ITHC/PRJ/17-18/EIA/89 IND TECH HOUSE CONSULT FORM 1, FORM 1A AND CONCEPTUAL PLAN FOR ENVIRONMENTAL CLEARANCE OF PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA, U.P. Project Proponent: M/S LOGIX INFOMEDIA PVT.LTD. EIA Consultant: Ind Tech House Consult (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini Delhi – 110 085 Tel: +91 11 2757 1410, 6460 7252 Fax: +91 11 2757 2241 Email: [email protected] August, 2017

PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

Embed Size (px)

Citation preview

Page 1: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

ITHC/PRJ/17-18/EIA/89 IND TECH HOUSE CONSULT

FORM 1, FORM 1A AND CONCEPTUAL PLAN

FOR

ENVIRONMENTAL CLEARANCE

OF

PROPOSED IT BUILDING “142 ONE”

AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

Project Proponent:

M/S LOGIX INFOMEDIA PVT.LTD.

EIA Consultant:

Ind Tech House Consult

(An ISO 9001:2008 Certified Organization)

G-8/6, Ground Floor, Sector 11, Rohini Delhi – 110 085

Tel: +91 11 2757 1410, 6460 7252 Fax: +91 11 2757 2241

Email: [email protected]

August, 2017

Page 2: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

ITHC/PRJ/17-18/EIA/89 IND TECH HOUSE CONSULT

For and on behalf of: Ind Tech House Consult

Approved by: Mr. Arvind Narayan Devikar

Signed:

Position: EIA Coordinator

Date: August, 2017

PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA, U.P.

Project Proponent:

M/S LOGIX INFOMEDIA PVT.LTD.

This report has been prepared by Ind Tech House Consult with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our general terms and conditions of business and taking account of the resources devoted to it by agreement with the client.

We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above.

The document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Ind Tech House Consult being obtained. Ind Tech House Consult accepts no responsibility or liability for the consequences of this document being used for a purpose other than the purpose for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Ind Tech House Consult for all loss or damage resulting there from. Ind Tech House Consult accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.

Page 3: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

Declaration by Experts Contributing to the Report of Proposed It Building “142 One” At Plot No. 03, Sector 142 Noida, U.P. I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above Report.

EIA coordinator: Mr. Arvind Narayan Devikar Signature and Date Associate Coordinator: Mr. Soumya Dwivedi Functional Area Experts:

S. NO.

Functional areas

Name of the expert/s Signature and date

1 WP Mrs. Supriti Guha (FAE) Mr. Soumya Dwivedi (Team Member)

2 MSW Mrs. Supriti Guha (FAE)

Mr. Soumya Dwivedi (Team Member)

3 LU Mr. Rajveer Singh (FAE)

Mr. Manish Shukla (Team Member)

4 AP Mr. Suman Banerjee (FAE)

Mr. Soumya Dwivedi (Team Member)

5 NV Dr. Manoj Kr. Mishra (FAE)

Mr. Suman Banerjee (Team Member)

6 EB Dr. Sameer DeshPande(FAE)

Dr. Bideh Shukla (Team Member)

7 SE Dr. Debashish Bhttacharya (FAE)

8 SC Mr. Shrikant Mishra (FAE)

Dr. Bideh Shukla (Team Member)

DECLARATION BY EXPERTS

Page 4: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

Signature For Ind Tech House Consult

Associate Staff 1. Mr. Anand Kumar Dubey

2. Mr. Indra Sharma

3. Ms Monika Singh

4. Saurabh Bharadwaj

Monitoring Laboratory Involved Ind Research and Development House ( NABL Approved Lab)

Page 5: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

S. No. Contents

I Form 1

II Form 1 A

III Conceptual Plan

IV Annexure

A DESCRIPTIVE

Site Location Map Annexure-A1

500 mts Radius Map Annexure-A2

10 km Radius Map Annexure-A3

Water balance Diagram Annexure-A4

Rainwater Harvesting Calculation Annexure-A5

C CONSULTANT DISCLOUSURE

Consultant Disclosure Annexure-C1

NABET Accreditation letter Annexure-C2

D DRAWINGS

Site Plan Annexure-D1

Landscape Plan Annexure-D2

Stilt & open Parking Plan Annexure-D3

Basement Parking Plan Annexure-D4

Page 6: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 1 IND TECH HOUSE CONSULT

Application for Prior Environmental Clearance (EC)

FORM 1 (See Paragraph – 6 Notification dt.14th September 2006)

As amended to EIA Notification, 2006 issued vide S.O. 3067(E) on

Dt.- 01.12.2009. Basic Information S. No. Item Details

1. Name of the project/s Environment Clearance for proposed IT building “142 One” at plot no. 03, sector 142 Noida. U.P.

2. S. No. in the schedule 8(a)

3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled

Plot Area: 8100 sq. m. Built Up area: 33841.18 sq. m. Number of Building Blocks: 1 Max. Building height: 50.95 m. Max No. of Floors: B+ST+SER+9

4. New/Expansion/Modernization New

5. Existing capacity/area etc. Nil

6. Category of the project i.e. ‘A’ or ‘B’

B

7. Does it attract the general condition? If yes, please specify.

No

8. Does it attract the specific condition? If yes, please specify.

No

9. Location Noida

Plot/Survey/Khasra No. Plot No. 3, Sector 142

Tehsil -

District Noida

State U.P.

10. Nearest railway station/airport along with distance in kms.

Dadri railway station: 12.58 km E Indira Gandhi International Airport: 31.41 km NW

11. Nearest town, city, District Headquarters along with distance in Kms.

Greater Noida: 9.17 km SE

12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given)

Noida

Page 7: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 2 IND TECH HOUSE CONSULT

13. Name of the applicant Logix Infomedia Pvt. Ltd.

14. Registered Address B-231, Greater Kailash – I, Delhi - 110048

15. Address for correspondence: Stellar Corporate Office, C-56/9, Sector-62, Noida -201309

Name Mr. Himanshu Mathur

Designation (Owner / Partner / CEO)

CEO

Address C-56/9, SECTOR-62, NOIDA

Pin Code 201309

E-mail [email protected]

Telephone No. 9350851959

Fax No. 0120-2401443

16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet.

No alternative site is examined

17. Interlinked Projects Not Applicable

18. Whether separate application of interlinked project has been submitted?

Not Applicable

19. If yes, date of submission Not Applicable

20. If no, reason. Not Applicable

21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The forest (Conservation)

Act, 1980? (b) The wildlife (Protection) Act,

1972? (c) The C.R.Z. Notification,

1991?

The project land is for the development of IT building as per the Master Plan and does not belong to any forest land and protected area hence mentioned approval is not required.

22. Whether there is any Government Order/Policy relevant/ relating to the site?

No

23. Forest land involved (hectares).

No

24. Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the

Court, if any and its relevance with the proposed

No

Page 8: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 3 IND TECH HOUSE CONSULT

project.

(I) Activity 1. Construction, operation or decommissioning of the Project involving

actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

No There is no change in the existing land use and the proposed development is as per the Noida Master Plan.

1.2 Clearance of existing land, vegetation and buildings?

No Since the project site is vacant, no clearance of existing land and vegetation & buildings is required as the land is free from any vegetation & structure.

1.3 Creation of new land uses?

No There will be no creation of new land use. The landuse for proposed project is in conformity with Noida Master Plan

1.4 Pre-construction investigations e.g. bore houses, soil testing?

Yes Geotechnical Soil investigation has been carried out.

1.5 Construction works? Yes The major construction works are given below:

Site Development Road Development

• Internal roads Utilities/Services

• Water Supply

• Sewerage

• Drainage

• Rain Water Harvesting Structures and Pits

• Power supply and back up facility,

Buildings

• IT office

• Parking Provisions

1.6 Demolition works? No Demolition work is not involved in the project, as the site has no existing building or constructed area.

1.7 Temporary sites used for Yes Mostly, local labors will be employed.

Page 9: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 4 IND TECH HOUSE CONSULT

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

construction works or housing of construction workers?

However temporary labour camps will be established for labourers and a dormitory for the site supervisors during the construction stage at project site only. All the construction activities including storage of raw materials will be confined to the storage spaces earmarked on project site only.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes Above ground building structures will include building of 01 block. The earthwork is involved for foundation and laying of underground services etc. Excavated soil will be used for site leveling, back filling/filling and road construction. Top 200 mm layer of soil will be separately stored and used for landscaping/horticulture development work.

1.9 Underground works including mining or tunneling?

Yes Underground works includes excavation of earth for construction of foundation, basement, water storage tank and STP.

1.10 Reclamation works? No Not involved.

1.11 Dredging? No Not involved.

1.12 Offshore structures? No Not involved.

1.13 Production and manufacturing processes?

No This is a construction of IT Building Hence no production or manufacturing activities will take place.

1.14 Facilities for storage of goods or materials?

Yes Temporary storage facilities will be created during construction phase for storage of construction materials.

1.15 Facilities for treatment or disposal of solid or liquid effluents?

Yes Solid Waste Construction Stage : Solid waste, generated during the construction phase, will comprise mainly of construction waste. The construction waste will be reused within the site for various constructions filling work.

