24
Proposed Group Housing Project At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form – 1) M/s ATS Homes Pvt. Ltd. 1 JM EnviroNet Pvt. Ltd. APPEND APPEND APPEND APPENDIX (See pa (See pa (See pa (See paragr agr agr agraph ph ph ph-6) FORM 1 FORM 1 FORM 1 FORM 1 I. I. I. I. Basic Info Basic Info Basic Info Basic Inform rm rm rmation ation ation ation S. S. S. S. No. No. No. No. Item Item Item Item Details Details Details Details 1. Name of the project Proposed Group Housing Project at Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh 2. S. No. in the Schedule Building and Construction Project, Category ‘B’ [(As per 14.09.2006 Notification, Project or Activity-8 (a)] 3. Proposed capacity /area/ length/ tonnage to be handled/ command area /lease area/ number of wells to be drilled: Total Plot area: 10.685 ha. (1,06,852.08 sq. m.) F.A.R. Permissible: 378820.14 sq. m. Proposed: 297130.644 sq. m. (Proposed F.A.R. for Commercial: 15050.678 sq. m. + Proposed F.A.R. for Residential: 282079.966 sq. m.) Ground coverage Permissible: 32055.62 sq. m (30.00 % of plot area) Proposed: 18654.593 sq. m (17.46 % of plot area) Built up area: 501124.805 sq. m (F.A.R- 297130.644 sq. m + Area Under Services – 41162.662 sq. m. + Basement Area- 73727.387 sq. m. + Stilt Area – 39114 sq. m. + non-F.A.R. area – 49990.112 sq. m.) 4. New/Expansion/Modernization The proposed project is a New Building Construction Project. 5. Existing Capacity/Area etc. Not Applicable, as the proposed project is a fresh Building Construction Project. 6. Category of Project i.e.' A' or 'B' Category ‘B’ 7. Does it attract the general condition? If yes, Please specify. No, it does not attract the general condition, as General Conditions are not applicable on S. No.– 8 projects of EIA Notification dated 14.09.2006. 8. Does it attract the specific condition? If 'yes, please specify. No, it does not attract the specific condition, as Specific Conditions are not applicable on S. No. –8 projects of EIA Notification dated 14.09.2006.

Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 1 JM EnviroNet Pvt. Ltd.

APPENDAPPENDAPPENDAPPENDIIIIXXXX

(See pa(See pa(See pa(See parrrragragragragraaaaphphphph----6666))))

FORM 1FORM 1FORM 1FORM 1

I.I.I.I. Basic InfoBasic InfoBasic InfoBasic Informrmrmrmationationationation

S. S. S. S.

No.No.No.No.

ItemItemItemItem Details Details Details Details

1. Name of the project Proposed Group Housing Project at Plot No. – SC-01/01,

Sector – 152, Noida, Uttar Pradesh

2. S. No. in the Schedule Building and Construction Project, Category ‘B’ [(As per

14.09.2006 Notification, Project or Activity-8 (a)]

3. Proposed capacity /area/ length/

tonnage to be handled/ command

area /lease area/ number of wells

to be drilled:

Total Plot area: 10.685 ha. (1,06,852.08 sq. m.)

F.A.R. Permissible: 378820.14 sq. m.

Proposed: 297130.644 sq. m. (Proposed

F.A.R. for Commercial: 15050.678 sq. m.

+ Proposed F.A.R. for Residential:

282079.966 sq. m.)

Ground

coverage

Permissible: 32055.62 sq. m (30.00 % of

plot area)

Proposed: 18654.593 sq. m (17.46 % of

plot area)

Built up area: 501124.805 sq. m (F.A.R- 297130.644 sq.

m + Area Under Services – 41162.662 sq.

m. + Basement Area- 73727.387 sq. m. +

Stilt Area – 39114 sq. m. + non-F.A.R.

area – 49990.112 sq. m.)

4. New/Expansion/Modernization The proposed project is a New Building Construction

Project.

5. Existing Capacity/Area etc. Not Applicable, as the proposed project is a fresh Building

Construction Project.

6. Category of Project i.e.' A' or 'B' Category ‘B’

7. Does it attract the general

condition? If yes, Please specify.

No, it does not attract the general condition, as General

Conditions are not applicable on S. No.– 8 projects of EIA

Notification dated 14.09.2006.

8. Does it attract the specific

condition? If 'yes, please specify.

No, it does not attract the specific condition, as Specific

Conditions are not applicable on S. No. –8 projects of EIA

Notification dated 14.09.2006.

Page 2: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 2 JM EnviroNet Pvt. Ltd.

9. Location: Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh

Plot/Survey/Khasra. No. SC-01/01,

Sector 152

District Noida

State Uttar Pradesh

Land documents are attached as Annexure IIAnnexure IIAnnexure IIAnnexure II....

10. Nearest Railway Station/ Airport

along with distance in kms.

Nearest Railway Station: Nearest Railway Station: Nearest Railway Station: Nearest Railway Station: Okhla Railway Station 24.0 km in

NW direction from the Project Site (approx).

Nearest Airport:Nearest Airport:Nearest Airport:Nearest Airport: Indira Gandhi International Airport, Delhi

approx. 39.0 km in WNW direction from the Project Site.

11. Nearest Town, city, District

Headquarters along with distance

in kms.

The Project site fall within Noida Development Authority

limits. District Headquarter, Noida.

12. Village Panchayats, Zilla Parishad,

Municipal Corporation, Local

body (complete postal addresses

with telephone nos. to be given)

Noida Development AuthorityNoida Development AuthorityNoida Development AuthorityNoida Development Authority

Sector 6, Noida – 201301, District. Gautam Budh Nagar,

Uttar Pradesh, India

Fax: 91- 120- 2422210-317

Help Line No. 2425025

E-Mail: [email protected]

13. Name of the applicant M/s. ATS Homes Pvt. Ltd.

14. Registered address 711/92, Deepali, Nehru Place, New Delhi-110019

15. Address for correspondence (1)

Name Mr. S.J. Raza

Designation

(Owner/Partner/CEO)

Authorized signatory

(Authorization Letter is enclosed as Annexure I)

Address Flat No. G-25 , Ground floor, Block –C, Gaur global

village, Crossing Republic , Ghaziabad, U.P

Pin Code 201016

E-mail [email protected]

Telephone No. 09711098902

Fax No. -

Address for correspondence (2): Environnemental Consultant

Mr. Sunil Dixit

(Associates Director)

Page 3: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 3 JM EnviroNet Pvt. Ltd.

