79
1 Proposed Basin Plan Amendment for Control of Discharge of Diazinon and Chlorpyrifos Into the San Joaquin River CEQA Scoping Meeting and Public Workshop January 19, 2005

Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

1

Proposed Basin Plan Amendment for Control of Discharge of Diazinon

and Chlorpyrifos Into the San Joaquin River

CEQA Scoping Meeting and Public WorkshopJanuary 19, 2005

Page 2: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

2

Introductions

• Les Grober, Chief, San Joaquin River TMDL Unit

• Diane Beaulaurier, Environmental Scientist, San Joaquin River TMDL Unit

• Joe Karkoski, Pesticide TMDL Coordinator

Page 3: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

3

Agenda• Introduction (5 min)• Background (15 min)• Alternative Water Quality Standards (15 min)• Implementation Alternatives (10 min)• Break (15 min)• Proposed Recommendations (25 min)• Summary and Next Steps (10 min)• Time for Questions at end of each section

Page 4: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

4

MonitoringAssessment

Planning

Implementation

Evaluation

WQOs and Loads met!

•Monitoring Results•Management Plans

CWA 303(d)Listed 1994

•Beneficial Uses•WQ Objectives•TMDLs•Implementation Plan

•Waivers•WDRs•Prohibition

Where are we in the process?

Special Studies

Page 5: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

5

Where are we in the process?

Estimated 2006USEPA Approval

Estimated 2006Office of Administrative Law Approval

Estimated 2005State Board Approval

August 2005Regional Board Hearing

April-June 2005Staff or Regional Board Workshop

January 2005CEQA Scoping Meeting

Jan-Feb 2005Draft BPA Staff Report to Peer Review

Nov 2000-Sept 20026 Workshops – TMDL Elements

August 2000Initial outreach of OP Pesticide TMDL

Page 6: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

6

Scope of CEQA Analysis

• Staff presentation of alternatives• Public comments on scope of this

TMDL and alternatives considered

Page 7: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

7

Questions?

Page 8: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

8

Background

Diane Beaulaurier

Page 9: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

9

Background

• Project area• Legal requirements, regulations

and policies• Water quality impairment and

sources

Page 10: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

10

Project Area for Organophosphorus Pesticide (OP) Pesticide TMDL

San Joaquin River

Stanislaus River

Tuolumne River

Merced River

Salt Slough

Mud Slough

Modesto

Patterson

Vernalis

Mendota Dam

Orestimba Creek Stevinson

Note: TMDL is for mainstem San Joaquin River only

Page 11: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

11

SJR Watershed

• 13,500 square mile drainage area• 3 Major east-side tributaries• 5 Minor west-side tributaries• Extensive agricultural land use

Page 12: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

12

303(d) Listing

• 1994 Listing under Section 303d Clean Water Act

• 130 miles from Mendota Dam to Airport Way Bridge near Vernalis

• Aquatic invertebrate toxicity– Aquatic invertebrates are base of food web– Aquatic life beneficial use not supported

• High OP concentrations year round– Dormant Season (December through February)– Irrigation Season (March through September)

Page 13: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

13

Legal Requirements• Federal Clean Water Act requires TMDLs for

impaired waters [303(d) listed]• State Water Quality Act (Porter-Cologne)

requires implementation program for TMDLs; implementation program is contained in the Basin Plan Amendment

• OP Pesticide TMDL will meet these legal obligations, and is designed to restore aquatic life beneficial use

Page 14: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

14

Policies

• Regional Board Policies– Controllable Factors– Water Quality Limited Segment– Antidegradation– Watershed– Application of Water Quality

Objectives

Page 15: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

15

Policies

• State Board Policies– Implementation and Enforcement of

NPS Pollution Program– Water Quality Control– Maintain High Quality of Water– Management Agency Agreement

(MAA) with California Department of Pesticide regulation (DPR)

Page 16: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

16

U. S. EPA / CDPR Regulatory Actions

• U.S.EPA and DPR have primary regulatory authority of pesticides

• U.S.EPA re-registrations for all OPs• DPR developing dormant spray

regulations• DPR label changes for diazinon in place

(CA)• DPR re-evaluation of diazinon and

chlorpyrifos initiated

Page 17: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

17

Sources of Diazinon and Chlorpyrifos

• Stormwater runoff (dormant season)• Irrigation runoff (irrigation season)• Both agricultural and urban sources;

agriculture is major source; use has been decreasing

• Most urban uses ended effective 12/31/2004 (USEPA re-registrations)