In addition to that there will be generation of small quantity of municipal waste from 19.5 kg/day

Page 10: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 5 IND TECH HOUSE CONSULT

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

(Camp-15, Floating-4.5) construction labors. It will be ensured that the generated waste will be sent to nearest designated waste storage bins. Operation Stage: Solid waste generation from the facility will be approximately 0.57 TPD including 0.34 TPD bio-degradable. Solid waste generated from the block will be collected by the dedicated and trained housekeeping staff. Twin bin systems will also be provided for segregation at sources. Recyclable wastes will be sold to vendors and non-recyclable wastes will be disposed through authorized agency to municipal waste disposal site. Biodegradable waste will be treated in organic waste converter and used as manure for horticulture development. MSW including horticulture waste will be handled as per the Municipal Solid Waste Management & Handling Rules, 2016. Sewage sludge 27 kg/day of sewage sludge will be generated which will be used as manure for plants. Waste water will also be generated from construction activities, cleaning, curing washing etc. which contain suspended materials. Hazardous waste: 4.04 liters/ day of waste oil will be generated and sold to authorized recyclers.

Page 11: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 6 IND TECH HOUSE CONSULT

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

Liquid Effluent Construction Stage: During the construction stage domestic liquid effluent generation will be limited to small quantity from labor camp proposed at site. Wastewater generated from construction site contains suspended materials, and washings from various areas. Construction wastewater shall be collected in a separate basin and shall be reused after primary treatment for sprinkling on roads. Mobile toilets and potable water facilities will be provided at site during construction phase for labour and staff. Operation Stage: Approximately 74 KLD of waste water will be generated from the proposed facility. This effluent will be treated in Sewage Treatment Plant of 90 KLD. The total treated water from STP will be reused for flushing, horticulture, D.G. Cooling and HVAC

1.16 Facilities for long term housing of operational workers?

No Not applicable

1.17 New road, rail or sea traffic during construction or operation?

No Not applicable

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

No Not applicable

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No Not applicable

1.20 New or diverted transmission lines or pipelines?

No Not applicable

Page 12: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 7 IND TECH HOUSE CONSULT

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No Not applicable

1.22 Stream crossings? No Not applicable

1.23 Abstraction or transfers of water form ground or surface waters?

No There will be no ground water extraction for the project during construction phase. During operation phase, water will be supplied by New Okhla Industrial Development Authority.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No Surface drainage may affect due to construction of the project. By considering run-off prior to development & run off after development there is some increment in storm water run-off. However, runoff generated from the project site during monsoon season will be used to recharge ground aquifer. Network of drainage system developed in the site will be used to collect roof as well as surface runoff. Potential Quantity of runoff will be 3343.3 CUM on annual basis which will be recharged to ground.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes During construction phase transport of personnel as well as construction materials would be required. The personnel would preferably be engaged from nearby areas. Precaution is being taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak hours. During operation phase, parking will be provided in Surface, stilt & basement.

1.26 Long-term dismantling or decommissioning or restoration works?

No Not applicable

Page 13: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 8 IND TECH HOUSE CONSULT

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

1.27 Ongoing activity during

decommissioning which could have an impact on the environment?

No Not applicable

1.28 Influx of people to an area in either temporarily or permanently?

Yes Construction phase – Temporary influx of about 80 people is expected from the nearby areas.

Operation phase – IT offices: 2201 + Visitors: 213, Total: 2414

1.29 Introduction of alien species? No Not applicable

1.30 Loss of native species or genetic diversity?

No Not applicable

1.31 Any other actions? No None

2. Use of Natural resources for construction or operation of the Project

(such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S.No. Information/checklist

confirmation Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

No The proposed project is for development of IT building and the proposed development is as per the Noida Master Plan.

2.2 Water (expected source & competing users) unit: KLD

Yes Water requirement during construction phase will be met through tanker water supply.

During operation phase, fresh water demand will be met from water supply department of New Okhla Industrial Development Authority. Treated water demand for flushing, gardening DG Set cooling and HVAC shall be met from treated water from STP installed at site. 60 KLD from treated water will be used within site premises from STP installed at site.

2.3 Minerals (MT) No Not applicable

2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

Construction materials such as Cement, Steel, Bricks, Stone aggregates, and Sand are required for construction of the project. These

Page 14: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 9 IND TECH HOUSE CONSULT

S.No. Information/checklist

confirmation Yes/ No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

materials are being procured from local reputed licensed vendors.

2.5 Forests and timber (source – MT) No Limited use of timber will be done and it will be restricted to selected locations.

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes Power for the proposed project will be supplied by Uttar Pradesh Power Corporation Ltd. Maximum power Demand for the proposed project is 2400 KW. DG sets of 3510 (1x1500+1x1010+1x1000) KVA will be used as power backup during power failure. HSD (ultra low sulphur variety as per availability) fuel will be used for DG sets.

2.7 Any other natural resources (use appropriate standard units)

No --

3. Use, storage, transport, handling or production of substances or

materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

No Not applicable.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No Not applicable.

3.3 Affect the welfare of people e.g. by changing living conditions?

No Not Applicable.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No Not applicable.

3.5 Any other causes No Not applicable

Page 15: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 10 IND TECH HOUSE CONSULT

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

4.1 Spoil, overburden or mine wastes No Top soil generated during earth excavation will be stacked, covered, and preserved for reuse as top layer for horticulture development. Remaining soil will be used for site leveling, back filling/filling in raft and road construction.

4.2 Municipal wastes (domestic and or commercial wastes)

Yes Construction Phase: Municipal solid waste – 19.5 kg/day Operation Phase: Municipal solid wastes – 0.57 TPD. Wastes includes paper, plastic cans etc. and wastes from street sweeping. Organic waste generated shall be treated into onsite OWC and recyclable waste shall be disposed off through authorized recyclers.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

Yes Waste oil 4.04 Lts on daily basis from DG sets will be the only hazardous waste generated from the project. This waste oil will be carefully stored in HDPE drums in isolated covered space and sold to recyclers authorized by CPCB / SPCB. Suitable care will be taken so as to prevent spills/ leaks of used oil from storage.

4.4 Other industrial process wastes No Not applicable

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other sludge from effluent treatment

Yes Sewage sludge shall be used as manure.

4.7 Construction or demolition wastes Yes Demolition work is not involved. Construction Work: Excavated soil will be used for landscaping and back filling. Other construction waste like bricks, concrete etc will be used in road works / manholes etc. Gunny bags, cardboards will be sent to

Page 16: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 11 IND TECH HOUSE CONSULT

S. No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

authorize recycler. The inert waste will be sent to nearby land fill site.

4.8 Redundant machinery or equipment No Not applicable

4.9 Contaminated soils or other materials

No Not applicable

4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air

(Kg/hr)

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes Emission will be from: � Stationary Sources: DG sets 3510

KVA � Mobile Sources: Vehicular

emissions CPCB approved DG sets with acoustic canopy will be used only during power failure.

5.2 Emissions from production processes

No Not applicable

5.3 Emissions from materials handling including storage or transport

No Fugitive dust emission due to handling and loading - unloading activities is envisaged during construction. Frequent water sprinkling is being done to minimize the fugitive emissions.

5.4 Emissions from construction activities including plant and equipment

Yes Margi

nal

During the construction phase, major emission will be in the form of fugitive dust, use of DG sets and transportation of construction material.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

Yes The project may cause rise in dust levels during construction phase. Precautions are being taken to reduce dust generation during construction phase:-

• RMC use will reduce the handling

Page 17: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 12 IND TECH HOUSE CONSULT

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

of cement, sand and concrete thus dust emission will be minimized.

• Tarpaulins will be used to cover trucks carrying debris.

Water sprinkling is being practiced at regular intervals to reduce dust emissions. Dust is likely to be generated during operation phase due to movement of vehicles and blowing of air. But the impact is negligible. Sewage generated from proposed project will be treated in onsite STP.

5.6 Emissions from incineration of waste

No Not applicable

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

No Burning of any substances including biomass, slash materials and/ or construction debris will be prohibited

5.8 Emissions from any other sources No Nil

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

Yes Noise is expected to be generated during construction phase mainly from operation of heavy machinery, DG sets, and traffic. The indicated noise levels from certain construction plants/equipment are indicated below: � Concrete Mixer - 85 dBA � Generator - 95 dBA � Pumps - 90 - 95 dBA � Trucks - 85 – 90 dBA For control of noise following measures shall be adopted:

• Properly maintained equipment with mufflers will be used.

• High noise generating construction activities would be

Page 18: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 13 IND TECH HOUSE CONSULT

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

carried out only during day time. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. During operation noise from operation of DG sets is envisaged. However, the generator sets installed will operate at noise level less than 75 dB (A) as the generators will be placed either in acoustic chambers or a canopy.

6.2 From industrial or similar processes No Not applicable

6.3 From construction or demolition Yes Noise Pollution Control: Noise pollution will be due to operation of machinery as well as transportation vehicles. As there is no habitation in nearby area hence there will be negligible impact. However following precautions shall be taken to control noise pollution:

• High noise generating construction activities would be carried out only during day time.

• Installation, use and maintenance of mufflers on equipment.

• Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs.

6.4 From blasting or piling No Blasting & piling work is not involved

in the project.

6.5 From construction or operational traffic

Yes Construction Phase: Welding is light and heat generating activity during construction. Appropriate safety measures will be taken as per I.S. code and CPWD work manual.

Materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.

Operation Phase: Car parking is provided on surface,

Page 19: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 14 IND TECH HOUSE CONSULT

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

stilt and in basement. Vehicular movement is restricted to roads and parking areas. Provision of soft green peripheral road side plantation will help in reduction of noise level.

