    CHAPTER CONTENT

    I INTRODUCTION

    II PROJECT DESCRIPTION

    III BACKGROUND/SITUATION ANALYSIS

    IV PROJECT OBJECTIVES

    V DESIRED IMPACT AND OUTCOME OF THE PROJECT

    VI RISK MANAGEMENT PLAN

    VII PROJECT ORGANIZATION AND STAFFING

    VIII PROJECT WORK PLAN

    IX DETAILED BUDGET REQUIREMENT

    X OTHER RELEVANT INFORMATION

    XI ATTACHMENTS

  • 8/13/2019 Proposal Water Distribution System, English

    3/13

    I. INTRODUCTION

    Every year as summer approaches, areas around the world grow concerned about seasonal

    drought. There are areas where drought is a regular year to year occurrence that lasts longer than just the

    summer. Philippines are one of these areas that experiences this season. It can impact crop production

    and cause changes to the natural distribution of various species. Distribution of water to a plantationmust be increased drastically to secure food production for future generation. The general approach is to

    avoid water loss and to ensure that all distributed water is being utilized by the crop. By this Water

    Regulator System, it will help the farmers to fight this season because this system will provide waterneeded for the plant to remain its vitality and maintain the crops yield.

  • 8/13/2019 Proposal Water Distribution System, English

    4/13

    II. PROJECT DESCRIPTION

    Project Title: WATER REGULATOR SYSTEM

    Type of Project: AGRICULTURAL AND TECHNOLOGICAL

    Project Proponent: CABRERA, LORIEBIE REAL

    ROSALES, ELDHIE ANN EGNALIG

    Number of Benefits: 100

    Project Beneficiaries: FARMERS, OWNERS OF A PLANTATION

    Location of Beneficiaries: PHILIPPINES

    Date of Implementation/Duration: SEPTEMBER 20, 2013/30 DAYS

    Area of Project Implementation: BRGY. BUGAS-BUGAS, MUNICIPALITY OF

    PLACER, SURIGAO CITY

    Budget Required: Php 21, 215.36

    Budget Requested: Php 25, 000.00

  • 8/13/2019 Proposal Water Distribution System, English

    5/13

    III. BACKGROUND SITUATION/ANALYSIS

    Philippines are one of those areas that can experience summer season which may become asdrought season. Shortages in precipitation, changes in evapo transpiration, and reduced ground water

    levels can create stress and problem for the crops. To secure our food production for future generations,

    the distribution of water to a plantation must be increased drastically as this season experienced. The

    Water Regulator System prompted to help the farmers to fight from the damages caused by this season.This device also controls the water flow in a plantation which helps farmers to save water.

  • 8/13/2019 Proposal Water Distribution System, English

    6/13

    IV. PROJECT OBJECTIVES

    To create a system that controls the distribution of water in a plantation. To design a regulator that conserve water and helps to fight the drought experienced by the

    country.

    STRATEGIES

    Prepare all the materials needed. Find location in a plantation to put the pipes and tubes.

  • 8/13/2019 Proposal Water Distribution System, English

    7/13

    V. DESIRED IMPACT AND OUTCOME OF THE PROJECTThis system has a great effect in our economy. It increases crop yield in spite of experiencing the

    seasonal drought. It gives a solution in a continuous increasing demand of the food and to the

    improvement, sustainability and efficiency of the agricultural sector. And it also saves water as you start

    The following are the specific measures to sustain the system:

    System regularly maintained and checked for leaks Nozzles and other applicators regularly calibrated Checked for evenness of application

  • 8/13/2019 Proposal Water Distribution System, English

    8/13

    VI. RISK MANAGEMENT PLANThere are risk and factors that may hamper or hinder the successful implementation of this

    system. One of these is the lack of control over the project team from the decentralization of decision-

    making and subsequent ineffective ratification of decisions, there should be an approval rights on all

    significant decisions. Another is the large expenditures for the acquisition of the hardware, software,and implementation cost. Otherwise find sponsors for the project to minimize the expenditures. Lastly is

    the weather condition, the weather should be good to avoid the delay of implementation and may cause

    changes in work plan.

