PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA 91780 A CONFIDENTIAL REPORT PREPARED FOR IEC Corporation 8795 Folsom Boulevard, Suite 205, Sacramento, CA 95826 916-383-6000 | iec-corporation.com

PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

PROP 39 PROJECT

RECOMMENDATION REPORT REV 2: June 26th, 2015

TEMPLE CITY UNIFIED SCHOOL DISTRICT

9700 Las Tunas Drive, Temple City, CA 91780

A CONFIDENTIAL REPORT PREPARED FOR

IEC Corporation 8795 Folsom Boulevard, Suite 205, Sacramento, CA 95826

916-383-6000 | iec-corporation.com

Page 2: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

Introduction:

Energy Benchmark:

Note 1:

• CEC Energy Savings Calculator (Version 7) used for calculation of Energy Use Intensity (EUI).

EUI Comparison Plot:

Energy benchmarking enables a school site to evaluate their energy performance in terms of annual kBTU per

sq-ft, or Energy Use Intensity (EUI) and use that metric to make comparisons with similar sites. The plot below

presents the EUI found for each site in the Temple City Unified School District.

Prop 39 Project Recommendation Report Prepared: 6/26/2015

IEC Corporation Temple City Unified School District

8795 Folsom Blvd. Suite 205 9700 Las Tunas Drive

This report presents the recommended Prop 39 projects for each Temple City Unified School District site. IEC

conducted energy audits at the seven (7) District sites from Dec 2-5, 2014. The quantity, condition, and

characteristics of site equipment and buildings were surveyed during the audits, and this information was used

in combination with utility bills to assess energy use at the site and evaluate potential energy efficiency

measures using the CEC Energy Savings Calculator (Version 7).

Sacramento, CA 95826 Temple City, CA 91780

916-383-6000 626-548-5000

0 20 40 60 80 100 120 140 160

Longden Elementary School

Emperor Elementary School

Oak Avenue Intermediate School

Cloverly Elementary School

Dr. Doug Sears Learning Center

La Rosa Elementary School

Temple City High School

Energy Use Intensity (EUI) (kBTU/Sq-Ft/Yr)

Page 3: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

Site Name: Cloverly Elementary School

Analysis Summary:

Item SIR Prop 39 Requested Funds

1 0.87 $87,877

2 0.92 $11,146

Total: 0.88 $99,023

Project Funding Breakdown:

Item Rebates Other Total Project Cost

1 $0 $0 $87,877

2 $1,590 $0 $12,736

Total: $1,590 $0 $100,613

• CEC Energy Savings Calculator (Version 7) used for evaluation of energy projects.

Assumptions:

IEC evaluated the 21 energy conservation measures (ECMs) identified in the CEC Energy Savings Calculator for the site. The

table below summarizes the recommended ECMs and provides the associated savings-to-investment ratios (SIRs) and

estimated project costs.

Prepared: 6/26/2015

ECM 19: Install PC power management

software

Temple City Unified School District

9700 Las Tunas Drive

Temple City, CA 91780

626-548-5000

Total 106 desktops on

campus

ECM 11: Replace HVAC unit with high

efficiency unit

(7) 5-ton packaged units

on rooms 1-7

Prop 39 Project Recommendation Report

$99,023 $0

$87,877

IEC Corporation

8795 Folsom Blvd. Suite 205

Sacramento, CA 95826

916-383-6000

Project Description Scope of Work

Prop 39 Requested Funds District Contribution

$11,146

$0

$0

Page 4: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

Site Name: Emperor Elementary School

Analysis Summary:

Item SIR Prop 39 Requested Funds

1 1.30 $1,680

2 0.93 $112,984

3 1.06 $10,831

4 2.79 $392

Total: 0.95 $125,887

Project Funding Breakdown:

Item Rebates Other Total Project Cost

1 $0 $0 $1,680

2 $0 $0 $112,984

3 $1,545 $0 $12,376

4 $100 $0 $492

Total: $1,645 $0 $127,532

• CEC Energy Savings Calculator (Version 7) used for evaluation of energy projects.

• The exterior LED retrofit assumes use of existing lighting controls.

$0

Assumptions:

Prop 39 Requested Funds District Contribution

$10,831 $0

$392 $0

$125,887 $0

$1,680

$112,984

Prepared: 6/26/2015

IEC Corporation Temple City Unified School District

8795 Folsom Blvd. Suite 205 9700 Las Tunas Drive

Sacramento, CA 95826 Temple City, CA 91780

916-383-6000 626-548-5000

Prop 39 Project Recommendation Report

One (1) vending machine

in cafeteria

ECM 20: Install beverage vending machine

misers

$0

Total 103 desktops on

campus

ECM 19: Install PC power management

software

IEC evaluated the 21 energy conservation measures (ECMs) identified in the CEC Energy Savings Calculator for the site. The

table below summarizes the recommended ECMs and provides the associated savings-to-investment ratios (SIRs) and

estimated project costs.

