Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01, Siddharth Vihar Yojna, Ghaziabad, UP --------------------------------------------------------------------------------------------------------- ----------- Page 1 FORM 1 i. Basic Information Sl. Item Details 1 Name of the project/s Construction of Proposed Group Housing Project Gaur Siddharthamat Plot No. 8/BS-01, Siddharth Vihar Yojna, Ghaziabad (U.P.) (Enclosed Site Plan at Annexure-1) 2 S.No. In the schedule Category: B, Activity: 8 (b) Building and Large Constructions Total Built-up area is 3,63,123.25 Sq.mt (Change in built-up area from 3,25,000.0 Sq.mt to 3,63,123.25 Sq.mt due to change in design ) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled Total Project area 48,750.00 Sqm or 12.0463 Acres (No Change) (Enclosed Site Plan at Annexure-1) 4 New/Expansion/Modernization New Project 5 Existing Capacity/Area etc. N A, it is a New Project. 6 Category of Project i.e. „A‟ or „B‟ Category A , Item 8b 7 Does it attract the general condition? If yes, please specify. No 8 Does it attract the specific condition? If yes, please specify. No. 9 Location Plot No. 8/BS-01, Siddharth Vihar Yojna, Ghaziabad (U.P.) (Enclosed Location Plan on Survey of India Map at Annexture-2, Google Map at Annexture-3 and the Lease Plan at Annexture-4,) Plot/Survey/Khasra No The project site has been allotted by the U.P. Awas Evam Vikas Parishad, Lucknow; Uttar Pradesh. Village NA Tehsil Ghaziabad District Ghaziabad State Uttar Pradesh 10 Nearest railway station/airport along with distance in km. Ghaziabad Railway Station 2 Km Sahibabad Railway Station - 7 km Airport- Delhi IGI- 32 km 11 Nearest town, city, district headquarters along with distance in kms. The proposed site is well connected with Road, Rail and Air networks. It is part of Ghaziabad City. Ghaziabad Railway Station -2 km, NH-24 -2 Km, Vaishali Metro

Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 1

FORM 1

i. Basic Information

Sl. Item Details

1 Name of the project/s Construction of Proposed Group Housing

Project “Gaur Siddhartham” at Plot No.

8/BS-01, Siddharth Vihar Yojna,

Ghaziabad (U.P.)

(Enclosed Site Plan at Annexure-1)

2 S.No. In the schedule Category: B, Activity: 8 (b) Building and

Large Constructions

Total Built-up area is 3,63,123.25 Sq.mt

(Change in built-up area from 3,25,000.0

Sq.mt to 3,63,123.25 Sq.mt due to change in

design )

3 Proposed capacity/area/length/tonnage to be

handled/command area/lease area/number of

wells to be drilled

Total Project area 48,750.00 Sqm or

12.0463 Acres (No Change)

(Enclosed Site Plan at Annexure-1)

4 New/Expansion/Modernization New Project

5 Existing Capacity/Area etc. N A, it is a New Project.

6 Category of Project i.e. „A‟ or „B‟ Category A , Item 8b

7 Does it attract the general condition? If yes,

please specify. No

8 Does it attract the specific condition? If yes,

please specify. No.

9 Location Plot No. 8/BS-01, Siddharth Vihar Yojna,

Ghaziabad (U.P.) (Enclosed Location Plan

on Survey of India Map at Annexture-2,

Google Map at Annexture-3 and the Lease

Plan at Annexture-4,)

Plot/Survey/Khasra No The project site has been allotted by the

U.P. Awas Evam Vikas Parishad,

Lucknow; Uttar Pradesh.

