Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
-
The Old LibraryAlbion Street, Lewes, East Sussex BN7 2ND
DRAWING NUMBER:
CA
D F
ILE
NA
ME
:
email. [email protected]. 01273 480608
STATUS:
CLIENT:
/Vol
umes
/Cur
rent
Pro
ject
s/C
urre
nt P
roje
cts
Mas
ter-J
ob F
iles/
8800
/883
0 M
erid
ian
Com
mun
ity P
rimar
y S
choo
l - E
xten
sion
/Dra
win
gs/A
rchi
cad
/883
0 M
erid
ain
Exi
stin
g M
k3.p
ln
LOCATION: Peacehaven
DRAWN BY:CHECKED BY:
SJD
REVISION:
RevID ChID Change Name Date
Revision History
PROJECT NAME:
NOTES
This drawing is Copyright and shall not be produced nor used for any other purposewithout the written permission of the Architects.
Do not scale this drawing.
The Contractor is responsible for checking all dimensions on site.Report any discrepancies, errors or omissions to the Architects immediately.
The Contractor shall ensure that all goods, materials and workmanship conform withcurrent British Agrément Certificates, British Standards and Building Regulations,and ensure that all works are executed in full compliance with all current Codes ofPractice and Regulations in respect of Health & Safety.
FOR PLANNING
FOR PLANNING
Meridian School
Emcor UK Ltd
8830 / P.115
SCALE: 1:100
DRAWING TITLE: Proposed Ground FloorPlan
SK
DRAWINGS:
Proposed Ground Floor Plan, ScaleBar
This office is licensed to reproduce Ordnance Survey maps onto drawings butanyone doing so must ensure that this use is acknowledged by displaying thefollowing on all copies of all paper maps:© Crown copyright. All rights reserved. Licence number AR 100006739
SHEET SIZE: A1
GFD - 28U 1
12 R
. @ 0
.163
11 T
. @ 0
.300
1
2
3
4
5
6
7
8
9
10
11
12
12 R
. @ 0
.163
11 T
. @ 0
.300
13
14
15
16
17
18
19
20
21
22
23
24
8 R. @ 0.1507 T. @ 0.300
12345678
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
A
A
B
B
C
C
E
E
F
F
H
H
I
I
1 1
2 2
3 3
4 4
6 6
D
D
G
G7 7
4a
4b
2.9023.6933.8113.9953.8933.8933.9953.811
1.34
57.
496
3.72
54.
367
3.07
40.
647
8.84
111
.813
4.36
70.
419
2.54
80.
758
2.02
4
3.50
6
7.602
2.860 S.O 0.490 2.998 S.O 1.441 2.860 S.O 0.590 2.998 S.O 1.441 2.998 S.O 0.490 2.860 S.O2.840 Opening
1.200 1.500 1.200 1.200 0.4001.219 C/L 1.519 C/L
2.978 Opening
1.200 1.500 1.200 1.200 0.4001.219 C/L 1.238 C/L 0.419 C/L 1.219 C/L 1.519 C/L 0.419 C/L1.238 C/L1.219 C/L
2.840 Opening 2.978 Opening
0.400 1.200 1.200 1.500 1.2000.419 C/L 1.238 C/L 1.219 C/L 1.219 C/L1.519 C/L
2.978 Opening 2.840 Opening
79°
+ 62.640approx
Gulleydrain
New Linear Drain +62.530 approx.+62.540 approx. At thresholds.
+62.540 approx. At thresholds.
Threshold +62.540 approx.
Threshold +62.540 approx.New Linear Drain +62.530 approx.
New Linear Drain+62.430 approx.
+ 61.280 approx
+ 62.440 approx
+ 62.320 approx
Gully + 62.310approx
+ 62.416 approx
Gully + 62.406approx
+ 62.465 approxS
lope
1:4
0
+ 62.416 approx
Gully + 62.406approxS
lope
1:4
0
Slope 1
:40
Threshold +62.540 approx.
+ 62
.540
app
rox
+ 62.368 approx
Gully + 62.358approx
Slope 1:60 + 62.450 approx
Existing + 62.040approx
8No. steps, 145mmRise, 300mm Going.
