Proposal Request (attachment to AIA Form G709)
\\cga\Data\Project\14\0744\Admin\07-Construction\05-Forms\02-PR\PR#06-Arcade\pr06-Arcade Columns.docx Page 1 of 2
DESCRIPTION OF WORK
The purpose of the Proposal Request is to price the replacement of the columns at the covered
walkways of the North and South Wings.
CHANGES TO CIVIL DRAWINGS:
Item No 01: Sheet C120
Revise Sheet C120 with the attached full size PDF.
Item No 02: Sheet C150
Revise Sheet C150 with the attached full size PDF.
Item No 03: Sheet C551
Revise Sheet C551 with the attached full size PDF.
CHANGES TO ARCHITECTURAL DRAWINGS:
Item No 01: Sheet A100
Revise Floor Plan to show new columns under existing covered walkway as shown per
the attached full size PDF.
Item No 02: Sheet A200
Revise Roof Plan to show new columns gridlines and to remove fabric structures as
shown per the attached full size PDF. Existing downspout ay courtyard needs to be
relocated. Contractor to verify that proper slope is provided the whole length of the
gutter.
Item No 03: Sheet A300
Revise Building Elevations to show new columns at covered walkways, and remove
fabric structures, and delete existing crawlspace vents as shown per the attached full size
PDF.
Item No 04: Sheet A810
Revise Reflected Ceiling Plan to show existing trimmed 2x beams, new columns and new
beam under cover area per the attached full size PDF. Contractor to price the option of
painting existing soffit and the option of adding new layer of fiber cement soffit
underneath, replace vents and paint.
Item No 05: Sheet A900
Update 3d View as shown per the attached full size PDF.
Add Partial Section as shown per the attached full size PDF
PR No: PR14-0744
Date: January 22, 2016
Project: Great Work Montessori School
Owner: Great Work Inc.
Architect: Cuningham Group
Copy To: File
\\cga\Data\Project\14\0744\Admin\07-Construction\05-Forms\02-PR\PR#06-Arcade\pr06-Arcade Columns.docx Page 2 of 2
CHANGES TO STRUCTURAL DRAWINGS:
Item No 06: S100 Revision made to arcade/courtyard area to incorporate permanent
dropped steel frame below soffit and corresponding shallow pier foundations. Also
added shallow piers to south side of building for new dropped steel frame structure and
embedded steel posts for sign structure on Grids 18 & 19. New section cuts added to
sheet for corresponding new foundations.
Item No 07: S200 Revision made to arcade/courtyard area to incorporate permanent
dropped steel frame below soffit and corresponding shallow pier foundations. Added
dropped steel beams below arcade structures to permanently support framing in these
areas. New section cuts added to sheet for corresponding new framing details. Shade
sails and related plan notes have been removed.
Item No 08: S300 Added details 9, 10, 11 and 12 to sheet to show foundations for new
arcade steel structure, sign foundation at south elevation, as well as connection details of
new dropped steel beams and columns at arcade structures.
ATTACHMENTS:
Civil Sheets: C120, C 150, C551
Architectural Sheets: A100, A200, A300, A810, A900
Structural Sheets: S100, S200, S300.
COMMENTS:
Initiated By: Design Service
� Owner � Architect � Original Scope � Revised Scope
� Contractor � Consulting Engineer
END OF PR 06
©
®
No. Date Description
GREAT WORK MONTESSORI SITE PLAN AT 6015 W. 16TH AVE. LAKEWOOD, COLORADO 80215 / CASE # ZP-15-013
7-10-15 Coord Set
7-17-15 Fire Dept
8-03-15 Civil 1
GREAT WORK MONTESSORI SCHOOL6015 WEST 16TH AVENUE
LAKEWOOD, COLORADO 80214
10-29-15 Civil 2
11-06-15 Civil 3
10-29-15 Civil 2
01-22-16 PR#061
©
®
No. Date Description
GREAT WORK MONTESSORI SITE PLAN AT 6015 W. 16TH AVE. LAKEWOOD, COLORADO 80215 / CASE # ZP-15-013
7-10-15 Coord Set
7-17-15 Fire Dept
8-03-15 Civil 1
GREAT WORK MONTESSORI SCHOOL6015 WEST 16TH AVENUE
LAKEWOOD, COLORADO 80214
10-29-15 Civil 2
11-06-15 Civil 3
01-22-16 PR#061
ONSITE
DETAILS
01-18-16 PR#061
WH
DN
REF
DW
DW
FD
FD
FD
FD
FD
UP
6
AD
300
occ.SF
PER.
