retrofit on the Hope Memorial Bridge
over the Cuyahoga River in the City of Cleveland.
$11,500,000
2/21/2019 100254 CUY East 49th Street/Harvard Ave Harvard Ave to Fleet Ave/ E. 55th to Washington/E. 49th Rehabilitate East 49th Street from Harvard Avenue to Fleet
Avenue and Harvard Avenue from East 55th Street to
Washington/East 49th Street in the Village of Newburgh
Heights.
$1,689,013
2/26/2019 96947 CUY SR 082 10.17 Widening SR-82 (East Royalton Rd) from east of SR-176 to Treeworth
Blvd in Broadview Hts.
Widen a section SR-82 from three-lane to a five-lane from east
of Broadview Road (SR-176) to Treeworth Boulevard. The
work include the construction of urban shoulder, curb and
gutter, resurfacing, bike path, traffic signals, signs, and
pavement markings.
$5,952,519
3/1/2019 104243 CUY SR 237 12.66 Lakewood; N of IR-90 to West Clifton Resurface Riverside Drive (SR-237) from north of I-90 to West
Clifton Blvd in Lakewood.
$260,000
3/7/2019 84490 GEA SR 044 13.05 Munson Twp; S of US-322 over Butternut Creek Replace and widen the slab bridge on Ravenna Road (SR44)
over Butternut Creek located 0.10 miles south of Mayfield Rd
(US-322) in Munson Twp.
$865,000
3/7/2019 85600 GEA US 006 05.90 Hambden Twp; Chardon ECL to SR-166 Resurface the GAR Highway (US-6) from the Chardon ECL to SR-
166 in Hambden Twp.
$930,000
3/7/2019 94577 CUY US 006 21.27 East Cleveland; East of Superior Rehabilitate, replace, or otherwise upgrade the 15' stone arch
drainage structure carrying Dugaway Brook under Euclid
Avenue (US-6) located just east of Superior Avenue in East
Cleveland.
$350,000
3/7/2019 95404 CUY EAST CLEVELAND SIGNALS East Cleveland - city wide MPO CMAQ Project: Upgrade and coordinate the traffic
signals along Euclid Avenue in the City of East Cleveland.
$2,302,293
3/7/2019 99530 CUY IR 071 05.72 Middleburg Hts, Brook Park; US-42 to I-480 Resurfacing from Pearl Rd (US-42) to I-480. $4,500,000
3/7/2019 107119 CUY IR 071 02.65 Auxiliary Lane Middleburg Hts, Strongsville; I-71 SB from I-80 to SR-82 Add an auxiliary lane along southbound I-71 from the Ohio
Turnpike (I-80) entrance ramp to the SR-82WB exit, a distance
of approximately 6200’ between ramp terminals. Work will
include converting the I-71 southbound exit to SR-82
westbound to a two-lane
$1,475,000
3/15/2019 96956 CUY NORTH MAIN STREET BRIDGE Chagrin Falls: North Main Street over Chagrin River CEAO LBR Project: Rehabilitate the North Main Street bridge
(C.R. 264) over the Chagrin River in the Village of Chagrin Falls.
Note that county is pursuing CBP credit.
$3,691,600
10year_Jan2018thruJan2028 9 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
3/21/2019 96187 FACD12 Vrooman Outpost Vrooman Outpost Replace the existing salt storage shed and construct a cold
storage building at the Vrooman Outpost in Lake county.
$1,500,000
3/21/2019 99679 GEA US 322 10.40 Claridon Twp; SR-44 to SR-608 PM treatment of Mayfield Rd (US-322) from Ravenna Rd (SR-
44) to SR-608 in Munson and Claridon Twps.
$950,000
3/21/2019 103821 CUY IR 090 21.02 Cleveland: IR-90/MLK Blvd Interchange o Safety Project: Improve traffic flow and reduce crashes at
the IR-90 interchange at Martin Luther King Drive by extending
two southbound lanes on MLK to East Blvd, signalizing the EB
and WB ramp terminal intersections, modifying the EB exit to
allow do
$2,371,676
3/21/2019 104800 CUY IR 480 03.98 Barrier North Olmsted, Fairview Park; SR-252 to the Rocky River Replace the median barrier along I-480 from SR-252 to the
Rocky River bridge in North Olmsted and Fairview Park. Work
will include upgrading the median lighting.
$3,000,000
3/21/2019 104932 CUY Clark Ave Streetscape Cleveland: West 41st S and Quigley Ave Resurface Clark Avenue pavement between West 41st Street
and Quigley Avenue and include streetscape improvements in
the City of Cleveland.
$6,870,233
4/4/2019 98601 D12 BH FY2019 Misc Various routes and sections District-wide bridge repair project on multiple structures.
Plans prepared under PID 98599.
$3,500,000
4/4/2019 99972 CUY US 006 14.56 Cleveland; Over the Cuyahoga River Place a new wearing surface on the Detroit-Superior bridge in
Cleveland. Other work includes substructure patching, fiber
wrapping, railing repair, and other concrete repairs.
$10,000,000
4/18/2019 89276 CUY SR 252 04.77/05.51 North Olmsted; SR-17 to SR-10/SR-10 to NCL Resurfacing from SR-17 to Lorain Rd (SR-10) and from Lorain
Rd to the North corp. limit in North Olmsted
$700,000
4/18/2019 106350 CUY IR 077 00.85 Noise Barrier Miller Road to Highland Drive Construct sections noise barrier along IR-77 approximately
between Miller Road and Oakes Road in the City of Brecksville.
$2,800,000
5/1/2019 105935 CUY Warrensville Ctr Rd Enhncmnt Norwood Rd to Thornton Park Warrensville Center Road Enhancement Project to streetscape
and construct a multipurpose path from Norwood Road to
Thornton Park in the City of Shaker Heights
$3,000,000
5/2/2019 98837 D12 TSG FY2019 Various routes & sections Various routes & sections $250,000
5/2/2019 105939 LAK West Jackson St WCL to Richmond St Resurface West Jackson Street from Painesville WCL to
Richmond Street in the City of Painesville. Work will include
signage and pavement markings to incorporate a share bicycle
lane in both directions.
$1,291,070
5/16/2019 98832 D12 GR FY2019 Various routes & sections Guardrail upgrade contract $1,400,000
5/16/2019 98836 D12 SIGN FY2019 Various routes & sections Sign structure repair $250,000
5/23/2019 89248 CUY SR 010 11.95 Cleveland; W.117th to West 65th St Resurface from West 117th St. to West 65th St. in Cleveland. $1,820,001
6/6/2019 98605 D12 PPM FY2019 Various routes & sections Pavement PM project throughout the district $2,000,000
6/6/2019 98833 D12 LG FY2019 Various routes & sections Lighting upgrade. $1,500,000
6/6/2019 99996 D12 BH FY2019 Deck Sealing Various Deck sealing $1,585,000
10year_Jan2018thruJan2028 10 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
7/1/2019 105725 CUY Warrensville Ctr Rd Chagrin Blvd to Fairmount Blvd Resurface Warrensville Center Road from Chagrin Boulevard
to Fairmount Boulevard in the City of Shaker Heights.
$1,998,200
7/1/2019 106761 CUY IR 480 15.57 Drainage Cleveland; Ramp W-N to CSX RR Replace the barrier wall between the Ramp W-N bridge and
the CSX bridge along EB IR-480 with a taller wall. Work will
include adding catch basins behind the wall and installing a
new 72" pipe from the catch basins to the 72" conduit
beneath IR-480 east o
$500,000
8/19/2019 80986 CUY PORT AUTHORITY ACCESS RD N/A Design and construct road enhancements of the Cleveland
Port Authority in the City of Cleveland.SAFETEA-LU Earmark
$2,047,500
9/1/2019 105003 GEA SR 168 04.10 Culvert Troy Twp; between Patch and Mumford Replace culvert GEA-168-04.10 on Tavern Rd (SR-168)
Between Patch Rd and Mumford Rd. Work will include
widening the shoulders for pedestrian traffic by enclosing the
ditch line.
$400,000
10/1/2019 23733 GEA SR 087 19.75 Safety Middlefield Twp; Hayes Rd to County Line Reconstruct the hill along SR-87 to improve vertical sight
distance from Hayes Rd to the east as necessary. Work will
include shoulder widening for Amish buggy use along a
portion of the project. Resurfacing completed under PID
92571. Work should incl
$2,040,000
10/1/2019 97389 GEA SR 608 07.10 Claridon Twp; S of US-322 Replace the concrete box beam superstructure of the SR-608
bridge over a creek located just south of US-322 in Claridon
Twp. Work will include repairing or replacing the wing walls
and other miscellaneous repairs.
$545,000
10/1/2019 98063 CUY IR 071 18.29 CCG7A Cleveland: West 14th St to Jenning Fwy Construct a deceleration lane on IR-71 SB to the SR-176 exit
ramp. Split off from PID 82378, CUY Innerbelt CCG7 Jennings.
