20
20 PROPOSED DESIGN CONCEPT

PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

20

P R O P O S E D D E S I G N C O N C E P T

Page 2: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

21

Page 3: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

22

PRIMARY LANDSCAPE SPACES + BUILDINGS

01 City Stadium

02 Calvin Falwell Field

03 Proposed Northside Park

04 Proposed South Entry Plaza

05 Proposed New Parking

06 Proposed Parking on Humane

Society Site

07- Lynchburg Grows

08 Proposed Sports Field

09 Proposed Field House

10 Proposed Connection Path

11 Neighborhood Park

12 Proposed North Entry Plaza

13 Proposed Amphitheater

Proposed extended precinct plan

01

02

03

04

06

07

10

09

08

11

05

05

12

P R O P O S E D S I T E P L A N

S I T E W O R K S

FORT AVENUE

WY

TH

E R

OA

D

NAVAL RESERVE RD.

EN

GLE

WO

OD

ST.

RU

TH

ER

FOR

ST.

13

P R O P O S E D D E S I G N C O N C E P T

08

Proposed Park

Page 4: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

23

Proposed Site Plan

PRIMARY LANDSCAPE SPACES + BUILDINGS

01 City Stadium

02 Calvin Falwell Field

03 Proposed Northside Park

04 Proposed South Entry Plaza

05 Proposed North Entry Plaza

06 Existing Building

07 Extended Game Day Bus Parking

08 On-site Stormwater Management

Opportunities

09 Proposed Additional Parking at

Humane Society Site

10 Proposed Upgrade Parking and Circulation

11 Improved Drop-off Area and Accessible

Parking

12 Proposed Parking for Home Team and Access

to Field House and Storage Area

05

04

01

02

0707

10

0910

11

03

06

12

08

08

S I T E W O R K S

FOR

T A

VE

NU

E

WYTHE ROAD

NA

VAL

RES

ERV

E R

D.

P R O P O S E D S I T E P L A N

P R O P O S E D D E S I G N C O N C E P T

Page 5: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

24

KEY ENTRY POINTS

01 Improved pedestrian entry to City Stadium

at the proposed Northside Park enhances

park visibility and pedestrian connections

02 North Entry Plaza with area for bus stacking

and emergency vehicle access

03 South Entry with new entry plaza, improved

vehicular and pedestrian circulation, drop-off

area, accessible parking and emergency

vehicle access

04 Improved site entry and signage

opportunities

05 Improved site entry and signage

opportunities

06 Pedestrian Entry Corridor connects future

site precinct development with the

City Stadium site

01

06

03

04

05

02

S I T E W O R K S

P R O P O S E D S I T E P L A N

P R O P O S E D D E S I G N C O N C E P T

Page 6: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

25

CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING

01 South Entry with new entry plaza, improved

vehicular and pedestrian circulation, drop-off

area, accessible parking and emergency

vehicle access.

02 Improved site entry and signage opportuni

ties.

03 Improved site entry and signage opportuni

ties.01

02

03

S I T E W O R K S

WY

TH

E R

OA

D

NAVAL RESERVE RD.

P R O P O S E D S I T E P L A N

P R O P O S E D D E S I G N C O N C E P T

Page 7: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

26

CITY STADIUM NORTHSIDE - NEW ENTRY PLAZA AND PARK

01 Improved pedestrian entry to City Stadium at

the proposed Northside Park enhances park

-visibility and pedestrian connections.

02 North Entry Plaza with area for emergency

vehicle access.