1376 SF
120
PRIMARY
75
69 SF
118
TOILET RM 4
occ.SF
PER.
362 SF
115
NAP RM.
12
103 SF
110
BREAK RM.
REF.
LANDING
120A
111
116
115
101
100A
100B
A79026
1
120B
2
3456789
12' - 0" 12' - 0" 8' - 0" 12' - 0" 12' - 0" 8' - 0" 12' - 0" 8' - 5 3/4"
1213141516
A790 23
A79032
1011
A
B
C
D
A79033
12' - 0"
6' -
0"
2' - 1"
2' - 1"
106
10' - 6"
161 SF
116
MUD RM 2
39 SF
119
TOILET RM 5
39 SF
114
TOILET RM 3
64 SF
102
TOILET RM 1
46 SF
103
STORAGE
68 SF
104
HEALTH
130 SF
106
RECEPTION
251 SF
107
OFFICE 1
112 SF
105
HALL
266 SF
108
WORK AREA
24
REF.
19 SF
109
MDF ROOM
E
26 SF
113
UTILITY
349 SF
112
HALL 2
130 SF
101
MUD RM 1
103
102A
102B
104
107
113
114
112
119
109
4' - 1" 3' - 0"
5
A300
6
A30
0
4
A300
1
A300
3
A30
0
1059' - 5 1/4"
1' -
3"
3' -
1 1
/2"
15' - 8 1/4" 11' - 0 1/2" 12' - 7 7/16"
7' - 4 3/8" 9' - 10 7/8"
7' - 11 5/8"
7' -
4"
5' -
0 1
/2"
4' -
9"
2' -
3"
4' - 8"
19' - 6 7/16"
3' -
10
3/8
"
4' -
3 1
/4"
5' -
6"
occ.SF
PER.
709 SF
100
YCC
35 21
A190
1
A190
2
A190
3
A500
1
A600
5
A600
4
31
A790 28
A79030
29
A79027
A790
25
8
A600
A500
3
D.1
1' -
6"
D.1
D.1
1' - 8"
4' - 8"
(E) WOOD POSTBETWEEN OPENINGS,TYP.VERIFY IN FIELD
A790
34
35
A790
A790
36
A79037
EQ
EQ
EQ
EQ
10
A600
4
A900
END OFFULL HEIGHT WALL
2
A00
1
2
A600
3
A600
A5002
1' -
6 1
/4"
11
4"
1
7' -
5 1
/4"
118
1
A900
W W3
3
3
3
3
3
3
3
W W2
3
3
7' - 4 13/16"
1718 19 20 21 22
8' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0"
8 SF
124
WATER HEATER
124
4
4
2' -
0"
3' -
0"
1' - 0"
4"
39
A790
38
A790
HIGH COUNTERL2' - 7 3/8"
1' -
10
5/8
"
2' -
6"
3' -
4 5
/8"
4' - 5 1/8"
7
7
25 26 27 28 29 30
16' - 0" 16' - 0" 16' - 0" 16' - 0"
6
16' - 0" 16' - 0"16' - 0"
5' - 1 7/8"
4' -
6"
4' -
6"
4' - 7 1/4"
(E) DOWNSPOUT,RELOCATED TO THISLOCATION
4"
4"
5' -
0"
2"
100C
8
©
Sheet Number
Sheet Title
Revisions
Consultant
Drawn By:
Comm. No.:
PIC / AIC:
Project Title
Date:
Document Phase:
Checked By:
601 South BroadwaySuite NDenver, C0 80209
Tel: 303 861 1600Fax: 303 861 1602
www.cuningham.com
®
Cuningham GroupArchitecture, Inc.
