Proposed NPDES Permit for Municipal Storm Water Discharges from Joint Base Lewis-McChord

U.S. Environmental Protection Agency Public Meeting

Lakewood Public Library

March 19, 2012

Page 2: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

2

Presentation

Background – what, why, where, who

Overview of proposed permit requirement

Next Steps

Page 3: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

EPA’s Proposed Permit

The permit authorizes

discharges to waters of the U.S. from the Municipal Separate Storm Sewer System (MS4)

owned or operated by Joint Base Lewis-McChord (JBLM) and that is located on the portion of the military subinstallation within Pierce & Thurston Counties.

3

Page 4: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

What is a MS4?

A municipal separate storm sewer system ..is a conveyance or system of conveyances... owned by a State, city, town, or other public entity, which discharges to waters of the U.S., and Is designed or used for collecting or conveying storm water, Is not a combined sewer, and Is not part of a Publicly Owned Treatment Works (POTW) MS4s include …roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, and/or storm drains…..

4

Page 5: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

About Joint Base Lewis-McChord Established in 2010; Includes Fort Lewis Army & McChord Air Force Bases

Population = 95,000 (Year 2010)

Includes military personnel, their families, civilian employees & visitors

Total land area = 90,880 acres ( 142 sq. miles) Estimated land area draining to the MS4 = 5,707 acres

5

Page 6: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Receiving Waters

6

The MS4 in the cantonment area considered….

..Discharges to these receiving waters:

JBLM Main Murray Creek; Bell & Hamer Marshes

JBLM North American Lake American Lake Marsh Elliot Marsh

McChord Field Clover Creek

If a MS4 exists in the JBLM Training Areas,* the MS4 may discharge to....

Muck Creek, Nisqually River, and/or Puget Sound

Page 7: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

7

Impaired Waters: Ecology’s 2008 Integrated Report

Receiving Water Pollutants of Concern

EPA Approved TMDL?

Clover Creek Fecal coliform Dissolved Oxygen pH

No

American Lake Total Phosphorus No

Page 8: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

8

Other Stormwater Associated with Construction & Industrial Activities

JBLM maintains separate permit coverage under both EPA’s Multi-Sector General Permit (MSGP) and Construction General Permit (CGP) as necessary; Requirements are implemented base-wide

Page 9: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

9

EPA’s Phase II MS4 Permit Requirements

“…Develop, implement, and enforce a storm water management program (SWMP), designed to:

Reduce the discharge of pollutants from the MS4 to the maximum extent practicable (MEP),

Protect water quality, and

Satisfy the appropriate water quality requirements of the Clean Water Act.”

Address “minimum control measures”

Comply with more stringent permit requirements which the permit

authority determines are needed to protect water quality.

Page 10: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

10

The “Minimum Control Measures”

1. Public Education

2. Public Involvement

3. Illicit Discharge Detection and Elimination

4. Construction Site Runoff Control at Sites Disturbing 1 or more acres

5. Post-Construction (Permanent) Storm Water Management in New and Redevelopment for projects that disturb 1 acre or more

6. Pollution Prevention/Good Housekeeping for Municipal Operations Program Evaluation, Recordkeeping and Reporting Standard NPDES permit requirements Address waters not meeting State WQ standards & protect water quality

Page 11: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Beyond the “Minimum Measures”

EPA has also proposed: • Including the entire JBLM subinstallation • Mapping any existing MS4 in Muck Creek watershed • Site disturbance threshold of 5,000 sq. ft. for the construction &

new/re- development programs – Explicit requirements for treatment, onsite SW management & flow control

• Detailed SW structure operations & maintenance requirements • For discharges to impaired waters:

– Retrofit plan for reducing existing discharges and volumes – Monitoring for SW discharges, water quality & biological baselines

11

Page 12: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

12

What Else Did EPA Consider When Developing the Proposed Permit?

Puget Sound Information

Washington Department of Ecology’s Information

Existing Watershed Basin Plans for Chambers/Clover, Muck, & Murray/Sequalitchew Creeks

National Research Council ‘s 2008 Report recommendations to EPA

Energy Independence & Security Act (EISA), Sec. 438

Page 13: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

What is Ecology’s Role?

Establishes WQ standards

Defines impaired waters

Develops Total Maximum Daily Load (TMDL) clean up plans

For the JBLM MS4 permit, Dept. of Ecology provided:

Comments on early drafts

Notice of its intent to certify the MS4 permit under CWA § 401

(See Fact Sheet, Appendix C)

13

Page 14: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

14

Summary of Proposed Permit

Part I – Applicability • Permit area • SWMP document • Defines “allowable” non-stormwater discharges

Part II – SWMP requirements • EPA review/approval of “equivalent” SWMP documents or programs • Share SWMP responsibilities with others

Parts II.B.1 & 2 - Public Education & Public Involvement

– Conduct public education programs to reduce behaviors that contribute to adverse water quality impacts

– Engage the “public” (ie, tenants, staff, contractors w/in fenceline) – Coordinate SWMP implementation across JBLM

