Coronet Foods (Pvt.) Ltd. PLOT NO. 55: ROAD NO. I, PHASE III, INDUSTRIAL STATE, HATTAR HARIPUR, KPK, PAKISTAN | 0995- 617551-2 Heat Recovery from Exhaust Flue Gases RESEARCH PROPOSAL REPORT PI: Engr. Asif Sultan, Coronet Foods (Pvt.) Ltd. Co-PI: Dr. Saim Saher, USPCAS-E UET Peshawar Co-PI: Engr. Khalid Mehmood, Coronet Foods (Pvt.) Ltd.

Proposal flue heat recover new

Embed Size (px)

Citation preview

Page 1: Proposal flue heat recover new

Coronet Foods (Pvt.) Ltd. PLOT NO. 55: ROAD NO. I, PHASE III, INDUSTRIAL STATE, HATTAR HARIPUR, KPK, PAKISTAN | 0995-617551-2

Heat Recovery from Exhaust Flue Gases

RESEARCH PROPOSAL REPORT

PI: Engr. Asif Sultan, Coronet Foods (Pvt.) Ltd.

Co-PI: Dr. Saim Saher, USPCAS-E UET Peshawar

Co-PI: Engr. Khalid Mehmood, Coronet Foods (Pvt.) Ltd.

Page 2: Proposal flue heat recover new

PI and Co-PI details

PI:

Engr. Asif Sultan, Shift Engineer Utilities

Renewable energy and Alternative fuel energy expert

Electrical engineer from PAF KIET

Plot No. 55: road No. I, Phase III, Industrial State, Hattar Haripur, KPK, Pakistan

Email: [email protected]

Phone: 0995-617551-2 (173)

Cell: +923333874940

I did my engineering from Karachi institute of Economics & Technology after completing my engineering

I joined R.A Engineering Company as Electrical/Power engineer and now I am in Coronet Foods as

engineer utilities. My areas of interest are R&D on energy, renewable energy, thermal energy and

Electrical Energy Systems.

Co-PI:

Dr. Saim Saher, Assistant Professor and Energy Expert

Materials for Energy Storage and Conversion

U.S.-Pakistan Center for Advanced Studies in Energy (USPCAS-E)

University of Engineering and Technology (UET), Peshawar

New Academic Block, 2nd Floor, University of Engineering and Technology, Peshawar, Khyber Pakhtunkhwa, Pakistan.

Email: s.saher@uetpeshawar

Phone: +92-91-9222089, 9222104

Fax: +92-91-5611159

Recently, Dr. Saim Saher has joined USPCAS-E as Assistant Professor after completing PhD studies in the field of Membrane Engineering. His areas of are renewable energy, energy conservation, innovative solutions for sustainable energy and smart energy systems.

Co-PI:

Engr. Khalid Mehmood, Mechanical Engineer

Coronet Foods (Pvt.) Ltd.

Plot No. 55: road No. I, Phase III, Industrial State, Hattar Haripur, KPK, Pakistan

Email: [email protected]

Page 3: Proposal flue heat recover new

Phone: 0995-617551-2 (183)

Cell: +923325323640

He has done bachelors in mechanical Engineering from Mirpur University of Science & Technology. His

areas of interest are mechanical design, fabrication and analysis.

Executive Summary

Waste heat is heat generated in a process by way of fuel combustion or chemical reaction, which is then

“dumped” into the environment and not reused for useful and economic purposes. The essential fact is

not the amount of heat, but rather its “value”. The mechanism to recover the unused heat depends on

the temperature of the waste heat gases and the economics involved.

This proposal report involved the design and construction of an exhaust flue heat recovery system. The

primary aim of the task is to design and construct a system which will recover 70% of natural gas furnace

ovens waste heat energy and make it useable for water heating purpose. Right now we are wasting this

energy into environment.

Coronet Foods operation depends almost 80% on natural gas and 20% on electricity energy. Food sector

is vital to the state’s economy and striving to keep low operating costs while maintaining clean

environment and energy-efficient operations.