Copyright by Cuningham Group Architecture, Inc. (All Rights Reserved)
1/2
2/2
016
2:3
1:5
8 P
MC
:\R
evitL
ocal\14
-07
44
_G
rea
tWork
Mo
nte
ssori-C
en
tral_
mS
ala
s. r
vt
July 17, 2015
PR14-0744
Checker
Author
Construction Documents
PH
Great Work MontessoriSchool
Floor Plan
A1002014
N
A100 1/4" = 1'-0"
1 First Floor Plan
Keynote Legend
Key Value Keynote Text
A1 New aluminum storefront door
A2 New aluminum storefront window throughout exceptNorth Wing - North Elevation
A3 24" deep counter with base cabinets. T.O. counter 34"A.F.F.
A4 24" deep counter with base cabinets. T.O. counter 22.5"A.F.F.
A5 New interior ramp with handrails both sides
A9 Existing upper and base cabinets to remain
A10 Undercounter refrigerator
A12 Custom wood cubbies similar to residential cabinets
A16 Washer and Dryer
A18 Floor sink
A19 Partial height partition
A21 Observation window
A24 Existing downspouts
A30 4'X 8' Chalkboard
A31 3' X 8' Tackboard
A33 Existing CMU wall to remain
A34 Full size refrigerator
A35 New wood post, TYP
A37 Chase
A38 Copier by Owner
A39 Floor Access Panel
A40 Refer to Sheet A102 for clerestory windows at Southelevations of North and South wings
A41 Vent Hinged Louver. Refer to Building Elevations SheetA300 for lcoation
A42 Surface Mounted Knox Box
A45 New butcher block where cook top was removed. Cut influshed with counter
A46 Open shelves where double oven was removed. Wood tomatch existing cabinets
A48 Fire extinguisher cabinet
A49 Privacy film glazing
No. Date Description
1 10/14/15 Addednum #01
3 12/18/15 PR04
4 01/07/16 ASI#01
6 01/18/16 PR#07
7 01/20/16 PR#06
8 01/22/16 PR#08
GENERAL NOTES:
1- PROVIDE CORNER GUARDS AT ALL EXTERNAL CORNERS2- TOILET ACCESSORIES (EXCEPT MIRRORS AND GRAB BARS) TO BE PROVIDED BY OWNER,INSTALLED BY GENERAL CONTRACTOR.3- PROVIDE BLOCKING AT WALLS WHERE TOILET ACCESSORIES ARE SHOWN.
A22
A22
A28
A23A23
A23A23
A24
A25
A25
123456789
1213141516
1011
A
B
C
D
E
NORTH WING
SOUTH WING
A26A26
A26
A27
A25
A25
A25
A44
TYP.
A44
TYP.
4
A900
A50
A50
1
A900
1718 19 20 21 22
7
7
7
25 26 27 28 29 30
©
Sheet Number
Sheet Title
Revisions
Consultant
Drawn By:
Comm. No.:
PIC / AIC:
Project Title
Date:
Document Phase:
Checked By:
601 South BroadwaySuite NDenver, C0 80209
Tel: 303 861 1600Fax: 303 861 1602
www.cuningham.com
®
Cuningham GroupArchitecture, Inc.
Copyright by Cuningham Group Architecture, Inc. (All Rights Reserved)
1/2
2/2
016
2:3
2:5
2 P
MC
:\R
evitL
ocal\14
-07
44
_G
rea
tWork
Mo
nte
ssori-C
en
tral_
mS
ala
s. r
vt
July 17, 2015
PR14-0744
Checker
Author
Construction Documents
PH
Great Work MontessoriSchool
Roof Plan
A2002014
A200 1/4" = 1'-0"
1 Roof Level
N
Keynote Legend
Key Value Keynote Text
A22 Existing photovoltaic panels to remain
A23 Sloped asphalt shingles roof
A24 Existing downspouts
A25 Existing gutter
A26 Existing rooftop unit curb to remain. Patch opening
A27 Flat roof area
A28 Parapet wall
A44 Roof penetrations. Refer to Plumbing and Mechanicaldrawings for locations
A50 6" min. batt insulation and vapor barrier at Attic
No. Date Description
7 01/20/16 PR#06
BUILDING SIGN
T ectonic Cop yright 2007 T ectonic Cop yright 2007 T ectonic Cop yright 2007 T ectonic Cop yright 2007 T ectonic Cop yright 2007
Level 10"
12 13
(E) ASPHALT SHINGLE ROOF
BRICK INFILL
(E) PARAPET WALL
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
GL-1
C.1 C.1 C.1.1 C.1 C.1.1 C.1
C.2 C.2 C.2 C.2 C.2 C.2
NEW CONCRETE STEPS
7
Level 10"
BRICK INFILL TO MATCH (E) WALLCONSTRUCTION, TYP.