$6,000,000
10/1/2019 99788 LAK IR 271 01.27/01.45 Willoughby Hills; Over Eddy Rd/Over I-271 Replace the ramp bridges from I-271 NB to I-90 WB over Eddy
Rd and mainline I-271 in Willoughby Hills. Work will include
new structures on a new alignment.
$9,500,000
10/1/2019 106732 CUY East 116th/Harvard Signal CUY E. 116th St/Harvard intersection, City of Cleveland, at
the CCRL grade crossing DOT # 262420C.
Upgrade the traffic signal at the south leg of the East
116th/Harvard Rd intersection to be interconnected with the
preemption at Cleveland Commercial Railroad grade crossing
DOT # 262420C. See PID 103919.
$150,000
1/1/2020 14198 CUY IR 071 09.94/VAR Paint Cleveland, Brook Park; Various structures in the IR-
480/71/237 interchange
Paint the structural steel of 11 bridges in the IR-71/IR-480/SR-
237 interchange in Cleveland and Brook Park.
$7,700,000
1/1/2020 76779 CUY IR 090 07.74 Lakewood, Cleveland; Rocky River to IR-71 Resurfacing from the Rocky River to West 44th St in Lakewood
and Cleveland.
$10,000,000
1/1/2020 76786 CUY IR 090 23.93/VAR Cleveland, Euclid; SR-283 to SR-2/IR-90 to the Cnty Line Resurfacing from Lakeshore Blvd to SR-2 in Cleveland and
Euclid. Includes SR-2 from IR-90 to the County Line.
$9,800,000
10year_Jan2018thruJan2028 11 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2020 77526 CUY IR 480 00.00 North Olmsted, Fairview Park; County Line to the Rocky
River
PM resurfacing from the Lorain County Line to the Rocky River
bridge in North Olmsted and Fairview Park. Includes lighting
upgrade.
$7,650,000
1/1/2020 84020 CUY IR 480 22.45 Maple Hts, Bedford Hts; Lee Rd to IR-271 Resurfacing IR-480 from Lee Road to IR-271 in Maple Hts and
Bedford Hts.
$4,000,000
1/1/2020 86249 CUY CARTER ROAD Cleveland: Carter Road over Cuyahoga River Rehabilitation of the Carter Road lift bridge over the Cuyahoga
River in the City of Cleveland.
$2,007,000
1/1/2020 88348 CUY IR 090 24.10/24.63 Cleveland; Over E.140th and E.152nd Replace the decks of the mainline IR-90 bridges over East
140th St and East 152nd St in Cleveland. Work will include
painting the structural steel.
$9,100,000
1/1/2020 88400 CUY IR 090 09.90/VAR Paint Cleveland; IR-90 bridge painting Paint the structural steel of 9 mainline bridges on I-90 in
Cleveland
$4,600,000
1/1/2020 89034 CUY LAKE LINK TRAIL N/A Construct the Greenway Corridor Trail (a.k.a Cleveland
Mahoning Trail) along the abandoned railroad right-of-way in
the Flats from the Towpath Trail along Irishtown Bend
underneath the Main Avenue bridge crossing the Willow
Street bridge to a proposed ped
$7,962,883
1/1/2020 89036 CUY US 042 Signals Middleburg Hts: N/A Coordinated Signal System Upgradeo NOACA Project Name:
CUY US 42 (Pearl Rd) Tri-City Traffic Signal Coordination
$1,843,000
1/1/2020 89711 LAK IR 090/SR 528 Enhancement Village of Madison: IR-90 and SR-528 (River Street) Madison Gateway Enhancement: Landscaping and signage
that will expose the area's viniculture and landscaping nursery
industries.o NOACA Enhancement Project
$143,448
1/1/2020 94371 GEA BUNDYSBURG ROAD BRIDGE Bundysburg Road over Swine Creek in Parkman Township CEAO LBR Project: Replace the Bundysburg Road bridge over
Swine Creek in Parkman Townshipo 2018 County LBR Project
using Credit Bridge Program credit.
$463,600
1/1/2020 97602 CUY Strongsville Signals Strongsville; Various routes & sections City-wide signal upgrade project along SR-82 and US-42 in the
City of Strongsville.
$1,688,188
1/1/2020 97719 GEA Mentor Rd G-K Chardon Twp: SR-44 to Lake County NOACA STP Project to resurface Mentor Road (CH 5N) Section
G-K from the Chardon Village north corporation line to the
Lake County Line.
$970,000
1/1/2020 97720 GEA MUNN ROAD Auburn Twp: Washington St to Stafford Rd NOACA STP Project to resurface Munn Road (CH 32) Section D
from Washington Street to Stafford Road in Auburn Township.
$408,000
1/1/2020 97721 GEA WASHINGTON STREET (G-J) Auburn Twp: Munn Rd to Ravenna Rd NOACA STP Project to resurface Washington Street (CH 606,
Section G-J) from Munn Road to Ravenna Road in Auburn
Township.
$3,880,000
1/1/2020 99637 LAK SR 307 00.00 Madison Twp; SR-528 to the Cnty Ln Chip seal from SR-528 to the Ashtabula County Line in
Madison Twp.
$650,000
1/1/2020 99640 GEA SR 608 02.45 Middlefield, Claridon, Huntsburg Twps; NCL to Cuyahoga
River
PM treatment to SR-608 from the Middlefield NCL to the
Cuyahoga River in Middlefield, Huntsburg, and Claridon Twps
$700,000
10year_Jan2018thruJan2028 12 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2020 99657 LAK SR 535 00.42 Fairport Harbor, Painesville Twp; Corp line to US-20 Resurfacing from the Painesville Corp Line to US-20 in Fairport
Harbor and Painesville Twp.
$1,100,000
1/1/2020 99678 GEA SR 306 12.08 Chester Twp; US-322 to Cnty Ln Resurface Chillicothe Rd (SR-306) from Mayfield Rd (US-322)
to the Lake County Line in Chester Twp.
$1,200,000
1/1/2020 101587 LAK Waite Hill Bridge Waite Hill Road over the Chagrin River Replace the existing Waite Hill Road bridge over the Chagrin
River in the Village of Waite Hill.o CEAO LBR Project for 2020o
Federal/State exchange project
$1,896,300
1/1/2020 102180 FACD12 Geauga FSMF N/A Construction of a new Geauga County FSMF on Tare Creek
Parkway in Middlefield to replace the existing Burton facility.
$9,000,000
1/1/2020 102451 CUY IR 271 07.20/VAR Paint Various Paint the structural steel on multiple bridges along I-271:
Harvard, Chagrin, Fairmount, Cedar, Brainard, and Lander.
$8,000,000
1/1/2020 102803 CUY SR 010 08.50 Slide Repair Fairview Park; east of W. 192nd Street Slope repair and roadway stabilization by installing a drilled
shaft retaining wall on the south side of Lorain Road just east
of W. 192nd Street.
$550,000
1/1/2020 102804 LAK IR 090 04.28 Slide Repair Willougby Hills: east of Maplegrove Road Slope repair on the north side of IR-90 just east of Maplegrove
Road
$500,000
1/1/2020 103163 GEA Maple Highlands Trail II SR-44 to Water Street Maple Highlands Trail Phase II - Construct a multi-purpose trail
from SR-44 to Water Street (0.86 mile) which will complete
the missing section of the Geauga County Maple Highlands
Trail network through the City of Chardon.
$1,547,811
1/1/2020 103297 D12 MOW FY2020 Various routes & sections Mowing $800,000
1/1/2020 103699 CUY SRTS FY2016 Cleveland N/A SRTS Infrastructure Project to construct sidewalk and path
ranging from 5 to 8 feet in width and improve signals and
crosswalks in priority corridors near Cleveland City Schools
$363,640
1/1/2020 103700 CUY SRTS FY2020 Cleveland Hts N/A SRTS Infrastructure Project to improve sidewalks, signals and
crossings at five (5) locations in the Cleveland
Heights/University Heights schools.
$223,000
1/1/2020 103707 CUY SRTS FY2020 Euclid N/A SRTS Infrastructure Project to install sidewalks, improve
crosswalk markings for visibility and accessibility in the Euclid
city shcools.
$107,500
1/1/2020 103714 CUY SRTS FY2020 Rocky River N/A SRTS Infrastructure Project to improve crossings by adding
pedestrian countdown signals and sidewalks around
intersections on priority corridors in the Rocky River School
District.
$153,000
1/1/2020 104509 CUY Memphis Avenue Memphis Avenue over CSXT RR CEAO LBR Project: Replace the Memphis Avenue Bridge over
the CSXT Railroad in the City of Brooklyn.
$2,979,400
10year_Jan2018thruJan2028 13 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2020 104941 CUY Johnston Mill Run Trail I Miles Ave to Lee Rd/Krruish Park Johnston Mill Run Trail Phase 1 is the construction of off-road,
paved, multi-purpose bike and pedestrian shared-use path
from Miles Avenue to Lee Road and Kerruish Park in the Cities
of Cleveland and Garfield Heights.
$1,298,700
1/1/2020 105722 CUY Warrensville Ctr Rd Broadway Avenue to IR-480 Resurface Warrensville Center Road from Broadway Avenue
to IR-480 in the Cities of Bedford and Maple Heights.