Page 15: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Summary of Permit: Part II.B.3 – Illicit Discharge Detection & Elimination

Update MS4 map Complete MS4 map etc for training areas (Muck Creek) Effectively prohibit all illicit discharges into the MS4 Find & address illicit discharges

15

Page 16: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

16

Summary of Permit: Part II.B.4 – Construction Site Runoff Control

Reduce pollutants from construction activities disturbing >5,000 sq. ft:

• Oversee all CGP-regulated construction activity

• Appropriate BMPs at construction sites disturbing >5,000 sq ft

• Specify requirements in all contracts

• Site plan reviews, site inspections & enforcement

Page 17: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

17

Summary of Permit: Part II.B.6 - Good Housekeeping & Pollution Prevention Inspect & maintain SW structures & catch basins;

• Spot check after major storm events • ~95% annual inspection rate by end of permit term

SWPPPs for material storage areas & maintenance yards

Page 18: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Permit Summary: Part II.C – Retrofits to Reduce Discharges to Impaired Waters

Create a retrofit plan to mitigate existing discharges & volume impacts to Clover Creek, American Lake & Murray Creek

Evaluate Low Impact Development opportunities

Identify potential project locations

Complete one or more projects to

disconnect ~5 acres of effective impervious area

18

Page 19: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

19

Part IV - Monitoring & Reporting

Annual Reports to EPA

Monitoring

• SW outfall monitoring in American Lake • WQ monitoring in both Murray & Clover Creeks • Benthic macroinvertebrate sampling in Murray & Clover Creeks

Page 20: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Summary of Permit: Part II.B.5 –Storm Water Management in New & Redevelopment

Manage runoff from public or private new/re-development disturbing > 5,000 sq. ft. to preserve & restore predevelopment hydrology:

SW site planning Source controls Minimize impervious areas, preserve vegetation & natural drainage Hydrologic performance standards for onsite SW mgmt & flow control Runoff treatment Wetland protection Ensure proper installation & operation Maintain inventory & records Provide staff training

20

Page 21: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Joint Base Lewis-McChord Draft Municipal Stormwater (MS4) Permit Performance Standard Illustration Public Meeting March 19, 2012

Ensuring safe and clean water for all Americans Healthy Watersheds Sustainable Communities

Page 22: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Impacts of Development

Adding impervious cover shifts the hydrologic cycle, resulting in increased surface runoff.

0%

20%

40%

60%

80%

100%

Predevelopment Unmitigated

Perc

enta

ge

Development Scenario

Evaporation

Groundwater

Interflow

Surface Runoff

Page 23: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Dispersion and infiltration BMPs consistent with the SMMWW apply.

Does the project disturb 5,000 square feet or

more?

Does the project create or replace 2,000 square feet but less than 5,000

square feet of hard surface?

On-site Storm Water Management lawn and landscape soil quality BMPs

requirements apply.

Yes

Yes No

Does the project create or replace 5,000 square feet or greater of hard

surface?

95% volumetric standard requirements apply.

or 8% of 2-year to 50% of 2-year peak flow Hydrologic Performance requirements

apply.

Yes

Yes Does the project create 10,000 square feet or more of hard surface?

Next Question

50% of 2-year to 100% of 50-year peak flow Hydrologic Performance

requirements apply.

On-site Stormwater Management and Hydrologic Performance requirements do not apply.

No

Part II.B.5.e (bullet 1)

Part II.B.5.e (bullet 2)

Part II.B.5.e (bullet 3)

Part II.B.5.f

Summary of EPA’s Proposed Hydrologic Performance Standard Requirements (Permit Part II.B.5.e & 5.f)

Next Question

Page 24: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

New Development Scenarios

24

1. Dispersion & Infiltration BMPs

2. 95% Volumetric Standard

3. Hydrologic Performance Standard

1

2 3

Page 25: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

1. Dispersion & Infiltration BMPs

25

No Performance Standard

Disturbs area greater than 5,000 ft2

Adds 2,000 - 5,000 ft2 hard surface

No additional treatment is required assuming soil

suitability criteria are met

Page 26: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

1. Dispersion & Infiltration BMPs

26

Downspout Dispersion Soil Amendment

Part II.B.5.e (bullet 1)

Part II.B.5.e (bullet 2)

Page 27: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

2. 95% Volumetric Standard

27

Performance Standard based on Historical Design

Storm

Disturbs area greater than 5,000 ft2

Adds greater than 5,000 ft2 hard surface

Existing Ecology Treatment Requirements apply

Page 28: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

95% Volumetric Standard

28

0

1

2

3

4

5

6

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Rai

nfal

l dep

th (i

nche

s)

Percentile

Olympia Airport (1948-2012)

95th = 1.28"

Volume of rain that would cover site footprint to a depth of the 95th percentile precipitation event (1.28 inches)

This volume must be retained on site

Page 29: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

2. 95% Volumetric Standard

29

Porous Pavement Bioretention Soil Amendment

Part II.B.5.e (bullet 1)

Part II.B.5.e (bullet 3)