Page 18: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

18

Page 19: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

19

Page 20: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

20

Page 21: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

21

Page 22: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

22

Irrigation Season Use

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

Pest

icid

e Us

e in

Pou

nds

1995 1996 1997 1998 1999 2000 2001 2002

ChlorpyrifosDiazinon

Source: California Department of Pesticide Regulation’s Pesticide Use Reports

Page 23: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

23

Dormant Season Use

0

10,000

20,000

30,000

40,000

50,000

60,000

Pest

icid

e Us

e in

Pou

nds

1995 1996 1997 1998 1999 2000 2001 2002

ChlorpyrifosDiazinon

Source: California Department of Pesticide Regulation’s Pesticide Use Reports

Page 24: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

24

Questions?

Page 25: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

25

Basin Plan Amendment Alternatives

Diane Beaulaurier

Page 26: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

26

Basin Plan Amendment Elements

• Introduction• Water Quality Standards

–Beneficial Uses–Water Quality Objectives

• Program of Implementation

Page 27: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

27

Basin Plan Introduction

• Alternatives– No Change– Add descriptions of subareas, and

correct inaccurate description of planning boundary between San Joaquin and Tulare Lake Basins

Page 28: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

28

Beneficial Use Alternatives

• Determine most sensitive use• No change to Aquatic Life use• Add new use• Modify existing use

Page 29: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

29

Narrative Objective is “No Toxics in Toxic Amounts”

• Toxicity is typically determined using indicator species– Fish– Zooplankton– Phytoplankton

Ceriodaphnia dubia

Page 30: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

30

When Diazinon and Chlorpyrifos Enter Rivers, the Food Pyramid Can Be Disrupted

*Drawings courtesy of UCIPM.

www.ipm.

ucdavis.edu

Page 31: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

31

Water Quality Objectives

• Diazinon alone• Chlorpyrifos alone• Additive toxicity

Page 32: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

32

Water Quality Alternatives for Diazinon

• No change to narrative objective• No diazinon• Propose new water quality objectives

Page 33: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

33

Alternative Water Quality Objectives for Diazinon

INSERT TABLE

Aquatic Life Criteria for Surface Water µµµµg/L CDFG Aquatic Life Criteria for freshwater – 4 day average concentration 0.05 CDFG Aquatic Life Criteria for freshwater – 1 hour maximum concentration 0.08 Recalculated CDFG Aquatic Life Criteria for freshwater – 4 day average concentration

0.10

Recalculated CDFG Aquatic Life Criteria for freshwater – 1 hour maximum concentration

0.16

EPA Draft Aquatic Life Criteria for freshwater – 4 day average concentration 0.10 EPA Draft Aquatic Life Criteria for freshwater – 1 hour maximum concentration 0.10 Australian and New Zealand trigger values (95% protection- based on NOEC) 0.010 Australian and New Zealand trigger values (99% protection – based on NOEC) 0.00003 1/10th Species mean average value (Ceriodaphnia dubia) (Basin Plan) 0.044 Human Health Criteria for Drinking Water USEPA Suggested No Adverse Response Levels (SNARL) for non-cancer toxicity 0.600 California Department of Health Services State Action Level for Toxicity 6.000 National Academy of Sciences SNARL for non-cancer toxicity 14.000 Canadian Environmental Quality Guidelines 20.000 Other - No observed effect concentration on salmon anti-predator response (Scholz, 2000) 0.100

Page 34: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

34

Alternative Water Quality Objectives for Chlorpyrifos

• No change to narrative objective

• No chlorpyrifos• New water quality objectives

Page 35: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

35

Alternative Water Quality Objectives for Chlorpyrifos

Aquatic Life Criteria for Surface Water µµµµg/L CDFG Aquatic Life Criteria for freshwater – 4 day average concentration 0.014 CDFG Aquatic Life Criteria for freshwater – 1 hour maximum concentration 0.02 EPA Draft Aquatic Life Criteria for freshwater – 4 day average concentration 0.041 EPA Draft Aquatic Life Criteria for freshwater – 1 hour maximum concentration 0.083 Canadian Environmental Quality Guidelines 0.0035 Australian and New Zealand trigger values (95% protection based on NOEC) 0.010 Australian and New Zealand trigger values (99% protection based on NOEC) 0.00004 1/10th Species mean average value (Ceriodaphnia dubia) (Basin Plan) 0.006 Human Health Criteria for Drinking Water USEPA Suggested No Adverse Response Levels (SNARL) for non-cancer toxicity 20.000 Canadian Environmental Quality Guidelines 90.000 Agriculture-Livestock Canadian Environmental Quality Guidelines 24.000