6.6 From lighting or cooling systems No Nil

6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants

into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data 7.1 From handling, storage, use or

spillage of hazardous materials Yes The waste oil, generated during

operation phase from the DG sets, will be collected and separately stored in HDPE drums, over concrete floor within the premises, before final disposal. All precautionary steps will be taken to avoid spillage. It will be directly transferred to authorized recyclers.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No Sewage, generated from the complex, will be treated in proposed on-site STP of 90 KLD and recycled within the project facility for gardening, DG cooling, flushing and HVAC etc.

7.3 By deposition of pollutants emitted to air into the land or into water

No Dust generation during construction phase from earthworks and movement of vehicles is a temporary phenomenon and will have short term impact during construction phase. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts.

Page 20: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 15 IND TECH HOUSE CONSULT

S.No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

DG exhaust will be discharged at height stipulated by CPCB.

7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build up

of pollutants in the environment from these sources?

No No.

8. Risk of accidents during construction or operation of the Project, which

could affect human health or the environment

S.No. Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances

No This is a construction for IT Building and does not involve major hazardous construction activity. Hence chances of explosions, spillages, fires are minimal.

8.2 From any other causes No Nil

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

Yes The project area is located at seismic zone IV, according to Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. There are no chances of flood and landslide in the area.

9. Factors which should be considered (such as consequential

development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project, which could have impact on the environment e.g.:

Yes

The project will be equipped with dedicated internal road, parking, internal water distribution system, and fire fighting system, internal sewage collection network, lighting facilities, solar lighting and power backup facility.

Page 21: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 16 IND TECH HOUSE CONSULT

S. No. Information/Checklist

confirmation Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of

information data

• Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

Yes Appropriate infrastructure like, roads, power supply and waste management will be developed within the site so that chances of occurrence of any adverse impacts are minimized.

• extractive industries No Not applicable

• supply industries No Not applicable

• other No Not applicable

9.2 Lead to after-use of the site, which could have an impact on the environment

No - -

9.3 Set a precedent for later developments

Yes This is a construction of IT building and there will be generation of employment during construction & operation phase.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

No -

(III) Environmental Sensitivity

S.No. Areas Name/

Identity

Aerial distance (within 15 km.) Proposed project location

boundary 1 Areas protected under

international conventions, national or local legislation for their ecological, landscape, cultural or other related value

No Not within 15 km from the project site.

2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests.

Yes Okhla Bird Sanctuary, 11.09 Km., NW Hindon River: 1.79 km, E Yamuna River: 3.21km, SW

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

Yes Okhla Bird Sanctuary, 11.09 Km., NW

4 Inland, coastal, marine or underground waters

No Not located within 15 km of the proposed project location.

Page 22: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1

ITHC/PRJ/17-18/EIA/89 17 IND TECH HOUSE CONSULT

S.No. Areas Name/

Identity

Aerial distance (within 15 km.) Proposed project location

boundary

5 State, National boundaries

Yes U.P. Haryana Border, 3.18 Km.,

SW U.P. Delhi Border: 6.66 Km, NW

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

No The site does no fall under any route to any pilgrim, tourist areas.

7 Defence installations

No Not located within 15 km of the proposed project location.

8 Densely populated or built-up area No Density of surrounding development is as per master plan.

9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

Yes Manmade community facilities such as hospitals, schools, places of worship and community facilities will not be affected due to construction of the project, since; they are not located in the vicinity of project.

10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

No Area does not fall in the ground water scarce category

11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

No Nothing specific

12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

Yes The project is located at seismic zone IV, according to Indian Standard Seismic Zoning Map. Structural design will be done for this seismic zone as per code. There are no possibilities of the proposed project site getting flooded as per available records. Landslides not applicable as the project site & surrounding land is flat.

Page 23: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

it'

tr

"l hereby given undertaking that the data and information given in the application andenclosures are true to the best ol my knowledge and belief and I am aware that ifany part of the data and inlormation submitted is found to be lalse.or misleading atany stage, the project will be rejecled and clearance give, il any to the project will berevoked at our risk and cost."

\*Signatudol the Proponent with

'Name and Full Address

tlirncruhu tvlirhwc-sal2 kelnr-6>

N 6ID,4

tTHC/PRJ/I7.1 8/EF,/89

Date:

Place:

BUILDING "142 ONE'AT PLOT NO,03, SECTOR 142 NOIDA,U.P.

18 IND TECH HOUSE CONSULT

Page 24: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 19 IND TECH HOUSE CONSULT

FORM-1 A (CHECKLIST OF ENVIRONMENTAL IMPACTS) 1.0 LAND ENVIRONMENT 1.1. Will the existing land use get significantly altered from the project that is not

consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use, if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans.

The construction of IT building is proposed at plot no 03, Sector 142, Noida, Uttar Pradesh. Project activity will not change the existing land use, since, the site is proposed for the development of IT building as per NOIDA Master Plan. The following maps are attached. (i) Site location, (ii) Layout ( Conceptual ) plan, (iii) Surrounding features of the proposed site (within 500 meters and 10 Km, Ref.

Annexure 1.2 List out all the major project requirements in terms of the land area, built up area,

water consumption, power requirement, connectivity, community facilities, parking needs etc.

The proposed project is construction of IT building. Salient feature of the proposed project is given below in Table -1:

Table-1: Salient Feature of the Project

S. No.

Description Quantitty Unit

GENERAL 1 Plot Area 8100.00 SQM

2 Proposed Built Up Area 33841.18 SQM

3 Number of Building Blocks 1 NOS

4 Max Height of Building (Upto Terrace) 50.95 M

5 Max No of Floors B+ST+SER+9 NOS

6 Cost of Project 100 CR

7 Expected Population (All Floating) 2414 PERSONS

AREAS 8 Permissible Ground Coverage Area (30%) 2430 SQM

9 Proposed Ground Coverage Area ( 29.7%) 2408 SQM

10 Permissible FAR Area 262.5 (Incl 5% for Green Rating) 21262.5 SQM

11 Proposed FAR Area 262.3 21260.99 SQM

12 Basement Area (Excluding Service Area) 4990.93 SQM

13 Stilt & other Non FAR areas 7589.27 SQM

14 Proposed Built Up Area 33841.18 SQM

WATER 15 Total Water Requirement 177.14 KLD

16 Fresh water requirement 117.25 KLD

Page 25: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 20 IND TECH HOUSE CONSULT

17 Waste water Generation 74.87 KLD

18 Proposed STP Capacity 90 KLD

19 Treated Water Available for Reuse 59.9 KLD

20 Recycled Water 59.9 KLD

21 Discharge to Municipal Sewer 0 KLD

RAIN WATER HARVESTING 22 Rain Water Harvesting Potential 3343.28 CUM

23 No of RWH of Pits Proposed 2 NOS

PARKING

24 Total Parking Required as / Building Bye Laws 425 ECS

25 Proposed Total Parking 446 ECS

26 Proposed Parking on Surface 96 ECS

27 Proposed Parking in Stilt 75 ECS

28 Basement Parking (Mech Stack Parking) 275 ECS

GREEN AREAS 29 Proposed Green Area (18.01% of Plot Area) 1459.35 SQM

WASTE GENERATION 30 Municipal Solid Waste Generation 0.57 TPD

31 Quantity of Hazardous waste Generation 4.04 LTS/DAY

32 Quantity of Sludge Generated from STP 27.5 KG/DAY

POWER 33 Total Power Requirement 2400 KW

34 DG set backup 3510 KVA

1.3 What are the likely impacts of the proposed activity on the existing facilities

adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology).

The project is being developed in accordance with NOIDA building bye laws, approved building plans and NBC - 2016 norms. The development will not cause any disturbance to local ecology and surrounding establishments. Peripheral green belt will be developed. Proposed project will provide all the basic utilities such as proper drainage, sewerage treatment & water supply system. The proposed development will have a positive impact as the project site is vacant and will be developed for IT building. The project will provide organized open spaces and green areas adding to aesthetics and improvement of surrounding environment.

1.4 Will there be any significant land disturbance resulting in erosion, subsidence &

instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given).

The main reasons for erosion are over exploitation of groundwater, unstable slopes, landslides etc. The proposed site area is primarily a flat land and is not prone to erosion. The proposed construction will involve excavation for foundation. Excavated soil will be used for backfilling, play fields and parking area. The project would involve construction of paved areas which would reduce the chances of erosion subsidence. Subsidence was not anticipated, as ground water will not be used.

Page 26: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 21 IND TECH HOUSE CONSULT

Structural design of building will be vetted by the Govt agency & structural stability certificate will be submitted to local body as per rules. Seismo-Tectonic Appraisal of the Area: Bureau of Indian Standards (BIS) has prepared a seismic zoning map of India based on tectonic features and records of past earthquakes. The project site falls under Zone-IV as per the Seismic Zoning map of India (IS 1893, Part I, 2002.) Necessary seismic factors as per codes shall be incorporated suitably while designing the structures to safeguard against earthquake risks.

1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site)

The proposed project activities will not cause any alteration of natural drainage system. No changes are expected outside from project premises. The project will implement planned drainage system within the site and there will be a positive change in the drainage pattern.

1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.)