Village NA

Tehsil Ghaziabad

District Ghaziabad

State Uttar Pradesh

10 Nearest railway station/airport along with

distance in km. Ghaziabad Railway Station – 2 Km

Sahibabad Railway Station - 7 km

Airport- Delhi IGI- 32 km

11 Nearest town, city, district headquarters

along with distance in kms. The proposed site is well connected with

Road, Rail and Air networks. It is part of

Ghaziabad City. Ghaziabad Railway Station

-2 km, NH-24 -2 Km, Vaishali Metro

Page 2: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 2

Sl. Item Details

Station- 7 Km, Gaur City-5 Km and Delhi

Border (UP Gate)- 8km, Hindon river-1 Km

and IGI Airport Delhi - 32 km. from the

project site

12 Village Panchayats, Zilla Parishad,

Municipal corporation, Local body (complete

postal addresses with telephone nos. to be

given)

Nagar Nigam Ghaziabad (2713580

/4113668) & Ghaziabad Development

Authority (GDA), (0120-2790891), Near

Old Bus Stand, Ghaziabad, U.P. 201001

13 Name of the applicant Gaursons India Private Limited

14 Registered address Gaur Biz Park, Plot No.-01, Abhay Khand-

II, Indirapuram , Ghaziabad, U.P.

15 Address for correspondence Gaur Biz Park, Plot No.-01, Abhay Khand-

II, Indirapuram , Ghaziabad, U.P

Name Gaursons India Private Limited

Designation (Owner/Partner/CEO) Company

Address Gaur Biz Park, Plot No.-01, Abhay Khand-

II, Indirapuram , Ghaziabad, U.P

Pin Code 201010

E-mail www.gaursonsindia.com

[email protected]

Telephone No. 0120-4343333

Fax No. 0120-4167317

16 Details of Alternative sites examined, if any.

Location of these sites should be shown on a

topo sheet.

No site alternatives are under consideration.

17 Interlinked projects Nil

18 Whether separate application of interlinked

project has been submitted? N.A.

19 If yes, date of submission N.A.

20 If no, reason N.A.

21 Whether the proposal involves

approval/clearance under: If yes, details of

the same and their status to be given.

(a) The forest (conservation) Act, 1980? No

(b) The wildlife (protection) Act, 1972? No

(c) The C.R.Z. Notification, 1991? No

22 Whether there is any Government

order/Policy relevant/relating to the site? The project lies in the Residential Land Use

Zone of the Master Plan of Ghaziabad-2021.

( Pl. ref. the Map enclosed at Annexture-5)

23 Forest land involved (hectares) No

24 Whether there is any litigation pending No

Page 3: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 3

Sl. Item Details

against the project and/or land in which the

project is propose to be set up?

(a) Name of the court

(b) Case No.

(c) Orders/directions of the court, if any and

its relevance with the proposed project.

No

25 Expected cost of the Project INR 819.00 Crores

ii. Activity

1. Construction, operation or decommissioning of the Project involving actions,

which will cause physical changes in the locality (topography, land use, changes

in water bodies, etc.)

S.No Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

1.1 Permanent or temporary

change in land use, land cover

or topography including

increase in intensity of land

use (with respect to local land

use plan)

No The proposed Land use of the Group Housing

Project „Gaur Siddhartham‟ is demarcated as

„Residential Land Use‟ in the Master Plan of

Ghaziabad-2021 by the local Development

Authority „GDA‟ ( Pl. ref. the Map enclosed at

Annexture-5)

Hence proposed project do not anticipate any

change in the land use, land cover or topography

of the area.

1.2 Clearance of existing land,

vegetation and buildings.

No This is Construction of Group Housing Project

on the plot of land earmarked for „Residential

Land use‟ as per the Master Plan of Ghaziabad-

2021.

1.3 Creation of new land uses? No The project site is already earmarked for

Residential Development as per the Master Plan

of Ghaziabad -2021 and will be developed as per

the local Building By-Laws. Hence no new land

use will be created.

1.4 Pre-construction investigations

e.g.

Bore holes, soil testing?

Yes Soil Investigation will be carried out and details

will be submitted.