$2,697,570
1/1/2020 105726 CUY US 042 04.29 Valley Parkway to West 130th Street Resurface Pearl Road (US-42) from Valley Parkway to West
130th Street in the Cities of Strongsville and Middleburg
Heights.
$5,963,263
1/1/2020 105727 CUY US 042 08.33 West 130th Street to Snow Road Resurface Pearl Road (US-42) from West 130th Street to Snow
Road in the Cities of Parma and Parma Heights.
$4,497,128
1/1/2020 105932 CUY Lorain Ave Complete Streets W 20th St to W 65th St Lorain Avenue (SR-10) Complete Streets project to enable safe
access for all users, including pedestrians, bicyclists, motorists
and transit riders of all ages and abilities from W. 20th Street
to W. 65th Street in the City of Cleveland.
$5,500,000
1/1/2020 105934 CUY Scranton Rd Sackett Avenue to Fairfield Avenue Repair and resurface Scranton Road from Sackett Avenue to
Fairfield Avenue in the City of Cleveland.
$2,587,936
1/1/2020 106785 CUY Scranton Rd Cleveland: Sackett Rd to Fairfield Ave Repair and resurface Scranton Road from Sackett Road to
Fairfield Avenue in the City of Cleveland.
$2,587,937
1/1/2020 106786 CUY Coit Rd Cleveland: Kirby Ave to St. Clair Ave Repair and resurface Coit Road from Kirby Street to St. Clair
Avenue in the City of Cleveland.
$919,645
1/16/2020 13182 CUY SR 014 06.20/06.70 Garfield Hts; Over Mill Creek Rehabilitate two (2) Broadway Ave (SR-14) bridges over Mill
Creek in Garfield Hts. Combined with PID 13183.
$2,400,000
3/1/2020 95109 CUY NORTH OLMSTED SIGNALS PH 2 North Olmsted: Various route within the city MPO CMAQ Project: Upgrade the traffic signals and signal
system along Brookpark Road (SR-17), Columbia Road (SR-
252), and Butternut Ridge Road in the City of North Olmsted.
This is phase 2 of the city's city wide signal upgrade plan. Also
see PID 95108 fo
$3,885,820
3/1/2020 99753 CUY Multi-Purpose Trail Phase 3 Cuyahoga Hts Village of Cuyahoga Heights Multi-Purpose Trail - Phase 3 is a
project to construct a multi-purpose trail (1300 L.F.) starting at
the end of Phase 2 of the Village's Multi-Purpose Trail
(approximately half-mile north of Canal Road) to just east of
East 71
$801,000
3/2/2020 93298 LAK VROOMAN ROAD Leroy Twp: SR-86 (Painesville-Warren Rd) to IR-90 Resurface Vrooman Road from SR-86 (Painesville Warren
Road) to IR-90 a distance of 1.2 miles more or less in Leroy
Township.
$1,455,000
3/3/2020 95474 LAK MADISON AVE Painesville Twp: Painesville City corp line to SR-84 MPO STP Project: Resurface Madison Avenue (CR-306) from
the Painesville City corporation line to SR-84 a distance of 2.21
miles more or less in Painesville Township.
$1,557,000
10year_Jan2018thruJan2028 14 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
3/15/2020 106932 CUY SR 175 07.30 Lyndhurst; SCL to US-322 Concrete pavement repairs to Richmond Road (SR-175) from
Cedar Road to Mayfield Road (US-322) in the City of
Lyndhurst.
$520,000
4/1/2020 25617 CUY IR 090 13.72 Cleveland; Over NS RR and Train Avenue Paint the IR-90 mainline bridge over the NS RR and Train
Avenue in Cleveland. Work will include structural steel
repairs.
$11,000,000
4/1/2020 85360 CUY SR 043 10.61 Cleveland; SCL to Broadway Resurfacing Miles Road from the Warrensville Hts corp line to
Broadway Avenue in Cleveland.
$2,730,000
4/1/2020 87616 LAK METROPARKS PEDESTRIAN BRIDGELake Metroparks bike/hike trail over NS RR just west of
Liberty St in Painesville
o Construct an overhead crossing (bridge and approaches)
over the Norfolk & Southern Railroad tracks that would
connect two sections of Lake Metroparks 4.5 mile Greenway
Corridor.o 2009 Appropriation Act Earmark OH392o SAFETEA-
LU Earmark OH175
$2,593,350
4/1/2020 87904 CUY IR 071 06.10 Barrier Various section along IR-71 in Cuyahoga County Replacement of the concrete median barrier on IR-71 from
SLM 6.10 to 10.20.
$4,000,000
4/1/2020 88901 CUY IR 090 13.34/23.71 Barrier Cleveland; Various sections on IR-90 Median barrier: Repair/replace concrete median barrier on I-
90 from SLM 13.34 to 14.40, and from SLM 23.71 to 29.17.
Split from PID 87903.
$7,000,000
4/1/2020 89259 CUY SR 014 06.09 Garfield Hts; WCL to ECL Resurface from the WCL to the ECL in Garfield Hts $1,770,000
4/1/2020 89267 CUY SR 017 07.09 Cleveland, Parma, Brooklyn; West 130th to ECL Resurface Brookpark Rd (SR-17) from West 130th St to the
Brooklyn Hts West corp limit in Cleveland, Parma, Brooklyn
and a small section of Brooklyn Hts.
$4,240,000
4/1/2020 90328 CUY INTERMODAL TRANSIT CENTER Shaker Heights; ITC at Warrensville/Northfield/Van
Aken/Chagrin intersection
Construct an Intermodal Transit Center at the end of the
extended Blue Line in Shaker Heights. Split from PID 85207
$40,000,000
4/1/2020 94535 CUY SR 174 03.75 Slide Gates Mills; SR-174 south of Rodgers Rd GSM Project: Stabilization of the slope on Chagrin River Road
(SR174), just south of Rodgers Road, in the Village of Gates
Mills. Work includes installation of sheet pile or segmental
retaining wall (based on geotechnical investigation and
recommendation
$432,813
4/1/2020 99997 D12 BH FY2020 Deck Sealing Various Deck sealing $2,150,000
4/1/2020 101741 CUY York Rd/Bennett Road North Royalton: York Road to Bennett Road Ohio Turnpike Mitigation Project in the City of North Royalton
to 1) re-establish ditch lines to intercept the drainage from the
turnpike in the area of York Road to Bennett Road, 2) clean a
storm culvert and rebuild/replace a manhole west of York
Road an
$117,000
4/1/2020 101846 CUY JOHN NAGY BOULEVARD Cleveland Slope restoration along John Nagy Boulevard adjacent to Big
Creek in Cleveland.
$2,000,000
4/1/2020 102435 CUY IR 090 03.65 Superstructure Westlake; I-90 over Tuttle Creek Replace the superstructure (slab) of the IR-90 bridge over
Tuttle Creek in Westlake.
$1,900,000
4/1/2020 103161 D12 BH FY2020 Misc Various routes and sections District-wide bridge repair project on multiple structures $2,500,000
10year_Jan2018thruJan2028 15 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
4/1/2020 103164 D12 GR FY2020 Various routes & sections Guardrail upgrade contract $1,400,000
4/1/2020 103165 D12 LG FY2020 Various routes & sections Lighting upgrade. $1,500,000
4/1/2020 103166 D12 PM FY2020 Various routes & sections Pavement marking contract for D-12 $2,200,000
4/1/2020 103167 D12 SIGN FY2020 Various routes & sections Sign structure repair $250,000
4/1/2020 103289 D12 PPM FY2020 Various routes & sections Pavement PM project throughout the district $2,000,000
4/1/2020 104801 CUY US 006 14.56 Pipe Cleveland; Over the Cuyahoga River Repair the drain pipe located in the southwest slope of the
Veterans Memorial Bridge. Plan preparation will be done
under PID 99972.
$400,000
4/1/2020 105256 CUY EAST 9TH STREET Removal Cleveland; Over RTA Remove the bridge structure over the GCRTA tracks located
just west of "new" East 9th Street in Cleveland.
$400,000
4/1/2020 105792 CUY IR 090 13.45 Deck Clevel; W. 44th over I-90 Replace the deck of the West 44th St bridge over I-90 in
Cleveland.
$3,500,000
4/1/2020 105821 D12 CU FY2020 Various Culvert rehab/replacement: GEA-700-07.63; replace 96X 24
concrete boxLAK-084-27.18; replace 53X102 sandstone box
$610,630
4/1/2020 105886 GEA US 422 00.30 Slope East of Chagrin River Road Slope repair along WB US-422 just east of Chagrin River Rd. $500,000
4/1/2020 105888 CUY SR 082 13.57 Brecksville; Creek to ECL Resurfacing from Chippewa Creek to the County Line in
Brecksville
$850,000
4/1/2020 107418 CUY IR 480N 00.00 Barrier Multiple LPA; I-480 to Green Road Replace the median barrier along I-480N from IR-480 to Green
Road in Warrensville Hts, Maple Hts, Bedford Hts, and North
Randall.