During construction phase, excavation is envisaged in order to provide foundations. 20 cm top soil will be stripped from the project site prior to start of construction/excavation. Total plot area is 8100 sqm. Quantity of top soil obtaining after stripping 20 cm: 1620 cum. This excavated soil will be properly stacked within the site under tarpaulin cover; and will be reused for backfilling purpose, road construction etc. The top-soil will be preserved separately and will be used for landscaping purpose only. Hence, no immediate adverse impacts on the land environment are envisaged. The valuable top soil will not be dumped or wasted under any circumstance.

1.7 Give details regarding water supply, waste handling etc. during the construction

period.

� Water Supply: During construction stage, Treated waste water from the tanker water will be taken for construction works. This water is tested for fitness for construction purpose.

� Waste Generation and Handling: Excavated soil will be stored and covered at site and it will be reused for site leveling, back filling and road construction. The fertile top soil will be reused for landscaping purpose. Spillage of oil from the machinery is being properly collected in drums and disposed off. For construction laborers, proper sanitary facilities & wash areas is provided and good hygienic conditions is maintained. Handling of waste generated is being done by a good agency approved by SPCB/CPCB.

1.8 Will the low lying areas and wetlands get altered? (Provide details of how low lying

and wetlands are getting modified from the proposed activity).

There is no low lying area observed within and around the vicinity of the project site .

Page 27: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 22 IND TECH HOUSE CONSULT

1.9 Whether construction debris and waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal)

The waste generated during construction phase can broadly be classified as construction waste and domestic waste. About 1354 MT of construction waste (Calculated using TIFAC (Technology Information, Forecasting, and Assessment Council standards, @ 40 Kg / sq m) and negligible quantity of domestic waste would be generated from labours employed at site.

Most of the construction waste generated will be used on the site as filler material for leveling and development of site and internal road. Construction waste if any remaining will be sent to an approved dumping site/landfill site through authorized agency.

80 labors per day will be employed during the construction stage of the project. Required

sanitary, drinking water and other requisite facilities will be provided at site. Wash areas will be constructed and good hygienic conditions would be maintained in labour camp.

2.0 WATER ENVIRONMENT

2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement. Total water requirement for this project is 177 KLD, out of which, 60 KLD of treated water from STP will be reused. The fresh water demand of 117 KLD will be met from water supply department of NOIDA. Breakup of water requirements for various uses is given below. Efficient dual flushing fixtures will be provided to achieve conservation of fresh water. Detail of water requirement has been given in table – 3 below:

Table 3: Water Requirement Details of the Project

S. No. Particulars Water requirement (KLD)

1. Total water requirement 177

2. Total treated water requirement 60

Treated waste water recycled for flushing 27

HVAC 70 (58 fresh+12 treated)

Treated waste water recycled for landscaping within project area 2

D G Cooling 19

3. Net fresh water requirement 117

Page 28: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 23 IND TECH HOUSE CONSULT

Water Balance Diagram

2.2 What is the capacity (dependable flow or yield) of the proposed source of water?

During operation stage fresh water will be supplied by water supply department of NOIDA. Any shortfall in supply will be met from tanker supplies/extraction of potable water from tube well with prior permission of CGWA.

2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality)

60 KLD of treated water will be met through on-site STP. The quality of water would conform to the desirable drinking water standards as per IS: 10500.

2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage)

Approximately 60 KLD of treated water from proposed on-site STP and will be used for flushing, D. G. Cooling, gardening and HVAC.

2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption).

Fresh water conforming to the drinking water standard will be supplied by water supply department of NOIDA. Therefore, no diversion of water from other user is expected and no impact on the existing users is anticipated.

2.6 What is the incremental pollution load from wastewater generated from the

proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity).

Waste water expected to be generated from the project is 74 KLD which will be treated in on-site STP. Approx. 60 KLD treated water will be used in horticulture, flushing, DG cooling and HVAC.

Page 29: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 24 IND TECH HOUSE CONSULT

2.7 Give details of the water requirements met from water harvesting? Furnish details

of the facilities created. As estimated, 74 KLD of waste water will be generated from the project which will be treated through proposed on-site STP. The characteristics of the wastewater and of the effluent after treatment are as follows:

Parameters

Conc. Value Expected in Wastewater

Reclaimed Water Quality

mg/l mg/l

pH 6.5-8.5 7.0 to 8.5

Biochemical Oxygen Demand (BOD5) 300-500 < 5

Chemical Oxygen Demand (COD) 800-1000 < 30

Suspended Solids 250-300 <5

Oil & Grease <50 <5

2.8 What would be the impact of the land use changes occurring due to the proposed

project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way?

Due to construction of the project on vacant land there would be change in the runoff characteristics quantitative and qualitative as well The quantitative change: Runoff coefficient from the project site prior to development of project = 0.2 Runoff coefficient from the project site after development of project = 0.75 (Considering different coefficients for paved area, soft area, terrace etc) Hence incremental runoff = 0.75 – 0.2 = 0.52 Qualitative change: Runoff from parking areas Storm water drainage & Rain water harvesting system as described in item no: 2.7 above meet quantitative, qualitative & prevention of over flooding/water logging requirements.

2.9 What are the impacts of the proposal on the ground water? (Will there be tapping

of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any). There will be no tapping of ground water and will be strictly prohibited during construction and operation phase of the project.

2.10 What precautions/measures are taken to prevent the run-off from construction

activities polluting land and aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts).

During the construction operation, Runoff from the construction site shall not be allowed to stand or enter into the roadside or nearby drain. Adequate measures shall be taken to collect such run off and either shall be reused (if possible) or disposed at the designated construction waste disposal location. Suitable garlanding drain as per the existing contours of the plot will be developed.

Page 30: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 25 IND TECH HOUSE CONSULT

2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels).

There will be a provision of storm water drain along the site. Storm water from run offs will be collected and channelized to common storm water collection system. Storm water from roof top of the IT building will be collected and channelized to rain water harvesting pits. Water so collected will pass through de-silting-cum-filter chamber, oil and grease separators.

2.12 Will the deployment of construction laborers particularly in the peak period lead to

unsanitary conditions around the project site (Justify with proper explanation)

Labour camp for 50 labours will be constructed at project site. Temporary rest rooms, office and first aid/ safety office will also be provided on site. Proper sanitation facility shall also be made available on site.

2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology and facilities for recycling and disposal)

During operational phase estimated quantity of sewage to be generated on project site is 74 KLD, which will be treated in proposed on-site STP. Approx 60 KLD treated water will be used in horticulture, HVAC, D. G. Cooling and flushing.

2.14 Give details of dual plumbing system if treated waste water is used for flushing of

toilets or any other use.

Treated waste water will be used for flushing of toilets. Treated waste water will be collected and stored in underground tank. This tank will provide water for horticulture and flushing. Water for flushing will be pumped from this tank to terrace tank of each tower and will be connected to each toilets through separate pipes.

3.0 VEGETATION

3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any)

There is no endangered plant or animal species in the region. Moreover, the area does not fall under the path of any migratory species. There is no reserve forest, wild life sanctuary or protected forest around the project site. Hence no threat to biodiversity is envisaged.

3.2 Will the construction involve extensive clearing or modification of vegetation?

(Provide a detailed account of the trees & vegetation affected by the project)

The proposed project site is vacant and clear from vegetation. The construction of proposed project does not involve extensive clearing or modification of vegetation.

3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale)

Page 31: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 26 IND TECH HOUSE CONSULT

Landscape development plan prepared for the project includes peripheral & avenue plantation with local species, ornamental as well as thick foliage plants especially on the periphery. Trees and plant species for plantation in the project will be selected from the list given below.

Table-3: List of Evergreen, Shady, Ornamental and Flowering Trees

for Green Belt Development

SN Botanical Name Common Name

1 Ficus Infectoria Pakur

2 Delonix regia Gulmohur

3 Cassia fistula Amaltas

4 Azadirachtha Indica Neem

5 Peltophorum ferrugineum Copper pod

6 Ficus retusa Usha

7 Alstonia Scholaris Scholar tree

8 Thespesia populnea Paras Pipal

9 Churasia tabularis Chukrasia

10 Anthocephalus cadamba Kadamba

11 Jacaranda mimosifolia Jacaranda

12 Mimusops Elengi Maulsari

13 Plumeria alba Temple tree

14 Terminalia arjuna Arjuna

15 Bauhinea Variegata Kachnar

16 Sarca indica Ashoka

17 Silver oak Grevillea Robusta

18 Semal Bombax Ceiba

19 Pilkhan Ficus

4.0 FAUNA 4.1 Is there likely to be any displacement of fauna-both terrestrial and aquatic or

creation of barriers for their movement? Provide the details.

No fauna has been recorded from the project influenced area. This site is not a natural host to any sensitive creature. Therefore, no animal habitat is likely to be effected due to construction of the proposed building.

4.2 Any direct or indirect impacts on the avifauna of the area? Provide details.

No direct or indirect impact on the avifauna of the area is envisaged.

4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna. Measures such as corridors, fish ladders are not applicable for this project.

5.0 AIR ENVIRONMENT 5.1 Will the project increase atmospheric concentration of gases and result in heat

islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions)

Page 32: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 27 IND TECH HOUSE CONSULT

Heat island effect will effect will be negligible due to reduction in hard area more plantation of hard area along roads and parking lots. Construction Phase The important activities during the construction phase that produce particulate matter and affect the air quality are excavation of earth for foundation structure, material storage, transportation and handling of excavated earth and construction materials like cement, sand and aggregates. Gaseous pollutants like SO2, NOx, CO emitted from the various machineries and vehicles used in construction activities. Appropriate mitigation measure will be employed during this stage of the project to reduce the pollution level to the acceptable limit. Operational Phase During this stage, there will be no major impact on air environment. Ultra Low sulphur diesel for DG Set will be used as a fuel which will causes air pollution. But APMC will minimize the pollution load into environment.