1.5 Construction works? Yes This is a proposed Group Housing building

construction project. All construction activities

will be confined within project area. The

proposed group housing project‟s detailed Site

Page 4: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 4

S.No Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

Plan is enclosed at Annexure-1. It has total 13

Building Blocks with Building Configuration of

3 Basements+ Stilt + G.Floor + 32nd

Floors.(13th

floor not counted) .

Erection of structures like underground water

storage, piping, electric substations, etc. and

temporary site offices, maintenance workshop

facilities & other infrastructure to support all

these activities would also be involved in the

project execution. There will be no physical

changes outside the project boundary.

Construction of the Group Housing Project

would be done as per applicable norms / Building

Bye-Laws :

Total

Plot area

48,750 m2 (No Change)

Facilities Group Housing/Residential

EWS/LIG

Community Centre

Educational Facilities

Commercial

Pray Area

Permissib

le Ground

Coverage

@40%

19,500.00 m2

Permissib

le FAR

@4.0

1,96,633.91 m2

Basement

Area

(3nos.)

Three Numbers- As per

Building Bye Laws

Total

Built up

area

(Sqmt)

Main group housing:

FAR- 1,96,574.03

5% Prescribed FAR- 8,786.37

Total Non-FAR- 95,045.50

Balcony Area- 38,677.91

EWS/LIG:

FAR- 18,324.14

Page 5: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 5

S.No Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

5% Prescribed FAR- 437.40

Total Non-FAR- 2456.30

Balcony Area- 2,821.61

Total- 3,63,123.25

(Total buildup area increase

from 3,25,000 Sq mt to

363123.25 Sq Mt )

Detailed area chart with

proposed amendment is

enclosed as page 20 - 21

Area for

Green &

Open

The project site is a Part of

Planned Lay Out Plan of

„Siddharth Vihar Yojana‟ at

Ghaziabad, of Awas & Vikas

Parishad, accordingly, more

than 10% of the plot area would

be provided exclusively as

Green / Open Landscaping

Area.

Permissib

le No. of

Dwelling

Units

1. For Main Group Housing

- 2476 (increased due to

change in design)

2. For EWS/LIG – 450

Total – 2926

Detailed area chart with

proposed amendment is

enclosed as Page No 21 – 21

Required

EWS

Dwelling

Units

10% of proposed units

Required

LIG

Dwelling

Units

10% of proposed units

Proposed

Dwelling

Units

Less than the above permissible

Dwelling Units (details are

given in the enclosed site plan)

No. of

Building

3 Basements+ Stilt + G.Floor

+32nd

Floors.(13th

floor not

Page 6: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 6

S.No Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

Blocks counted)

Max. Height

of building

98.20 M

1.6 Demolition works: No Presently the site is not having any type of

development. Enclosed existing site photographs

at Annexure-6.

1.7 Temporary sites used for

construction works

Or housing of construction

workers?

No All The construction activities including storing

of raw materials will be confined with in the

project site only. No temporary construction

worker‟s camp is proposed. Construction workers

from nearby areas would be engaged.

1.8 Above ground buildings,

structures or earthworks

including linear structures, cut

and fill or excavations

Yes The proposed group housing has buildings of

public utility only. Erection of structures like

underground water storage, piping, electric

substations, etc. and temporary site offices,

maintenance workshop facilities & other

infrastructure would also be there to support all

the proposed activities.

1.9 Underground tunneling? works

including mining or

No No such underground works are required

1.10 Reclamation works? No No reclamation work required.

1.11 Dredging? No No site dredging.

1.12 Offshore structures? No No off shore structures required.

1.13 Production and manufacturing

processes?

No No production/manufacturing process is

involved.

1.14 Facilities for storage of goods

or materials?

Yes Separate raw material storage yard will be made. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.

1.15 Facilities for treatment of

disposal of solid waste or

liquid effluents?