Page 36: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

36

Water Quality Additivity Formula

• Additive Toxicity:– Multiple pesticides increase aquatic

toxicity– Must meet existing additivity formula

for pesticides with same toxicity mechanism (e.g. cholinesterase inhibition for OP pesticides)

Page 37: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

37

Water Quality Additivity Formula

0.1CWQO

CC

DWQODC

≤+

where

CD = diazinon concentration in the receiving water.

CC = chlorpyrifos concentration in the receiving water.

WQOD = acute or chronic diazinon water quality objective or criterion.

WQOC = acute or chronic chlorpyrifos water quality objective or criterion.

Page 38: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

38

Questions?

Page 39: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

39

Program of Implementation

Joe Karkoski

Page 40: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

40

Program of Implementation

• Load Limits and Control Actions–Load Allocations–Implementation Alternatives

Page 41: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

41

Load Limits and Allocations

• Allocation of Loading Capacity–Load Allocations to non-point

sources–Waste Load Allocations to point

sources

Page 42: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

42

Page 43: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

43

Available Practices and Technology

• Reduce loads from sources• Pest management practices• Pesticide application practices• Water management practices

Page 44: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

44

Implementation Alternatives

• Conditional Prohibition of Discharge• Waste Discharge Requirements

(WDRs)• Conditional Waiver of WDRs

Page 45: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

45

Scoping Questions?

• Project area?• Water Quality Standards?

–Beneficial use–Water Quality Objectives

• Implementation?

Page 46: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

46

BREAK

Page 47: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

47

Where are we now?

• Upcoming peer review of Draft Report• Draft Recommendations for peer review

– Water Quality Standards– Program of Implementation

• Public comments upon release of Draft Report after peer review

Page 48: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

48

Proposed Recommendations (Peer Review Draft Staff Report)

Page 49: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

49

Introduction Recommendation

• Add descriptions of subareas, and correct inaccurate description of planning boundary between San Joaquin and Tulare Lake Basins

Page 50: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

50

Proposed RecommendationsWater Quality Standards

Diane Beaulaurier

Page 51: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

51

Beneficial Use Recommendation

• Recommendation – No Change

• Aquatic Life use is most sensitive to OP pesticides

Page 52: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

52

Recommended Water Quality Objectives for Diazinon

• No new water quality objective at this time• Propose new water quality targets (TMDL only)

– For diazinon alone:Acute = 0.100 µg/L (Scholz 2000)

– For diazinon in combination with chlorpyrifos:Acute = 0.16 µg/L; Chronic = 0.10 µg /L

(recalculated CDFG criteria)• Future development of WQOs

Page 53: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

53

0.001

0.01

0.1

1

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

San Joaquin River Mainstem Diazinon Concentrations

µg/L

Page 54: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

54

Recommended Water Quality Objectives for Chlorpyrifos

• New Water Quality Objectives(CDFG criteria):

• Acute = 0.025 ug/L• Chronic = 0.014 µg/L

Note: Acute criterion recalculated to two significant figures per US EPA methodology (1985)

Page 55: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

55

0.001

0.01

0.1

1

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

San Joaquin River Mainstem Chlorpyrifos Concentrations

µg/L

Page 56: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

56

Water Quality Additivity Formula

0.1CWQO

CC

DWQODC

≤+

where

CD = diazinon concentration in the receiving water.

CC = chlorpyrifos concentration in the receiving water.

WQOD = acute or chronic diazinon water quality objective or criterion.

WQOC = acute or chronic chlorpyrifos water quality objective or criterion.