Project Description Scope of Work

ECM 11: Replace HVAC unit with high

efficiency unit

Nine (9) 5-ton packaged

units on rms 1-9

ECM 9: Replace exterior HPS fixtures with LED

One (1) pole-mounted

fixture in the parking lot

Page 5: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

Site Name: La Rosa Elementary School

Analysis Summary:

Item SIR Prop 39 Requested Funds

1 1.37 $1,990

2 1.10 $3,360

3 0.81 $75,323

Total: 0.84 $80,673

Project Funding Breakdown:

Item Rebates Other Total Project Cost

1 $173 $0 $2,163

2 $0 $0 $3,3603 $0 $0 $75,323

Total: $173 $0 $80,846

• CEC Energy Savings Calculator (Version 7) used for evaluation of energy projects.

• The exterior LED retrofit assumes use of existing lighting controls.

Assumptions:

ECM 11: Replace HVAC unit with high

efficiency unit

Six (6) packaged units on

rooms 7-12

ECM 7: Replace 32W T8 lamps with 28W T8

lamps

346 lamps in portables,

front office, MP, etc

ECM 9: Replace exterior HPS fixtures with LED

Four (4) pole-mounted

fixtures in parking lot

Prop 39 Requested Funds District Contribution

$1,990 $0

$3,360 $0

$80,673 $0

$75,323

Prop 39 Project Recommendation Report

$0

IEC evaluated the 21 energy conservation measures (ECMs) identified in the CEC Energy Savings Calculator for the site. The

table below summarizes the recommended ECMs and provides the associated savings-to-investment ratios (SIRs) and

estimated project costs.

Project Description Scope of Work

Prepared: 6/26/2015

IEC Corporation Temple City Unified School District

8795 Folsom Blvd. Suite 205 9700 Las Tunas Drive

Sacramento, CA 95826 Temple City, CA 91780

916-383-6000 626-548-5000

Page 6: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

Site Name: Longden Elementary School

Analysis Summary:

Item SIR Prop 39 Requested Funds

1 2.14 $392

2 1.26 $317,400

Total: 1.27 $317,792

Project Funding Breakdown:

Item Rebates Other Total Project Cost

1 $100 $0 $4922 $0 $0 $502,400

Total: $100 $0 $502,892

• CEC Energy Savings Calculator (Version 7) used for evaluation of energy projects.Assumptions:

$317,792 $185,000

ECM 21: Install Photovoltaic System

120.6 kW-STC-DC solar

rooftop system

$317,400 $185,000

$392 $0

IEC evaluated the 21 energy conservation measures (ECMs) identified in the CEC Energy Savings Calculator for the site. The

table below summarizes the recommended ECMs and provides the associated savings-to-investment ratios (SIRs) and

estimated project costs.

Project Description Scope of Work

Prop 39 Requested Funds District Contribution

ECM 20: Install beverage vending machine

misers

One (1) vending machine

in cafeteria

Prop 39 Project Recommendation Report Prepared: 6/26/2015

IEC Corporation Temple City Unified School District

8795 Folsom Blvd. Suite 205 9700 Las Tunas Drive

Sacramento, CA 95826 Temple City, CA 91780

626-548-5000916-383-6000

Page 7: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

Site Name: Oak Avenue Intermediate School

Analysis Summary:

Item SIR Prop 39 Requested Funds

1 1.28 $5,880

2 0.87 $16,738

3 2.46 $392

Total: 1.00 $23,010

Project Funding Breakdown:

Item Rebates Other Total Project Cost

1 $0 $0 $5,880

2 $0 $0 $16,7383 $100 $0 $492

Total: $100 $0 $23,110

• CEC Energy Savings Calculator (Version 7) used for evaluation of energy projects.

• The exterior LED retrofit assumes use of existing lighting controls.

Assumptions:

ECM 11: Replace HVAC unit with high

efficiency unit

Two (2) 3.5-ton rooftop

units on rooms 401 & 508

ECM 8: Replace exterior mercury vapor

fixtures with LED

Six (6) fixtures in parking

lot,etc

ECM 20: Install beverage vending machine

misers

One (1) vending machine

outside gym

Prop 39 Requested Funds District Contribution

$5,880 $0

$16,738 $0

$392 $0

$23,010

Prop 39 Project Recommendation Report

$0

IEC evaluated the 21 energy conservation measures (ECMs) identified in the CEC Energy Savings Calculator for the site. The

table below summarizes the recommended ECMs and provides the associated savings-to-investment ratios (SIRs) and

estimated project costs.