5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters.

During construction phase, generation of dust, Particulate Matter is the main pollutant. Other emission sources are intermittent and include emissions of SO2 NOx and CO from materials transport of heavy vehicles on site & periodic operation of DG sets etc. Proper upkeep and maintenance of vehicles, DG sets, sprinkling of water on roads and construction site are some of the measures that would reduce the impact during construction phase. Sources of Air pollution during operational phase

• The gaseous emission from vehicles.

• Emissions from DG set while in operation only during power failure.

Mitigation measures:

• The traffic congestion will be avoided by proper parking arrangement and maintaining smooth traffic flow.

• Regular PUC check up for vehicles.

• CPCB approved DG sets only will be used.

• Regular maintenance of DG sets shall be done & ultra low sulphur diesel shall be used.

5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site.

No, proposal does not create shortage of parking space; for vehicles parking provisions exceed bye law requirements, well organized parking arrangement has been designed for the project.

5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category.

Movement pattern is given in parking and circulation plan.

Page 33: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 28 IND TECH HOUSE CONSULT

5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above.

The source of noise is mainly vehicular noise. Well organized parking arrangement is designed to maintain smooth traffic flow which would help in reducing traffic congestion and noise levels. Trees planned along road & periphery and soft areas would act as noise barrier and will reduce the noise level.

5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details.

D.G. Sets will be operated only in case of power failures during construction and operational phase in case of IT building. The pollutants like Particulate Matter, SO2 that may arise from emissions from D.G. sets will be discharged through vent of proper height. D.G. sets will be installed with inbuilt acoustic enclosures to reduce the noise of D.G. sets while in construction or operation. Plantation of trees would act as noise barrier and will reduce noise level.

DG sets of 3510 KVA capacity have been proposed for operation phase as power backup during failure of power supply.

6.0 AESTHETICS

6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?

As the proposed site is in conformity with the local land use and represent IT Building. There is no scenic amenity or landscaping in its surroundings so there is no possibility of obstruction of abovementioned conditions.

6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? Since the developmental plan is as per the master plan by New Okhla Industrial development Authority, hence, the construction of the proposed project will not have any adverse impact on the existing structures.

6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. There are no local consideration of urban forms and urban design influencing the project area. The project will be constructed within the site and as per the local building by laws, defined by the New Okhla Industrial development Authority.

6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered. No, anthropological or archeological sites of significance do not exist in the vicinity of the project site. However all possible measures will be taken to reduce the impact on air and noise pollution during construction and operation phase.

Page 34: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 29 IND TECH HOUSE CONSULT

7.0 SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local

population? Provide the details.

No change in demographic structure is expected.

7.2 Give details of the existing social infrastructure around the proposed project. The area is for construction IT Building. The proposed project site is located at plot no: 03, Sector 142, Noida Uttar Pradesh. Bus stand for public transport, hospitals/ clinics, market, educational institutions are located in a convenient distance.

7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? The proposed construction will not have any adverse effects on local communities.

8.0 BUILDING MATERIALS

8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) ISI marked building materials of reputed brands to be procured from 400 km range as far as possible. Preference will be given to locally available building materials for construction. Use of alternative technologies for each component of the buildings of envelope, superstructure, finishes and the road and surrounding areas will be as per guidelines provided in NBC 2016. Some of them are given below:

• Ready mix concrete with 15-20% fly ash.

• Fly ash/AAC bricks will be used for walls. Some of the alternate materials proposed for construction will be used to the extent possible

• Use of steel of smaller diameter from recycled content,

• Saw dust/Particles board for door panels,

• Alternatives for floor finishes include Ceramic tiles The use of the above alternatives for building materials will help reduce the use of non-renewable resources and impact on natural resources.

8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts?

Mitigation Measures for Air Pollution during Construction Stage The impact on ambient air quality during construction stage around the project site will be assessed. Various construction activities especially related to handling of loose material likely to cause generation of fugitive dust will affect the air quality of the surrounding area of the project site. To minimize such impact following measures shall be taken:

Page 35: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 30 IND TECH HOUSE CONSULT

� The construction material will be carried in properly covered vehicles.

� Construction material will be stored at identified site/temporary go downs at site. � All the loose material either stacked earth or transported shall be provided with

suitable covering such as tarpaulin, etc. � Internal roads will be maintained in good conditions with regular sprinkling of water to

curb the dust nuisance to the surrounding. � Water sprinkling shall be done at the location where dust generation is anticipated. � Tin sheets will barricade the periphery of the plot.

Mitigation Measures for Noise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of 80-85 dB (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver’s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact.

8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? Locally available recyclable & recycle content materials would be given preference However, bricks made from the fly-ash/AAC will be used for construction of side walls, boundaries for parks etc. Readymix concrete (RMC) will be used in construction. This will result in significant saving in the total cost of project.

8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. As estimated, generation of solid waste is 0.57 TPD from block will be generated. Waste Management during operation phase: Municipal Solid Waste Sweepers will be engaged for collection and handling municipal waste. Location for bin/container at common places would be identified for collection of waste. Adequate number of collection bins separately for biodegradable and non-biodegradable waste shall be provided as per the Municipal Solid Waste (Management and Handling) Rule, 2016. Wastes from such bins shall be collected on daily basis handed over to authorized agency for disposal

Appropriate site for storage and segregation will be identified in the project. � All waste collection bins shall be properly maintained on regular basis.

� Arrangement will be made with local civic authority, for providing garbage station or

transfer point (preferably near the entry/ exit point of the site), for collection and

Page 36: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 31 IND TECH HOUSE CONSULT

disposal of inert waste. It will be assured that there is no spillage of waste along the internal roads during collection of wastes.

� The garbage storage/transfer point will be covered and cleaned every day to as to

avoid any nuisance, vectors and unhygienic conditions. � Biodegradable waste shall be treated into onsite organic waste converter.

Landscape waste comprises of fallen leaves and other vegetative material which shall be collected and treated along with other biodegradable waste.

9.0 ENERGY CONSERVATION

9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption?

� Power will be sourced from Uttar Pradesh Power Corporation Ltd.

The maximum power demand for the project is estimated to be as around 2400 KW. The power shall be supplied by Uttar Pradesh Power Corporation Ltd. DG set of 3510 KVA Capacity: is proposed to meet requirement of power back up during grid failure. � Energy Conservation Measures & Management Plan:

During operation phase, appropriate energy conservation measures & management plan will be adopted in order to minimize the consumptions of conventional energy. The following energy saving measures are suggested to be adopted.

o Incorporate solar passive techniques in a building design to minimize load on conventional systems.

o Programmable switching arrangement for common areas/ street lighting. o Energy efficient lighting fixture & LED lamps to reduce energy consumption. o Use of local building material (400 Km range) to reduce pollution & transportation

energy. o The DG sets shall be automatically controlled to optimize the usage based on the

actual load requirement at any given time. These measures will effectively cut down fuel & energy consumption.

o Variable frequency drive with Motors, Pumps and Lifts. o Power factor shall be maintained 0.96 or higher o Transformer shall have minimum no load losses as compared to conventional

transformers. o Cables shall be derated to avoid heating and reduce losses

9.2. What type of, and capacity of, power back-up to you plan to provide?

I) Type: D.G. Set II) 3510 KVA will be provided for power back-up

9.3 What are the characteristics of the glass you plan to use? Provide specifications

of its characteristics related to both short wave and long wave radiation?

Glass panes will have high light transmission, but low solar heat inflow. This will reduce the quantity of heat flowing into the buildings, lessens cooling load on air-conditioners and induces energy saving.

Page 37: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 32 IND TECH HOUSE CONSULT

9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project.

Passive solar technique:- Building design and envelope has been optimized through selection of appropriate wall and roof construction and through adoption of solar passive measures after analysis of sun path movement.

Predominantly N/S orientation Day light integrated to reduce artificial lighting demand.

9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details.

Yes, the layout of streets & buildings has been designed to maximize the potential for solar energy devices. Further, solar energy will also be used for common area lighting to the extent possible.

9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected?

Provision of peripheral plantation for shading & reduction of cooling load. Roof shall have insulation to reduce solar gains.

9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications.

Yes, energy efficient air conditioning system shall be free of CFC and HCFC.

9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects?

Proposed green area and treatment of hard area will reduce heat island effect.

9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components.

• Glass: Energy efficient low U Value glass shall be selected for external glazing.

• Roof: shall have insulation.

• Walls: Energy efficient material with low U values shall be selected for paneling screen for external wall.

• Building envelope shall comply ECBC norms.

9.10 What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans.

In design component of the project, adequate measure has being taken as per the provisions of the National Building Code 2016 to provide for fire protection services.

Page 38: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 33 IND TECH HOUSE CONSULT

Sufficient quantity of water will be stored within the premise to subdue fire if at all required. Water will be supplied from the underground water storage reservoir. Apart from providing sufficient water for firefighting, other measures that have been considered include:

� The 6 m internal road will have sufficient load bearing capacity to withstand fire engines

� The building materials shall be of appropriate fire resistance standard. Further, design shall include provision for the following:

o The electrical systems shall be provided with automatic circuit breakers activated by the rise of current as well as activated by over current.

o Fire Alarm systems at appropriate places

o Means of escape,

o Access for fireman

o Adequate fire fighting requirement shall be taken into account while designing the electrical distribution system

9.11 If you are using glass as wall material provides details and specifications including emissive and thermal characteristics.