J. M. EnviroNet (P) Ltd.

1st & 2nd Floor, S.C.O. 16,

Sector 10 – A, Gurgaon (Haryana)

Tel. 0124 – 3206559

Mobile No. 09971699906

Email: [email protected]

Disclosure of the consultant has been enclosed as AnnexureAnnexureAnnexureAnnexure

IIIIIIIIIIII. . . .

16. Details of Alternative Sites

examined, if any. Location of

these sites should be shown on a

topo sheet.

There is not any alternative site related to this project as

this is a Group Housing project M/s ATS Homes Pvt. Ltd.

Keeping in view the above narrated facts, no alternative

site can be given here. Hence Not Applicable in this case

The land document is attached as The land document is attached as The land document is attached as The land document is attached as Annexure II.Annexure II.Annexure II.Annexure II.

17. Interlinked Projects There is not any interlinked project, related to this project

as this is a Group Housing Project of M/s ATS Homes Pvt.

Ltd.

18. Whether separate application of

interlinked project has been

submitted

Not Applicable, as this is a Group Housing Project of M/s

ATS Homes Pvt. Ltd.

19. If yes, date of submission Not Applicable, as this is a Group Housing Project of M/s

ATS Homes Pvt. Ltd.

20. If no, reason Not Applicable, as this is a Group Housing Project of M/s

ATS Homes Pvt. Ltd.

21. Whether the proposal involves

approval/ clearance under: if yes,

details of the same and their

status to be given.

(a) The Forest (Conservation)

Act, 1980?

(b) The Wildlife (Protection)

Act, 1972?

(c) The C.R.Z. Notification,

1991?

Not Applicable, as no approval / Clearance involves under

any Notification and under any Act, a Group Housing

Project of M/s ATS Homes Pvt. Ltd.

22. Whether there is any Government

Order/ Policy relevant/ relating to

the site?

Not any, Proposed Project is a Group Housing Project of

M/s ATS Homes Pvt. Ltd.

23. Forest land involved (hectares) Not any Forest land involved is a Group Housing Project

Page 4: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 4 JM EnviroNet Pvt. Ltd.

of M/s ATS Homes Pvt. Ltd.

24. Whether there is any litigation

pending against the project

and/or land in which the project

is proposed to be set up?

(a)Name of the Court

(b)Case No.

(c) Orders/directions of the Court,

if any and its relevance with the

proposed project

No litigation is pending against the project and/or land in

which the project is proposed to be set up.

(II)(II)(II)(II) ActivityActivityActivityActivity

1.1.1.1. Construction, operation or decommissioning of the Project involving actions, which will cause Construction, operation or decommissioning of the Project involving actions, which will cause Construction, operation or decommissioning of the Project involving actions, which will cause Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in physical changes in physical changes in physical changes in the locality (topography, land use, changes in water bodies, etc.the locality (topography, land use, changes in water bodies, etc.the locality (topography, land use, changes in water bodies, etc.the locality (topography, land use, changes in water bodies, etc.

S. S. S. S.

No.No.No.No.

Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/

NoNoNoNo

Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities

/rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of

information datainformation datainformation datainformation data

1.1 Permanent or temporary change in

land use, land cover or topography

including increase in intensity of land

use (with respect to local land use

plan)

Yes The Proposed Project being developed by M/s.

ATS Homes Pvt. Ltd. is a construction of a new

Group Housing Project on plot 10.685 ha.

(1,06,852.08 sq. m.) of a vacant land. (Land

documents are enclosed as Annexure Annexure Annexure Annexure –––– IIIIIIII).

There Will bé green-area development on

43379.800 m2 (40.60 % of total plot area) of

the plot to provide beautiful and natural

environment to the site.

1.2 Clearance of existing land, vegetation

and buildings?

No The proposed site is an open land, with scanty

vegetations mainly herbs and low lying shrubs &

possesses existing no structure. Hence no

clearance of structure and vegetation will be

required.

Site photographs showing the present condition

of the site have been enclosed as AnnexureAnnexureAnnexureAnnexure IIIIVVVV....

Page 5: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 5 JM EnviroNet Pvt. Ltd.

1.3 Creation of new land uses? No Project has been earmarked for commercial

development as per Master Plan of Noida The

project site will be developed as per the local

building by-laws. So, no new land use will be

created. Location map of the project site along

with the Noida Master Plan is being enclosed as

AnnexureAnnexureAnnexureAnnexure----V.V.V.V.

1.4 Pre-construction investigations e.g.

bore holes, soil testing?

Yes Soil investigation was carried out and the results

were found satisfactory.

1.5 Construction works? Yes This is a building construction project. The

construction activities will be confined within

the project site; there will be no physical

changes due to project development

activities outside the project boundary.

1.6 Demolition works?

No No demolition is required, as no building

structure exits at the proposed project site.

1.7 Temporary sites used for construction

works or housing of construction

workers?

No No temporary residential facilities will be

required for the workers, as all the workers will

be coming from nearby area. The construction

work will be done only in the daytime.

There will be provision of facilities such as rest

shelter, drinking water, toilet etc. for workers at

the project site & will be arranged by contractor.

1.8 Above ground buildings, structures or

earthworks including linear

structures, cut and fill or excavations

Yes Excavation materiel carried out for foundation

and construction of basement. The estimated

quantity of excavated earth material will be

used for back filling, and other site

developmental activities like leveling and

horticulture at the project site. The fertile top

soil will be stack at separate place and it will be

reused for plantation / horticulture purpose on

site of the project.

Land/soil environment may be temporarily

affected due to activities like Site preparation,

excavation, material handling & storage etc.

during construction phase, which will be

mitigate by dust suppression and water

sprinkling.

Page 6: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 6 JM EnviroNet Pvt. Ltd.

1.9 Underground works including mining

or tunnelling?

No No underground works including mining /

tunnelling is required, except excavation of

earth only for the construction of basement.