Project Description Scope of Work

Prepared: 6/26/2015

IEC Corporation Temple City Unified School District

8795 Folsom Blvd. Suite 205 9700 Las Tunas Drive

Sacramento, CA 95826 Temple City, CA 91780

916-383-6000 626-548-5000

Page 8: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

Site Name: Temple City High School

Analysis Summary:

Item SIR Prop 39 Requested Funds

1 1.07 $62,160

2 0.73 $72,450

3 1.08 $2,463

Total: 0.89 $137,073

Project Funding Breakdown:

Item Rebates Other Total Project Cost

1 $0 $0 $62,160

2 $0 $0 $72,450

3 $300 $0 $2,763

Total: $300 $0 $137,373

• CEC Energy Savings Calculator (Version 7) used for evaluation of energy projects.

• The exterior LED retrofit assumes use of existing lighting controls.

IEC evaluated the 21 energy conservation measures (ECMs) identified in the CEC Energy Savings Calculator for the site. The

table below summarizes the recommended ECMs and provides the associated savings-to-investment ratios (SIRs) and

estimated project costs.

Project Description Scope of Work

$72,450 $0

Assumptions:

ECM 20: Install vending machine misers

Six (6) in pool bldg and

rooms 404-409

ECM 8: Replace exterior mercury vapor

fixtures with LED

37 fixtures on tennis

courts and around pool

ECM 11: Replace HVAC unit with high

efficiency unit

Six (6) 5-ton packaged

units on cafeteria, etc

Prop 39 Requested Funds District Contribution

$62,160 $0

$2,463 $0

$137,073 $0

Prop 39 Project Recommendation Report Prepared: 6/26/2015

IEC Corporation Temple City Unified School District

8795 Folsom Blvd. Suite 205 9700 Las Tunas Drive

Sacramento, CA 95826 Temple City, CA 91780

916-383-6000 626-548-5000

Page 9: PROP 39 PROJECT RECOMMENDATION REPORT€¦ · PROP 39 PROJECT RECOMMENDATION REPORT REV 2: June 26th, 2015 TEMPLE CITY UNIFIED SCHOOL DISTRICT 9700 Las Tunas Drive, Temple City, CA

IEC Corporation Temple City Unified School District

8795 Folsom Blvd. Suite 205 9700 Las Tunas Drive

Sacramento, CA 95826 Temple City, CA 91780

916-383-6000 626-548-5000

Conclusion:

District Funding Breakdown:

Prop 39

Requested

Funds

District

Contribution Rebates Other Total Project Cost

$99,023 $0 $1,590 $0 $100,613

$0 $0 $0 $0 $0

$125,887 $0 $1,645 $0 $127,532

$80,673 $0 $173 $0 $80,846

$317,792 $185,000 $100 $0 $502,892

$23,010 $0 $100 $0 $23,110

$137,073 $0 $300 $0 $137,373

Total: $783,458 $185,000 $3,908 $0 $972,366

Project Summary Total:

SIR

0.88

0.00

0.95

0.84

1.27

1.00

0.89

Total: 1.05

RESERVED Program Management/Implementation Funds:

(12% of Years 2-5 Prop 39 Allocation)

Total Proposed Budget for Energy Expenditure Plan:

Oak Avenue Intermediate School

Temple City High School

Site

Cloverly Elementary School

Prop 39 Requested Funds

$99,023

$0

$125,887

Esimated Total 5-Year Prop 39 Allocation

(after IEC Phase I Energy Planning Costs):

Emperor Elementary School

La Rosa Elementary School

Longden Elementary School

Oak Avenue Intermediate School

Temple City High School

Dr. Doug Sears Learning Center

Cloverly Elementary School

Dr. Doug Sears Learning Center

Emperor Elementary School

La Rosa Elementary School

Longden Elementary School

Prop 39 Project Recommendation Report

Site

This report provides energy use benchmarks for the Temple City Unified sites and evaluates the feasibility of the 21 energy

conservation measures identified by the CEC to be the most cost effective for energy savings. The Energy Expenditure Plan

submitted to the CEC for Prop 39 funding will need to present measures that have an overall composite SIR of 1.05 or

greater. Due to the SIR requirement, the District will need to select energy efficiency projects that balance capital costs with

energy savings. For the District, energy efficiency projects should also be prioritized based on the District’s Capital

Improvement Plan and other immediate needs.

Prepared: 6/26/2015

$783,458

$80,673

$317,792

$23,010

$137,073

$916,372

Management Cost

$96,073

Total Cost

$879,531