1
DEC '18 PROPOSED ELEVATIONS 3D VIEWS PROPOSED RE-DEVELOPMENT OF THE PRESBYTERIAN CHURCH 18-121 GH P04 SCALE TITLE PROJECT CLIENT PROJECT NO. DRAWN DATE REV. NO. DRG. NO. GUYSMERE SITE, CASTLEROCK William Shannon Architect + T H E G U Y S M E R E C E N T R E DINING LOUNGES KITCHEN CAFE BALCONY LOUNGES MAIN ENTRANCE 2 STOREY BEDROOM ACCOMODATION FIRE ESCAPE PROPOSED BEACH ELEVATION PROPOSED ENTRANCE ELEVATION PROPOSED ENTRANCE PROPOSED BEACH ELEVATION PROPOSED CAFE / ENTRANCE

PROPOSED BEACH ELEVATION - Microsoftbtckstorage.blob.core.windows.net/site16196/GuysmereP04...GUYSMERE SITE, CASTLEROCK William Shannon Architect + T H E G U Y S M E R E C E N T R

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROPOSED BEACH ELEVATION - Microsoftbtckstorage.blob.core.windows.net/site16196/GuysmereP04...GUYSMERE SITE, CASTLEROCK William Shannon Architect + T H E G U Y S M E R E C E N T R

DEC '18

PROPOSED ELEVATIONS 3D VIEWS

PROPOSED RE-DEVELOPMENT OF THE

PRESBYTERIAN CHURCH

18-121 GH

P04

SCALE

TITLE

PROJECT

CLIENT

PROJECT NO. DRAWN

DATE REV. NO.DRG. NO.

GUYSMERE SITE, CASTLEROCK

William Shannon Architect+

T H E G U Y S M E R E C E N T R E

DINING LOUNGES KITCHEN CAFEBALCONY

LOUNGES MAIN ENTRANCE 2 STOREY BEDROOM ACCOMODATION FIRE ESCAPE

PROPOSED BEACH ELEVATION

PROPOSED ENTRANCE ELEVATION

PROPOSED ENTRANCE

PROPOSED BEACH ELEVATION

PROPOSED CAFE / ENTRANCE