(E) ASPHALT SHINGLESROOF
(E) PHOTOVOLTAIC PANELS
KNOX BOX #2
5' -
0"
(E) DOWNSPOUTTO BE RELOCATED
(E) DOWNSPOUTTO BE RELOCATED
CUSTOM SIGN
GL-2
GL-2
GL-2
GL-2
GL-2
GL-2GL-2 GL-2
GL-2 GL-2 GL-2 GL-2 GL-2 GL-2 GL-2 GL-2
GL-2
GL-2
GL-2 GL-2 GL-2
GL-2 GL-2
GL-2 GL-2
GL-2
THIS OPENING MAYNEED TO BE SUBDIVIDED.CONTRACTOR TO VERIFY
17 18 19 20 21 22
NEW POSTUNDER (E) COVEREDAREA, TYP OF 6
NEW BEAM
5
2' -
10
"
18' - 0"
Level 10"
A B C DE
(E) SIDING TO BE PAINTED(E) SIDING TO BE PAINTED
Level 10"
1 2 3 4 5 6 7 8 9 10 11
(E) CMU WALL TO BE PAINTED
(E) ASPHALT SHINGLE ROOF(E) VINYL SLIDINGWINDOWS TO REMAIN
10
A600
Level 10"
23456789
Ceiling Level7' - 10 1/8"
(E) ASPHALTSHINGLE ROOF
(E) PHOTOVOLTAICPANELS TO REMAIN
ALUMINUM STOREFRONTDOOR BRICK INFILL TO MATCH
(E) WALL CONSTRUCTION,TYP.
(E) WOOD POSTSBETWEEN OPENINGS,V.I.F. 10
A600
BRICK INFILL
GL-2 GL-2 GL-2 GL-2
GL-2 GL-2 GL-2 GL-2
GL-2 GL-2
GL-2
GL-2 GL-2 GL-2 GL-2 GL-2GL-2 GL-2 GL-2 GL-2
GL-2
GL-2
GL-2
GL-2
GL-2
GL-2
GL-2
GL-2
GL-2
GL-2
GL-2
A.1 C.11 A.1 A.1
A.2.1 C.9 A.2.1 A.2.1
B.1 B.1 B.1 A.1 A.1 A.1 A.1
A.2 A.2 A.2 A.2
A.3
A.4
B.1B.1 B.1 B.1 B.1.1 B.1.1 B.1 B.1
7
Level 10"
ABCD E
5
7
2 1
/8"
5' -
2 1
/2"
4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 1 7/16" V.I.F.
3' - 4"
GATE w/ PANIC HARDWAREOTHER HARDWARE PER GATEMANUFACTURER
V.I.F.
1X4 HORIZONTAL CEDARSLATS
METAL GATE FRAME
4X4 CEDAR POSTS
2"X2"WIRE MESHIN A 1X1 FRAME
1x4 VERTICALCEDAR SLATSATTACHED @ TOPAND BOTTOM METAL CAP
SLOPED FENCE CAP
1x2 CEDAR SLATS ONBOTH SIDES
GALVANIZED SIMPSONPOST BASE
GATE HINGE
MIN
.
1' -
6"
8
A300
3' -
10
3/8
"1
3/4
"
8"
2 1
/4"
4 1
/8"
5
POSTBEYOND
1x4 VERTICALCEDAR SLATS
WIRE MESH
1X FRAME
5' -
2 1
/2"
5
©
Sheet Number
Sheet Title
Revisions
Consultant
Drawn By:
Comm. No.:
PIC / AIC:
Project Title
Date:
Document Phase:
Checked By:
601 South BroadwaySuite NDenver, C0 80209
Tel: 303 861 1600Fax: 303 861 1602
www.cuningham.com
®
Cuningham GroupArchitecture, Inc.
