33
Michael Brown, Construction Tyler Donnell, Construction Proposed Elementary School Reading, Pennsylvania AEI Competition Proposed Elementary School Reading, Pennsylvania AEI Competition OVERVIEW Outline AEI Project Overview Project Delivery Method Site Logistics/Safety Schedule Sequencing Quality Control Budget Conclusion PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSION QUALITY CONTROL O O OVERVIEW VERVIEW VERVIEW VERVIEW

Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Michael Brown, Construction Tyler Donnell, Construction

Proposed Elementary School

Reading, Pennsylvania

AEI Competition

Proposed Elementary School

Reading, Pennsylvania

AEI Competition

OVERVIEW

Outline

• AEI Project Overview

• Project Delivery Method

• Site Logistics/Safety

• Schedule

• Sequencing

• Quality Control

• Budget

• Conclusion

PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOOOOVERVIEWVERVIEWVERVIEWVERVIEW

Page 2: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Michael Brown, Construction Tyler Donnell, Construction

Proposed Elementary School

Reading, Pennsylvania

AEI Competition

Proposed Elementary School

Reading, Pennsylvania

AEI Competition

OVERVIEW

Outline

• AEI Project Overview

• Project Delivery Method

• Site Logistics/Safety

• Schedule

• Sequencing

• Quality Control

• Budget

• Conclusion

PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOOOOVERVIEWVERVIEWVERVIEWVERVIEW

Page 3: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOOOOVERVIEWVERVIEWVERVIEWVERVIEW

Existing Site Plan New Site PlanAEI Student Competition

• Team consisted of CM, Structural, & Mechanical

• Given bridging documents:

• Existing & new site plans, floor plans, elevations

• Finish design & develop construction plan

• Achieve LEED certification

• Provide a budget to school board

• Owner considering natatorium as add-on

Page 4: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Building Information

• Three-story elementary school, 87,000 Sq. Ft.

• Located in Reading, PA

• Adjacent existing elementary school

• Steel frame w/ shear walls & braced frames

• Accessible Green Roof

• Hybrid geothermal system

• Brick & aluminum panel façade

• Driven steel piles

• New natatorium

Existing Elementary School

Aluminum Accent Panels

Driven Piles

New Natatorium

Accessible Green Roof

PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOOOOVERVIEWVERVIEWVERVIEWVERVIEW

Page 5: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Owner Profile & Goals

• Cost is important but not the only driving factor

• Improved occupant performance and comfort

• Long-lasting and future-proof facility

• Willing to spend upfront to achieve lifecycle

savings

• Prefers construction of new building affect

existing operations for only one school year

PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOOOOVERVIEWVERVIEWVERVIEWVERVIEW

Page 6: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Construction Goals

• Minimize disruptions to existing elementary school

during construction

• Promote integrated, collaborative project

team environment

• Provide an affordable budget while

maximizing innovation and lifecycle savings

• Effectively control cost, schedule, and quality

PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOOOOVERVIEWVERVIEWVERVIEWVERVIEW

Page 7: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

OVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOOOOVERVIEWVERVIEWVERVIEWVERVIEW

BIM Execution Plan

• BIM Goals

• Weekly coordination meetings as well as

constant collaboration through shared

workspace

• Main software programs:

• Revit, Navisworks, Synchro, SketchUp

• Process maps for design coordination

Page 8: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHODPPPPROJECTROJECTROJECTROJECT DDDDELIVERYELIVERYELIVERYELIVERYMMMMETHODETHODETHODETHOD

Project Delivery Method Background

• Pennsylvania publicly-funded project

• Separations Act of 1913

• Multiple prime contracts

• Mandate Waiver Program

http://wwp.greenwichmeantime.com/time-zone/usa/pennsylvania/images/state-flag-pennsylvania.jpg

SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGET CONCLUSIONQUALITY CONTROLOVERVIEW

Page 9: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

http://wwp.greenwichmeantime.com/time-zone/usa/pennsylvania/images/state-flag-pennsylvania.jpg