Solid Wastes:

Total about 7.6 Tons/day (Main Group Housing

– 6.5 Tones /day and EWS/LIG - 1.1 ton/day)

quantity of Solid Waste estimated to be

generated during the full operation of the project

which would be domestic in nature. Floor wise

Page 7: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 7

S.No Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

door-to-door segregated solid waste collection

system has been envisaged in separate colored

bins. It would be then collected at a common

point at dedicated habitable ventilated Basement

area. Then after the secondary level segregation;

In-organic/ Non-Bio-degradable wastes would

be stored/ sold to authorize respective vendors

for recycling/ reuse and the Organic/ Bio-

degradable wastes would be treated in the

„Organic Waste Convertor‟ Machines to convert

the same to „Compost‟ which would be used for

site Landscape purposes or sold-out, as per the

requirements. Only hazardous waste would be

handed over to the competent agency as being

designated by the local authority, for its further

disposal.

Liquid Effluent:

During construction stage, if any sewage

generated at the site, the same would be treated

and disposed through septic tank/ soak pits /

portable STP.

During the operational phase of the project, the

waste water generated would be treated in the

STP proposed at the site. Recycled water would

be used for Flushing, Horticulture and allied

uses as required, using tertiary treatment.

1.16 Facilities for long term

housing of operational

Workers?

Yes Not applicable

1.17 New road, rail or sea traffic

during construction or

operation?

No Not required

1.18 New road, rail, air waterborne

or other transport

infrastructure including new or

altered routes and stations,

ports, airports etc?

No Not required

Page 8: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 8

S.No Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

1.19 Closure or diversion of

existing transport routes or

infrastructure leading to

changes in traffic movements?

No Not required

1.20 New or diverted transmission

lines or pipelines?

No There will be no shifting of transmission line.

1.21 Impoundment, damming,

culverting, realignment or

other changes to the hydrology

of watercourses or aquifers?

No No impounding, damming, culverting,

realignment or other changes to the hydrology of

surface watercourses is proposed.

1.22 Stream crossings? No Not required.

1.23 Abstraction or transfers of

water from ground or surface

waters?

No Only STP water treated in WTP would be used

for all constructional activities for the project.

1.24 Changes in water bodies or the

land surface affecting drainage

or run-off?

No There is no change in water bodies or the land

surface; therefore project will not affect the

surface drainage and run-off of the area.

1.25 Transport of personnel or

materials for construction,

operation or

decommissioning?

Yes Pre-dominantly significant part of Construction

workers and material would be used from the

nearest available market. During the operation

phase, parking provision as per norms shall be

provided.

1.26 Long-term dismantling or

decommissioning or

restoration works?

No Not applicable

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No Not applicable

1.28 Influx of people to an area in

either temporarily or

permanently?

Yes During the construction phase, majority of

laborers will be locally & temporarily hired,

hence, there will not be major influx of people

into the proposed project site area.

Whereas, during the operational phase,

Permanent residential population influx would

take place, for which Residential Complex with

all basic amenities and supporting infrastructure

Page 9: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 9

S.No Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

is proposed.

1.29 Introduction of alien species? No All local/indigenous and fast growing species

would be planted.

1.30 Loss of native species or

genetic diversity?

No No loss of native species or genetic diversity is

envisaged.

1.31 Any other actions? No No

2. Use of Natural resources for construction or operation of the Project (such as land,

water, materials or energy, especially any resources which are non-renewable or in

short supply):

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

2.1 Land especially undeveloped

or agricultural land (ha)

This is proposed Construction of new Group Housing

Development Project on vacant plot of land earmarked

for „Residential Landuse‟ in the Master Plan of

Ghaziabad-2021.

2.2 Water (expected source &

competing users) unit:

Total Water demand estimated during full operation

stage of the project would be 1422 KLD. Out of which

fresh water demand for Main Group Housing is 909

KLD and 146.25 KLD for EWS which would be met

from the Municipal Supply and the recycled water for

Main Group Housing is 314.7 KLD and for EWS is

47.25 KLD used for flushing and 4.9 KLD would be

used for horticulture purposes.