1.10 Reclamation works? No No reclamation work required, as the basement

shall be used for parking and other services.

1.11 Dredging? No No dredging required, as case of Group Housing

development project.

1.12 Offshore structures? No No dredging required, as case of Group Housing

development project.

1.13 Production and manufacturing

processes?

No Since, it is a construction of Group Housing

Project, hence, no production / manufacturing

process is involved in this project.

1.14 Facilities for storage of goods or

materials?

Yes Separate raw material storage yard will be made

during construction phase:

• Cement will be separately stored under

cover in bales.

• Sand will be stacked neatly under

tarpaulin cover.

• Bricks and steel will be laid in open

• The raw material handling yard will be

located within the project site and

separated by enclosures.

1.15 Facilities for treatment or disposal of

solid waste or liquid effluents?

Yes Solid WasteSolid WasteSolid WasteSolid Waste

Solid wastes which are likely to be generated in

project will be domestic and commercial in

nature.

DomesDomesDomesDomestic wastes: tic wastes: tic wastes: tic wastes:

Approximately, 4308 kg/day of solid waste will

be generated from the existing and project

activity; these will be collected from designated

locations and segregated into inorganic and

organic wastes. The inorganic non-

biodegradable wastes will be sold to vendors for

recycling and the organic biodegradable wastes

will be disposed as per MSW rules.

Commercial waste (ECommercial waste (ECommercial waste (ECommercial waste (E----wasteswasteswasteswastes):::: E-waste will start

being generated after a latency period of 4-5

Page 7: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 7 JM EnviroNet Pvt. Ltd.

years. Since most of these components are

recyclable in nature, efforts will be made to

recycle it to the maximum extent, hence actual

waste generated as E-waste should be minimal.

It is estimated that from the project about 0.5-1

MT/yr E-waste will be generated.

Management of EManagement of EManagement of EManagement of E----wastewastewastewaste

The principle idea of E-waste management is to

recycle the E-waste generated. Authorized

vendors of electronic goods will take back their

old equipment/cartridge/toner rolls etc. and pay

some concessions on the new equipment. On

the other hand, reusable material like

cartridges/toners will be refilled and reused.

Outdated computers/ fax/ phones etc. will be

value added and sold to downstream uses

through resellers. These arrangements will be

made with existing CPCB authorized vendors to

simultaneously & effectively reduce the quantity

of E-waste generated and also to generate

substantial revenue for running the management

system. Whatever E-waste left, will be collected

separately in HDPE drums and will be stored in

special containments, onto puckka platforms

and under lock and key. The collected e –waste

will be handed over to the CPCB authorized

vendors.

Liquid Effluent:Liquid Effluent:Liquid Effluent:Liquid Effluent:

During construction phase, sewage will be

treated and disposed through soak pits via septic

tanks. During operation phase 733 KLD waste

water will be generated which will be treated in

the Sewage Treatment Plant (STP) up to tertiary

level.

Dewatered/ dried sludge from STP will be used

as manure in horticulture.

Hazardous Wastes:Hazardous Wastes:Hazardous Wastes:Hazardous Wastes:

No hazardous wastes will be produced from

project activities except some Spent Oil

Page 8: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 8 JM EnviroNet Pvt. Ltd.

(Category 5.1) generated from D.G. sets; it will

be stored in HDPE tank properly and will be

handed over to authorized processor for the

facility.

1.16 Facilities for long term housing of

operational workers?

No No facilities for long term housing of

operational workers are proposed, as they are

coming from nearby area.

1.17 New road, rail or sea traffic during

construction or operation?

No The project site is well connected by wide

service road, So no new road will be laid during

construction or operation of the project

activities except for internal roads.

1.18 New road, rail, air or waterborne or

other transport infrastructure

including new or altered routes and

stations, ports, airports etc?

No The project site is located in a developed area. It

is well connected by roads to whole of the city,

so there will be no alteration of routes or lying

down of new routes done due to project

activity. Internal roads within the project site

will be constructed for smooth movement of

traffic.

1.19 Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

No There shall not be any closure or diversion of

existing transport routes. So there shall not be

any change in traffic movement.

1.20 New or diverted transmission lines or

pipelines?

No There will be no shifting of electrical

transmission line.

1.21 Impoundment, damming, culverting,

realignment or other changes to the

hydrology of watercourses or

aquifers?

No No impoundment, damming, culverting,

realignment or other changes to the hydrology

of surface watercourses is proposed.

1.22 Stream crossings? No As such no river or drain is passing by the

project site.

1.23 Abstraction or transfers of water

form ground or surface waters?

Yes The total water requirement of the project will

be 1105 KLD. The fresh water required will be

646 KLD; the recycled water demand will be

459 KLD. The water will be sourced from

private water tanker supply and Noida

Development Authority.

1.24 Changes in water bodies or the land No There shall be no effect on Surface Drainage /

Page 9: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 9 JM EnviroNet Pvt. Ltd.

surface affecting drainage or run-off? Runoff as the required land for the project with

any water body near the project site.

For collecting storm water, storm water

drainage network has been provided during the

design as per the guidelines. Adequate measures

will be taken to collect run off and suitable

garlanding drain as per the existing contours of

the plot will be developed.

1.25 Transport of personnel or materials

for construction, operation or

decommissioning?

Yes Transport of personnel/material during the

construction and operation of the commercial

project shall be envisaged. During the

operational phase sufficient parking space will

be provided for the vehicles like scooters, cars

and bus.

1.26 Long-term dismantling or

decommissioning or restoration

works?

No This is a new construction of Group Housing

project, hence no Long-term dismantling or

decommissioning or restoration works.

1.27 Ongoing activity during

decommissioning which could have

an impact on the environment?

No Not Applicable, as this is a new construction of

Group Housing project.

1.28 Influx of people to an area in either

temporarily or permanently?

Yes All the workers employed / hired will be from

nearby areas. Hence, there will be minor influx

of people in the area. Temporarily local labours

will visit the site during the construction phase

and during operation phase approx 1000

persons will be involved in the project

1.29 Introduction of alien species? No All the trees and plants that are proposed to be

planted are native to the area.

1.30 Loss of native species or genetic

diversity?