Project Delivery Method Background

• Pennsylvania publicly-funded project

• Separations Act of 1913

• Multiple prime contracts

• Mandate Waiver Program

• Expired in 2010

Project Delivery Method Decision

• Multi-Prime with CM Agency

• Use multiple primes to our advantage

• Split up the General trades

• Removes GC from the critical path

• Removes GC markups

• Subcontractor Competition

SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGETPPPPROJECTROJECTROJECTROJECT DDDDELIVERYELIVERYELIVERYELIVERYMMMMETHODETHODETHODETHOD CONCLUSIONQUALITY CONTROLOVERVIEW

Page 10: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHOD

Project Delivery Method Background

• Pennsylvania publicly-funded project

• Separations Act of 1913

• Multiple prime contracts

• Mandate Waiver Program

• Expired in 2010

Project Delivery Method Decision

• Multi-Prime with CM Agency

• Use multiple primes to our advantage

• Split up the General trades

• Removes GC from the critical path

• Removes GC markups

• Subcontractor Competition

How to be Innovative with Multi-Primes

• Lack of teamwork & collaboration?

• Collaborative contract language

• Tied to low bidders?

• Comprehensive plan-check program

SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING BUDGETPPPPROJECTROJECTROJECTROJECT DDDDELIVERYELIVERYELIVERYELIVERYMMMMETHODETHODETHODETHOD CONCLUSIONQUALITY CONTROLOVERVIEW

Page 11: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

SITE LOGISTICS/SAFETY

Site LogisticsStart of Construction Geothermal Field Installation Pool Construction

SCHEDULE SEQUENCING BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SSSSITEITEITEITE LLLLOGISTICSOGISTICSOGISTICSOGISTICS/S/S/S/SAFETYAFETYAFETYAFETY

Page 12: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Site Layout

• Utilizing topography for security

• Minimizing terrain alterations

SCHEDULE SEQUENCING BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SSSSITEITEITEITE LLLLOGISTICSOGISTICSOGISTICSOGISTICS/S/S/S/SAFETYAFETYAFETYAFETY

+367’ 0”

+357’ 0”

Page 13: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Site Layout

• Utilizing topography for security

• Minimizing terrain alterations

• Pool Location

SCHEDULE SEQUENCING BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SSSSITEITEITEITE LLLLOGISTICSOGISTICSOGISTICSOGISTICS/S/S/S/SAFETYAFETYAFETYAFETY

Page 14: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

SITE LOGISTICS/SAFETY

Site Layout

• Utilizing topography for security

• Minimizing terrain alterations

• Pool Location

• Sustainable site

SCHEDULE SEQUENCING BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SSSSITEITEITEITE LLLLOGISTICSOGISTICSOGISTICSOGISTICS/S/S/S/SAFETYAFETYAFETYAFETY

Page 15: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

SCHEDULE

Pre-Construction Phases

• Moving from design to construction

• Plan Check

• Bid Period

• Maintaining critical milestones

• Sequencing to avoid delays

• Limiting long lead items

Procurement Strategy

• Mechanical Systems

• RTU’s, AHU’s, Cooling Tower

• Electrical Systems

• Switchgear, Transformers, Basement Equipment

• Structural Systems

• Steel Mill Order

SEQUENCING BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SITE LOGISTICS/SAFETY SSSSCHEDULECHEDULECHEDULECHEDULE

Page 16: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

SCHEDULE SEQUENCING BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SITE LOGISTICS/SAFETY SSSSCHEDULECHEDULECHEDULECHEDULE

2 Construction Phase

• Front Loaded Schedule

• Start of classes – August 26, 2013

• Minimize Disruptions

• Limiting long Critical Path tasks

• Avoid stacking trades

Page 17: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

SEQUENCING

Sequencing

• Steel Erection Plan

• West to East

• Noise

• Safety

• Winter Schedule

• Front end loaded to begin interior work

• Geothermal Wells

• Exterior Facade

BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SSSSEQUENCINGEQUENCINGEQUENCINGEQUENCING

Page 18: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

SEQUENCINGSEQUENCING BUDGETPROJECT DELIVERY METHOD CONCLUSIONQUALITY CONTROLOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SSSSEQUENCINGEQUENCINGEQUENCINGEQUENCING

4D Modeling

• Schedule check

• Visualization for bidders

• Communication of sequence to owner

• Teaching tool for students

• Side-by-side views (What if analysis)