  • 8/13/2019 Proposal Water Distribution System, English

    9/13

    VII. PROJECT ORAGANIZATION AND STAFFINGOffice/StaffDesignated Responsibilties Contact Person Contact Details

    Cabrera, Loriebie Planning Committee Real, Betoy 09075615101

    Rosales, Eldhie Ann Programmer Lerio, Jomel 09092751905

    Belbes, Jane Designer Belbes, Tanem 09156894523

    Clerigo, Jessrich

    Electronics, trouble

    shooting Erigay, Jade 03175896423

    De Mesa, Prince Josh Installer De Mesa, Edelyn 09306458525

  • 8/13/2019 Proposal Water Distribution System, English

    10/13

    X. PROJECT WORK PLANPHASES

    OF THE

    PROJECT

    (DATE)

    ACTIVITIES OUTPUT/TARGET INDICATORS

    PERSON

    IN

    CHARGE

    RESOURCES

    NEEDEDCOST

    Nov. 4, 2013

    Canvass and

    search for the

    needed materials

    Decide for the cheapest but

    high quality equipmentsMs. Changco Derosa

    Engr.Cabrera,

    Loriebie

    Mr. Tan,Kimbom

    Computer, and

    Internet

    Connection

    Php100

    Nov. 5, 2013Buy all the

    decided materials

    Complete all the needed

    equipmentsEngr. Donzales, Tom

    Engr.Cabrera,

    LoriebieMr. Tan,

    Kimbom

    Engr.Gonzales,

    Tom

    Computer,Money, and

    Internet

    Connection

    Php20,

    000

    Nov. 11, 12,2013

    Planning andanalyzing Phase

    Plan and analyze about the

    making of the project toachieve the desired

    objectives

    Engr. Cabrera, Loriebie

    Engr.

    Cabrera,Loriebie

    Mr. Tan,

    KimbomEngr.

    Gonzales,

    TomMr. Tan,

    KeverEngr.

    Camus,Rhea

    Mr. Kier,

    BabyMs. Espina,

    Florides

    Computer, andInternetConnection, and

    Stationery

    Php150

    PreparationPhase

    Prepare all the materials,

    place for the constructionand the materials needed in

    a project

    Mr. Tan Kimbom

  • 8/13/2019 Proposal Water Distribution System, English

    11/13

    Nov. 13, 30,

    2013

    Programming the

    microcontroller

    The farmer will receive adata to her mobile phone

    notifies him that water

    were reached to its desiredlevel

    Engr. Rosales, Eldhie

    Ann

    Engr.Rosales,

    Eldhie Ann

    Engr.Cabrera

    Computer and

    ElectricityPhp200

    Construction/Installation on

    going

    Finish the system

    accordingly to its designMr. Kier, Baby

    Engr.

    Cabrera,LoriebieMr. Tan,

    Kimbom

    Engr.Gonzales,

    TomMr. Tan,

    Kever

    Engr.

    Camus,Rhea

    Mr. Kier,

    Baby

    Ms. Espina,Florides

    Plantation,

    Water, and

    Electricity

    Php3,

    000

    Test the system

    if its functionalAchieve all the objectives

    Engr. Rosales, Eldhie

    Ann

    Engr. Led,

    Josh

    Engr.Cabrera

  • 8/13/2019 Proposal Water Distribution System, English

    12/13

    I. DETAILED BUDGET REQUIREMENTBudget Line Item Description Amount

    NeededProposedSource/s

    Tubes, Pipe and

    HoseA flexible tubes used to convey water. Php 22,050

    Marlyn

    HardwareControl and Safety

    ValvesPhp 2,100

    Mobile Phone Php 699 Prime Hub

    Microchip Php 66.36 Alibaba

    Stationery Php 100 Uni City

    Regular LoadRegular Load in Globe Tattoo USB stick for

    Internet Connection.

    Php 400 Margarita

    TOTAL Php 21,215.36