No No such case is reported from the area so far. As

environmental disturbance is not much and it is

not likely in future also.

1.31 Any other actions? None None, no other actions will be required except

mentioned above.

2222.... Use of Natural resources for construction or operation of the Project (such as land, water, Use of Natural resources for construction or operation of the Project (such as land, water, Use of Natural resources for construction or operation of the Project (such as land, water, Use of Natural resources for construction or operation of the Project (such as land, water,

materials or energy, especially any resources which are nonmaterials or energy, especially any resources which are nonmaterials or energy, especially any resources which are nonmaterials or energy, especially any resources which are non----renewable or in short srenewable or in short srenewable or in short srenewable or in short supply):upply):upply):upply):

S. S. S. S. Information/Information/Information/Information/ checklist confirmationchecklist confirmationchecklist confirmationchecklist confirmation Yes/ Yes/ Yes/ Yes/ Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities

Page 10: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 10 JM EnviroNet Pvt. Ltd.

No.No.No.No. NoNoNoNo /rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of

information datainformation datainformation datainformation data

2.1 Land especially undeveloped or

agricultural land (ha)

No The Proposed Group Housing project is a

construction on plot area 10.685 ha.

(1,06,852.08 sq. m.) of vacant land. The area

around the project site is under rapid

development.

2.2 Water (expected source &

competing users) unit: KLD

Yes The total water requirement of the project will

be 1105 KLD. The fresh water required will be

646 KLD; the recycled water demand will be 459

KLD. The water will be sourced from Hired

Private Water Tankers supplying water from safe

zone. Waste water will be treated in STP. Dual

Plumbing system will be proposed for recycling

the treated water for flushing, horticulture

purpose.

2.3 Minerals (MT) Yes Sand and stone aggregates will be use as

Construction material.

2.4 Construction material–stone,

aggregates, sand / soil (expected

source – MT)

Yes Usual construction materials will be utilized like

Cements, Bricks, Sand, Iron rods, Fly ash based

products, etc.

Source:Source:Source:Source: Steel and cement will be procured from

authorized vendors. Sand & aggregate will be

procured from local material suppliers.

2.5 Forests and timber (source – MT) No Timber required will be taken from nearby

markets.

2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel

(MT), energy (MW)

Yes The power Requirement for the proposed

project total connected load is 11863.737 KW.

Source of electricity: Local grid supply of Noida,

U.P.

8 no. of D.G. sets with capacity of 9375 KVA

(7x1250 KVA + 1 x 625 KVA) will be installed for

power back up in case of power failure.

2.7 Any other natural resources (use

appropriate standard units)

No Not applicable, not any natural resources will be

required except mentioned above.

3. 3. 3. 3. Use, storage, transport, handling or production of substances or materials, which could be Use, storage, transport, handling or production of substances or materials, which could be Use, storage, transport, handling or production of substances or materials, which could be Use, storage, transport, handling or production of substances or materials, which could be

harmful to human health or the environment or raise concerharmful to human health or the environment or raise concerharmful to human health or the environment or raise concerharmful to human health or the environment or raise concerns about actual or perceived risks to ns about actual or perceived risks to ns about actual or perceived risks to ns about actual or perceived risks to

human health.human health.human health.human health.

S. S. S. S. Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/Yes/Yes/Yes/ Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/

Page 11: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 11 JM EnviroNet Pvt. Ltd.

No.No.No.No. NoNoNoNo rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of

information datainformation datainformation datainformation data

3.1 Use of substances or materials,

which are hazardous (as per MSIHC

rules) to human health or the

environment (flora, fauna, and

water supplies)

No The project is a Group Housing Project and

hence, no storage of hazardous chemicals (as

per MSIHC rules) will be done, except HSD

required to run D.G. sets, for which the

quantity stored will be below the threshold

limit specified in the MSIHC rules. Necessary

permission will be obtained from the Explosives

Dept.

3.2 Changes in occurrence of disease or

affect disease vectors (e.g. insect or

water borne diseases)

No Suitable drainage and waste management

measures will be adopted in both the

Construction and Operational Phase, which will

restrict stagnation of water or accumulation of

waste. This will effectively restrict the

reproduction and growth of disease vectors.

3.3 Affect the welfare of people e.g. by

changing living conditions?

Yes No use, storage, transport, handling or

production of any harmful product will be

envisaged from the project. Thus no major

adverse impacts on the human health/

environment are envisaged.

Moreover this project will help in increasing

socio-economic standards of the local people. It

will generate employment. Thus, the project is

supposed to have major beneficial impacts.

3.4 Vulnerable groups of people who

could be affected by the project e.g.

hospital patients, children, the

elderly etc.,

No No effect is envisaged due to this project.

3.5 Any other causes None Not applicable, as there not any other risk will be

developed except mentioned above.

4.4.4.4. Production ofProduction ofProduction ofProduction of solid wastes during construction or operation or decommissioning (MT/month)solid wastes during construction or operation or decommissioning (MT/month)solid wastes during construction or operation or decommissioning (MT/month)solid wastes during construction or operation or decommissioning (MT/month)

S. No.S. No.S. No.S. No. Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/

NoNoNoNo

Details thereof (with approximate Details thereof (with approximate Details thereof (with approximate Details thereof (with approximate

quantities/rates, wherever possible) with source quantities/rates, wherever possible) with source quantities/rates, wherever possible) with source quantities/rates, wherever possible) with source

of information dataof information dataof information dataof information data

Page 12: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 12 JM EnviroNet Pvt. Ltd.

4.1 Spoil, overburden or mine wastes No No spoil, overburden or mine waste will be

generated in this case.

4.2 Municipal waste (domestic and or

commercial wastes)

Yes Solid wastes likely to be generated in project are

of domestic and commercial in nature.

During operation phase total Solid Waste

generated from Project (Permanent & visiting

population) will be 4308 kg/day. Base of

calculation @ 250 gm/person/day for floating

population and @ 450 gm/person/day for

permanent population, which will be collected

from designated location and segregated into

inorganic and organic wastes. Solid waste will be

disposed off as per MSW (M & H) Rules, 2000.

The sludge generated from STP will be used as

manures in horticulture.