Page 57: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

57

0.01

0.1

1

10

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

San Joaquin River Mainstem Additive Toxicity(Diazinon + Chlorpyrifos)

No units

Page 58: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

58

Review Water Quality Standards Recommendations

• Aquatic life beneficial use is most sensitive for OP pesticides

• Establish water quality targets for diazinon

• Establish water quality objectives for chlorpyrifos

• Meet existing additive toxicity formula

Page 59: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

59

Proposed RecommendationsImplementation

Joe Karkoski

Page 60: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

60

Recommended Implementation Alternative

• Two Conditional Prohibitions of Discharge– Dormant season (Dec - Feb)

If objectives or loads exceeded in previous year

– Irrigation season (March – Sept)If objectives or loads exceeded in previous year

Backstop for waiver or WDRs

Page 61: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

61

How would TMDL interface with Ag Waiver?

• Ag waiver expires December 2005• Ag Waiver could be renewed or new waiver

could be developed.• TMDL will assure that either

1. any applicable waiver or WDR will implement WQOs and load allocations, or

2. conditional prohibition of discharge will take effect

Page 62: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

62

Other Proposed Basin Plan Amendment Elements

Joe Karkoski

Page 63: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

63

Other Basin Plan Amendment Elements

• Management Plans• Surveillance and Monitoring• Time Schedule• Economic Analysis

Page 64: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

64

Management Plans

• Dischargers to submit management plans

• Plan will describe actions taken to reduce OP runoff and meet allocations

• Plan may include actions required by state and federal pesticide regulations

• Document link between actions and expected reductions

Page 65: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

65

Management Plans

• Individual dischargers, discharger groups or coalitions could submit plans

• Plan must comply with any applicable WDRs or Waiver

• Regional Board will review and may require revisions

Page 66: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

66

Surveillance and Monitoring

• Determine Success of Amendment• Discharger Ultimately Responsible

Page 67: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

67

Surveillance and Monitoring

• Program Goals– Compliance with Objectives– Compliance with Load Allocations– Effectiveness of Management

Practices– Avoid toxicity from alternative

pesticides

Page 68: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

68

Time Schedule for Compliance

• Time schedules will be needed for:– Compliance with objectives and

allocations– Dormant season prohibition – Irrigation season prohibition– Submission of Management Plans– Monitoring

Page 69: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

69

Economic Analysis

• NPS Discharger Costs– Dormant season practices– Irrigation season practices– Monitoring, planning, evaluation

• NPDES Permittee Costs– Not anticipated due to elimination of urban

uses– Costs if alternatives cause toxicity

Page 70: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

70

Economic Analysis

• Potential sources of financing– Government grants, loans or

appropriations– Surcharge on water– Ad Valorem tax– Fees by drainage management

district– Private financing

Page 71: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

71

Review Program of Implementation

Recommendations• Load limits and control actions• Allocation of loads for point and nonpoint

sources • Two Conditional Prohibitions of Discharge

– Dormant season (December – February)– Irrigation season (March – September)

• Backstop for waiver or WDRs

Page 72: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

72

Questions?

Page 73: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

73

Summary

Les Grober

Page 74: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

74

The Big Ideas:

• Diazinon and chlorpyrifos impair 130 miles of SJR

• Sources are primarily agricultural• Need to avoid causing new impairments• Solutions are available (e.g., Integrated

Pest Management (IPM), management practices, grant funds)

Page 75: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

75

The Big Ideas:• No change to WQOs for diazinon at this

time; use best available information to interpret narrative objective

• Propose CDFG chlorpyrifos criteria as WQOs

• Existing formula for additive toxicity• Conditional prohibitions if objectives or

loads not met, and if not already regulated by waiver or WDRs

Page 76: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

76

Questions?

Page 77: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

77

Next Steps• Draft staff report to be released

March/April• Board Workshop in April or June• Submit comments regarding scope

Page 78: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

78

Next StepsSubmit comments to:

Diane BeaulaurierCVRWQCB11020 Sun Center Drive, #200Rancho Cordova, CA [email protected]

Program info:http://www.waterboards.ca.gov/centralvalley/programs/tmdl/sjrop/

Listserve:http://www.waterboards.ca.gov/lyrisforms/reg5_subscribe.html

Page 79: Proposed Basin Plan Amendment for Control of Discharge of ... · 7 Questions? 8 Background Diane Beaulaurier. 9 Background • Project area ... 2. conditional prohibition of discharge

79