$400,000
5/1/2020 91563 CUY OLD ROCKSIDE ROAD BRIDGE Independence: Old Rockside Road over the Cuyahoga River Municpal Bridge Project: Replace the Old Rockside Road
bridge over the Cuyahoga River in the City of Indpendence.
The new structure will provide a 10-feet of width for
pedestrian and bicycle traffic.
$3,906,000
6/1/2020 85412 CUY/SUM/STA/TUS Canalway Signage N/A Phase 2: Installation of informational signs and kiosks along
the 110-mile Ohio & Erie Canal Way Scenic Byway in
Cuyahoga, Summit, Stark, and Tuscarawas counties.Earmark
ID: SB0606 (SB-2006-OH-6)
$646,289
6/1/2020 103193 D12 TSG FY2020 Various routes & sections Various routes & sections $250,000
9/1/2020 89035 CUY SOUTH GREEN RD SIGNALS South Euclid: Cedar Rd to Monticello Blvd 2013 NOACA CMAQ Project: Upgrade and replace obsolete
traffic signal equipement at the existing signalized
intersections along South Green Road between Cedar Road
and Moniticello Boulevard in the City of South Euclid.
$1,883,622
10/1/2020 106261 GEA US 322 07.64 US-322 and Auburn Road Highway Safety Project to improve the US-322 (Mayfield Road)
and Auburn intersection by constructing exclusive left-turn
lanes on all approaches and improving the signal head
visibility within Munson Township.
$1,627,000
11/1/2020 104094 LAK SR 306 05.18 Deck Willoughby; Over I-90 Replace the deck of the SR-306 bridge over IR-90 in
Willoughby. Includes painting the structural steel
$8,000,000
10year_Jan2018thruJan2028 16 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2021 13484 LAK SR 002 01.05 L&R Wickliffe; Over Worden Rd Replace the mainline SR-2 slab bridges over Worden Rd in the
City of Wickliffe.
$3,000,000
1/1/2021 22131 CUY IR 090 07.58 Paint Rocky River, Lakewood; Over the Rocky River Paint the structural steel of the mianline IR-90 bridge over the
Rocky River in Rocky River and Lakewood. Major Bridge
Program
$30,000,000
1/1/2021 75483 CUY IR 090 18.72 Cleveland; SR-2 to East 55th Street Resurface the East Shoreway (IR-90) from the Innerbelt Curve
to East 55th Street in Cleveland.
$1,800,000
1/1/2021 85526 CUY IR 480 06.78 Cleveland; Bridge to W. 139th PM resurfacing from the Rocky River Bridge to West 139th St
in Cleveland. Includes lighting upgrade.
$4,200,000
1/1/2021 85529 CUY IR 071 10.48 Cleveland; I-480 to the Brooklyn Corp Line PM resurfacing from IR-480 to the Brooklyn Corp Line.
Inlcudes lighting upgrade.
$5,200,000
1/1/2021 85605 GEA SR 700 00.00 Troy Twp; County Line to US-422 Resurface Claridon-Troy Rd (SR-700) from the Portage County
Line to US-422 in Troy Twp.
$870,000
1/1/2021 85611 LAK SR 608 00.00 Concord Twp; County Line to Painesville-Ravenna Rd Resurface Concord-Hambden Rd (SR-608) from the Geauga
County Line to Painesville-Ravenna Rd in Concord Twp.
$830,000
1/1/2021 87800 CUY SR 002 15.75 Cleveland; Bridge to IR-90 Resurface the Shoreway from the Main Avenue Bridge to IR-
90 in Cleveland.
$3,100,000
1/1/2021 90901 CUY/LAK IR 271 14.85/00.00 Highland Hts, Mayfield, Willoughby Hils; S of Wilson Mills
to IR-90
PM resurfacing of mainline IR-271 from south of Wilson Mills
Rd. to IR-90 in the Cities of Highland Hts. and Willoughby Hills
and the Village of Mayfield.
$3,800,000
1/1/2021 97390 CUY IR 090 14.52 Deck Cleveland; Scranton Ave over IR-90 Replace the deck of the Scranton Avenue bridge over IR-90 in
Cleveland. Includes painting the structural steel.
$4,650,000
1/1/2021 99632 GEA SR 086 05.37 Thompson Twp; SR-528 to Cnty Ln Resurfacing from SR-528 to the Lake County Line in Thompson
Twp.
$780,000
1/1/2021 99652 GEA US 006 08.86 Hambden, Montville Twps; SR-166 to the Cnty Ln Resurfacing of the GAR Highway from SR-166 to the County
Line in Hambden and Montville Twp.
$1,200,000
1/1/2021 99677 LAK US 020 24.99 Madison Twp; Townline Rd to the County Line Resurface North Ridge Rd (US-20) from Townline Rd to the
Ashtabula County Line in Madison Twp.
$5,100,000
1/1/2021 99694 GEA SR 306 04.45 Bainbridge, Russell Twps; Washington St to SR-87 Resurfacing from Washington St in Bainbridge Twp to Kinsman
Rd (SR-87) in Russell Twp.
$850,000
1/1/2021 101293 D12 BH FY2021 Deck Sealing Various routes and sections Bridge deck sealing $1,000,000
1/1/2021 101941 CUY SR 176 10.13 Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Replace the concrete pavement in the I-480/SR-176
interchange in Cleveland and Brooklyn Heights; create new
access points for SR 176 SB to enter I-480 EB quicker; modify
legs entering SR 176 NB such that one full lane enters from
Brookpark Road, I-480 EB,
$12,000,000
1/1/2021 102069 LAK Markell Road Bridge Waite Hill: Markell Rd over E. Branch Chagrin River Replace the Markell Road bridge over the East Branch of the
Chagrin River approximately 0.5 mile west of SR-306 in the
Village of Waite Hill.o This project has been approved for the
Federal/State Exchange Program.
$1,454,200
10year_Jan2018thruJan2028 17 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2021 102434 GEA US 422 12.26 Deck Troy Twp; Over the Cuyahoga River Replace the deck and paint the structural steel of the US-422
structure over the Cuyahoga River in Troy Twp. Work may
include widening the structure to maintain traffic.
$3,100,000
1/1/2021 103298 D12 MOW FY2021 Various routes & sections Mowing $800,000
1/1/2021 103299 D12 LG FY2021 Various routes & sections Lighting upgrade. $1,500,000
1/1/2021 103300 D12 PM FY2021 Various routes & sections Pavement marking contract for D-12 $2,300,000
1/1/2021 103884 GEA SR 608 03.09 Buggy Lane Middlefiled Twp: Nauvoo Rd to north of Burton Windsor
Rd
Safety Project: Widen the SR-608 (Old State Road) shoulders
between Nauvoo Road to approximately 2500' north of Burton
Windsor Road in Middlefield Township.o Also refer to PID
101685 --- Amish safety Study
$1,929,000
1/1/2021 103991 CUY IR 480 07.27 Deck Cleveland; Over I-480 Replace the deck of the Grayton Rd bridge over I-480 in
Cleveland. Includes steel retrofits and pier repairs.
$6,400,000
1/1/2021 104000 CUY SR 021 09.09 Deck Independence; Over I-480 Replace the deck and paint the structural steel of the
Brecksville Rd (SR-21) bridge over I-480 in Independence.
$8,200,000
1/1/2021 104099 GEA SR 166 01.08 Hambden Twp; Over a creek Replace the twin pipe structure over a creek east of Williams
Rd in Hambden Twp.
$200,000
1/1/2021 104327 GEA SR 306 07.96 SR-87 to US-322 Resurfacing $1,300,000
1/1/2021 105183 LAK SR 002 14.76/VAR Various Paint the structural steel on multiple mainline bridges along
the SR-2 corridor: SR-283, Sanford, St. Clair, State, Grand
River, and Bacon.
$6,000,000
1/1/2021 105715 CUY Brainard Rd Cedar Road to Willson Mills Resurface Brainard Road from Cedar Road to Wilson Mills in
the Cities of Lyndhurst and Highland Heights
$3,496,850
1/1/2021 105717 CUY Ridge Rd Memphis Avenue to Denison Avenue Resurface Ridge Road from Memphis Avenue to Denison
Avenue in the Cities of Brooklyn and Cleveland.
$2,058,146
1/1/2021 105720 CUY West 130th St Bagley Road to Snow Road Resurface West 130th Street from Bagley Road to Snow Road
in the Cities of Brook Park, Middleburg Heights, Parma, and
Parma Heights.
$6,993,700
1/1/2021 105769 CUY IR 271 13.90/VAR Paint Various Paint the structural steel of the Ridgebury, Highland, White,
Chardon and I-90 EB over I-271 and Rockefeller over I-90.
$5,000,000
1/1/2021 105778 CUY St. Clair Ave Bridge N/A Rehabilitate the St. Clair Avenue bridge. $3,791,600
1/1/2021 105926 CUY Cle Downtown Connector Trl 1 Fleet Ave to Pershing Ave Cleveland Downtown Connector Trail (Phase 1) is a project to
construct a shared use path from Fleet Avenue to Pershing
Avenue along the west side of IR-77 in the City of Cleveland.