Existing Gully Raised+62.310 approx
Existing Gully Raised+62.310 approx
Slope 1:47 to suit falls
Slope 1:41 to suit falls
+ 62.640approx
Slope 1:52 to suit falls
Gully + 62.530approx
+ 63.750approx
+ 62.550 approx
Slo
pe 1
:31
to s
uit f
alls
Threshold+63.750 approx.
Threshold+63.750 approx.
+63.310 approx.
Slop
e 1:
19 to
sui
t
BLINDS BLINDSFire Exit Sign
RWP RWP
RWP RWP
RWP
RWP
AVBB
SFSSFS
D2
D2
AV
SFSSFS
2
2
BBAV
SFSSFS
2
2
BB
AV
SFSSFS
2
2
BBAV
SFSSFS
2
2
BBAV
SFSSFS
2
2
BB
D1 D1 D1
D1
D1
Lift
New soft landscaping
New soft la
ndscapingNew soft landscaping
New soft landscaping
New soft landscaping
Classroom01
A: 55.010 m2
H: 2,900 mmV: 161.60 m3
Classroom02
A: 55.016 m2
H: 2,900 mmV: 162.96 m3
Classroom03
A: 55.010 m2
H: 2,900 mmV: 161.61 m3
Classroom04
A: 55.010 m2
H: 2,900 mmV: 161.64 m3
Classroom05
A: 55.010 m2
H: 2,900 mmV: 161.65 m3
Classroom06
A: 55.010 m2
H: 2,900 mmV: 161.60 m3
Storage07
A: 1.500 m2
Storage08
A: 1.500 m2
Storage09
A: 1.500 m2
Storage10
A: 1.500 m2
Storage11
A: 1.500 m2
Storage12
A: 1.500 m2
Cloaks13
A: 2.486 m2
Cloaks14
A: 2.486 m2
Cloaks15
A: 2.486 m2
Cloaks16
A: 2.486 m2
Cloaks17
A: 2.486 m2
Cloaks18
A: 2.486 m2
Circulation19
A: 21.280 m2
H: 2,900 mm
Circulation20
A: 29.763 m2
H: 2,900 mm
Circulation21
A: 24.277 m2
H: 2,900 mm
Plant22
A: 13.238 m2
H: 3,442 mm
Circulation23
A: 12.223 m2
H: 3,558 mm
2 22 2 22 22 2
2 22 22 22 22
GFD - 04FD 60s
GFD - 05FD 60s
GFW - 01WHD 0.350x2.680
GFW - 07WHD 1.800x1.200
GFW - 02WHD 0.350x2.680
GFW - 08WHD 1.800x1.200
GFD - 06FD 60s
GFD - 07FD 60s
GFW - 03WHD 0.350x2.680
GFW - 09WHD 1.800x1.200
GFW - 04WHD 0.350x2.680
GFW - 10WHD 1.800x1.200
GFD - 08FD 60s
GFD - 09FD 60s
GFW - 05WHD 0.350x2.680
GFW - 12WHD 1.800x1.200
GFW - 06WHD 0.350x2.680
GFW - 11WHD 1.800x1.200
GFD
- 02
FD30
s
GFD
- 03
FD30
s
GFD - 22U 1
GFW - 13WHD 0.600x1.900GFD - 23
U 1
GFD
- 01
FD30
s
GFW
- 14
WH
D0.
600x
2.70
0
GFD - 10FD 30s
GFD - 11FD 30s
GFD - 13FD 30s
GFD - 15FD 30s
GFD - 14FD 30s
GFD - 12FD 30s
5.255
5 5
1:1000 5m 10m
GFW - 33WHD 1.570x1.800
GFW - 34WHD 1.800x2.700
GFD - 28U 1
GFW - 36WHD 1.800x0.800
GFD - 24U 1
GFW - 35WHD 1.800x0.600
GFD - 25U 1
GFD - 26FD 30s
GFD
- 27
FD60
s
8 R. @ 0.1507 T. @ 0.300
12345678
1
2
3
4
6
7
RWP
Circulation24
A: 17.851 m2
H: 2,358 mm
Circulation25
A: 26.443 m2
H: 2,800 mm
Storage26
A: 3.573 m2
GFD
- 01
FD30
s
5
1:100Proposed Ground Floor Plan
S-02
S-02
S-01 S-01
Site
Wes
tEl
evat
ion