Water Consumption KLD

Fresh Water for EC 909 KLD

Fresh water for EWS/LIG 146.25 KLD

Flushing Water for EC 314.7 KLD

Flushing water for

EWS/LIG

47.25 KLD

Horticulture/Landscape 4.9 KLD

Total 1422.0 KLD

Water Source: Municipal Supply

Page 10: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 10

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

2.3 Minerals (MT) No Not required.

2.4 Construction material – stone

aggregates,, and / soil

(expected source – MT)

Yes Different types of construction material will be

required according to the design and size. These will

be purchased from various vendors. Hence no

permission is required separately.

S.No. Item Quantity

1 Steel 14,000 MT

2 RMC 1,25,000 MT

Steel and RMC would be sourced from authorized

vendors.

2.5 Forests and timber (source-

MT)

No Not required.

2.6 Energy including electricity

and fuels (source, competing

users) Unit: fuel (MT), energy

(MW)

Total Power requirement will be 8102 KVA (Main

Group Housing - 7339 KVA & EWS /LIG – 763.51

KVA) which would be tapped from the respective

power supply agency.

2.7 Any other natural resources

(use appropriate standard

units)

No Not required.

3. Use, storage, transport, handling or production of substances or materials,

which could be harmful to human health or the environment or raise concerns

about actual or perceived risks to human health.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health

or the environment (flora,

fauna, and water supplies)

No The Project is a Group housing development

project hence, no storage of hazardous chemicals

(as per MSIHC rules) will be done, except LSD

(low sulphur diesel) required to run standby DG

sets. Also, the quantity stored will be below the

threshold limit specified in the MSIHC rules.

Suitable management practice will be adopted for

the same.

Page 11: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 11

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

3.2 Changes in occurrence of

disease or affect disease

vectors (e.g. insect or water

borne diseases)

No Suitable drainage and waste management

measures will be adopted in both construction and

operational phase, which will restrict stagnation

of water or accumulation of waste. This will

effectively restrict the reproduction and growth of

disease vectors.

3.3 Affect the welfare of people e.g.

by changing living conditions?

Local workers will be employed during

construction of the project and the project has

beneficial impacts.

3.4 Vulnerable groups of people who

could be affected by the project

e.g. hospital patients, children, the

elderly etc.,

No This is development of Group Housing Project, so

no adverse impact will be anticipated by this

project.

3.5 Any other causes No

4. Production of solid wastes during construction or operation or

decommissioning (MT/month)

No. Information/Checklist

confirmation

Yes/No Details there of (with approximate

quantities/rates, wherever possible) with source

of information data

4.1 Spoil, overburden or mine

wastes

No Soil generated during excavation will be backfilled

wherever required within the project site.

4.2 Municipal Waste (domestic

and or commercial wastes)

Yes It is estimated that approximately Total about 7.6

Tons/day (Main Group Housing – 6.5 Tones /day

and EWS/LIG -1.1 ton/day) solid waste would be

generated during operational phase. The solid

wastes generated during operation phase will

consist of organic waste such as waste vegetables,

foods etc and inorganic waste like papers, cartons,

thermocol, glass plastics, polythene bags, etc. These

solid wastes will be segregated into biodegradable

and non-biodegradable wastes and collected in

separate colored bins. The recyclable wastes will be

sold to recyclers and the biodegradable & inert

wastes will be handed over to the competent

authority for the further disposal.

Page 12: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 12

No. Information/Checklist

confirmation

Yes/No Details there of (with approximate

quantities/rates, wherever possible) with source

of information data

4.3 Hazardous wastes

(as per Hazardous Waste

Management Rules)

Yes The only hazardous waste in the project would be

used/spent oil from standby DG sets, which is

classified as hazardous waste category 5.1 as per

Hazardous Wastes (Management & Handling)

Amendments Rules, 2003. The spent oil will be

carefully stored in HDPE drums under isolated

storages, and periodically sold to authorize

recyclers. All precautions will be taken to avoid

spillage from the storage.