Page 30: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

3. Hydrologic Performance Standard

30

Performance Standard based on Predevelopment

Hydrology

Predevelopment: 17 acres Forested A/B soils Flat

Average Yearly Runoff Volume:

~5,700 Gallons

Page 31: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

3. Hydrologic Performance Standard

31

Performance Standard based on Predevelopment

Hydrology

Average Yearly Runoff Volume:

~5,600,000 Gallons

Existing Ecology Treatment Requirements apply

Page 32: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

3. Hydrologic Performance Standard

32

Porous Pavement Bioretention Vegetation Soil Amendment

Part II.B.5.e (bullet 1)

Part II.B.5.f

Page 33: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

0

0.001

0.002

0.003

0.004

0.005

0.006

0.007

0.001 0.01 0.1 1 10 100

Runo

ff (c

fs)

Percent Time Rate Exceeded

Predevelopment Flow Duration

Curve

50% of 2-year peak flow

8% of 2-year peak flow

range of peak flows

portion of flow duration curve to match with LID

Example Flow Duration Curve

33

Page 34: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

0

0.001

0.002

0.003

0.004

0.005

0.006

0.007

0.001 0.01 0.1 1 10 100

Runo

ff (c

fs)

Percent Time Rate Exceeded

Flows that fail standard

Flows that pass standard

Predevelopment Flow Duration

Curve

Flow Duration Curve Interpretation

34

Page 35: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Development Scenarios Triggering Hydrologic Performance Standard

35

1. Predevelopment 2. Unmitigated 3. Detention Pond 4. LID

1

3

2

4

Page 36: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Performance Standard Results

36

0

0.002

0.004

0.006

0.008

0.001 0.01 0.1 1 10 100

Runo

ff (c

fs)

Percent Time Rate Exceeded

8% of 2-year peak flow

50% of 2-year peak flow

100% of 50-year peak flow

Page 37: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Performance Standard Results

37

0

0.002

0.004

0.006

0.008

0.001 0.01 0.1 1 10 100

Runo

ff (c

fs)

Percent Time Rate Exceeded

Predevelopment

8% of 2-year peak flow

50% of 2-year peak flow

100% of 50-year peak flow

1

Page 38: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Performance Standard Results

38

0

0.002

0.004

0.006

0.008

0.001 0.01 0.1 1 10 100

Runo

ff (c

fs)

Percent Time Rate Exceeded

Predevelopment Unmitigated

8% of 2-year peak flow

50% of 2-year peak flow

100% of 50-year peak flow

1 2

Page 39: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Performance Standard Results

39

0

0.002

0.004

0.006

0.008

0.001 0.01 0.1 1 10 100

Runo

ff (c

fs)

Percent Time Rate Exceeded

Predevelopment Unmitigated

8% of 2-year peak flow

50% of 2-year peak flow

100% of 50-year peak flow

Detention Pond

1 2 3

Page 40: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Performance Standard Results

40

0

0.002

0.004

0.006

0.008

0.001 0.01 0.1 1 10 100

Runo

ff (c

fs)

Percent Time Rate Exceeded

Predevelopment Unmitigated

8% of 2-year peak flow

50% of 2-year peak flow

100% of 50-year peak flow

Detention Pond LID

1 2 3 4

Page 41: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

41

Public Comments Accepted through March 30, 2012

By mail: EPA Region 10

Office of Water and Watersheds, OWW-130 Attn: NPDES Stormwater – JBLM 1200 Sixth Avenue, Suite 900 Seattle, WA 98101

Or via email: [email protected] Include name & contact info; Cite specific permit provision, as appropriate; Describe basis & facts supporting the comment, include suggested text

revision. After the comment period, EPA will:

• Respond to comments & revise permit text as necessary • Request final CWA §401 certification from Ecology • Issue the final permit

Page 42: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Thank You

Misha Vakoc , NPDES Stormwater Permit Coordinator

206-553-6650, [email protected]

Dino Marshalonis, Stormwater Technical Coordinator 206-553-1519, [email protected]

John Palmer, Senior Advisor to the Office of Water & Watersheds

206-553-6521, [email protected]

Jayshika Ramrakha, Watershed Stormwater Coordinator 206-553-1788, [email protected]

42

Page 43: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

43

Page 44: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

2. 95% Volumetric Standard

44

Unmitigated: ~175,000 gal

Bioretention only: ~6,000 gal

Porous Pavement only: ~5,500 gal

95% Volumetric Standard: ~15,000 gal

Average Predevelopment Runoff Volume:

~150 gal

Page 45: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

3. Flow Control Standard - Traditional

45

Detention Pond

Page 46: Proposed NPDES Permit for Municipal Storm Water Discharges ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments... · Proposed NPDES Permit for Municipal Storm Water Discharges from

Average Yearly Runoff Volume

46

Predevelopment: ~5,700 gal

Unmitigated: ~5,600,000 gal

Mitigation Scenarios:

Pond: ~41,000 gal LID: ~700 gal

Using combination of LID BMPs, runoff can be

effectively reduced and treated