A Kitchen Management Project By Grant Klover. Proposed Changes for NECI on Main. The Project Goals of the Project The Idea Pros Cons Old and New Floor Plans Cost Projected Sales Further Improvements Plan to Phase in Conclusion. Table of contents. - PowerPoint PPT Presentation

Citation preview

Page 1: Proposed Changes for  NECI on Main

1

PROPOSED CHANGES FOR NECI ON MAIN

A Kitchen Management ProjectByGrant Klover

Page 2: Proposed Changes for  NECI on Main

2

TABLE OF CONTENTS The Project Goals of the Project The Idea Pros Cons Old and New Floor Plans Cost Projected Sales Further Improvements Plan to Phase in Conclusion

Page 3: Proposed Changes for  NECI on Main

3

THE PROJECT NECI on Main Restaurant Redesign.

Students will work with Kevin O’Donnell and Esteban Guevara with a budget of $100,000; on exploring the feasibility of moving the bar from the Chefs Table down to the main floor of NECI on Main, and creating a more open design for the Chefs Table as an event focused dining space. This creates possibilities for swapping Tapas and Farm to Table Dining locations and may have kitchen implications.

Page 4: Proposed Changes for  NECI on Main

4

GOALS OF THE PROJECT To come up with an idea that will present the

best solution to fit within the following criteria: Educational Impact Sales (potential) Volume (potential) Demand (potential) Staffing (will staffing needs change or stay the

same) Diversity/ flexibility Catering

Page 5: Proposed Changes for  NECI on Main

5

THE IDEA1. Move the Bar down from Chef’s Table

to the Main Floor2. Fill the hole between the Main Floor

and Basement3. Switch service of Tapas to the Main

Floor and Farm to Table to the Basement

4. Remodel Chef’s Table to be a more open catering space

Page 6: Proposed Changes for  NECI on Main

6

PROS Opens up CT to bigger catering/ meeting events The demand for F2T would be “artificially” increased

because of less seats Tapas has the potential to do 53% more business

because of gaining more seats Filling the hole between floors gives a greater

separation of space by helping decrease the noise level between floors

Because of bar placement the main floor will potentially look busier from the outside

Farm to Table would be more intimate/private dining Remodel’s attract new attention from the general

public

Page 7: Proposed Changes for  NECI on Main

7

CONS The market may not support a “white table cloth” or

a higher average check for Farm to Table The basement will discourage large parties from

eating Farm to Table, as it is harder to accommodate them

Farm to Table will be “hidden” like Tapas is now and could see a decrease in business

Construction on the main floor and filling the hole between floors would cause the restaurant to close

Potential for confusion with long time guests if not marketed correctly

Unless it is marketed better Catering currently doesn’t have the business to support a remodel

Page 8: Proposed Changes for  NECI on Main

8

CURRENT NOM FLOOR PLAN

Page 9: Proposed Changes for  NECI on Main

9

NEW NOM FLOOR PLAN

Page 10: Proposed Changes for  NECI on Main

10

CURRENT CT FLOOR PLAN

Page 11: Proposed Changes for  NECI on Main

11

NEW CT FLOOR PLAN

Page 12: Proposed Changes for  NECI on Main

12

COST All cost are Estimated Projections given to us by Eric

Seidel: Move the Bar down from Chef’s Table to the Main Floor

($25-30,000) This does not include an estimate on new carpeting or any other

décor changes Fill the hole between the Main Floor and Basement ( about

$10,000) Even if filling the hole only grants the main floor an additional 5

seats it would only take 87 turns at Tapas current check average of $23 to have this project pay for itself.

Remodel Chef’s Table to be a more open catering space ($5-10,000)

Once again this does not include an estimate for carpeting or décor changes

Page 13: Proposed Changes for  NECI on Main

13

PROJECTED SALES

           

  Current        

    Covers Avg check Sales  

  F2T 75 seats 1744  $    26.07   $    45,466.08   

  Tapas 40 seats 1170  $    23.54   $    27,541.80   

  Total  2914    $    73,007.88   

           

           

  Flip Flop        

    Covers Avg check Sales  

  F2T 40 seats 802  $    26.07   $    20,914.40   

  Tapas 75 seats 2208  $    23.54   $    51,965.66   

  Total  3010    $    72,880.06   

           

           

  F2T $29 Check avg      

    Covers Avg check Sales  

  F2T 40 seats 802  $    29.00   $    23,258.00   

  Tapas 75 seats 2208  $    23.54   $    51,976.32   

  Total  3010    $    75,234.32   

           

  F2T $30 check avg      

    Covers Avg check Sales  

  F2T 40 seats 802  $    30.00   $    24,060.00   

  Tapas 75 seats 2208  $    23.54   $    51,976.32   

  Total  3010    $    76,036.32   

           

 F2T $32 check 

avg        

    Covers Avg check Sales  

  F2T 40 seats 802  $    32.00   $    25,664.00   

  Tapas 75 seats 2208  $    23.54   $    51,976.32   

  Total  3010    $    77,640.32   

           

• These Charts are based on a 5 month average from October 2011, and the previous 4 months of 2012 (Jan, Feb, March, and April)

Page 14: Proposed Changes for  NECI on Main

14

FURTHER IMPROVEMENTS Build a catering/finishing kitchen

upstairs (2nd floor) If F2T is showing profitable sales,

switch where F2T and catering/meetings events are located This gives F2T more seats and it’s own

entrance so it can be a stand alone restaurant

Weatherize Patio for year round service

Page 15: Proposed Changes for  NECI on Main

15

PLAN TO PHASE IN: Phase 1 (minimum cost of $50k)

Switch what floor Tapas & F2T are served on (“free”) Move the CT bar down to the main Floor into the space marked “CT Bar” in the

above picture ($30k) Fill the hole between the main floor and basement ($10K)

This would be a great time to make any changes to carpet/ wall paint and also buy high-top tables (this can be taken out of the “un-budgeted” $50K)

Remodel CT to be a completely open floor plan (+/- $10k) Total Cost of Phase 1 ≈ $50,000

Phase 2 (minimum cost of $20K) If F2T is showing success with less seats at a higher average check in the

basement, Move F2T up to CT Build Catering/Finishing Kitchen in one of the office upstairs. (With no hood

system $10K. With a hood system $20K. This does not account for any ovens or hot-boxes that may need to be bought.)

Move Catering/ meetings from CT down to the Basement Total Cost of Phase 1 & 2 ≈ $70,000

Phase 3 (+/- $5-10K) Weatherize the patio to be used for year round seating (+/- $5-10K)

Total Cost of All 3 Phases ≈ $80,000

Page 16: Proposed Changes for  NECI on Main

16

CONCLUSION Without any construction the projected sales support switching what

floor Farm to Table and Tapas are served on This idea puts the bar in CT to a better use then it is currently being

used for, while opening up CT to be a more flexible catering/meeting space.

Based on the information given in this presentation we feel that the idea presented would be both practical and a worthwhile investment.

We are only using half of our budget to implement the first phase of the idea, leaving the other half to be used for things like: New Carpeting Décor High-top tables Paint Inventory for new bar Phase 2 & 3