Coronet foods is one of the largest biscuit industries in Pakistan and our production is mainly depends on

Gas. Due to limited resources and low gas pressure of natural gas we are using LPG-natural gas

combination in our plants to fulfill our industrial requirement of plants.

There are various exhaust flue gas stacks in our ovens and the temperature of exhaust is around 200C°-

250C°. We can recover this heat by implementing comprehensive flue gas heat recovery system (FGHRS)

for producing hot water used in production process, washing areas and kitchens. Currently we are

performing this operation from gas geezers.

The heat recovery system is essential to the industry and viable for country economy. The efficiently

recovering of wasted heat in exhaust gases from the furnaces and converting it to useable energy can save

more than 20% of the Pakistan energy resources.

Aim

To investigate the possibility of decreasing the gas consumption of the Coronet foods (Pvt.) Ltd. by

suitably utilizing the waste heat of exhaust gasses produced by natural gas baking ovens, which is at

present directly released to the environment.

Page 4: Proposal flue heat recover new

Objectives

To analyze the waste flue gases from oven’s exhaust.

To recover maximum exhaust waste heat and make it useable energy.

To implement heat recovery system for water heating.

Background

Coronet foods is one of the largest biscuit industries in Pakistan and our production is mainly depends on

Gas. Our company’s operation depends almost 80% on natural gas and 20% on electricity energy. We have

6 biscuits plants and key part of our plant is gas oven. The share of gas section in our utility bill is 80% in

terms of monetary value. Due to limited resources and low gas pressure of natural gas we are using natural

gas in combination with LPG to fulfil plant requirement. Our average monthly consumption of gas is

around 27, 33,72m³ in which 70% is LPG and 30% is natural gas. On the other hand we required huge

amount of hot water in our different areas of production process like mixing areas, washing areas and

kitchens. Our hot water requirement is around 200 gallons/hour and we are using gas geezers for this

operation. These gas geezers is adding the huge amount in our utility bill.

Average natural gas consumption in m³ is around = 156,728 m³ / month

Natural gas per unit cost = 18 / m³ PKR

Average natural gas consumption cost = 282,110,4 PKR / month

Average LPG consumption in Kg is around = 81,150 KG / month

Average LPG consumption in m³ is around = 116,644 m³ / month

LPG per unit cost = 52 / m³ PKR

Average LPG consumption cost = 608,625,0 PKR /month

Total Average Gas consumption in m³ (Natural gas + LPG) = 273,372 m³ / month

Gas consumption per unit cost (LPG + NG) = 33 PKR / m³

Total cost of gas (LPG + NG) = 890,735,4 PKR / month

Importance and application of the project

Waste flue gas heat recovery project is very useful for industrial sector. This system can save more than

20% of gas consumption in most of the industries according to exhaust flew gas temperature and flow

rate. There are many applications of heat recovery project like

Steam generation for stirling power engines

Water pre heating for boilers

Combustion air pre heating for ovens

Water distillation

Page 5: Proposal flue heat recover new

The objective of project is to recycle the exhaust waste flue gases and using recycling heat for heating

water used in production processes. The utilization of wasted heat will lower 10% to 25% of production

cost.

Technical details

Fuel composition – The initial fuel composition directly affects the ultimate composition of combustion

products and the amount of heat released into heating system. In general, with all other conditions

remaining the same, flues containing higher carbon monoxide and hydrogen would have lower available

heat, most fossil fuels are combusted with ambient air (as differentiated from combustion with pure

oxygen).

Since ambient air contains about 76% volume gaseous nitrogen (N2), which is essentially non-

combustible, the largest part of the flue gas from most fossil-fuel combustion is un-combusted nitrogen

and the least part of Carbon dioxide (CO2). The next largest part of flue gas can be as much as 10−25%

volume.

Flue Gas Losses

Waste heat losses means energy is emitted in unused form into the atmosphere. And this loss is greater

and the hotter the flue gas leaves the heat generator. The stack temperature should be as low as possible.