4.3 Hazardous wastes (as per

Hazardous Waste Management

Rules)

No Spent Oil from D.G. sets will be carefully stored

in High Density Polythene (HDPE) drums in

isolated covered facility. This spent oil will be

handed over to some authorized processor.

Suitable care will be taken so that spills / leaks of

spent oil from storage could be avoided.

The used oil generated from DG set will be

disposed off as per H.W. (M & H) Rules, 1989.

4.4 Other industrial process wastes No Not applicable, as this is a Group Housing Project

thus there will not be any production of

industrial waste during construction or operation.

4.5 Surplus product No Not applicable, as this is a New Group Housing

Project.

4.6 Sewage sludge or other sludge from

effluent treatment

Yes The mechanism of sludge drying will be

centrifugation and the dewatered/ dried sludge

from STP will be converted to cakes and will be

used as manures in horticulture and also disposed

to designated municipal area. The total waste

water generation will be 733 KLD, which will be

treated in STP and reuse for Flushing of toilets &

irrigation of green area development.

Page 13: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 13 JM EnviroNet Pvt. Ltd.

4.7 Construction or demolition wastes Yes Construction waste generation will be limited

to the construction phase only and will be

limited to project site only. These will be

reused for levelling, backfilling and site

preparation after manual segregation. Unusable

and excess construction debris will be disposed at

designated places in tune with the local norms.

Some quantity of construction debris will be used

for road development activities.

The estimated quantity of excavated earth

material shall be utilized at site for the purpose of

back filling, green area development, and other

site development activities.

4.8 Redundant machinery or equipment No No Redundant machinery or equipment is

involved.

4.9 Contaminated soils or other

materials

No No Contaminated soils or other materials are

involved.

4.10 Agricultural wastes No Not applicable, as this is a New construction

project of Group Housing thus there will not be

any Agriculture Wastes produced during

construction or operation phase.

4.11 Other solid wastes No Not applicable, as there not any other solid

waste produces except mentioned above.

5.5.5.5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. S. S. S.

No.No.No.No.

Information/ChecklisInformation/ChecklisInformation/ChecklisInformation/Checklist confirmationt confirmationt confirmationt confirmation Yes/ Yes/ Yes/ Yes/

NoNoNoNo

Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/

rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of

information datainformation datainformation datainformation data

5.1 Emissions from combustion of fossil

fuels from stationary or mobile

sources

Yes There is no major air pollutant generating

source in this project except operation of D.G

Sets and vehicular movement. The emission of

gasses & Particulate Matter will be due to use of

diesel in D.G. set. The emissions from DG sets

shall be within MoEF limits. There will be

generation of noise from D.G. set but that will

be only during the time of power failure.

Moreover, D.G. Set / D.G. Set Rooms will be

provided with proper acoustic enclosure /

Page 14: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 14 JM EnviroNet Pvt. Ltd.

acoustic treatment that will mitigate the noise

up to a large extent.

During construction phase as well as during

commissioning phase there will be generation

of noise due to transport of vehicle. Better

maintenance and installation of proper

pollution control equipment will help to reduce

such emissions.

5.2 Emissions from production processes No Not applicable, as this is Group Housing Project

and there is not any production process.

5.3 Emissions from materials handling

including storage or transport

Yes Dust may arise due to the materials handling

during the construction phase which will be

restricted to the construction phase and

construction site only.

Dust emission will be prevented by regular

sprinkling of water and by providing tarpaulin

covers.

5.4 Emissions from construction activities

including plant and equipment

Yes Dust emission will be restricted to construction

phase and construction site only. The dust

emitted will be of negligible amount and will be

generated due to movement of the equipments.

Suitable preventive measures will be taken.

5.5 Dust or odours from handling of

materials including construction

materials, sewage and waste

Yes There is chance of dust emission during the

construction phase which will be prevented by

the sprinkling of water and covering the raw

material by tarpaulin cover.

Better sanitation facilities will be provided to

workers so that there will be no odour

generation. There would not be much impact

of noise due to operation of D.G. sets because

firstly they will be in use only during power

failure and secondly they be provided with

proper acoustic enclosure that will help in

mitigating noise up to a large extent. Moreover,

the green belt plantation will further attenuate

the noise level so the impact of noise due to

operation of D.G. set will be negligible.

5.6 Emissions from incineration of waste No Not applicable, as this is a Group Housing

Project and there will not be any incineration

Page 15: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 15 JM EnviroNet Pvt. Ltd.

of wastes

5.7 Emissions from burning of waste in

open air (e.g. slash materials,

construction debris)

No Open burning of biomass / other material will

be prohibited.

5.8 Emissions from any other sources No Not applicable, no other actions will be

required except mentioned above.

6666 Generation of Noise and Vibration, and Emissions of Light and Heat:Generation of Noise and Vibration, and Emissions of Light and Heat:Generation of Noise and Vibration, and Emissions of Light and Heat:Generation of Noise and Vibration, and Emissions of Light and Heat:

S. S. S. S.

No.No.No.No.

Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/

NoNoNoNo

Details thereof (with approxiDetails thereof (with approxiDetails thereof (with approxiDetails thereof (with approximate quantities/mate quantities/mate quantities/mate quantities/

rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of

information data with source of information information data with source of information information data with source of information information data with source of information

datadatadatadata

6.1 From operation of equipment e.g.

engines, ventilation plant, crushers

Yes The machinery used for the construction activity

will be of high standard and of reputed make

and according to the international standards.

These standards themselves take care of noise

pollution control/vibration control and air

emission control. Hence insignificant impacts due

to construction machinery are envisaged. Apart

from this the construction activity will be carried

out in day time only.

During the operation phase of the project, the

noise emission is caused only due to DG sets

installed for backup power supply. As the DG

sets will be placed in an acoustic enclosure, hence

the noise generated meets the ambient standard

as per MoEF norms.

6.2 From industrial or similar processes. No Not Applicable

6.3 From construction or demolition No Due to the various construction activities, there

will be short-term noise impacts in the immediate

vicinity of the project site. The construction

activities will include the following noise

generating activities:

Operation of DG sets, concreting & mixing

Excavation for foundation and grading of the

site. Construction plant and heavy vehicle

movement. Construction of structures and

facilities.

Page 16: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 16 JM EnviroNet Pvt. Ltd.