Copyright by Cuningham Group Architecture, Inc. (All Rights Reserved)
1/2
2/2
016
2:3
3:3
8 P
MC
:\R
evitL
ocal\14
-07
44
_G
rea
tWork
Mo
nte
ssori-C
en
tral_
mS
ala
s. r
vt
July 17, 2015
PR14-0744
Checker
Author
Construction Documents
PH
Great Work MontessoriSchool
New Building Elevations
A3002014
A300 1/8" = 1'-0"
1 South Wing - North Elevation
A300 1/8" = 1'-0"
2 South Wing - South Elevation
A300 1/8" = 1'-0"
3 West Elevation
A300 1/8" = 1'-0"
4 North Wing - North Elevation
A300 1/8" = 1'-0"
5 North Wing - South Elevation
A300 1/8" = 1'-0"
6 Main Entry - East Elevation
No. Date Description
5 01/15/16 PR#05
7 01/20/16 PR#06
EXTERIOR PAINTING SCOPE NOTES:
1- EXTERIOR PAINT COLORS TO BE DETERMINED2- TRIM AT FASCIA TO BE PAINTED3- TRIM ABOVE AND BELOW WINDOWS TO BE PAINTED4- 2X MEMBERS AT COVERED AREA TO BE PAINTED5- GUTTERS AND DOWNSPOUTS TO BE PAINTED
A300 1/4" = 1'-0"
7 Fence ElevationA300 1/2" = 1'-0"
8 Fence Detail
123456789
1213141516
LOUVER
1011
A
B
C
D
7' - 9 5/8"
7' - 10 1/8"
7' - 10 1/8"
7' - 10 1/8"
7' - 9 3/4"
7' - 10 1/8"
7' - 10 1/8"
7' - 9 3/4"
7' - 5 1/4"
7' - 8"
7' - 7 3/8"
7' - 7 5/8"
7' - 7 5/8"
7' - 7 5/8"
E
7' - 8 1/4"12' - 0"8' - 0"12' - 0"
7' - 10 1/8"
(E) SKYLIGHT
(E) SKYLIGHT
NEW W8X21 ATGRIDLINES 13, 14, 15, 16
NEW W8X21 ATGRIDLINES 2, 3, 4, 5,6, 8, 9, 10
120
PRIMARY
116
MUD RM 2
118
TOILET RM4
119
TOILET RM5
115
NAP RM.
114
TOILET RM3
110
BREAK RM.
108
WORKAREA
107
OFFICE 1
112 SF
105
HALL
106
RECEPTION
68 SF
104
HEALTH
103
STORAGE102
TOILET RM1
112
HALL 2
113
UTILITY
EQ
EQ
EQ EQ EQ EQ 7' - 6 3/4" EQ EQ 7' - 5 9/16"
8' -
0"
8' -
0"
8' -
0"
EQ
EQ
EQEQ EQ
EQ
19 SF
109
MDF ROOM
101
MUD RM 1
2
A900
EQ
EQ
100
YCC
4
A900
9
A600
11
A600
1
A90017 18 19 20 21
39
A790
38
A790
(E) 2X TO BETRIMMED
NEW POSTSUNDER (E)COVERED AREANEW POST
FOR SIGN
(E) GUTTER TOREMAIN
7
725 26 27 28 29 30(E) 2x TRIMMEDUNDER COVEREDAREA, TYP.
NEW STEEL BEAMUNDER (E) 2x's, TYP.
EQ EQ
EQ
EQ
6' - 0"
8
12" x 12" PARADIGM LED PANEL LIGHT
24" x 24" PARADIGM LED PANEL LIGHT
GYPSUM WALLBOARD CEILING
RECESSED WALL LIGHT (LOW)
WALL SCONCE
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST
ACCESS PANEL
EXTERIOR WALL SCONCE
STRIP LIGHT
©
Sheet Number
Sheet Title
Revisions
Consultant
Drawn By:
Comm. No.:
PIC / AIC:
Project Title
Date:
Document Phase:
Checked By:
601 South BroadwaySuite NDenver, C0 80209
Tel: 303 861 1600Fax: 303 861 1602
www.cuningham.com
®
Cuningham GroupArchitecture, Inc.
