Upload
phungthuy
View
218
Download
0
Embed Size (px)
Citation preview
Artur WyrwaArtur Wyrwa -- AGHAGH
Promotion of RESPromotion of RES--E E
in the new EU Member in the new EU Member
States States ––the example the example
of Poland of Poland
2
Lecture outlineLecture outline
� EU Context
� RES Support Schemes
� Polish Context
� Evolution of RES-E support system
� Present RES-E support scheme
� Examination
5
EU EU –– RES(E) main documentsRES(E) main documents
•White Paper (RES) 1998
- Strategia rozwoju RES
-CEL: 12% RES (Gross energy consumption)
• Directive 2001/77/EC (RES-E)- Indicative targets for RES-electricity (22%)
- Calls for implementation of RES-E supports schemes
• Directive 2003/30/EC (Biofuels)
- 5.75 % of all petrol and diesel should be bio-fuels by 2010.
• GREEN PAPER 2006
-A European Strategy for Sustainable, Competitive and
Secure Energy
Renewable Energy Road Map
6
Idea Systemu StaIdea Systemu Stałłej Ceny (ej Ceny (FeedFeed--in Tarrifsin Tarrifs))
Podaż
Popyt
Przedsiębiorstwo Energetyczne
CenaGwarantowana
$/kWh
7
Idea Idea RPS RPS -- konkurencjakonkurencja rynkowa produkcji RESrynkowa produkcji RES
Popyt
Rynek Energii
Rynek Certyfikatów
Podaż
Certyfikat
za np.1 kWh
8
9
10
11
Poland & EUPoland & EU--15 Energy Flows in 200015 Energy Flows in 2000
Imports Domestic production
Domestic direct use
Other sectors
(industrial)
Centralized energy transformation
Central. Heat & Power sector
(efficiency = 52,2%)
Sources: EETT2030 Baseline Scenario, EDF Polska, ARE
12
Electricity & gas annual consumption per capitaElectricity & gas annual consumption per capita
08 00016 000
Poland
Austria
Belgium
Denmark
Finland
France
Germany
Greece
Ireland
Italy
Luxembourg
Netherlands
Portugal
Spain
Sweden
UK
Electricity
kWhe/capita/year
0 1 000 2 000 3 000
Gas
Nm3/capita/year
Source: ENERDATA 2001
13
Future Future electricityelectricity demanddemand scenarios scenarios
Source: Polish Energy Policy till 2025(Draft)
Pro GAS
Pro Coal
Efficiency
14
RESRES--E Production in Poland (2004)E Production in Poland (2004)
Gross electric energy production 154, 1 TWh
Total RES capacity installed 1 026,4 MW
Total RES electricity generation 2,8 TWh
15
BAU scenario (Mt CO2)BAU scenario (Mt CO2)
Sources: EDF Polska Environment Workshop; EETT2030; PP2030
EETT 2030
Transport
Tertiary
Residential
Industry
Energy branch
Gas fired systems
CHP & Municipal Plants - Hard coal fired
Power Plants - Hard coal fired
Power Plants - Lignite fired
-10% between 1988-2002
-1%/year from 2010 (UK)
-75% between 2010-2050
-10% between 1988-2002
-1%/year from 2010 (UK)
-75% between 2010-2050
47
8
38
2
368
37
2
364
37
2
34
9
37
3
36
2
33
8
330
47
8
38
2
368
37
2
364
37
2
34
9
37
3
36
2
33
8
330
100
200
300
400
500
600
100
200
300
400
500
600
0
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
0
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
BAU scenario
c.a. 800 Mtc.a. 800 Mtc.a. 800 Mt
Kyoto cap (-6% between 1988-2010) Kyoto cap (-6% between 1988-2010) Kyoto cap (-6% between 1988-2010)
16
RES Support RES Support –– history & presenthistory & present
� 1997 Polish Energy Act
� 1999 First Ordinance (electricity from unconventional sources)
� 2001 Development Strategy of Renewable Energy Sector
- 7.5 % RES in 2010
- 14 % RES in 2020
� 2001 Ordinance of the Minister of Economy on RES Electricity Purchase Obligation ( 2001, amended 2003)
� Acession Treaty: ~ 9 % RES in the total electric energy sale 2010
� 2004 – New Ordinance, guarantee of origin (PEA)