However, it should not be so low that water vapor in the exhaust condenses on the stack walls. This is

important in fuels containing significant Sulphur and low temperature can lead to Sulphur dew point

corrosion. Stack temperatures greater than 150°C indicates potential for recovery of waste heat. We can

use flue gas heat for preheating of ovens that will cause temperature drop in flue gas exhaust. If

temperature of exhaust is above to 150°C we can use this flue heat for water heating.

1 m3 natural gas needs about 10 m3 air (Stoichiometric Combustion)

Page 6: Proposal flue heat recover new

So for every m3 natural gas we produce 11 m3 flue gas

Natural Gas contains = 31.56 MJ / m³

More air, more loss

One m³ of natural gas = 3500 BTU

One KG of LPG = 0.54 m³

1 BTU = 1055 joule

Heat: m. Cp. ∆T

Where: m = mass, Cp = Specific heat and ∆T = temperature difference

Exhaust flue temperature of oven = 250 C°

Fuel temperature = 30 C°

Cp =1

- Flue heat losses per m³ of natural gas = 11 * 1 * (250 – 30) = 2530 kJ

- Our total gas consumption = 273,372 m³ / month

- Average flue gas losses in a month = 691,631 MJ / month

- Average flue gas losses in a month = 655.5 mmbtu / month

- Average flue gas losses in an hour = 900,000 btu / hour

- Average flue gas losses in one minute = 15,000 btu / min

Line losses, air mixture in LPG losses and LPG re-filling pump losses are not considered in all above calculations.

Flue gas heat Recovery

A Btu is defined as the amount of heat required to raise the temperature of one pound of water one

degree Fahrenheit.

If we change the temperature 1 gallon of water from 12C°or 55°F to to 40C°or 105°F then

The amount of heat required = Water Volume (lb) x Temperature rise (°F) x 1 Btu/lb°F

Water Volume (lb) = 1 gal/min x 1 min x 8.34 lb/gal = 8.34 lb

Temperature rise from 50°F to 105°F = 55°F

-The amount of heat required = 8.34 lb x 55°F = 458btu (BTU required to raise 1 gallon of 12C° water up

to 40C° in one minute)

- Our flue gas losses is 15000 btu / min, and the required btu to raise 1 gallon of 12C° water up to 40C°

in one minute is 458 btu /min.

Page 7: Proposal flue heat recover new

- So we can recover this flue loses to heating water = 15000 btu / 458 btu = 32.7 gallon / min and 1962

gallons / hour.

We are wasting 655.5 mmbtu flue gases in a month into environment which is equal to 18,728m³ ideally

Savings

Our hot water requirement is 200 gallon / hour, for this purpose we are using gas geezers.

The amount of heat required = Water Volume (lb) x Temperature rise (°F) x 1 Btu/lb°F

Water Volume (lb) = 3.3 gal/min x 60 min x 8.34 lb/gal = 1651.3 lb

Temperature rise from 50°F to 105°F = 55°F

The amount of heat required = 1651.3 lb x 55°F = 90821.5 (BTU required to raise 3.3 gallons of

12C° water up to 40C° in one hour)

- If the gas water geezers efficiency is 50%, then there would (90821.5 /.50) = 181,643 btus required

- Water geezers gas consumption per hour = 181643btu / 3500btu = 51m³ / hour

- Water geezer gas consumption per month = 36,720m³ / month

- One m³ cost of gas (LPG + NG) = 33 PKR / m³.

- Gas consumption cost per month = 36720 * 33 = 121, 176,0 PKR / month

Currently we are investing this amount only for water heating. After installation of heat recovery system we would save every month.