$1,743,750
1/1/2021 105929 CUY Coit Rd St Clair Ave to Kirby Ave Resurface Coit Road from St. Clair Avenue to Kirby Avenue in
the City of Cleveland.
$929,225
1/1/2021 105930 CUY E 55th St Harvard Ave to Broadway Ave Repair and resurface East 55th Street from Harvard Avenue to
Broadway Avenue in the City of Cleveland.
$1,892,106
10year_Jan2018thruJan2028 18 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2021 105936 LAK Bennett Rd US-20 to Lake Rd Rehabilitate and widen Bennett Road from North Ridge Road
(US-20) to Lake Road in the Madison Township.
$2,425,000
1/1/2021 105937 LAK Stevens Blvd ECL to SR-91 Resurface Stevens Boulevard from Estlake ECL to SR-91 in the
City of Eastlake.
$2,452,039
1/1/2021 105938 LAK Tyler Blvd SR-615 to Heisley Rd Resurface Tyler Boulevard from SR-615 to Heisley Road in the
City of Mentor.
$945,750
1/1/2021 106107 CUY SR 175 13.31 SR-175 and US-20 intersection Highway Safety Improvement Program project consisting of 1)
widening the south leg Richmond Road (SR-175)/Euclid
Avenue intersection, 2) reconstruct the west approach to
Richmond Road/Brush Avenue intersection, 3) remove the
westbound to northbound slip l
$1,737,771
1/1/2021 106352 CUY SRTS FY2021 Cleveland N/A SRTS Infrastructure Project in the Cleveland City Schools to
upgrade intersection immediately adjacent to and on high
traffic areas of 7 high-priority campuses.
$360,000
1/1/2021 106378 CUY East 75th Street E. 75th Street over NS, GCRTA railroads Municipal Bridge Project to replace the East 75th Street bridge
over Norfolk Southern and GCRTA Rapid Transit railroads in
the City of Cleveland.
$2,447,368
1/15/2021 105755 CUY Cedar Point Rd Cedar Point Road over Rocky River Rehabilitate Cedar Point Road Bridge over the Rocky River in
the City of North Olmsted.o CEAO LBR Project for SFY 2019
$2,119,600
3/1/2021 89057 LAK SR 091 00.00 Bikeway Willoughby Hills SCL (White Rd) to US-20 (Euclid Ave) in the
Cities of Willoughby Hills and Willoughby
NOACA Enhancment Project: Construct a shared use path
along the east side of SOM Center Road (SR-91) in the Cities of
Willoughby Hills and Willoughby.
$1,028,037
4/1/2021 89258 LAK SR 615 04.93 Mentor; SR-2 to Munson Resurfacing from north of SR-2 to Munson Rd in Mentor. $650,000
4/1/2021 89268 CUY US 422 00.00 Cleveland; Public Square to Woodland Ave Resurfacing from Public Square to Woodland Avenue in
Cleveland.
$2,200,000
4/1/2021 103162 D12 BH FY2021 Misc Various routes and sections District-wide bridge repair project on multiple structures $2,000,000
4/1/2021 103197 D12 GR FY2021 Various routes & sections Guardrail upgrade contract $1,400,000
4/1/2021 103301 D12 SIGN FY2021 Various routes & sections Sign structure repair $250,000
4/1/2021 103303 D12 PPM FY2021 Various routes & sections Pavement PM project throughout the district $1,500,000
4/1/2021 104269 CUY US 020 03.49 Westlake; over Cahoon Creek Repair the stone arch on Center Ridge Road (US-20) over
Cahoon Creek located between Dover Center Rd and
Westwood Dr in Westlake. Work may involve lining the arch
with another pipe or replacing the structure.
$1,400,000
4/1/2021 105892 CUY US 006A 00.00 Rocky River; US-6 to US-20 Resurfacing from Lake Rd (US-6) to Wooster Rd (US-20) $300,000
4/1/2021 105893 LAK SR 084 03.61 Willoughby; SR-91 to ECL Resurfacing from SR-91 to the ECL in Willoughby $1,700,000
4/1/2021 105902 CUY US 020 27.78 Euclid; US-6 to the ECL Resurfacing Euclid Ave (US-20) from Chardon Rd (US-6) to the
ECL in Euclid
$3,000,000
5/1/2021 105887 CUY SR 017 00.00 North Olmsted; SR-10 to the ECL Resurfacing from Lorain Rd (SR-10) to the ECL in North
Olmsted.
$1,850,000
6/1/2021 103302 D12 TSG FY2021 Various routes & sections Various routes & sections $250,000
10year_Jan2018thruJan2028 19 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
7/1/2021 84019 CUY IR 480 10.38 Cleveland, Brooklyn; West of W. 130th to Idlewood PM Resurfacing of IR-480 from approx. West 130th St to
Idlewood Dr in Cleveland and Brooklyn. Includes lighting
upgrade.
$2,400,000
7/1/2021 92069 CUY IR 090 18.22/VAR various CMP repair at 5 locations. Work may include a structural
spray lining.
$2,000,000
10/1/2021 105743 CUY IR 077 10.08 Cuyahoga Hts, Newburgh Hts, Cleveland; S of SR-21 to SR-
14
Replace the pavement of I-77 from the Cuyahoga River Valley
to approximately Broadway Ave (SR-14). Work will include
replacing the median barrier, upgrading the drainage, and
widening the shoulders where possible.
$68,000,000
1/1/2022 10788 CUY SR 176 09.31 Parma; 0.57 mi S of SR-17 Replace the deck of the Broadview Rd (SR-176) bridge over
West Creek located south of Brookpark Rd (SR-17) in Parma.
Overlay done in 2004 under PID 75203.
$2,200,000
1/1/2022 11230 CUY SR 175 00.56 Solon; S of Cannon Rd under NS RR spur Replace the NS RR (Cleveland Commercial Railway) spur track
bridge over Richmond Rd (SR-175) with a new overhead
structure. This structure is located just south of Cannon Rd in
Solon. The new structure span will provide clearance for a
standard 2-lane r
$7,000,000
1/1/2022 13184 CUY SR 014 12.12E Bedford; Over Tinkers Creek Rehabilitate the Union St (SR-14) bridge over Tinkers Creek
located south of Broadway Ave in Bedford.
$1,100,000
1/1/2022 21806 CUY SR 087 15.12 Hunting Valley, Moreland Hills; Over a culvert east of SR-91 Remove the existing structure over a culvert and replace with
fill east of SR-91 in Hunting Valley and Moreland Hills.
$1,000,000
1/1/2022 83635 GEA SR 087 07.70 Newbury, Burton Twps; Auburn Rd to Burton WCL Resurface Kinsman Rd (SR-87) from Auburn Rd to the Burton
WCL in Newbury and Burton Twps. Includes work on several
culverts.
$1,700,000
1/1/2022 85629 CUY IR 090/490 13.41/00.00 Cleveland; W.44th to IR-71/IR-90 to W. 14th St PM resurfacing of IR-90 from West 44th St to IR-71; and IR-490
from IR-90 to the concrete pavement all in Cleveland.
$2,700,000
1/1/2022 88398 CUY IR 077 09.09/VAR Paint Independence; I-77/I-480 interchange bridges Paint the structural steel of 5 bridges in the I-77/I-480
interchange in Independence.
$8,000,000
1/1/2022 89048 CUY PARMA SIGNALS PHASE 2 N/A Signal Synchronization along Brookpark Rd, along Stumph Rd,
W. 54th Street, Snow Rd, Broadview Rd, and Pleasant Valley
Rd. This work was split from PID 15345.
$5,197,500
1/1/2022 92601 GEA SR 044 08.88 Newbury, Munson Twps; SR-87 to US-322 Resurfacing from Kinsman Rd (SR-87) to Mayfield Rd (US-322)
in Newbury and Munson Twps.
$1,400,000
1/1/2022 95403 CUY ROCKSIDE ROAD BRIDGES Rockside Rd over CSX RR and over Cuyahoga River in
Independence and Valley View
MPO STP Project - Bridge replacements in the City of
Indpendence and the Village of Valley View:o Bridge 03.23
(SFN 1830260) over CSX railroad, Cuyahoga Valley Scenic
Railroad and an access roado Bridge 03.32 (SFN 1830279) over
the Cuyahoga River
$11,640,000
1/1/2022 99541 CUY IR 271X 13.20/VAR US-322 to SR-91 Resurfacing the I-271 express lanes from Mayfield Rd (US-322)
to SOM Center Rd (SR-91).
$4,800,000
1/1/2022 99553 CUY IR 077 01.89 Oakes to Rockside Resurfacing from Oakes Rd to Rockside Rd. $4,900,000
10year_Jan2018thruJan2028 20 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2022 99666 LAK US 020 19.59 Perry Twp; SR-2 to Townline Rd Resurface Ridge Rd (US-20) from SR-2 to Townline Rd in Perry
Twp.
$4,900,000
1/1/2022 99700 GEA SR 168 00.21 Parkman Twp; SR-528 to Nash Rd Resurfacing from SR-528 to Nash Rd in Parkman Twp $540,000
1/1/2022 99706 GEA SR 087 12.58/VAR Burton; WCL to ECL/Middlefield, Middlefield Twp; WCL to
Cnty Ln.