6.4 From blasting or piling No No blasting or mechanized piling will be done in

construction phase.

6.5 From construction or operational

traffic

Yes Some noise will be generated from vehicular

movement in the construction and operational

phase. Every possible provision will be taken up

to avoid/minimize traffic chaos.

During construction phase noise will be

generated due to excavation machineries,

movement of heavy vehicles like trucks. In

Operational phase major source of noise is D.G.

set which will operate in case of power failure.

Increase in noise and vibration due to traffic of

project site will be marginal. Hence noise and

vibration due to traffic is not anticipated on the

project site. This will be minimized by plantation

along the roadside.

6.6 From lighting or cooling systems No Not envisaged.

6.7 From any other sources No There will be no other sources for noise &

vibration generation except the mentioned

above.

7.7.7.7. Risks of contamiRisks of contamiRisks of contamiRisks of contamination of land or water from releases of pollutants into the ground or into nation of land or water from releases of pollutants into the ground or into nation of land or water from releases of pollutants into the ground or into nation of land or water from releases of pollutants into the ground or into

sewers, surface waters, groundwater, coastal waters or the sea:sewers, surface waters, groundwater, coastal waters or the sea:sewers, surface waters, groundwater, coastal waters or the sea:sewers, surface waters, groundwater, coastal waters or the sea:

S. S. S. S.

No.No.No.No.

Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/

NoNoNoNo

Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/

rates, wherever possrates, wherever possrates, wherever possrates, wherever possible) with source of ible) with source of ible) with source of ible) with source of

information datainformation datainformation datainformation data

7.1 From handling, storage, use or

spillage of hazardous materials

No Used oil from D.G. Sets will be handled with

care, it will be stored in HDPE drums and

provided to authorize vendor. Hence, no risk of

contamination is envisaged.

7.2 From discharge of sewage or other

effluents to water or the land

(expected mode and place of

discharge)

No The waste water after treatment will be fully

reused for flushing of toilets and green area

development.

No waste water will be discharge outside the

project area.

7.3 By deposition of pollutants emitted No Air emissions will be generated due to increased

Page 17: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 17 JM EnviroNet Pvt. Ltd.

to air into the land or into water vehicular movement and occasional use of D.G.

set for which effective measures will be taken like

sufficient greenbelt development and use of low

sulphur diesel in D.G. sets etc. So, there would

not be any deposition of pollutants emitted to

air, land or water.

7.4 From any other sources No There will be no other sources which can

contaminate land & water resources.

7.5 Is there a risk of long term build up

of pollutants in the environment

from these sources?

No Likelihood of such an event is not foreseen till

now in the area and suitable measures will be

adopt to control and reduce emission, so that

there will be no such risk in the coming future.

8.8.8.8. Risk of accidents during construction or operation of the Project, which could affect human Risk of accidents during construction or operation of the Project, which could affect human Risk of accidents during construction or operation of the Project, which could affect human Risk of accidents during construction or operation of the Project, which could affect human

health or the environmenthealth or the environmenthealth or the environmenthealth or the environment

S. S. S. S.

No.No.No.No.

Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/

NoNoNoNo

Details thereof (with approxDetails thereof (with approxDetails thereof (with approxDetails thereof (with approximate quantities/imate quantities/imate quantities/imate quantities/

rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of

information datainformation datainformation datainformation data

8.1 From explosions, spillages, fires etc

from storage, handling, use or

production of hazardous substances

No The entire building shall be designed as per

N.B.C. guidelines of India pertaining to fire

hazards. They will apply good construction

safety practices at the project. All precautionary

measures will be adopted and use of protective

footwear and helmet will be mandatory.

However, to meet out the minor incidences and

accidents first aid measures at site will be

provided.

Fire safety measures include Fire extinguishers,

Water tanks, Yard hydrants, hose reels,

automatic detection system, illuminated Exit

signs, sprinkler system and compartmentalisation

etc.

There are very little chances of explosion,

spillages and fire. There will be provision of

personal protective equipment as required

under the health & safety norms for the

workers during the time of construction

activities. Over and above awareness and

Page 18: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 18 JM EnviroNet Pvt. Ltd.

training will be provided to all the supervisors

dealing with construction workers during the

construction activity.

As such no hazardous product or substances will

be stored within project site and also no

industrial or process activity is involved in the

project hence chances of chemical hazards and

accidents are minimal. However, there will be

suitable fire fighting measures will be provided

to reduce chances of fire-accidents.

8.2 From any other causes No No other causes are involved except the

mentioned above.

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g. Floods,

earthquakes, landslides, cloudburst

etc)?

No No cases are reported so far and chances are

minimal. The site is selected carefully keeping in

view all the factors to avoid any environmental

damage due to natural disasters. The project

area falls in Zone-IV of seismic Zoning Map of

India. The seismic factors have been

appropriately incorporated in the civil designs

for the proposed Construction Project

9.9.9.9. Factors wFactors wFactors wFactors which should be considered (such as consequential development) which could lead to hich should be considered (such as consequential development) which could lead to hich should be considered (such as consequential development) which could lead to hich should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned environmental effects or the potential for cumulative impacts with other existing or planned environmental effects or the potential for cumulative impacts with other existing or planned environmental effects or the potential for cumulative impacts with other existing or planned

activities in the localityactivities in the localityactivities in the localityactivities in the locality

S. S. S. S.

No.No.No.No.

Information /Information /Information /Information / Checklist confirmChecklist confirmChecklist confirmChecklist confirmaaaationtiontiontion Yes/ Yes/ Yes/ Yes/

NoNoNoNo

DeDeDeDetails thetails thetails thetails therererereof of of of ((((wwwwiiiitttth apph apph apph apprrrroximate qoximate qoximate qoximate quauauauantitiesntitiesntitiesntities ////

rrrraaaates, tes, tes, tes, wwwwhehehehererererevvvver possible)er possible)er possible)er possible) wwwwiiiithththth source source source source oooof f f f

information dinformation dinformation dinformation daaaatatatata

9.1 Lead to development of supporting

utilities, ancillary development or

development stimulated by the

project which could have impact on

the environment e.g.