4.4 Other industrial process

wastes

No Not applicable

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other

sludge from effluent

treatment

Yes Will be used as manure for horticulture.

4.7 Construction or demolition

wastes

Yes It is estimated that approximately 3, 00,000 m3

of earth material will be excavated during initial

construction phase for foundations, basement.

Excavated material will be re-used for construction

and landscaping works within the site only.

The soil excavated during construction would be

first temporarily stored in an area earmarked and

then shall be used for landscaping and road

construction and surplus soil (if any) will be

transported to the designated disposal site in tune

with the local norms.

4.8 Redundant machinery or

equipment

No There will be no generation of redundant machinery

or equipment for disposal.

4.9 Contaminated soils or other

materials

No Not applicable

4.10 Agricultural wastes Yes 18 kg/day Horticulture waste will be generated,

which includes cutting, trimmings, dry leaves &

grasses etc. Garden waste including Biodegradable

waste will be transported to the compost site for

bio-composting.

4.11 Other solid wastes No Not applicable

Page 13: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 13

5. Release of pollutants or any hazardous, toxic or noxious substances to air

(Kg/hr)

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

5.1 Emissions from

combustion of fossil

fuels from stationary or

mobile sources

Yes During construction, emission will be generated from

vehicles, construction machineries and D.G. sets.

During operational phase, D.G. Set‟s emissions and

vehicular emissions will be there which would be

complying the UPPCB Norms.

5.2 Emissions from

production processes

No Not applicable

5.3 Emissions from

materials handling

including storage or

transport

Yes Water sprinkling shall be carried out regularly at

construction and camp sites. Vehicles delivering

construction materials will always be covered to avoid

spillage of construction materials.

5.4 Emissions from

construction activities

including plant and

equipment

Yes The emissions will be marginal and restricted to

construction phases, will be short lived and reversible.

All construction machinery will meet the prescribed

emission standards.

5.5 Dust or odours from

handling of materials,

including construction

materials sewage and

waste

Yes Dust pollution during the construction phase would be

controlled by providing proper closed site barricading,

use of nets, sprinkling regular water, provided with

tarpaulin cover over transported/stored raw material,

use of masks etc. to reduce dust emission.

5.6 Emissions from

incineration of waste

No

5.7 Emissions from burning

of waste in open air (e.g.

slabh materials,

construction debris)

No

5.8 Emissions from any

other sources

No

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

6.1 From operation of equipment

ventilation plant, crushers e.g.

engines,

Yes The machinery which will be used for

construction be of highest standard of reputed

make and will adhere to international standard.

Insignificant impacts due to construction

Page 14: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 14

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

machinery are envisaged. Besides, the

construction activities will be restricted do

daytime only. Source of noise in operational

phase will be DG sets which will be in operation

during power failure only.

6.2 From industrial or similar

processes

No

6.3 From construction or

demolition

Yes During construction work, noise will be

generated from construction machinery; however,

adequate precautionary measures would be taken

to reduce noise generation.

6.4 From blasting or piling No No blasting or piling will be done.

6.5 From construction or

operational traffic

Yes It shall be restricted within a limited area. Some

amount of noise will be generated in the

construction and operational phase however,

adequate precautions will be taken to reduce

noise generation i.e. development of green area

which will act as barrier to control noise/air

pollution.

6.6 From lighting or cooling

systems

No During power failure, operation of DG sets will

generate noise. However, these shall be housed in

acoustically enclosed chambers as per the norms.