Copyright by Cuningham Group Architecture, Inc. (All Rights Reserved)
1/2
2/2
016
2:3
4:1
3 P
MC
:\R
evitL
ocal\14
-07
44
_G
rea
tWork
Mo
nte
ssori-C
en
tral_
mS
ala
s. r
vt
July 17, 2015
PR14-0744
Checker
Author
Construction Documents
PH
Great Work MontessoriSchool
Reflected Ceiling Plan
A8102014
A810 1/4" = 1'-0"
1 Ceiling Plan
NOTES:
1. CONTRACTOR TO VERIFY (E) CEILINGHEIGHTS
2. PROVIDE NEW GYPSUM WALLBOARDCEILING THROUGHOUT.IF EXISTING GYPSUM WALLBOARD CEILINGREMAINS, NEW BULKHEAD MAY RESULTBETWEEN EXISTING CEILINGS
No. Date Description
7 01/20/16 PR#06
8 01/22/16 PR#08
N
T ectonic Cop yright 2007 T ectonic Cop yright 2007 T ectonic Cop yright 2007 T ectonic Cop yright 2007
13NEW W 8X21,PAINTED
5/8" GYPSUM BOARD CEILING
(E) 2X8 AT 16" O.C.
BACKER RODAND PAINTABLE SEALANTEA. SIDE
Level 10"
3456789
Ceiling Level7' - 10 1/8"
25 26 27 28 29
NEW W 8X21 SHOWSBELOW CEILING 1/4"
(E) 2X8 AT 16" O.C.
NEW INSULATION ANDVAPOR BARRIERBETWEENJOISTS
Level 10"
D
Ceiling Level7' - 10 1/8"
(E) 2x's TO BE TRIMMED.ADD 2x TO COVERARCADE BEAMS
(E) GUTTER
NEW BEAM W6X12
NEW 8X4UNDER COVEREDAREA
NEW 8x4 TO MOUNTNEW SIGNAGE
NEW SIGN
©
Sheet Number
Sheet Title
Revisions
Consultant
Drawn By:
Comm. No.:
PIC / AIC:
Project Title
Date:
Document Phase:
Checked By:
601 South BroadwaySuite NDenver, C0 80209
Tel: 303 861 1600Fax: 303 861 1602
www.cuningham.com
®
Cuningham GroupArchitecture, Inc.
Copyright by Cuningham Group Architecture, Inc. (All Rights Reserved)
1/2
2/2
016
2:3
4:3
8 P
MC
:\R
evitL
ocal\14
-07
44
_G
rea
tWork
Mo
nte
ssori-C
en
tral_
mS
ala
s. r
vt
July 17, 2015
PR14-0744
Checker
Author
Construction Documents
PH
Great Work MontessoriSchool
Miscellaneous Details
A9002014
No. Date Description
7 01/20/16 PR#06
A900 1 1/2" = 1'-0"
2 Ceiling Detail 2
A900
3 3D View
A900 1/4" = 1'-0"
4 Shading Sails Elevation
A900 1" = 1'-0"
5 Ceiling Detail 1
A900 1/4" = 1'-0"
1 Section 3
7
7
7
FOUNDATION/FLOOR PLAN1
©
®
7/15/2015 9:31:59 A
MC
:\R
evitLocal\14-0744_G
reatW
orkM
ontessori-C
entral_etandler.rvt
No. Date Description
ANCHOR ENGINEERING, INC.
Consulting Structural Engineers
1 01/20/16 PR#06
ROOF FRAMING PLAN1
©
®
7/15/2015 9:31:59 A
MC
:\R
evitLocal\14-0744_G
reatW
orkM
ontessori-C
entral_etandler.rvt
No. Date Description
ANCHOR ENGINEERING, INC.
Consulting Structural Engineers
1 01/20/16 PR#06
SECTION1
SECTION2 SECTION3 SECTION4 SECTION5
SECTION6SECTION7 SECTION8 SECTION9
SECTION10 SECTION11 SECTION12©
®
7/15/2015 9:31:59 A
MC
:\R
evitLocal\14-0744_G
reatW
orkM
ontessori-C
entral_etandler.rvt
No. Date Description
ANCHOR ENGINEERING, INC.
Consulting Structural Engineers
1 01/20/16 PR#06