Glass on external walls shall be as per ECBC recommendation for WWR to reduce solar gain.

9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration.

Air conditioned areas are made air tight with the provision of weather strips, sealants. Infiltration rate will be controlled within the limits specified in ECBC.

9.13 To what extent the non-conventional energy technologies are utilized in the overall

energy consumption? Provide details of the renewable energy technologies used.

Solar energy will be used for common area lighting to the extent possible.

10.0 Environment Management Plan

The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

Table 5: Environment Management Plan

Sl. No.

Potential Impact

Action Parameters for Monitoring Timing

I. Construction Phase

1. Air Emission

All equipments are Operated within specified design parameters.

Random checks of Equipment logs/ manuals

Construction activities

Vehicle trips to be minimized to the extent Possible

Vehicle logs

Site Clearance and Construction activities

Any dry, dusty materials stored Absence of stockpiles or Construction

Page 39: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 34 IND TECH HOUSE CONSULT

Sl. No.

Potential Impact

Action Parameters for Monitoring Timing

in sealed containers or prevented from blowing.

open containers of dusty materials.

activities

Compaction of soil during various construction activities

Construction logs

Construction activities

Ambient air quality within the premises of the proposed unit to be monitored.

The ambient air quality will conform to the standards for PM10, PM2.5, SO2, NOx, CO

As per PCB requirement.

2. Noise

List of all noise generating machinery onsite along with age to be prepared. Equipment to be maintained in good working order.

Equipment logs, noise reading

During construction phase.

Night working to be minimized. Working hour records Construction activities

Generation of vehicular noise Maintenance records of vehicles

During construction phase.

Implement good working practices (equipment selection and siting) to minimize noise and also reduce its impacts on human health (ear muffs, safe distances, enclosures).

Site working practices records, noise reading

During construction phase.

Acoustic mufflers / enclosures to be provided in large engines

Mufflers / enclosures in place.

Prior to use of equipment.

Noise to be monitored in ambient within the plant premises.

Noise reading

As per PCB requirement or quarterly whichever is lesser.

The Noise level will not exceed the permissible limit both during day and night times.

All equipment operated within specified design parameters.

Random checks of Equipment logs/ manuals

During construction phase.

Vehicle trips to be minimized to the extent Possible

Vehicle logs

During construction phase.

3. Wastewater Discharge

No untreated discharge to be made to surface water, groundwater or soil.

No discharge hoses in vicinity of watercourses.

During construction phase.

The discharge point should be selected properly and sampling and analysis should be undertaken prior to discharge

Discharge norms for effluents as given in consent to operate by PCB.

During construction phase. Take care in disposal of

wastewater generated such that soil and groundwater resources are protected.

Discharge norms for effluents as given in consent to operate by PCB.

4. Soil Erosion

Minimize area extent of site clearance, by staying within the defined boundaries

Site boundaries not extended / breached as per plan document.

During construction phase.

Protect topsoil stockpile where possible at edge of site.

Effective cover in place.

During construction phase.

5. Drainage and effluent Management

Ensure drainage system and specific design measures are working effectively. The design to incorporate existing drainage pattern and avoid disturbing the same.

Visual inspection of drainage and records thereof

During construction phase

6. Waste Management

Implement waste management plan that identifies and characterizes every waste arising associated with

Comprehensive Waste Management Plan in place and available for inspection on-site. Compliance with

Prior to site Clearance.

Page 40: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 NOIDA,

U.P.

FORM-1A

ITHC/PRJ/17-18/EIA/89 35 IND TECH HOUSE CONSULT

Sl. No.

Potential Impact

Action Parameters for Monitoring Timing

proposed activities and which identifies the procedures for collection, handling & disposal of each waste arising.

MSW Rules, 1998 and Hazardous Wastes (Management and Handling Rules), 2003

7.

Non-routine events and accidental releases

Plan to be drawn up, considering likely emergencies and steps required to prevent/limit consequences.

Mock drills and records of the same

During construction phase

8. Environmental Management Cell/Unit

The Environmental Management Cell/Unit is to be set up to ensure implementation and monitoring of environmental safeguards.

A formal letter from the management indicating formation of Environment Management Cell

During construction phase

II. Operational Phase

9. Air Emission

Stack emissions from DG set to be optimized monitored

The ambient air quality will conform to the standards for SPM, SO2 and NOx as given by SPCB.

During operation phase

Ambient air quality within the premises of the proposed unit to be monitored. Exhaust from vehicles to be minimized by use of fuel efficient vehicles and well maintained vehicles having PUC certificate.

The ambient air quality will conform to the standards for PM10, PM2.5, SO2 and NOx as given by SPCB Vehicle logs to be maintained

During operation phase

Vehicle trips to be minimized to the extent possible

Vehicle logs

During operation phase

10. Noise

Noise generated from operation of DG set to be optimized and monitored DG sets to generate less than 75 dB(A) Leq at 0.5 m from the source DG sets are to be provided with acoustic enclosures with height of chimney as specified by PCB

Maintain records of vehicles

Generation of vehicular noise Maintain records of vehicles During operation phase

11. Wastewater Discharge

No untreated discharge to be made to surface water, groundwater or soil.

No discharge hoses in vicinity of watercourses.

During operation phase.

Take care in disposal of wastewater generated such that soil and groundwater resources are protected

Discharge norms for effluents

12. Drainage and Effluent Management

Ensure drainage system and specific design measures are working effectively. Design to incorporate existing drainage pattern and avoid disturbing the same.

Visual inspection of drainage and records thereof

During operation phase

13. Energy Usage Replacement of conventional luminaries to energy efficient luminary fittings

Luminary parameters During operation phase

14.

Emergency preparedness, such as fire fighting

Fire protection and safety measures to take care of fire and explosion hazards, to be assessed and steps taken for their prevention.

Mock drill records, on site emergency plan, evacuation plan

During operation phase

15. Environment Management Cell/Unit

The Environment Management Cell/Unit to be set up to ensure implementation and monitoring of environmental safeguards.

A formal letter from the management indicating formation of Environment Management Cell

During operation phase

Page 41: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 36 IND TECH HOUSE CONSULT

1.0 Introduction

M/S Logix Infomedia Pvt Ltd. has proposed a IT Building “142 ONE” at plot no. 03, Sector 142, Noida, Uttar Pradesh.

Figure-1: NOIDA Master Plan 2.0 Project Details

The proposed project is planned on a plot area of 8100 sq. m. The total built up area will be 33841.18 sq m.

The Design approach shall be sensitive to environmental issues. The main thrust shall be laid on energy conservation, safety and ease of maintenance and current technological development. The Design Philosophy is to ensure fulfillment of all functional requirements in accordance with Design Guidelines, Relevant Standards and Codes as well as local Bye Laws.

The following design standards/guidelines with latest amendments shall be followed during detailed design of services. In case of any discrepancy, the stringent shall be followed:

� National Building Code of India – 2016. � National Building Code of India – 2016 (Fire & Life Safety) � Relevant Codes of Bureau of Indian Standards

Project Site

Page 42: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 37 IND TECH HOUSE CONSULT

� Energy Conservation Building Codes 2009 � Indian Electricity Rules 1956 � Environmental Guidelines. � New Okhla Industrial Development Area Building Regulation, 2010 � IEC 60726/ IS: 2026 (Part 1, II and IV)/ IS 11171(Part III): Transformers (Cast

Resin) � IEC 60831/ IS 13340 & IS 13341: Capacitors � IEC 60947/ IS 13947: Specification for low voltage switch gear & control gear � BS 6651/ IS 2309: Lightning protection system � BS 7430, IS 3043: Earthing & bonding � BS 7671 requirements for electrical installation � NEC – NFPA 70, National Electric Code.

The project area statement and its components are as per the table 1 details given below:

Table1- Area Statement for Proposed Project

S. No.

Description Quantity Unit

GENERAL

1 Plot Area 8100.00 SQM

2 Proposed Built Up Area 33841.18 SQM

3 Number of Building Blocks 1 NOS

4 Max Height of Building (Upto Terrace) 50.95 M

5 Max No of Floors B+ST+SER+9 NOS

6 Cost of Project 100 CR

7 Expected Population (All Floating) 2414 PERSONS

AREAS

8 Permissible Ground Coverage Area (30%) 2430 SQM

9 Proposed Ground Coverage Area ( 29.7%) 2408 SQM

10 Permissible FAR Area 262.5 (Incl 5% for Green Rating) 21262.5 SQM

11 Proposed FAR Area 262.3 21260.99 SQM

12 Basement Area (Excluding Service Area) 4990.93 SQM

13 Stilt & other Non FAR areas 7589.27 SQM

14 Proposed Built Up Area 33841.18 SQM

WATER

15 Total Water Requirement 177.14 KLD

16 Fresh water requirement 117.25 KLD

17 Waste water Generation 74.87 KLD

18 Proposed STP Capacity 90 KLD

19 Treated Water Available for Reuse 59.9 KLD

20 Recycled Water 59.9 KLD

21 Discharge to Municipal Sewer 0 KLD

RAIN WATER HARVESTING

22 Rain Water Harvesting Potential 3343.28 CUM

23 No of RWH of Pits Proposed 2 NOS

PARKING

24 Total Parking Required as / Building Bye Laws 425 ECS

25 Proposed Total Parking 446 ECS

Page 43: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 38 IND TECH HOUSE CONSULT

26 Proposed Parking on Surface 96 ECS

27 Proposed Parking in Stilt 75 ECS

28 Basement Parking (Mech Stack Parking) 275 ECS

GREEN AREAS

29 Proposed Green Area (18.01% of Plot Area) 1459.35 SQM

WASTE GENERATION

30 Municipal Solid Waste Generation 0.57 TPD

31 Quantity of Hazardous waste Generation 4.04 LTS/DAY

32 Quantity of Sludge Generated from STP 27.5 KG/DAY

POWER

33 Total Power Requirement 2400 KVA

34 DG set backup 3510 KVA

3.0 Connectivity

The project site is well connected to the major roads through network of road and is situated at 0.48 KM W from Noida Gr. Noida Expressway and 3.47 KM NE from Dadri Main Road.