Resurface SR-87 from the WCL to the ECL in the Village of
Burton; and from the Middlefield WCL to the County Line.
Work includes resurfacing SR-87DA through Burton square.
$440,000
1/1/2022 100751 GEA US 322 14.47 Claridon, Huntsburg Twps; SR-608 to the Cnty Ln PM treatment on Mayfield Rd (US-322) from Old State Rd (SR-
608) to the Ashtabula County Line in Claridon and Huntsburg
Twps.
$1,475,000
1/1/2022 102232 LAK IR 271 01.27 Deck Willoughby Hills; Over I-271 Replace the deck of the Eddy Road bridge over I-271 in
Willoughby Hills. Includes painting structural steel.
$3,600,000
1/1/2022 102561 CUY SR 082 09.66 Broadview Hts; W of SR-176 Replace the Royalton Rd (SR-82) bridge over Chippewa Creek
located 0.57 miles west of SR-176 in Broadview Hts. Conduct
a hydraulic analysis to determine the necessary hydraulic
opening .
$1,000,000
1/1/2022 104097 CUY SR 043 06.07 Solon; Over a branch of Tinkers Creek Replace the Aurora Rd (SR-43) bridge over a branch of Tinkers
Creek located east of SR-175 in Solon.
$470,000
1/1/2022 104101 GEA SR 528 15.26 Montville Twp; S of SR-86 Replace the structure on SR-528 over a stream located south
of SR-86 in Montville Twp
$200,000
1/1/2022 104510 GEA Wilson Mills Road Wilson Mills Road over east branch of Chagrin River CEAO LBR Project: Replace the Wilson Mills Road bridge over
an east branch of the Chagrin River in the Chester Township.o
Approved for Federal/State Funding Exchange
$319,100
1/1/2022 104837 D12 LG FY2022 Various routes & sections Lighting upgrade. $1,500,000
1/1/2022 105251 GEA US 422 01.70/VAR Paint Various Paint the structural steel on multiple mainline bridges along
the GEA-422 corridor: Chagrin River, River Rd, SR-306,
Haskins, Munn, Auburn, SR-44, LaDue.
$5,500,000
1/1/2022 105260 CUY US 422 13.90/VAR Paint Various Paint the structural steel on multiple mainline bridges along
the CUY-422 corridor: SR-175, SR-91, Solon Rd, Liberty Rd.
$4,300,000
1/1/2022 105317 CUY IR 077 04.79 Deck Broadview Hts; Over I-77 Replace the deck and paint the structural steel of the Wallings
Rd bridge over I-77 in Broadview Hts. May be combined with
PID 106239.
$3,000,000
1/1/2022 105744 CUY IR 271 06.04 Emery to Fairmount PM resurfacing of mainline IR-271 from Emery Rd to
Fairmount Rd in Warrensville Hts, Orange, Beachwood, and
Pepper Pike.
$4,000,000
1/1/2022 105745 GEA SR 088 03.82/VAR Various routes & sections Chip seal various routes in Geauga County $1,400,000
1/1/2022 105776 D12 MOW FY2022 Various routes & sections Mowing $800,000
1/1/2022 105779 CUY Pleasant Valley Rd Bridge N/A CEAO LBR Project: Rehabilitate the Pleasant Valley Road
bridge 09.68. Located in City of Independence and Village of
Valley View.
$0
10year_Jan2018thruJan2028 21 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2022 106239 CUY IR 077 04.79/Wallings Road Broadview Heights; Wallings Road and IR-77 Widen Wallings Road bridge over IR-77 and provide additional
turn movements at the intersections in order to improve the
interchange traffic flow. IR-77/Wallings Rd interchange
improvement consisting of: 1) Widening the Wallings Road
bridge over IR-77 to
$6,020,539
3/1/2022 104504 CUY Pleasant Valley Road Bridges over: Riverview Road, Cuy Valley Scenic RR, Canal
Rd/CVNP's Ohio & Erie Canal Towpath Trail/Cuy River
Rehabilitate/Reconstruct the following Pleasant Valley Road
bridges: 9.03 over Riverview Road and a creek, 9.35 over the
Cuyahoga Valley Scenic Railroad, and 9.68 over Canal Road,
CVNP's Ohio & Erie Canal Towpath Trail, and Cuyahoga River
in the City of I
$14,353,233
4/1/2022 89257 CUY SR 021 08.22 Independence; Rockside Rd to NCL Resurface Brecksville Rd (SR-21) from Rockside Rd to the
Cuyahoga Valley railroad in Independence.
$1,050,000
4/1/2022 89260 CUY SR 091 02.45 Solon; SR-43 to US-422 Resurface SOM Center Rd (SR-91) from Aurora Rd (SR-43) to
US-422 in Solon. Urban Paving Program
$890,000
4/1/2022 89265 CUY SR 003 02.72 North Royalton; SR-82 to the NCL Resurfacing from Royalton Rd (SR-82) to the NCL in North
Royalton.
$1,210,000
4/1/2022 103305 D12 PPM FY2022 Various routes & sections Pavement PM project throughout the district $1,200,000
4/1/2022 104836 D12 GR FY2022 Various routes & sections Guardrail upgrade contract $1,550,000
4/1/2022 104838 D12 PM FY2022 Various routes & sections Pavement marking contract for D-12 $2,300,000
4/1/2022 104839 D12 SIGN FY2022 Various routes & sections Sign structure repair $250,000
4/1/2022 105894 LAK SR 174 00.00 Willoughby Hills; Cnty Ln to NCL Resurfacing from the County Line to the NCL in Willoughby
Hills
$1,600,000
4/1/2022 105903 LAK SR 283 06.82 Willoughby; WCL to ECL Resurfacing Lakeshore Blvd from the WCL to the ECL in
Willoughby
$600,000
4/1/2022 105908 D12 BH FY2022 Misc Various routes and sections District-wide bridge repair project on multiple structures $3,000,000
4/1/2022 105992 CUY US 006 26.54 Richmond Hts; WCL to ECL Resurfacing from the West Corporation Line to the East
Corporation Line in Richmond Hts
$800,000
4/1/2022 105998 CUY US 006 20.74 East Cleveland; WCL to ECL Resurfacing Superior Ave from the West Corporation Line to
the East Corporation Line on Euclid Ave in East Cleveland.
$2,900,000
4/1/2022 107378 LAK SR 002 13.38 Painesville Twp; SR-44 to SR-283 Resurface $1,500,000
6/1/2022 104840 D12 TSG FY2022 Various routes & sections Various routes & sections $250,000
6/1/2022 106863 CUY SR 017 20.44 Bedford Hts; SR-8 to SR-43 Resurfacing of Libby Rd (SR-17) from Northfield Rd (SR-8) to
Aurora Rd (SR-43) in Bedford Hts.
$485,000
10/1/2022 98564 LAK SR 615 04.03 Deck Mentor; SR-615 over NS Railroad Replace the deck of the Center Street (SR-615) bridge over NS
railroad in Mentor. Includes painting structural steel.
$13,000,000
10/1/2022 107299 D12 PM FY2023 Various routes & sections Pavement marking contract for D-12 $2,300,000
1/1/2023 23449 CUY SR 021 06.98 Independence; Over Hemlock Creek Replace the 20' concrete culvert along Brecksville Rd (SR-21)
over Hemlock Creek located just north of Selig Dr in
Independence.
$900,000
10year_Jan2018thruJan2028 22 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2023 79374 CUY IR 090 07.58 Overlay Rocky River, Lakewood; Over the Rocky River Valley Wearing surface replacement on the I-90 bridge over the
Rocky River Valley in Rocky River and Lakewood.
$6,955,000
1/1/2023 85627 CUY IR 480 16.12 Brooklyn Hts, Independence; Tuxedo to the Valleyview
Bridge
PM resurfacing of IR-480 from Tuxedo Ave to the Valleyview
Bridge in Brooklyn Hts and Independence.
$2,900,000
1/1/2023 89230 LAK SR 306 04.33 Kirtland; South of IR-90 Replace the superstructure of the Kirtland Road (SR-306)
bridge over the East Branch of the Chagrin River located south
of IR-90 and just north of Chillicothe Rd (SR-615) in the City of
Kirtland. Repairs will be made under a maintenance contract,
PID 953
$2,675,000
1/1/2023 92614 LAK SR 086 01.68 Painesville Twp, LeRoy Twp; SCL to Vrooman Rd Resurface Painesville-Warren Rd (SR-86) from the Painesville
SCL to Vrooman Circle in Painesville and LeRoy Townships.
$1,200,000
1/1/2023 99531 CUY IR 071 14.66 Brooklyn, Cleveland; Corp line to I-90 Resurfacing from the Brooklyn Corp line to IR-90 in Brooklyn
and Cleveland
$4,700,000
1/1/2023 99537 CUY US 422 13.19 Solon; IR-271 to Solon Rd Resurfacing from IR-271 to Solon Rd $3,150,000
1/1/2023 99540 CUY IR 271X 05.94 I-480N to US-322 Resurfacing the I-271 express lanes from I-480N to Mayfield
Rd (US-322).
