CHAPTER CONTENT
I INTRODUCTION
II PROJECT DESCRIPTION
III BACKGROUND/SITUATION ANALYSIS
IV PROJECT OBJECTIVES
V DESIRED IMPACT AND OUTCOME OF THE PROJECT
VI RISK MANAGEMENT PLAN
VII PROJECT ORGANIZATION AND STAFFING
VIII PROJECT WORK PLAN
IX DETAILED BUDGET REQUIREMENT
X OTHER RELEVANT INFORMATION
XI ATTACHMENTS
8/13/2019 Proposal Water Distribution System, English
3/13
I. INTRODUCTION
Every year as summer approaches, areas around the world grow concerned about seasonal
drought. There are areas where drought is a regular year to year occurrence that lasts longer than just the
summer. Philippines are one of these areas that experiences this season. It can impact crop production
and cause changes to the natural distribution of various species. Distribution of water to a plantationmust be increased drastically to secure food production for future generation. The general approach is to
avoid water loss and to ensure that all distributed water is being utilized by the crop. By this Water
Regulator System, it will help the farmers to fight this season because this system will provide waterneeded for the plant to remain its vitality and maintain the crops yield.
8/13/2019 Proposal Water Distribution System, English
4/13
II. PROJECT DESCRIPTION
Project Title: WATER REGULATOR SYSTEM
Type of Project: AGRICULTURAL AND TECHNOLOGICAL
Project Proponent: CABRERA, LORIEBIE REAL
ROSALES, ELDHIE ANN EGNALIG
Number of Benefits: 100
Project Beneficiaries: FARMERS, OWNERS OF A PLANTATION
Location of Beneficiaries: PHILIPPINES
Date of Implementation/Duration: SEPTEMBER 20, 2013/30 DAYS
Area of Project Implementation: BRGY. BUGAS-BUGAS, MUNICIPALITY OF
PLACER, SURIGAO CITY
Budget Required: Php 21, 215.36
Budget Requested: Php 25, 000.00
8/13/2019 Proposal Water Distribution System, English
5/13
III. BACKGROUND SITUATION/ANALYSIS
Philippines are one of those areas that can experience summer season which may become asdrought season. Shortages in precipitation, changes in evapo transpiration, and reduced ground water
levels can create stress and problem for the crops. To secure our food production for future generations,
the distribution of water to a plantation must be increased drastically as this season experienced. The
Water Regulator System prompted to help the farmers to fight from the damages caused by this season.This device also controls the water flow in a plantation which helps farmers to save water.
8/13/2019 Proposal Water Distribution System, English
6/13
IV. PROJECT OBJECTIVES
To create a system that controls the distribution of water in a plantation. To design a regulator that conserve water and helps to fight the drought experienced by the
country.
STRATEGIES
Prepare all the materials needed. Find location in a plantation to put the pipes and tubes.
8/13/2019 Proposal Water Distribution System, English
7/13
V. DESIRED IMPACT AND OUTCOME OF THE PROJECTThis system has a great effect in our economy. It increases crop yield in spite of experiencing the
seasonal drought. It gives a solution in a continuous increasing demand of the food and to the
improvement, sustainability and efficiency of the agricultural sector. And it also saves water as you start
The following are the specific measures to sustain the system:
System regularly maintained and checked for leaks Nozzles and other applicators regularly calibrated Checked for evenness of application
8/13/2019 Proposal Water Distribution System, English
8/13
VI. RISK MANAGEMENT PLANThere are risk and factors that may hamper or hinder the successful implementation of this
system. One of these is the lack of control over the project team from the decentralization of decision-
making and subsequent ineffective ratification of decisions, there should be an approval rights on all
significant decisions. Another is the large expenditures for the acquisition of the hardware, software,and implementation cost. Otherwise find sponsors for the project to minimize the expenditures. Lastly is
the weather condition, the weather should be good to avoid the delay of implementation and may cause
changes in work plan.
8/13/2019 Proposal Water Distribution System, English
9/13
VII. PROJECT ORAGANIZATION AND STAFFINGOffice/StaffDesignated Responsibilties Contact Person Contact Details
Cabrera, Loriebie Planning Committee Real, Betoy 09075615101
Rosales, Eldhie Ann Programmer Lerio, Jomel 09092751905
Belbes, Jane Designer Belbes, Tanem 09156894523
Clerigo, Jessrich
Electronics, trouble
shooting Erigay, Jade 03175896423
De Mesa, Prince Josh Installer De Mesa, Edelyn 09306458525
8/13/2019 Proposal Water Distribution System, English
10/13
X. PROJECT WORK PLANPHASES
OF THE
PROJECT
(DATE)
ACTIVITIES OUTPUT/TARGET INDICATORS
PERSON
IN
CHARGE
RESOURCES
NEEDEDCOST
Nov. 4, 2013
Canvass and
search for the
needed materials
Decide for the cheapest but
high quality equipmentsMs. Changco Derosa
Engr.Cabrera,
Loriebie
Mr. Tan,Kimbom
Computer, and
Internet
Connection
Php100
Nov. 5, 2013Buy all the
decided materials
Complete all the needed
equipmentsEngr. Donzales, Tom
Engr.Cabrera,
LoriebieMr. Tan,
Kimbom
Engr.Gonzales,
Tom
Computer,Money, and
Internet
Connection
Php20,
000
Nov. 11, 12,2013
Planning andanalyzing Phase
Plan and analyze about the
making of the project toachieve the desired
objectives
Engr. Cabrera, Loriebie
Engr.
Cabrera,Loriebie
Mr. Tan,
KimbomEngr.
Gonzales,
TomMr. Tan,
KeverEngr.
Camus,Rhea
Mr. Kier,
BabyMs. Espina,
Florides
Computer, andInternetConnection, and
Stationery
Php150
PreparationPhase
Prepare all the materials,
place for the constructionand the materials needed in
a project
Mr. Tan Kimbom
8/13/2019 Proposal Water Distribution System, English
11/13
Nov. 13, 30,
2013
Programming the
microcontroller
The farmer will receive adata to her mobile phone
notifies him that water
were reached to its desiredlevel
Engr. Rosales, Eldhie
Ann
Engr.Rosales,
Eldhie Ann
Engr.Cabrera
Computer and
ElectricityPhp200
Construction/Installation on
going
Finish the system
accordingly to its designMr. Kier, Baby
Engr.
Cabrera,LoriebieMr. Tan,
Kimbom
Engr.Gonzales,
TomMr. Tan,
Kever
Engr.
Camus,Rhea
Mr. Kier,
Baby
Ms. Espina,Florides
Plantation,
Water, and
Electricity
Php3,
000
Test the system
if its functionalAchieve all the objectives
Engr. Rosales, Eldhie
Ann
Engr. Led,
Josh
Engr.Cabrera
8/13/2019 Proposal Water Distribution System, English
12/13
I. DETAILED BUDGET REQUIREMENTBudget Line Item Description Amount
NeededProposedSource/s
Tubes, Pipe and
HoseA flexible tubes used to convey water. Php 22,050
Marlyn
HardwareControl and Safety
ValvesPhp 2,100
Mobile Phone Php 699 Prime Hub
Microchip Php 66.36 Alibaba
Stationery Php 100 Uni City
Regular LoadRegular Load in Globe Tattoo USB stick for
Internet Connection.
Php 400 Margarita
TOTAL Php 21,215.36