Heat Exchanger for waste flue gases heat

The 130 °C limit for economizers makes sense even though the complete thermal energy is not utilized in

this way. In this case the flue gas does not cool down on the way to the top of the stack to such an extent

that the temperature drops below the dew point and the water vapor in the flue gas condenses. This

would have fatal consequences, i.e. corrosion in the entire flue gas system. Things are different with

stainless steel. This material is resistant to corrosion. If the economizer and the flue gas system are made

of stainless steel, the flue gas temperature can therefore be substantially further reduced. This is referred

to as “condensing appliance technology”. The condensing appliance technology is of particular interest if

a great deal of fresh water or process water has to be heated up. In other words, the lower the flue gas

temperature can be reduced, the more efficient the condensing appliance technology. The function of the

condensing heat exchanger corresponds to that of the economizer, the big difference being that here the

flue gas can be cooled down much more. This technology is advantageous especially with fuels that

contain a great deal of hydrogen (e.g. natural gas) because the water vapour in the flue gas begins to

condense at higher temperatures (in the case of natural gas, for example, at 58 °C) and thus releases its

energy at an early stage.

Page 8: Proposal flue heat recover new

Construction

A heat pipe is a metal tube, sealed at both ends with a vacuum inside, filled with a small quantity of fluid.

The fluid used depends upon the required working temperature range of the heat pipe. The working

temperature range with a water fill is 80ºC to 320ºC which will meet over 90% of application

requirements.

The metal used for the heat pipe construction depends upon the application and most common materials

are:

• Copper

• Carbon steel

• Stainless steel (AISI 304 and AISI 316)

• Aluminum

Potential for commercialization

Food processing industry of Pakistan will be the beneficial of our heat recovery system. At first stage the

Coronet Foods, a biscuit manufacturing company will be the end user of heat recovery project. Expert

machinery is a company which will implement this heat recovery project in Coronet Foods with the help

of research team.

The cost of this heat recovery project is 239, 850,0 PKR.

For maximum heat recovery from the flue

gases use condensing appliance technology.

Page 9: Proposal flue heat recover new

This heat recovery project will save 121,1760 PKR / month ideally and system cost will be recovered in

60 working days.

This heat recovery project will save 969,408 PKR / month at 80% efficiency and system cost will be

recovered in 72 working days.

This heat recovery project will save 484,704 PKR / month at 40% efficiency and system cost will be

recovered in 147 working days.

Research plan:

Work packages (WP), Tasks (T), Milestone (M) and Deliverables (D)

Work Packages & Related Tasks Milestones & Deliverables 1st Year

Q1 Q2 Q3 Q4

WP1: Design and material procurement

T1.1: Design of equipment M1.1: Fluid flow analysis M1.2: Structure design and analysis M1.3: Material procurement D1.1. Report on equipment design

T1.2: Procurement of material

WP2: Material processing

T2.1: Bending, drawing and machining of parts

M2.1: Material processing, for example: bending, drawing and machining of parts M2.2: Initial fitting check of parts D2.1: Report on material processing

T2.2: Fitting check of parts

WP3: Assembly and installation of equipment

T3.1: Assembly of equipment M3.1: Assembly of heat recovery system at workshop M3.2: Installation of heat recovery system in plant D6.1: Internal dissemination of knowledge D6.2: Dissemination through papers in specialized high impact scientific journals D6.3: Participation in knowledge transfer events (national and international conferences, seminars) D6.4: Master Theses D6.5: International patent applications (if any)

T3.2: Installation of equipment in plant

T3.3: Training and education of young researchers

T3.4: Dissemination of knowledge through scientific publications, conference presentations and IPR protection (international patent application)

Page 10: Proposal flue heat recover new

Budget allocation:

Cost Categories Total Allocation

Remuneration to PI (Coronet) [12 month] Rs. 30,000/month

Remuneration to Co-PI #1 (Coronet) [12 month] Rs. 30,000/month

Remuneration to Co-PI #2 (USPCAS-E UET Peshawar) [12 month] Rs. 30,000/month

Studentships: MS/M. Phil. Student (01) [12 month] Rs. 20,000/month

Design cost Heat exchanger fluid flow analysis Heat exchanger structure design and analysis

Rs. 200,000/-

Material cost Consumables: Metal pipes, metal sheets, welding rods, soldering metal, sealing material, fasteners

Rs. 450,000/-

Equipment, Lab. Supplies Operational hours of metal drawing, bending, machining. Ultrasonic testing of welded and soldered pipes for monitoring of welded and soldering joints.