� New situation after October 2005
Primary Energy
17
RESRES--E QuotasE Quotas
18
Present RESPresent RES--E support schemeE support scheme
RES-E
generator
Guarantee of
origin (GoO)
Electricity Local energy
utility
Market
of GoO
certificates
19
Local energy utility is oblige
- to purchase electricity from RES power generators (possessing a license) connected to the grid in its area of activity
- the price of green electricity is equal to the average electricityprice from the previous calendar year
- penalty for incomplance imposed by ERA not lower than theproduct of amount of electricity that utility evaides to buy multipled by the average electricity price on the competetivemarket from the previous year
Present RESPresent RES--E support schemeE support scheme
20
Present RESPresent RES--E support schemeE support scheme
Energy utility that produces or turnovers electricity and sells it to the final consumers is obliged to:
- obtain and present guarantee of origin certificates (to write off) to director of Energy
Regulatory Authority
- pay a subsidary fee respectively to the shortage in GoO C
- a subsidary fee is equal to 240 PLN/MWh (approx. 60 EUR) (and since 2007 is subjected to valorization)
21
Penalty for incompliancePenalty for incompliance
monitoring & control
Grid operator
confirmation of amount of RES electricity introduced
to the grid
Application for the GoO certificate
EnergyRegulatory Authority
validation
Confirmed application
CommodityExchangeMarket (CEM)
Register of GoO and property rights
comunication of
descrepancies
issuing a certificate
refusal of issuing a certificate
Record of certificate in Register of GoO C
Up to 14 days Up to 14 days
22
Accountig Accountig
Obliged entity
NFEP
ERA
Compliance control
CEMApplication for issuing a document
which confirms the amount of
GoO certificates to write offDocument
Payment of subsidary fee
- statement of the amount of total electricity sold to the final consumers
- document from CEM confirming the quantity of GoO C retired
- document confirming the payment of subsidary fee
Document in electronic form
23
Penalty for incompliance Penalty for incompliance
- if energy utility does not present sufficient amount of GoO certificates, then the minimal penalty for incomplianceis calculated from the equation:
Penalty = 1.3 * (Sub. Fee to pay – Sub. Fee paid)
- money goes the budget of the National Fundfor Environment Protection and Water Management and mustbe used to support RES development.
24
Projections of RESProjections of RES--E productionE production
Projected gross energy production [TWh/yr]
Projected final sale [TWh/yr]
Required quotas [%]
RES-E [TWh/yr]
Sources: CEM
25
ConclusionsConclusions
Previous systems were malfunctioning
� unclear rules (double counting)
� not sufficient penalties
� lack of investment into new RES capacity
� only RES-E quotas, no TGC market
New system since October 2005
� obligatory quotas and
� tradable GoO certificates
� subsidary fee (240 PLN) ~ 60 EUR/MWh
� guaranteed RES-E price (130 PLN) ~30 EUR/MWh
� penalties for incompliance
26
Pytania na egzaminPytania na egzamin
1. Rozwój energetyczny a zmiany klimatu.(Zrównoważony rozwój energetyczny)
2. UNFCCC i protokół z Kioto
3. Mechanizmy elastyczne.
4. Mechanizm stałej ceny Renewable Energy Feed-in Tariffs.
5. Mechanizm “zielonych certyfikatów”-RPS.
6. Rozwój sektora LCP w Polsce w świetle Dyrektywy LCP.
7. Rozwój OZE w Polsce (Uwarunkowania Prawne).