Page 19: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

QUALITY CONTROL

Quality Control

• Winter Façade Installation

• Scaffolding Wrap

• Multiple Batch Plants

• Interior MEP Install

• Exposed Ceilings

• Sealed ducts

• Polished Concrete

• Evaporation control and wet cure

Exposed Ceiling

Typ. Classroom

9’-2

Drop Ceiling

Typ. Corridor10

’-7”

14

’-0”

BUDGETPROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QQQQUALITYUALITYUALITYUALITY CCCCONTROLONTROLONTROLONTROL

Page 20: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Constructability

BUDGETPROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QQQQUALITYUALITYUALITYUALITY CCCCONTROLONTROLONTROLONTROL

Page 21: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

QUALITY CONTROL

Constructability

BUDGETPROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QQQQUALITYUALITYUALITYUALITY CCCCONTROLONTROLONTROLONTROL

Page 22: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Constructability

• Foundation Design

• Geotechnical Report

• Site prone to sinkholes

• Three options:

• Excavation and replacement

• Compaction grouting

• Driven steel piles

BUDGETPROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROLQQQQUALITYUALITYUALITYUALITY CCCCONTROLONTROLONTROLONTROL

Page 23: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Constructability

• Foundation Design

• Geotechnical Report

• Site prone to sinkholes

• Three options:

• Excavation and replacement

• Compaction grouting

• Driven steel piles

• Grade Beam Sizes

GRADE BEAM SIZES

Grade Beam

Depth (ft)

Width (ft)

TopReinf.

BottomReinf.

ShearReinf.

GB-1 2’-0” 1’-6” (2)#9 (4)#9 #3 @ 9”

GB-2 1’-6” 1’-3” (2)#6 (3)#6 #3 @ 7”

GB-B 2’-6” 1’-6” (2)#9 (3)#9 #3 @ 7”

BUDGETPROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROLQQQQUALITYUALITYUALITYUALITY CCCCONTROLONTROLONTROLONTROL

3

Page 24: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

BUDGET

Budget PlanCon

PROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BBBBUDGETUDGETUDGETUDGET

41% of project cost

http://media.web.britannica.com/eb-media/31/3431-004-133BE72B.gif

54

Page 25: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Add-Alternate Information

PROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGETBBBBUDGETUDGETUDGETUDGET

6

Page 26: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Cost ComparisonAdd-Alternate Information

PROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGETBBBBUDGETUDGETUDGETUDGET

6 7

Page 27: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

Cost ComparisonAdd-Alternate Information

PROJECT DELIVERY METHOD CONCLUSIONOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGETBBBBUDGETUDGETUDGETUDGET

5

$2,000,000.00

$2,500,000.00

$3,000,000.00

$3,500,000.00

$4,000,000.00

$4,500,000.00

$5,000,000.00

$5,500,000.00

$6,000,000.00

0 2 4 6 8 10 12 14 16 18 20 22 24

Tota

l P

rese

nt

Va

lue

Years

Life Cycle Analysis

Baseline

Design

Geothermal Life Cycle Analysis

7

Page 28: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

CONCLUSION

Conclusion

• Construction Goals

• Minimize disruptions to existing elementary school

during construction

• Promote integrated, collaborative project

team environment

• Provide an affordable budget while

maximizing innovation and lifecycle savings

• Effectively control cost, schedule, and quality

PROJECT DELIVERY METHODOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CCCCONCLUSIONONCLUSIONONCLUSIONONCLUSION

Page 29: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHODOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CCCCONCLUSIONONCLUSIONONCLUSIONONCLUSION

Q & A

Page 30: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHODOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CCCCONCLUSIONONCLUSIONONCLUSIONONCLUSION

Appendix

Page 31: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHODOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CCCCONCLUSIONONCLUSIONONCLUSIONONCLUSION

Appendix

Page 32: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHODOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CCCCONCLUSIONONCLUSIONONCLUSIONONCLUSION

Appendix

Page 33: Proposed Elementary School Outline AEI Competition CM... · OOOVERVIEW PROJECT DELIVERY METHOD SITE LOGISTICS /S AFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CONCLUSION AEI Student

PROJECT DELIVERY METHODOVERVIEW SITE LOGISTICS/SAFETY SCHEDULE SEQUENCING QUALITY CONTROL BUDGET CCCCONCLUSIONONCLUSIONONCLUSIONONCLUSION

Appendix