03 Proposed Northside Park

04 Proposed North Entry Plaza

05 Existing Building

06 Extended Game Day Bus Parking

07 Proposed Parking for Home Team and Access

to Field House and Storage Area

08 City Stadium

09 Calvin Falwell Field

03

04

06

06

07

08

09

01

05

S I T E W O R K S

FORT AVENUE

WY

TH

E R

OA

D

P R O P O S E D S I T E P L A N

P R O P O S E D D E S I G N C O N C E P T

Page 8: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

27

P R O P O S E D S I T E P L A N

Aerial View Proposed Site Plan

S I T E W O R K S P R O P O S E D D E S I G N C O N C E P T

Page 9: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

28S I T E W O R K S

P R O P O S E D S I T E P L A N

Aerial View Proposed Site Plan

P R O P O S E D D E S I G N C O N C E P T

Page 10: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

29

P R O P O S E D S T A D I U M P L A N

PRIMARY LANDSCAPE SPACES + BUILDINGS=

01 Proposed South Entry Plaza

02 Proposed North Entry Plaza

03 Calvin Falwell Field

04 Proposed Accessible Ramps

05 Proposed New Bathrooms and Concessions

06 Existing Press Box

07 Proposed New Press Boxes

08 Proposed New Video Scoreboard

09 Proposed New Site Fence

10 Proposed Parking for Home Team and Access

to Field House and Storage Area

11 Proposed New Concourse connection be

tween baseball and football stadium

12 Proposed Bathroom/Concessions/Ticket

Booth at South Entry

13 Proposed New Artifi cial Turf/Re Sodded Field

14 Proposed South Entry Gate

15 South Plaza Vehicular Access Gate

01

02

10

03

04

04

05

05

06

06

07

07

08

09

09

11

12

12

13

14

15

FOR

T A

VE

NU

E

P R O P O S E D D E S I G N C O N C E P T

Page 11: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

30

STADIUM SECTION

01 Proposed Entry Gate

02 Proposed South Entry Plaza

03 Existing Press Box

04 Concourse Bathrooms/Concessions

05 Proposed New Press Boxes

06 Field Entrance Tunnel

07 Proposed New Scoreboard

08 Calvin Falwell Field

09 New Accessible Ramp

10 Proposed Connector Concourse

11 Team Locker Rooms

12 Stadium Access Road

S T A D I U M P L A N — S E C T I O N

010306 020507 08091004

04 031011

12

12

P R O P O S E D D E S I G N C O N C E P T

Page 12: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

31

MAIN ENTRY

The proposed new entrance to the stadium will consist of

a large entry gate and canopy intended to create a sense

of arrival. Included in the proposed entry gate will be a

new ticket booth to sever visitors. As part of a strategy to

have stadium services distributed throughout the stadium

on both sides of the new entry will be new bathrooms

facilities and a concession booth. These service will be

available to visitors within the stadium from the proposed

adjacent plaza. Within the plaza will be a new area to

house existing memorial and dedication plaques honoring

those who once played at the stadium.

P R O P O S E D S T A D I U M P L A N

Ground Level at proposed South Entry - Bathrooms, ticket booth and concessions

Aerial View of South Entry

Concessions

Ticket Booth

Men’s RestroomWomen’s

Restroom

Stadium Memorialand Dedication

Women’s Restroom

Women’s Restroom

P R O P O S E D D E S I G N C O N C E P T

Page 13: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

32

CONCOURSE LEVEL

The proposed concourse level located behind the top

row of seating on both sides of the stadium will provide

a great space for people to stretch their legs and to watch

the game. This level will allow attendees to directly access

the bathrooms and concessions. Located at this level will

also be an expanded and enclosed press box space for

use by teams. Also at the concourse level will be new

wheelchair accessible seating areas which the stadium

currently does not have.

Concourse Level Bathrooms and Concessions

S T A D I U M P L A N - S T A D I U M S E R V I C E S

Men’sRestroom

Women’sRestroom

Women’sRestroom Men’s

RestroomConcessions Concessions

Wheelchair Accessible SeatingWheelchair Accessible Seating

Existing Press BoxNew Press Box New Press Box

View at Concourse Level on home team side

Existing Field Lighting Existing Field Lighting

P R O P O S E D D E S I G N C O N C E P T

Page 14: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

33

S T A D I U M P L A N - T E A M S E R V I C E S

GROUND LEVEL

At ground level below the proposed concourse will be the

new team locker facilities. These new facilities will contain

team locker/meeting rooms, showers, and new coaches

and offi cials’ lockers. The new team facilities will connect

directly to the fi eld via a new tunnel allowing teams and

coaches to enter and exit directly onto the fi eld.

Also located at the ground level main entrance will be

additional bathroom facilities along with a concessions

stand and new ticket booth. This new plaza and entry will

provide a great area to view the game and a place to con-

gregate during games.

Ground Level Home Team Locker Rooms

Home Team Lockers

Bathroom/Showers

Field Access Tunnel

Coaches/Offi cials Offi ce

Field Maintenance Storage

View of home side team/stadium support building

P R O P O S E D D E S I G N C O N C E P T

Page 15: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

34

S T A D I U M P L A N - T E A M S E R V I C E S

GROUND LEVEL

At ground level on the visitors side are the same team

facilities as found on the home side of the stadium. Along

with the team facilities there will be a secondary ticket

booth and gate to access the stadium for visitors arriv-

ing at the Stadium from the North Plaza. The proposed

North Plaza will also contain a new bus drop lane which

will allow team members to unload and go directly to

their lockers. The bus drop lane and plaza will also accom-

modate the marching band and cheerleaders arriving on

game day..

Ground Level Visitor’s Side Locker Rooms

View of proposed North Plaza and team/stadium support building.

Visitor Team Lockers

Bathroom/Showers

Field Access Tunnel

Coaches/Offi cials Offi ce

Field Maintenance StorageTicket Booth

Ground Level Visitor Team Locker Rooms

P R O P O S E D D E S I G N C O N C E P T

Page 16: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

35

B A S E B A L L L O C K E R S

GROUND LEVEL

As part of this study we considered what it would take to

include a new baseball team support building on the site.