Figure-2: Project site Location

Page 44: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 39 IND TECH HOUSE CONSULT

Figure-3: 500 m Radius Map

Figure-4: 10 km radius map

Page 45: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 40 IND TECH HOUSE CONSULT

4.0 Project Surroundings

The proposed commercial project site is located at plot no 03, Sector 142 Noida, U.P. Project site is at 28°36’13.95”N to 77°27’01.74”E. The details of site surroundings are given below in Table- 2.

Table-2: Site and Surrounding of the project Site

S. No. Particulars Details

1. Nearest National Highway Noida Gr. Noida Expy: 0.48 KM/W Dadri Main Road: 3.47 KM /NE

2. Nearest Railway Station Dadri railway station: 12.58 km E

3. Nearest Airport Indira Gandhi International Airport: 31.41 km NW

4. Nearest Town/ City Gr. Noida

5. River Body Hindon River: 1.79 km, E Yamuna River: 3.21km, SW

6. Hills/ Valleys Not within 10 km from the project site

7. Site Topography Plain

8. Archaeologically Important Site Nil

9. National Parks/ Wildlife Sanctuaries Okhla Bird Sanctuary- 11.09 km,NW

10 State Boundary U.P. Haryana Border, 3.18 Km., SW U.P. Delhi Border: 6.66 Km, NW

11. Reserved/ Protected Forests Okhla Bird Sanctuary- 11.09 km,NW

12. Seismicity The study area falls under Seismic Zone-IV

500 m and 10 km radius surroundings of the project site are given above in Fig 3 and Fig 4 respectively:

5.0 Occupancy Details During operation phase employees and staff will be 2201 and visitors will be 213. The total floating population will be 2414 persons.

POPULATION

I T OFFICES (Employees/Staff etc ) 21261 10 2126

CANTEEN/RECRN/GYM 2000 50 40

FACILITY MANAGEMENT STAFF/DRIVERS LS 35

TOTAL 2201

VISITORS

I.T. OFFICES 213

TOTAL VISITORS 213

TOTAL POPULATION 2414

Page 46: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 41 IND TECH HOUSE CONSULT

6.0 Water Demand

6.1 Water supply & source

The water supply for the project during operation phase will be sourced from New Okhla Industrial Development Authority. The total water requirement based on the population will be 177 KLD. The daily water requirement calculation for the project and waste water generation and reuse details are provided in Table 4 and the water balance Diagram is given below in Figure-5.

Table 4: Calculations for Daily Water Demand for Proposed Project

WATER REQUIREMENT

POPULATION/

AREA/UNIT RATE IN

LTS TOTAL QTY

IN KL

NON RESIDENTIAL (Working)

DOMESTIC (Fresh) 2201 18 39.62

FLUSHING (Treated) 2201 12 26.41

VISITORS

DOMESTIC (Fresh) 213 10 2.13

FLUSHING (Treated) 213 5 1.06

TOTAL POPULATION 2414

SEATS

CAFETERIA (Fresh) 250 70 17.5

SQM

GARDENING (Treated) 1459.4 1 1.46

KVA

D G COOLING (Treated) 3510 0.9 19.0

TR

HVAC (Fresh + Treated) 700 10 70.0

TOTAL WATER REQUIREMENT 177.14

TOTAL TREATED WATER REQUIREMENT 59.89

TOTAL FRESH WATER 117.25

CAPACITY OF STP

WATER FLOW TO STP (DOMESTIC) 80% 47.40

WATER FLOW TO STP (FLUSHING) 100% 27.48

TOTAL WASTE WATER GENERATION 74.87

REQUIRED CAPACITY OF STP - 120% 90

SAY 90

AVAILABLE TREATED WATER (80%) 59.90

REUSE OF TREATED WATER 59.90

DISCHARGE TO MUNICIPAL SEWER 0

Page 47: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 42 IND TECH HOUSE CONSULT

Fig 5: Water Balance Diagram for Proposed IT Building

7.0 Solid Waste Generation, Collection, Transport and Disposal

Solid waste would be generated both during the construction as well as during the operation phase. The solid waste expected to be generated during the construction phase will comprise of excavated materials, used bags, bricks, concrete, MS rods, tiles, wood etc. The following steps are to be followed for the management solid waste:

• Construction yards are used for storage of construction materials.

• The excavated material such as topsoil and stones will be stacked for reuse during later stages of construction.

• Excavated top soil will be stored in temporary constructed soil bank and will be reused for landscaping of the Project.

• Remaining soil shall be utilized for refilling / road work / rising of site level at locations/ selling to outside agency for construction of roads etc.

Figure 6: Solid Waste Management Scheme (Construction Phase)

Page 48: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 43 IND TECH HOUSE CONSULT

Table 5: Quantity of Waste Generation from Commercial / Multiplex

WASTE GENERATION Total Waste Generation 0.57 TPD

Organic Waste Generation 0.34 TPD

Sludge Generation 27 KG/Day

Hazardous Waste Generation (DG Waste Oil)

4.04 Lts/ Day

N B: The solid waste generation has been calculated @ 0.5 kg. per capita per day basis. Following arrangements will be made at the site in accordance to Municipal Solid Wastes (Management and Handling) Rules, 2000 and amended Rules, 2016. � Collection and Segregation of waste

1. For adequate number of colored bins (Green and Blue & dark grey bins–

separate for Bio-degradable and Non Bio-degradable) are to be provided at the strategic locations of the commercial area.

8.0 Power Requirement Details

The power supply shall be supplied by Uttar Pradesh Power Corporation Ltd. The connected load for the project will be approx. 2400 KW.

Table: 6 Power Demand

ELECTRICAL LOAD & DG BACK UP`

ELECTRICAL - DEMAND LOAD 2400 KW

POWER BACK UP - DG SETS 3510 KVA

NO OF DG SETS (1X1500+1X1010+1X1000)

DG STACK HEIGHT (6M above Building Block) 56.65 M

8.1 Backup Power Details

There is provision of DG set of 3510 (1X1500+1X1010+1X1000)) KVA for power back up in proposed IT Building project. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion.

Energy Conservation Measures: The energy conservation measures shall be adopted to minimize the demand on non- renewable resources and maximize the utilization efficiency of these resources. The benefits of Energy Conservation measures are as follows:

• Reduced Energy Consumption without sacrificing comfort levels.

• Reduced destruction of natural resources.

• Reduced air pollution.

• Reduced Pollution Loads.

• Increased user productivity.

Page 49: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 44 IND TECH HOUSE CONSULT

Following Energy Conservation Measures will be adopted:

a) Energy efficient LED Lamps

b) All cables shall be derated to avoid heating during use. This also indirectly reduces losses and improves reliability.

c) Power factor shall be maintained 0.95 or higher. This will reduce electrical

power distribution losses in the installation. 9.0 Construction of Storm Water Drains

A network of storm water drainage shall be planned to collect rain water for recharge& excess rain water shall be discharged in municipal drain.

10.0 Rain Water Harvesting System The storm water disposal system for the premises shall be self-sufficient to avoid any collection/stagnation and flooding of water. The amount of storm water run-off depends upon many factors such as intensity and duration of precipitation, characteristics of the tributary area. Rain water will be harvested and the potential for rain water harvesting projected is given as per the Table 7. Two rain water harvesting pits at selected locations, which will harvest the maximum run-off from the area. Design specifications of the rain water harvesting plan are as follows:

• Catchments/roofs would be accessible for regular cleaning.

• The roof will have smooth, hard and dense surface which is less likely to be damaged allowing release of material into the water. Roof painting has been avoided since most paints contain toxic substances and may peel off.

• No sewage or wastewater would be admitted into the system.

Table 7: Calculations for storm water Harvesting Potential

RAIN WATER HARVESTING

PARTICULARS OTHER OPEN AREAS

ROAD/PAVEMENT/PARKING AREAS

GREEN AREA

ROOF TOP

AREA

Area (Sq.m.) 350.7 3882.00 1459.35 2408.0

Runoff coefficient 0.3 0.75 0.2 0.9

Rainfall (m) 0.7632 0.7632 0.7632 0.7632 Harvesting potential (cu.m.) 80.28 2222.06 222.76 1654.01

Net water availability and potential for recharge (cu.m.) per year (considering 20% losses)

3343.3

Page 50: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 45 IND TECH HOUSE CONSULT

Rain Water Harvesting Pit Design Particulars Values Unit

Peak hourly rate taken @ 45 mm/hr for one hour duration 246.41 CUM

Peak hourly rate taken @ 45 mm/hr for 15 min duration 61.60 CUM

Volume of recharge pit 31 CUM

No. of recharge pit required 1.99 No.