6.7 From any other sources No

7. Risks of contamination of land or water from releases of pollutants into the

ground or into sewers, surface waters, groundwater, coastal waters or the

sea:

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

7.1 From handling, storage,

hazardous materials use or

Spillage of hazardous materials

Yes The only hazardous waste is, spent oil from

standby DG sets. The spent oil will be

carefully stored in HDPE drums under isolated

storage, and periodically sold to authorize

recyclers. All precautions will be taken to

avoid spillage from storage.

7.2 From discharge of sewage or

other effluents water or the land

No There will be no discharge of untreated

sewage on water or land, as the sewage will

Page 15: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 15

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

(expected mode and place of

discharge) to

be discharged in municipal sewer. So, no

adverse effect is envisaged.

7.3 By deposition of pollutants

emitted to air into the land or

into water

No Deposition of dust on land & plants from air

due to transportation will be there, both during

operational & construction phase but will be

minimal. Water sprinkling and good house

keeping shall be regularly carried out

7.4 From any other sources No

7.5 Is there a risk of long term build

up of pollutants in the

environment from these

sources?

No There is no risk of long term build up of

pollutants in the environment from handling,

storage, use or spillage of hazardous materials,

discharge of sewage or other effluents to water

or the land and by deposition of pollutants

emitted to air into the land or into water

sources.

8. Risk of accidents during construction or operation of the Project, which could

affect human health or the environment.

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

8.1 From explosions, spillages,

fires etc from storage, handling,

use or production of hazardous

substances

This is basically a construction project and does

not involve major hazardous construction

activity. Hence, chances of explosions, spillages,

fires are minimal.

All construction workers will be provided with

suitable personal protective equipment (PPE) as

per the health & safety norms. Training and

awareness about the safety norms will be

provided to all supervisors and workers involved

in construction activities.

An agreement will be signed with the contractor,

which will clearly deal safety aspects during

construction. No major hazardous waste is being

stored with in the project site. No industrial or

process activity is involved in this project hence

chances of chemical hazards and accidents are

Page 16: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 16

No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

minimal. However, suitable fire-fighting

measures will be provided.

8.2 From any other causes No For accidental fires, Fire fighting

Pumps are to be installed

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc)?

No The project falls under seismic Zone IV. Design

and architecture of building will be earthquake

resistant and will comply with the required IS

Specifications

Proper measures shall be taken in detailed design

to minimize the impact of any disaster. Area is

not flood prone. Building to be designed as per

seismic zone requirements.

9. Factors which should be considered (such as consequential development)

which could lead to environmental effects or the potential for cumulative

impacts with other existing or planned activities in the locality

No. Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

9.1 Lead to development of

supporting facilities, ancillary

development or development

stimulated by the project which

could have impact on the

environment e.g.:

This is a development of Group Housing project.

The existing infrastructure is adequate to meet

the requirement of proposed project.

In order to support, power lines will be drawn,

roads will be constructed within the proposed

project as well as for access. Water supply and

sewage systems will be laid down extensively.

• Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc.)

Yes Residential project

• housing development Yes

• extractive industries No

• supply industries No

• other No

9.2 Lead to after-use of the site,

which could have an impact on

the environment

No

Page 17: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 17

No. Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

9.3 Set a precedent for later

developments

No The area falls under the Master Plan of

Ghaziabad-2021 of the local development

authority „GDA‟, therefore, no illegal activity is

predicted and development of the entire region is

anticipated as proposed in the Master Plan.

9.4 Have cumulative effects due to

proximity to other existing or

planned projects with similar

effects

It will improve the environment by creating a

more attractive and inter active environment for

living, leisure & recreation, create an urban

landmark.

iii. Environmental Sensitivity

S.N Areas Name/

Identity

Aerial distance (within 15 km.) proposed

project location boundary

1. Areas protected under

international conventions,

national or local legislation for

their ecological, landscape,

cultural or other related value

No Nil

2. Areas which are important or

sensitive for ecological reasons

- Wetlands, watercourses or

other water bodies, coastal

zone, biospheres, mountains,

forests

Yes Hindan River – 1.0 km (approx.) Pl ref Plan

enclosed at Annexure-7 (A) & 7(B)

3. Areas used by protected,

important or sensitive species of

flora or fauna for breeding,

nesting, foraging, resting, over

wintering, migration.