This new team building would provide new locker rooms

to both home and visitor teams. It would also include

coaches offi ce, offi cials locker rooms, and a new training

area for the team.

CONCOURSE LEVEL

On top of the new baseball team support building would

be an occupiable roof which would act as an extension of

baseball stadium’s concourse. This new concourse exten-

sion would link up to the new football stadium’s con-

course and allow for visitors to view games on both fi elds.

Concourse Level of proposed baseball lockeroom and team building

Ground Level of proposed baseball team locker room

Visitor Team Lockers

Coaches‘Offi ce

Home Team Lockers

Training Room

Coaches‘Offi ce

Home Team Lounge

Trainer’s Offi ce

Offi cials‘Offi ce

Baseball Field

Additional Seating

CONCOURSE

P R O P O S E D D E S I G N C O N C E P T

Page 17: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

36

P H A S I N G + C O S T P R O J E C T I O N S

PHASE 1- MAIN ENTRANCE GATE + HOME SIDE

ADDITION

DURATION : 10-11 Months

CONSTRUCTION COST : $5,473,000

PHASE 1A - MAIN ENTRANCE GATE

Phase 1A of the Lynchburg City Stadium Renovation

would include the construction of the new main entrance

gate and plaza. This will included new bathrooms facili-

ties, concessions, and ticketing as part of the entry. Part of

the front entry will also be a memorial area to house new

plaques commemorating the past players and history of

the stadium. Also part of Phase 1A a new PA system will

be installed in the stadium, replacing the outdated system

currently in place.

PHASE 1B - HOME SIDE ADDITION

Phase 1B construction will include the fi rst accessible

ramp on the south side of the stadium and the new home

side team/stadium support building. A new service en-

trance off of Fort Avenue, at what was the old pedestrian

ticket booth, would also be part of this phase of construc-

tion.

Stand alone items which would also be included in this

phase would be the restoration work associated with

refurbishment of the existing stadium bleachers and the

handrails. Other potential work to be included in this

phase would be adding an artifi cial turf fi eld to the sta-

dium and the addition of a new video scoreboard.

PHASE 1APHASE 1B

P R O P O S E D D E S I G N C O N C E P T

Page 18: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

37

P H A S I N G + C O S T P R O J E C T I O N S

PHASE 2 - VISITOR’S SIDE ADDITION + NORTH

PLAZA/PARKING

DURATION : 8-9 Months

CONSTRUCTION COST : $3,817,000

Phase 2 of the project would include the visitor’s side

team and stadium support building. Also part of phase 2

would be the second accessible route which would take

people from the new entrance plaza to the concourse

and seating. Also part of the Phase 2 work would be the

new north plaza bus drop off area. Connected to this

work would also be the new player and offi cial parking lot

located just behind the baseball stadium outfi eld wall. This

lot will contain 33 parking spaces.

PHASE 2

P R O P O S E D D E S I G N C O N C E P T

Page 19: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

38

P H A S I N G + C O S T P R O J E C T I O N S

PHASE 3A - PARKING ON HUMANE SOCIETY SITE

DURATION : 2-3 Months

CONSTRUCTION COST : $932,900

Phase 3A of the project would provide new parking to

the stadium and baseball fi eld. Located on the former

Humane Society site, this new parking lot would add 143

new parking spots to the park.

PHASE 3B - STADIUM PARKING

DURATION : 5-6 Months

CONSTRUCTION COST : $1,919,500

Phase 3B work would include the renovation of the exist-

ing parking lot that currently exists on the south end

of the site and serves as the main lot for events at the

stadium. The total parking spots in this area when work is

done will be 341.PHASE 3B

PHASE 3A

P R O P O S E D D E S I G N C O N C E P T

Page 20: PROPOSED DESIGN CONCEPT · 02 SITEWORKS PROPOSED SITE PLAN PROPOSED DESIGN CONCEPT. 25 CITY STADIUM SOUTHSIDE - MAIN ENTRY & PARKING 01 South Entry with new entry plaza, improved

39

P H A S I N G + C O S T P R O J E C T I O N S

PHASE 4 - NORTH SIDE PARK

DURATION : 3-4 Months

CONSTRUCTION COST : $820,500

The fi nal portion of the work will be complete in Phase 4

which will address the Northern most corner of the site.

Currently on the site in this area is the remnant of a road

which originally served as a car entrance to the site from

the intersection of Fort. Ave. and Wythe Road. This new

park will be both an amenity to the neighborhood and a

place to gather and tail-gate before games at the stadium.

PHASE 4

P R O P O S E D D E S I G N C O N C E P T