Rs. 500,000/-

Installation cost of equipment Rs. 300,000/-

Labor cost (matching funds from industry) Labor of Machining shop, process unit, welding and soldering unit, assembly shop

Rs. 300,000/-

Salary of engineers and project team (matching funds from industry) Process engineer (01), 20% of the full salary/month/year Machine shop engineer (01), 20% of the full salary/month/year Account and finance manager (01), 10% of the full salary/month/year Office boy (01), 20% of the full salary/month/year

Rs. 600,000/-

Office and other supplies (matching funds from industry) Rs. 150,000/-

Training of USPCAS-E UET students (matching funds from industry) Rs. 100,000/-

Journals and Conference feeds Rs. 80,000/-

Secretariat staff of CAS-EP and Research Directorate staff involved in the project

Rs. 30,000/-

Supplies Rs. 20,000/-

Audit/Accounts Rs. 30,000/-

Travel (in Pakistan) Rs. 50,000/-

Consultancy charges Rs. 20,000/-

Cost under the budget head of USPCAS-E project proposal Matching funds from Coronet Industry Total cost under the budget head of USPCAS-E + Coronet Industry

Rs. 300,000/- Rs. 115,0000/- Rs. 415,0000/-

Page 11: Proposal flue heat recover new

References

[1] Agriculture and Agri-Food Canada, Departmental Electronic Publications. Heat Recovery for Canadian Food and Beverage Industries. 2001. www.agr.gc.ca/cal/epub/5181e/images/5181e_pic85.gif and www.agr.gc.ca/cal/epub/5181e/5181-0007_e.html

[2] Department of Coal, Government of India. Coal and Industrial Furnaces – Efficient Utilization. 1985

[3] Hardtech Group. www.hardtech.es/hgg_tt_hrt.0.html

[4] King Fahad University of Petroleum & Minerals. 2003. http://faculty.kfupm.edu.sa/me/antar/Shell_Tube/classes/Shell-and-tube.jpg

[5] Petroleum Conservation Research Association (PCRA), Ministry of Petroluem. Fuel Economy in Furnaces and Waste heat recovery. Industrial Booklet 5. 1998. www.pcra.org Reay, D.A. and Span, F.N. Heat Recovery Systems.1979.

[6] Reay, D.A. Low Temperature Waste Heat Recovery in the Process Industry. Good Practice Guide No. 141. 1996.

[7] SADC Energy Sector. Module 15. Heat Recovery Systems. Developed as part of the SADC Industrial Energy Management Project for the Canadian International Development Agency. www.siemp.co.zw/manuals/htm 1999.

[8] Sustainable Energy Authority of Victoria (SEAV), Australia. Best Practice Design, Technology and Management, Module 5. 2004. www.seav.vic.gov.au/ftp/advice/business/info_sheets/HeatRecoveryInfo_0_a.pdf

Page 12: Proposal flue heat recover new

COVER LETTER

December 15, 2015

Asif Sultan, Engineer

Coronet Foods

PLOT NO. 55: ROAD NO. I, PHASE III, INDUSTRIAL STATE, HATTAR HARIPOR, KPK, Pakistan

Dear Deputy Director Projects USPCAS-E UET Peshawar:

I am pleased to submit to you this research proposal for my project, tentatively titled ‘Heat Recovery

from Exhaust Flue Gases.’ This is the joined project of Coronet Foods and Xpert Machinery companies.

The purpose for this research proposal is to request funding from the USPCAS-E UET Peshawar to

complete the project."

If you have any questions or need further assistance, please contact me at 0995-617551-2 (173) or

[email protected]

Sincerely,

Asif Sultan, Engineer, Coronet Foods, Principal Investigator

Dr. Saim, Assistant Professor, USPCAS-E UET Peshawar, Co-Principal Investigator

Khalid Mehmood, Engineer, Coronet Foods, Co-Principal Investigator