No Nil

4. Inland, coastal, marine or

underground waters

No Nil

5. State, National boundaries No Project lies in U.P. State.

6. Routes or facilities used by the

public for access to recreation

or other tourist, pilgrim areas

No NH- 24 – approx 1.75 Km

7. Defense installations Yes Hindan Air base- approx. 6 Km

Page 18: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 18

S.N Areas Name/

Identity

Aerial distance (within 15 km.) proposed

project location boundary

8. Densely populated or built-up

area

Ghaziabad Railway Station-2 km, Noida- 3 km)

Delhi Border (UP Gate) -8 km

9. Areas occupied by sensitive

man-made land uses (hospitals,

schools, places of worship,

community facilities)

Yes All such places are available in close proximity.

10. Areas containing important,

high quality or scarce resources

(ground water resources,

surface resources, forestry,

agriculture, fisheries, tourism,

minerals)

No Hindan River – 1 Km

Pl ref Plan enclosed at Annexure-7 (A) & 7 (B)

11. Areas already subjected to

pollution or environmental

damage. (Those where existing

legal environmental standards

are exceeded).

Nil

12 Areas susceptible to natural

hazard which could cause the

project to present environmental

problems (earthquakes,

subsidence, landslides, erosion,

flooding or extreme or adverse

climatic conditions)

No The area is not susceptible to natural hazard,

such as, subsidence, landslides, erosion,

flooding, or extreme or adverse climatic

conditions.

However, the proposed site is located in seismic

Zone IV for which BIS standards shall be

followed during design of the building.

Page 19: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,

Siddharth Vihar Yojna, Ghaziabad, UP

---------------------------------------------------------------------------------------------------------

-----------

Page 19

“I hereby given undertaking that the data and information given in the application

and enclosures are true to the best of my knowledge and belief and I am aware that if

any part of the data and information submitted is found to be false or misleading at

any stage, the project will be rejected and clearance give, if any to the project will be

revoked at our risk and cost.

Date: 28.04.2017

Place: Ghaziabad Mr Devendra Bhandari

Signature of the applicant

With Name and Full Address

(Project Proponent/ Authorized Signatory)

NOTE:

1. The Projects involving clearance under Coastal Regulation Zone Notification,

1991 shall submit with the application a C.R.Z map duly demarcated by one of

the authorized agencies, showing the project activities, w.r.t. C.R.Z. and the

recommendations of the state Coastal Zone management Authority.

Simultaneous action shall also be taken to obtain the requisite clearance under

the provisions of the C.R.Z. Notification, 1991 for the activities to be located in

the CRZ.

2. The projects to be located within 10 km of the National Parks, Sanctuaries,

Biosphere Reserves, Migratory Corridors of Wild Animals, the project

proponent shall submit the map duly authenticated by Chief Wildlife Warden

showing these features vis-à-vis the project location and the recommendations

or comments of the Chief Wildlife Warden thereon.”

3. All correspondence with the Ministry of Environment & Forests including

submission of application for TOR/Environmental Clearance, subsequent

clarifications, as may be required from time to time, participation in the EAC

Meeting on behalf of the project proponent shall be made by the authorized

signatory only. The authorized signatory should also submit a document in

support of his claim of being an authorized signatory for the specific project”.

Page 20: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”

Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01, Siddharth Vihar Yojna, Ghaziabad, UP

--------------------------------------------------------------------------------------------------------------------

Page 20

Page 21: Proposed Group Housing Project “Gaur Siddhartham” Siddharth …environmentclearance.nic.in/writereaddata/...1_SiddharthVihar.pdf · Proposed Group Housing Project “Gaur Siddhartham”