Proposed 2 No.

Total of 02 Rain Water Harvesting pits are to be proposed for artificial rain water recharge within the project premises.

Figure-8: A typical recharge pit

11.0 Landscape & Shelterbelt development

Total green area measures 1459.35 (18.01%.of the plot area) will be under tree plantation within the plots, commercial area and along the roads. There are several trees which will be planted along the sides of the Project boundary. Trees that are to be planted in the project premises are given below in below:

Page 51: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 46 IND TECH HOUSE CONSULT

List of Evergreen Trees, Dense Foliage, Shady, Ornamental and

Flowering Trees for Green Belt Development

SN Botanical Name Common Name

1 Ficus Infectoria Pakur

2 Delonix regia Gulmohur

3 Cassia fistula Amaltas

4 Azadirachtha Indica Neem

5 Peltophorum ferrugineum Copper pod

6 Ficus retusa Usha

7 Alstonia Scholaris Scholar tree

8 Thespesia populnea Paras Pipal

9 Churasia tabularis Chukrasia

10 Anthocephalus cadamba Kadamba

11 Jacaranda mimosifolia Jacaranda

12 Mimusops Elengi Maulsari

13 Plumeria alba Temple tree

14 Terminalia arjuna Arjuna

15 Bauhinea Variegata Kachnar

16 Sarca indica Ashoka

17 Silver oak Grevillea Robusta

18 Semal Bombax Ceiba

19 Pilkhan Ficus

12.0 Parking Facilities

Adequate provision will be made for parking at proposed IT Building. There shall also be adequate parking provisions for visitors so as not to disturb the traffic and allow smooth movement at the site.

12.1 Parking Details Table 8: Parking Facilities

Total Parking Required as / Building Bye Laws 425 ECS

Proposed Total Parking 446 ECS

Proposed Parking on Surface 96 ECS

Proposed Parking in Stilt 75 ECS

Basement Parking (Mech Stack Parking) 275 ECS

13.0 Seismicity

Based on the tectonic features and records of earthquake, a Seismic Zoning map has been developed for the country by Bureau of Indian Standard (BIS). The area under study falls in Seismic Zone-IV. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. Earthquake resistant construction material will be used.

14.0 Emergency Lighting

The emergency lights operated on battery power should be provided at appropriate locations – such as corridors, common area, staircase, exit and entrance doors,

Page 52: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 47 IND TECH HOUSE CONSULT

parking, etc. The transformers will be kept energized and should feed independently alternate rows of lights so that in case of failure of one transformer, there will not be complete darkness.

15.0 Fire Safety

� Fire Fighting Designed: As per National Building Code 2016 � Fire Tender route with access to each block

� Fire escape staircases as per NBC requirements.

� Fire Alarm system

� Sand buckets will be placed on each floor of convenient shopping.

16.0 Environmental Pollution Mitigation Measures

16.1 Air Pollution

Increased traffic generation due to project (no. of parking space proposed for the project is not going to cause significant increase in atmospheric concentration of gases and will not result in heat island formation as adequate landscaping has been provided.

Mitigation Measures for Air Pollution during Construction Stage Air quality around the project site will be impacted during construction stage. Various construction activities especially related to handling of loose material are likely to generate fugitive dust that will affect the air quality of the surrounding area of the project site. To minimize such impacts following measures has been proposed:

� All the loose material either stacked or transported will be provided with suitable

covering such as tarpaulin, etc.

� Water sprinkling shall be done at the locations where dust generation is anticipated.

� To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity.

Mitigation Measures for Air Pollution during Operational Stage Operation of DG Sets is the only source of air pollution during operational phase. Sufficient stack height will be provided for proper dispersion of pollutants. Also, it is proposed to minimize air pollution by providing plantation as buffer on the periphery of the project site and on the open spaces. An area of 1459.35 (18.01%.of the plot area) has been kept for plantation purposes.

16.2 Water Pollution

Page 53: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 48 IND TECH HOUSE CONSULT

The source of water pollution during construction and operation phase is due to waste water generated from toilets and washing. Mitigation Measures for Water Pollution during Operational Stage: Waste water generation and treatment and reuse are dealt in 6.1.

16.3 Noise Environment

It is envisaged that there shall be maximum movement of light motor vehicles within the project site, which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the sides of internal roads, on the open spaces inside and around the periphery of whole complex. Proper maintenance of the internal roads will also be carried out and Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits.

Mitigation Measures for Noise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of 80-85 dB (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver’s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact. Mitigation Measures for Noise Pollution during Operation Stage It is envisaged that there shall be maximum movement of light motor vehicles, which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the open spaces and around the periphery of whole complex. Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits.

Page 54: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

M/S LOGIX INFOMEDIA

PVT.LTD.

ENVIRONMENT CLEARANCE FOR PROPOSED IT

BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142

NOIDA, U.P.

CONCEPTUAL PLAN

ITHC/PRJ/17-18/EIA/89 49 IND TECH HOUSE CONSULT

17.0 Construction Materials

The following construction materials are required for IT building construction;

1. Coarse sand

2. Fine sand

3. Stone aggregate

4. Cement

5. Fly Ash

6. Reinforcement steel

7. Plywood & steel shuttering

8. Pipe scaffolding (cup lock system)

9. Bricks

10. Granite stones & Marble

11. Vitrified &ceramic tiles

12. P.V.C. conduit

13. MCBs/DBs

14. PVC overhead water tanks

15. Pavors

16. CPVC pipe

17. waste water lines

18. S.W. sewer line upto main sewer

19. UPVC pipes

20. Glass

21. Joinery hardware

Apart from this, in order reduce the overall energy requirement of the building; materials with low U value will be used.

18.0 List of Machinery Used During Construction

(i) Dumper (ii) Concrete mixer with hopper (iii) Excavator (iv) DG Sets (v) Scaffoldings (vi) Cranes (vii) Road roller (viii) Tower Cranes (ix) Hoist (x) Concrete pressure pumps (xi) Mobile transit mixer

19.0 Cost of the Project The cost of the proposed IT building project is approximately 100 Cr.

Page 55: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

SITESITE LOCATION MAP ON GOOGLE EARTHLOCATION MAP ON GOOGLE EARTH

Page 56: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

500 MT RADIUS MAP ON GOOGLE EARTH500 MT RADIUS MAP ON GOOGLE EARTH

Page 57: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

S.NO. FEATURES LEGENDS

1 PROJECT SITE

2 ROADS

3 RIVER BODY

4 STATE

BOUNDARY

GOOGLE MAP 10 KM MT RADIUSGOOGLE MAP 10 KM MT RADIUS

S.N Feature Distance

1 HINDON RIVER 1.79 KM/E

2 YAMUNA RIVER 3.21 KM/SW

3 NOIDA

GREATER

NOIDA EXPY.

0.48 KM/W

4 DADRI MAIN

RD.

3.47 KM/NE

5 UP –HARYANA

BORDER

3.18 KM/SW

6 UP-DELHI

BORDER

6.66 KM/NW

Page 58: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

Total Waste

water : 74

KLD

Proposed

Non Residential Fresh : 40 KLD Waste Water : 32 KLD

Waste Water : 26 KLD

Waste Water : 1 KLD

Non Residential Flushing: 26

KLD

Waste Water : 1 KLD

Visitors Fresh : 2 KLD

Visitors Flushing: 1 KLD

Total Water

Demand of

project : 177

KLD

Proposed

STP : 90

KLD

Treated Water

: 60 KLD

Total Fresh

Water

Demand:

117 KLD

Zero Discharge

Waste Water : 14 KLD

Recycled Treated Waste

water : 60 KLD

Treated

water

reuse :

60 KLD

Gardening: 2 KLD

Cafeteria: 17 KLD

DG Cooling: 19 KLD

HVAC: 70 KLD (58 KLD Fresh+

12 KLD Treated)

Page 59: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO

RAIN WATER HARVESTING

PARTICULARS OTHER OPEN AREAS

ROAD/PAVEMENT/PARKING AREAS

GREEN AREA

ROOF TOP

AREA

Area (Sq.m.) 350.7 3882.00 1459.35 2408.0

Runoff coefficient 0.3 0.75 0.2 0.9

Rainfall (m) 0.7632 0.7632 0.7632 0.7632 Harvesting potential (cu.m.) 80.28 2222.06 222.76 1654.01

Net water availability and potential for recharge (cu.m.) per year (considering 20% losses)

3343.3

Rain Water Harvesting Pit Design Particulars Values Unit

Peak hourly rate taken @ 45 mm/hr for one hour duration 246.41 CUM

Peak hourly rate taken @ 45 mm/hr for 15 min duration 61.60 CUM

Volume of recharge pit 31 CUM

No. of recharge pit required 1.99 No.

Proposed 2 No.

Page 60: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO
Page 61: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO
Page 62: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO
Page 63: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO
Page 64: PROPOSED IT BUILDING “142 ONE” AT PLOT NO. 03, SECTOR 142 ...environmentclearance.nic.in/writereaddata/EIA/10082017YS1OZ8VH... · PROPOSED IT BUILDING “142 ONE” AT PLOT NO