$5,600,000
1/1/2023 99554 CUY IR 077 08.46 Rockside Rd to I-490 Resurfacing from Rockside Rd to SR-21 $1,650,000
1/1/2023 99585 GEA US 422 03.19 SR-306 to SR-44 Resurfacing from SR-306 to SR-44. $4,800,000
1/1/2023 99639 GEA SR 166 04.09 Thompson Twp; SR-86 to Cnty Ln Resurfacing from SR-86 to the Ashtabula County Line in
Thompson Twp.
$1,940,000
1/1/2023 102238 CUY IR 071 01.70 Strongsville: IR-71/SR-82 interchange This project consists of a modification of the IR-71/SR-82
interchange south of SR-82 by constructing a southbound off
ramp that terminates at the Howe/Shrumer Road intersection,
the widening of Howe Road from Southpark Mall to Shurmer
Road and intersecti
$5,958,000
1/1/2023 104102 CUY IR 071 18.89 SW Deck Cleveland; Over IR-490 Replace the deck of the ramp structure from SR-176NB to IR-
90 WB over IR-490 in Cleveland. Work will include steel
retrofits.
$3,500,000
1/1/2023 104323 LAK SR 002 07.68 Mentor; E of SR-306 to E of Munson Resurfacing $5,200,000
1/1/2023 105185 CUY IR 071 14.01 Brooklyn; Over I-71 Replace the deck and paint structural steel of the NS RR bridge
over I-71 in Brooklyn. Work will include painting the structural
steel.
$5,300,000
1/1/2023 105777 LAK SR 002 11.41 Deck Mentor, Hendricks over SR-2 Replace the deck of the Hendricks Rd bridge over SR-2 in
Mentor
$3,000,000
1/1/2023 105786 LAK SR 084 13.20 Concord Twp; Mentor ECL to Painesville WCL PM treatment to Johnny Cake Ridge Rd (SR-84) from the
Mentor ECL to the Painesville WCL in Concord Twp.
$1,100,000
1/1/2023 105793 CUY IR 071 18.48 Deck Clevel; Buhrer pedestrian bridge over I-71 Replace the deck of the Buhrer pedestrian bridge over I-71 in
Cleveland.
$1,000,000
1/1/2023 105802 CUY IR 090 22.00/VAR Paint Various Paint the structural steel of I-90 structures from East 105th to
the Euclid Spur
$8,500,000
1/1/2023 105811 D12 BP FY2023 Various Paint the structural steel of 9 bridges all over water. $5,000,000
10year_Jan2018thruJan2028 23 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2023 105814 CUY IR 071 04.67/VAR Paint Various Paint the structural steel on multiple bridges $5,000,000
1/1/2023 107230 D12 LG FY2023 Various routes & sections Lighting upgrade. $1,500,000
1/1/2023 107232 D12 MOW FY2023 Various routes & sections Mowing $800,000
1/1/2023 107385 CUY/GEA US 422 18.31/00.00 Solon; Solon Rd to the County Line / Bainbridge Twp;
County Line to east of SR-306
Resurface US-422 from Solon Rd to east of SR-306 in Solon and
Bainbridge Twp.
$3,500,000
1/1/2023 107386 LAK SR 044 00.00 Concord Twp; County line to IR-90 Resurfacing from the County Line to IR-90 in Concord Twp. $1,400,000
4/1/2023 85397 LAK SR 174 03.83 Willoughby; SCL to US-20 Resurface River Rd (SR-174) from the SCL to Euclid Ave (US-20)
in Willoughby. Urban Paving Program
$620,000
4/1/2023 89274 LAK SR 640 00.00 Wiilowick; SR-283 to ECL Resurface Vine St (SR-640) from Lakeshore Blvd (SR-283) to
the ECL in Willowick. Urban paving Program
$1,420,000
4/1/2023 105746 D12 PPM FY2023 Various routes & sections Pavement PM project throughout the district $2,800,000
4/1/2023 105905 CUY US 042 11.01 Parma; SCL to NCL Resurfacing Pearl Rd (US-42) from the SCL to the NCL in
Parma.
$1,450,000
4/1/2023 105906 CUY SR 043 00.00 Solon; County Line to Solon Rd Resurfacing from the County Line to Solon Rd in Solon. $1,764,000
4/1/2023 105907 CUY SR 003 06.22 Parma; Pleasant Valley to US-42 Concrete repairs from Pleasant Valley Rd to Ridgewood; and
resurfacing from Ridgewood to Pearl Rd (US-42) in Parma.
$4,000,000
4/1/2023 105909 D12 BH FY2023 Misc Various routes and sections District-wide bridge repair project on multiple structures $3,000,000
4/1/2023 107229 D12 GR FY2023 Various routes & sections Guardrail upgrade contract $1,400,000
4/1/2023 107298 D12 SIGN FY2023 Various routes & sections Sign structure repair $250,000
4/1/2023 107300 D12 TSG FY2023 Various routes & sections Various routes & sections $250,000
10/1/2023 21781 CUY SR 002 05.97 Rocky River; Over IR-90 Replace the deck of the Detroit Rd (SR-2/SR-254) bridge over
IR-90 in Rocky River.
$4,200,000
10/1/2023 77613 CUY East 55th St CCG4F Cleveland; CSX Railroad Bridge over East 55th Street Replace the non-inventoried CSX Railroad Bridge over East
55th Street located just south of IR-90 in order to accomodate
the widening of East 55th Street, including bike lanes. This
project will remain dormant until pid 77413 (CCG4E) is
identified for fun
$21,000,000
10/1/2023 105790 LAK SR 002 16.77 Deck Mantle over SR-2 Replace the superstructure of the Mantle Rd bridge over SR-2. $4,500,000
10/1/2023 107323 D12 MOW FY2024 Various routes & sections Mowing $800,000
10/1/2023 107324 D12 PM FY2024 Various routes & sections Pavement marking contract for D-12 $2,300,000
1/1/2024 85532 LAK SR 044 04.14 North of SR-84 to SR-2 Resurfacing SR-44 from north of SR-84 to SR-2; $1,150,000
1/1/2024 85601 GEA SR 087 00.00 Russell Twp; County Line to SR-306 Resurface Kinsman Rd (SR-87) from the Cuyahoga County Line
to Chillicothe Rd (SR-306) in Russell Twp.
$1,035,000
1/1/2024 90202 CUY SR 014 02.19 Paint Cleveland; Over IR-490 Paint the Broadway Ave (SR-14) bridge over IR-490 in
Cleveland
$2,000,000
1/1/2024 99529 LAK IR 090 21.12 Paine to the County Line PM resurfacing of I-90 from Paine Rd to the Ashtabula County
Line
$6,100,000
1/1/2024 99583 LAK SR 002 14.38 Newell St to US-20 Resurfacing from Newell St to US-20. $3,000,000
10year_Jan2018thruJan2028 24 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
1/1/2024 99628 GEA SR 608 07.53 Claridon, Hambden Twps; US-322 to Sisson Rd Resurfacing of SR-608 from Mayfield Rd (US-322) to Sisson Rd
in Claridon and Hambden Twps.
$1,150,000
1/1/2024 103076 LAK SR 002 10.39 Mentor Resurface $2,000,000
1/1/2024 104329 LAK SR 084 23.91 Perry Twp, Madison Twp; Shepard Rd to Madison WCL Resurfacing South Ridge Rd (SR-84) from Shepard Rd to the
Madison WCL in Perry and Madison Twps.
$1,400,000
1/1/2024 105187 LAK SR 091 04.23/04.49 Eastlake; SR-91 over NS/CSX, Lakeland Blvd Replace the decks of the S.O.M. Center Road (SR-91) bridges
over the Lakeland Boulevard and CSX & NS Railroads in the
City of Eastlake.
$12,600,000
1/1/2024 105709 GEA SR 608 00.00/05.22 Middlefield, Huntsburg, Claidon Twps; River to US-322 PM treatment to SR-608 from the east branch of the Cuyahoga
River to Mayfield Rd (US-322) in Middlefield, Huntsburg, and
Claridon Twps.
$600,000
1/1/2024 105774 CUY IR 480 19.55/VAR Paint Various Paint the structural steel of I-480 structures from E.98th St to
Camden Ave.
$12,500,000
1/1/2024 105815 CUY IR 480 09.43/VAR Paint Various Paint the structural steel $7,000,000
1/1/2024 105818 LAK SR 044 02.07/VAR Paint Various Paint the structural steel $5,500,000
1/1/2024 107408 CUY IR 490 00.41/01.65 Cleveland; W.11th to east of I-77 Resurfacing from the West 11th ped bridge to east of I-77 in
Cleveland.