Yes The project activity will have positive impact on

the ancillary infrastructure like roads, markets,

conventional shops, public health amenities, and

conveyance facilities in the area.

•Supporting infrastructure (roads,

power supply, waste or waste water

treatment, etc.)

Yes The project will have positive impact on the

ancillary infrastructure like roads, markets,

public health, amenities, conveyance facilities

etc. in the area.

• housing development No Not applicable

• extractive industries No Not applicable

• supply industries No Not applicable

Page 19: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 19 JM EnviroNet Pvt. Ltd.

• other No Not applicable

9.2 Lead to after-use of the site, which

could have an impact on the

environment

No Not applicable

9.3 Set a precedent for later developments Yes Negligible impact is envisaged on air, noise and

aesthetic parameters due to the proposed

project. A beautiful after use scenario, which is

likely to increase aesthetics of the area &

greenery, May set precedence for subsequent

entrepreneurs who venture such projects.

9.4 Have cumulative effects due to

proximity to other existing or

planned projects with similar effects

No The proposed project is a Group Housing

Project. A better-planned and executed project

has to yield better result individually.

(III)(III)(III)(III) EnvEnvEnvEnvironmental Sensitivityironmental Sensitivityironmental Sensitivityironmental Sensitivity

S. S. S. S.

No.No.No.No.

AreasAreasAreasAreas Name/ IdentityName/ IdentityName/ IdentityName/ Identity Aerial distance (within 15 km.) Aerial distance (within 15 km.) Aerial distance (within 15 km.) Aerial distance (within 15 km.)

Proposed project location boundaryProposed project location boundaryProposed project location boundaryProposed project location boundary

1 Areas protected under international

conventions, national or local

legislation for their ecological,

landscape, cultural or other related

value

Tillpat Forest

Range

Approx. 12.0 km in WNW direction

from the Project Site.

2 Areas which are important or sensitive

for ecological reasons - Wetlands,

watercourses or other water bodies,

coastal zone, biospheres, mountains,

forests

Hinden River

Yamuna River

Approx. 2.0 km in SE direction from

the Project Site.

Approx. 3.0 km in SW direction from

the Project Site.

3 Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting,

over wintering, migration

None

Not located within 15 km of the

project location.

4 Inland, coastal, marine or

underground waters

None Not located within 15 km of the

project location.

5 State, National boundaries Delhi State

border

Approx. 16.0 km in NW direction

from project site.

6 Routes or facilities used by the public

for access to recreation or other

tourist, pilgrim areas

Noida

Expressway

Yamuna

Expressway)

Approx. at 3.0 km in North direction

from project site.

Approx. 2.0 km in West direction from

the Project Site.

Page 20: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 20 JM EnviroNet Pvt. Ltd.

7 Defence installations None Not located within 15.0 km of the

proposed project location.

8 Densely populated or built-up area Noida city Located at a distance of approx. 11.0

K.M in NNW direction from the

project site.

9 Areas occupied by sensitive man-made

land uses (hospitals, schools, places of

worship, community facilities)

Yes There are number of major hospitals,

schools etc. There are numerous

places of worship and community

within the project influenced area.

10 Areas containing important, high

quality or scarce resources (Ground

water resources, surface resources,

forestry, agriculture, fisheries, tourism,

minerals)

Yes Ground-water resources in the study

area are depleting at very fast rate and

are declared as scarce resource.

11 Areas already subjected to pollution

or environmental damage. (Those

where existing legal environmental

standards are exceeded)

No No Environmental damage reported

from the area so far. All parameters

of Air, Water, and Noise etc. will be

maintained within permissible limits

specified by SPCB / CPCB with

proper mitigation measures.

12 Areas susceptible to natural hazard

which could cause the project to

present Environmental problems

(Earthquakes, subsidence, landslides,

erosion, flooding or extreme or

adverse climatic conditions)

None The area under study falls in Zone-

IV, according to the Indian Standard

Seismic Zoning Map. Suitable seismic

coefficients in horizontal and

vertical directions respectively, will

be adopted while designing the

structures to mitigate the seismic

impacts.

There are no possibilities of the

proposed project site getting flooded

as per records available.

IV. Proposed Terms of Reference:IV. Proposed Terms of Reference:IV. Proposed Terms of Reference:IV. Proposed Terms of Reference:

PROJECT / LAND USEPROJECT / LAND USEPROJECT / LAND USEPROJECT / LAND USE

� A site plan showing the project site and its surroundings with physical features and

topographical details, such as land use, contours and drainage pattern, along with

photographs of the site from all four sides, should be included in the background

information.

� List the kind of activities that are proposed or likely to come up in the complex

� Examine in detail the proposed site with reference to impact on infrastructure covering

water supply, storm water drainage, sewerage, power, etc., and the disposal of

Page 21: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 21 JM EnviroNet Pvt. Ltd.

treated/raw wastes from the complex on land/water body and into sewerage system.

� Examine existing education and health facilities, police and other services and include

adequate provisions in the proposal

BASELINE ENVIRONMENTAL STUDIESBASELINE ENVIRONMENTAL STUDIESBASELINE ENVIRONMENTAL STUDIESBASELINE ENVIRONMENTAL STUDIES

� To examine the baseline status of the project site and its surrounding area, one season

baseline monitoring will be done for the project and results will be incorporated in

EIA/EMP Report to be prepared for the project.

� Study the existing flora and fauna of the area and the impact of the project on them

will be conducted.

� Adequate rainwater harvesting proposals to recharge ground water, which should be

made with due safeguards for ground water quality. Maximize recycling of water and

utilization of rainwater

ENVIRONMENT:ENVIRONMENT:ENVIRONMENT:ENVIRONMENT:

� Make provision of tree plantation as a measure for mitigation of dust and noise in the

proposed complex. Landscape plan, tree plantation and open spaces along with

species proposed in the complex, may be described.

� Make adequate provision for wastewater treatment facilities.

� Assess soil erosion in view of the soil characteristics, topography and rainfall pattern.

� Describe solid waste management and their disposal scheme.

� Arrangements for hazardous waste (Used / spent oil from DG sets) management

through registered recyclers.