$4,600,000
1/1/2024 107521 GEA SR 168 01.64 ????? to Burton SCL Resurfacing $1,600,000
4/1/2024 89255 CUY SR 010 14.13 Cleveland; W.65th to US-422 Resurfacing from West 65th St to Ontario Avenue in Cleveland $2,380,000
4/1/2024 107286 D12 BH FY2024 Misc Various routes and sections District-wide bridge repair project on multiple structures $4,000,000
4/1/2024 107287 CUY SR 010 00.00 North Olmsted; WCL to ECL Resurface Lorain Rd (SR-10) from the County Line to the ECL in
North Olmsted.
$5,100,000
4/1/2024 107288 CUY SR 017 02.11 Fairview Park; WCL to the Rocky River Resurface Brookpark Rd (SR-17) from the WCL to the Rocky
River in Fairview Park.
$620,000
4/1/2024 107289 CUY SR 094 10.05 Cleveland; SCL to US-42 Resurface State Rd (SR-94) from the Brookpark Rd (SR-17) to
West 25th St (US-42) in Cleveland.
$1,200,000
4/1/2024 107317 D12 GR FY2024 Various routes & sections Guardrail upgrade contract $1,400,000
4/1/2024 107322 D12 LG FY2024 Various routes & sections Lighting upgrade. $1,500,000
4/1/2024 107325 D12 SIGN FY2024 Various routes & sections Sign structure repair $250,000
4/1/2024 107326 D12 TSG FY2024 Various routes & sections Various routes & sections $250,000
4/1/2024 107382 CUY IR 480 12.78 Cleveland; Idlewood to SR-17 PM resurfacing from Idlewood Rd to Granger Rd (SR-17) in
Cleveland. Brooklyn, and Brooklyn Hts
$3,900,000
10/1/2024 80736 CUY IR 480 17.87/VAR I-480/I-77 interchange Bridge replacement $30,000,000
10/1/2024 82380 CUY IR 077/090 14.96/16.33 CCG3 I-90 from E. 9th to E. 22nd; I-77 from I-490 to I-90 Innerbelt CCG3: Improve I-90 in the “Central Interchange”
area between E 9th Street and Carnegie Ave; improve E 22nd
Street using part-width construction; remove the Cedar
Avenue bridge over I-90; improve I-77 north of the Kingsbury
Run Bridge; and replac
$395,000,000
10year_Jan2018thruJan2028 25 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
10/1/2024 104132 CUY SR 014 06.93 Garfield Hts; Over CSX Railroad Rehabilitate the Whitehouse Crossing bridge (SR-14) over CSX
RR in Garfield Hts. Part 1 is to prepare a life cycle cost analysis
between rehabilitating the existing structure and replacing it.
$30,000,000
1/1/2025 22215 CUY SR 252 08.79 Westlake; Columbia over IR-90 Replace the deck of the Columbia Rd bridge over IR-90 in
Westlake. CUY-090-0356
$6,000,000
1/1/2025 86044 CUY IR 071 18.29 Cleveland; West 14th over I-71 Replace the deck of the West 14th St bridge over IR-71 in
Cleveland. Includes painting the structural steel.
$9,300,000
1/1/2025 88350 CUY IR 071 13.72 Deck Cleveland; Bellaire over IR-71 Replace the deck of the Bellaire Road bridge over IR-71 in the
City of Cleveland.
$4,900,000
1/1/2025 100253 CUY Center St River Road to Old River Road Rehabilitate Center Street from River Road to Old River Road
in the City of Cleveland.
$1,599,345
1/1/2025 100255 CUY Elm St Division Avenue to Main Avenue Rehabilitate Elm Street from Division Avenue to Main Avenue
in the City of Cleveland
$812,790
1/1/2025 100259 CUY Main Ave West 25th St to Center St Rehabilitate Main Avenue from West 25th Street to Center
Street in the City of Cleveland.
$819,720
1/1/2025 101256 CUY IR 090 00.00 Westlake; County Line to Canterbury Rd Microsurfacing along I-90 from the Lorain County Line to west
of Canterbury Rd in the City of Westlake.
$2,000,000
1/1/2025 104380 CUY IR 271 09.73 Fairmount to S of Wilson Mills PM resurfacing of mainline IR-271 from Fairmount Blvd. to
south of Wilson Mills Rd.
$4,600,000
4/1/2025 104322 CUY US 322 14.11 Gates Mills; WCL to ECL Resurface Mayfield Rd (US-322) from the WCL to the ECL in
Gates Mills.
$2,300,000
6/6/2025 9670 LAK SR 084 08.14 SR-306 TO GARFIELD BLVD WIDEN & RECONSTRUCT SR84 FROM REYNOLDS RD (SR306)
TO GARFIELD RD IN MENTOR. MPO-STP. UNFUNDED AT THIS
TIME
$10,115,000
6/15/2025 13190 LAK SR 002 03.03 R OVER A STREAM Widen & replace the superstructure of the eastbound
Lakeland Freeway bridge over a stream located just west of SR-
91 in Eastlake. WB structure done under PID 93467. Bridges
overlayed and repaired under PID 21778.
$1,000,000
6/15/2025 18747 LAK IR 090 29.20 COUNTYLINE RD OVER IR-90 REPLACE THE DECK OF THE COUNTY LINE RD BRIDGE OVER IR-
90 IN MADISON TWP.
$2,600,000
10/1/2025 23051 CUY SR 237 07.16 TRAC AT HOPKINS AIRPORT IMPROVE THE BEREA FREEWAY RAMP ACCESS TO CLEVELAND
HOPKINS AIRPORT.CITY TO HIRE CONSULTANT FOR PLANS
USING TRAC FUNDING.TIER 2 ON 6/30/06 TRAC LIST. MOVED
WHILE WAITING ON CLEVELAND PORT AUTHORITY.
$16,110,000
1/1/2026 21788 CUY IR 077 11.11 Cuyahoga Hts; CSX over IR-77 Replace the CSX RR bridge over IR-77 located south of Grant
Avenue in Cuyahoga Hts. New structure will be longer with no
center pier.
$32,000,000
1/1/2026 99684 GEA SR 088 03.81 Parkman Twp; E of SR-528 to Cnty Ln Resurfacing from Hosmer Rd to the County Line in Parkman
Twp.
$1,080,000
1/1/2026 101258 GEA SR 088 00.00/VAR Various routes and sections Chip seal various routes in Geauga County $220,000
10year_Jan2018thruJan2028 26 of 27 MJH_All Projects for PIO_excel.qry
Proposed ODOT Construction Projects
6/19/17 thru 6/18/28
2/15/2018
Construction
Sale Date PID Project Name Project Termini Project Description Estimate
4/1/2026 104298 LAK IR 090 00.00 Wickliffe, Willoughby Hills; County Line to Rockefeller PM treatment on I-90 from the County Line to Rockefeller in
Wickliffe and Willoughby Hills.
$1,800,000
4/1/2026 104370 CUY IR 090 16.45 Cleveland; I-77 to SR-2 Microsurfacing from I-77 to SR-2 in Cleveland. $2,300,000
10/1/2026 76807 CUY IR 480 21.88 Cuyahoga County IR 480 from 21.88 to 26.39 Candidate Major Rehabilitation Project from Major Rehab
Candidate.
$27,060,000
1/1/2027 99696 LAK US 020 17.13 Painesville Twp; ECL to SR-2 Resurfacing from the Painesville ECL to SR-2 in Painesville Twp. $2,060,000
1/1/2027 99698 CUY IR 077 15.01 Cleveland; Kinsbury Run Bridge to IR-90 Resurface I-77 from the Kinsbury Run Bridge to IR-90 in
Cleveland
$1,300,000
1/1/2027 99699 CUY SR 008 06.40 Highland Hills; SCL to NCL Resurfacing Northfield Rd (SR-8) from the Warrensville Hts
Corp Line to the Shaker Hts Corp Line in the Village of
Highland Hills. From SLM 6.40 to 6.64 only the NB lanes will
be resurfaced.
$1,150,000
1/1/2027 104406 CUY IR 090 20.01 Cleveland, Bratenahl; East 55th to the Bratenahl ECL PM treatment from East 55th St to the Bratenahl ECL in
Cleveland and Bratenahl.
$5,800,000
1/1/2027 105747 GEA US 322 04.89 to SR-44 Microsurface US -322 from ??? to SR-44 $1,400,000
4/1/2027 22132 CUY IR 480 06.47 Fairview Park, Cleveland; Over the Rocky River Valley Overlay the deck of the IR-480 bridge over the Rocky River
Valley in Fairview Park and Cleveland.
$3,625,000
4/1/2027 25622 CUY IR 490 01.00 Cleveland; Over the Cuyahoga River Overlay the deck of the IR-490 bridge over the Cuyahoga River
in Cleveland. Major Bridge program
$5,250,000
4/1/2027 104352 GEA US 322 00.00 Chester Twp; Cnty Line to Heath Rd PM treatment on Mayfield Rd (US-322) from the Cuyahoga
County Line to Heath Rd in Chester Twp.
$3,000,000
1/1/2028 76804 CUY IR 480 00.00 Cuyahoga County; IR-480 from 0.00 to 6.48 Candidate Major Rehabilitation Project from Major Rehab
Candidate
$40,560,000
10year_Jan2018thruJan2028 27 of 27 MJH_All Projects for PIO_excel.qry