� Solid wastes will be segregated into organic and inorganic components. Both the

biodegradable & non-biodegradable/ recyclable wastes will be sold to authorized

vendors for recycling of non-biodegradable wastes and disposal of biodegradable

waste. Dewatered / dried sludge from STP will be used as manure in horticulture.

� Air dispersion modelling to access the impact of project on Ambient Air Quality.

� Examine separately the details for construction and operation phases both for

Environmental Management Plan and Environmental Monitoring Plan.

� Provisions made for safety in storage of materials, products and wastes may be

described.

� Disaster management facility shall be provided.

ENERGY CONSERVATION:ENERGY CONSERVATION:ENERGY CONSERVATION:ENERGY CONSERVATION:

� Application of renewable energy/alternate energy, such as solar energy may be

described including solar water heating in the guidelines for entrepreneurs.

� Use of local building materials should be emphasized during construction.

� Provide for conservation of resources, energy efficiency and use of renewable sources

Page 22: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 22 JM EnviroNet Pvt. Ltd.

of energy in the light of ECBC code

TRAFFIC MTRAFFIC MTRAFFIC MTRAFFIC MANAGEMENT:ANAGEMENT:ANAGEMENT:ANAGEMENT:

� Traffic management plan including parking areas may be described.

� Adequate parking provision and parking space should be provided.

� Provide adequate approach road for entry and exit to project site.

PROJECT SPECIFIC ADDITIONAL SUGGESTIONSPROJECT SPECIFIC ADDITIONAL SUGGESTIONSPROJECT SPECIFIC ADDITIONAL SUGGESTIONSPROJECT SPECIFIC ADDITIONAL SUGGESTIONS

PROJECTPROJECTPROJECTPROJECT DETAILS:DETAILS:DETAILS:DETAILS:

� Specify clearly as to whether there is displacement of population due to this project.

� Submit contour plan, Master plan, Services layout, car parking plan, traffic circulation

plan elevation section plan, perspective view plan and area demarcation plan.

� Dual plumbing system shall be proposed for recycling of the treated water and submit

the hydraulic design of STP with dimension of each component.

� Valid license along-with collaboration agreement and revenue record of the area of

the project.

� Submit detailed Solid waste management plan.

� Water recharging system (water harvesting) will provide as per standard guidelines.

WELFARE & SAFETY MEASURES FOR LABOURSWELFARE & SAFETY MEASURES FOR LABOURSWELFARE & SAFETY MEASURES FOR LABOURSWELFARE & SAFETY MEASURES FOR LABOURS

� Submit Health & Safety plan as per Noida construction workers rules.

� Signed copy of Company’s Environment and Safety Policy

� Submit social activities if any, are to be under-taken.

� Emergency preparedness plan.

ELECTRICAL HAZARDS:ELECTRICAL HAZARDS:ELECTRICAL HAZARDS:ELECTRICAL HAZARDS:

� Submit the detailed design about lightening arrestors along with electrical safety plan

along-with line diagram indicating standards and codes.

� Submit the electricity load and backup calculation of D.G sets

� Submit detailed earth pits plan with design details

� Submit the Noise and vibration reduction plan.

FIRE AND SAFETYFIRE AND SAFETYFIRE AND SAFETYFIRE AND SAFETY::::

� Submit fire fighting plan along –with diagram indicating standards & codes.

� Fire fighting & fire rescue plan.

ENERGY ENERGY ENERGY ENERGY CONSERVATION:CONSERVATION:CONSERVATION:CONSERVATION:

� Submit energy conservation measures giving the energy saved by using non

conventional.

� Sources of energy along –with calculation regarding the energy saved.

� Submit study of simulation of incidence of sunlight to assess the orientation building.

Page 23: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 23 JM EnviroNet Pvt. Ltd.

� List of the energy saving construction material to be used for construction activities.

AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE

PROJECT:PROJECT:PROJECT:PROJECT:

� An undertaking will be submitted regarding the no construction activities of the

project

An undertaking for the assurance of the supply of the water from Municipal Authority

and supply from hired private water tankers (from safe zone An agreement for supply

of water through tankers from safe zone /MOU for the utilization of STP treated water

during construction phase will be submitted.

� An undertaking will be submitted that we will use low sulphur diesel/ HSD (0.25%)

for their Gen sets.

FOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROFOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROFOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROFOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROJECT FROM RESPECTIVE JECT FROM RESPECTIVE JECT FROM RESPECTIVE JECT FROM RESPECTIVE

AUTHORITIES FOR THE PROJECT:AUTHORITIES FOR THE PROJECT:AUTHORITIES FOR THE PROJECT:AUTHORITIES FOR THE PROJECT:

� Permission from the Airport Authority regarding the height of the building.

Page 24: Proposed Group Housing Project APPENDIAPPEND IIIXXXX FORM ...environmentclearance.nic.in/writereaddata/Online/... · Proposed Group Housing Project At Plot No. – SC-01/01, Sector

Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))

M/s ATS Homes Pvt. Ltd. 24 JM EnviroNet Pvt. Ltd.

“I hereby given undertaking that the data and information given in the application and

enclosures are true to the best of my knowledge and belief and I am aware that if any part of

the data and information submitted is found to be false or misleading at any stage, the project

will be rejected and clearance give, if any to the project will be revoked at our risk and cost.”

Date:

Place:

Signature of the applicant

Mr. S. J. Raza

Authorized Signatory

M/s M/s M/s M/s ATS HomesATS HomesATS HomesATS Homes Pvt. Ltd.Pvt. Ltd.Pvt. Ltd.Pvt. Ltd.

711/92, Deepali, Nehru Place, New Delhi-

110019

NOTE:NOTE:NOTE:NOTE:

1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall

submit with the application a C.R.Z map duly demarcated by one of the authorized agencies,

showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of

the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall

also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification,

1991 for the activities to be located in the CRZ.

2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere

Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map

duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project

location and the recommendations or comments of the Chief Wildlife Warden "thereon (at

the stage of EC)."

3. All correspondence with the Ministry of Environment & Forests including submission "of

application for TOR/Environmental Clearance, subsequent clarifications, as may be required

from time to time, participation in the EAC Meeting on behalf of the project proponent shall

be made by the authorized signatory only. The authorized signatory should also submit a

document in support of his claim of being an authorized signatory for the specific project".