Interpretation of Drawings & Specifications
In general, the working details will indicate dimensions, position and kind ofconstruction, and the specifications, qualities and methods. Any workindicated on the working details and not mentioned in the specifications, orvice versa, shall be furnished as though fully set forth in both. Work notparticularly detailed, marked or specified, shall be the same as similar partsthat are detailed, marked or specified. If conflicts occur on drawingsand/or specifications, the most expensive materials or methods will prevail.Should an error appear in the working details or specifications or in workdone by others affecting this work, the Contractor shall notify the Architectat once and in writing. If the Contractor proceeds with the work soaffected without having given such written notice and without receiving thenecessary approval, decision or instructions in writing from the Owner, thenhe shall have no valid claim against the Owner, for the cost of soproceeding and shall make good any resulting damage or defect. No verbalapproval, decision, or instruction shall be valid or be the basis for anyclaim against the Owner, its officers, employees or agents. The foregoingincludes typical errors in the specifications or notational errors in theworking details where the interpretation is doubtful or where the error issufficiently apparent as to place a reasonably prudent contractor on noticethat, should he elect to proceed, he is doing so at his own risk.
Construction shall conform to all applicable codes and regulations.Shop Drawing Note:
When not adressed by division 1 of the specifications, paper formatStructural Shop Drawings shall be submitted in the form of three copiesminimum of each sheet.The purpose of Shop Drawings submittals by the Contractor is todemonstrate to the Structural Engineer that he understands the designconcept by indicating which material he intends to furnish and install, andby detailing the fabrication and installation methods he intends to use on astand alone set of documents. Duplication of design documents for thepurpose of shop drawings is not acceptable.Prior to fabrication, Shop Drawings shall be submitted for review by theStructural Engineer. Shop Drawing submittals shall include, but are notnecessarily limited to, structural steel, reinforcing steel, & glued laminatedbeams.Prior to submission the Contractor shall review all submittals forconformance with the Contract Documents and shall stamp submittals asbeing "Reviewed for Conformance".Shop Drawings submittals processed by the Structural Engineer are notChange Orders.Any detail on the Shop Drawing that deviates from the Contract Documentsshall clearly be marked with the note "This a change".Shop drawings or calculations submitted for review that require resubmittalfor re-review shall be billed hourly for such time to the General Contractor.Re-review will not proceed without written approval from the GeneralContractor for additional engineering review services.
Safety Note:
The contractor shall notify the Architect and Structural Engineer where a conflictor discrepancy occurs between the Structural drawings and any other portion ofthe Contract Documents or existing field conditions. Such notification shall begiven in due time so as not to affect the construction schedule. In case of aconflict between Structural drawings and specifications the more restrictivecondition shall take precedence unless written approval has been given for theleast restrictive. Contractor shall verify all dimensions with Architectural prior tocommencing any work.
Where no specific detail is shown, the construction shall be identical or similarto that indicated for like cases of construction on this project. Should therebe any question, contact the Architect and Structural Engineer prior toproceeding.
When construction attaches to or is within an existing building, a complete set of drawingsof the existing building shall be kept on the job site. Contractor to obtainthese drawings from the Owner (if they are available).Contractor shall provide an allowance equal to 2% of the bid for structural steel,misc. iron and reinforcing steel to be used at the discretion of the StructuralEngineer. Unused amount to revert to the Owner upon completion of the job.Any substitutions for structural members, hardware or details shall be reviewedby the Architect and Structural Engineer. Such review will be billed on a timeand materials basis to the General Contractor with no guarantee that thesubstitution will be allowed.Do not scale drawings. Contact the Architect or Structural Engineer for anydimensions not shown.These drawings are not complete until reviewed and accepted by local BuildingOfficials and signed by the Owner and the Structural Engineer.
GENERAL NOTES100SN001-1
It is the Contractors responsibility to comply with the pertinent sections, asthey apply to this project, of the "Construction Safety Orders" issued by theState of California latest edition, and all OSHA requirements.
The Owner and the Structural Engineer do not accept any responsibility forthe Contractor's failure to comply with these requirements.
The Contractor shall be responsible for adequate design and constructionof all forms and shoring required. Shoring indications (location, direction,duration, etc.) are only shown on the Structural drwgs when required toimplement the design intent of the final work product. Determination whethershoring is required for temporary or intermediate conditions duringcoonstruction is wholly the resposibility of the contractor.
For convenience, specifications have been prepared for this project and arearranged in several sections, but such separation shall not be considered asthe limits of the work required of any separate trade. The terms andconditions of such limitations are wholly between the contractor and hissubcontractors.
1.
2.3.
4.
5.
6.
7.
8.
9.
10.
11.
a.
b.
c.
d.
e.
f.
g.
a.
b.
c.
a.
b.
c.
DESIGN CRITERIA100SN002-1
Codes and Standards2013 California Building Code (CBC)ASCE 7-10ACI 318-11AISC 360-10, 341-10, 358-10TMS 402-11/ACI 530-11/ASCE 5-11TMS 602-08/ACI 530.1-08/ASCE 6-082012 NDS, 2008 SDPWS
Vertical loads
Soils Values Allowable soils pressure (Ancillary site structures only)
DL 2500 psfDL + LL 2500 psfDL + LL + Seismic 3333 psf
Footing Minimum depth = 12 " Minimum width = 24 "
Roof Live Load = 20 psf Floor Live Load = 85 psf Floor Partition Live Load = 15 psf Corridors = 100 psf Floor live loads are reduced where permitted by code.
Lateral loadsSeismic:
Site Class ESs = 1.686 ; Sds = 1.012S1 = 0.666 ; Sd1 = 1.066
Occupancy Category: IISeismic Design Category: DI = 1.00 ; Ip = 1.00
Analysis Procedure: Equivalent Lateral Force
Seismic Force Resisting Systems:1) Ordinary Steel Moment Frame R = 3.5 ; Ωo = 3.0 ; Cd = 3.0 ;Cs = .394
2) Ordinary Steel Concentric Braced Frame R = 3.25 ; Ωo = 2.0 ; Cd = 3.25 ;Cs = .424
Wind:Basic Wind Speed = 110 mphExposure Category CIw- = 1.0
3.
1.
2.
4.
1)2)3)
ABabvblwbofbrgbtwnccCTJCJPclrCMUCJcontcontrcskDFDLdodwg(e)EFEJElENeoseqEWEWEFFB
FC
FFFSFTgaglbHBhdrHSBHSShtjhLLLLHLLVLSLWLWICMB
-----------------------------------------------------------------
------------------------------------------------------------------------
-----------------------------------------------------------------
--------------------------------------------------------------------------------------------------
-----------
-----------
-----------------------------------------------------------------
-------------------------------
-----------------------------------------------------
--------------------------------
-----------
Anchor BoltAboveBelowBottom of FootingBearingBetweenCenter to CenterControl JointComplete Joint PenetrationClearConcrete Masonry UnitConstruction JointContinuousContractorCountersinkDouglas FirDead LoadDittoDrawingExistingEach FaceExpansion JointElevationEdge NailingEdge of SlabEqualEach WayEach Way Each FaceFace of Block(or Brick) orFlat BarFace of Concrete orFraming Clip(Simpson A35 uno)Finish FloorFace of Stud or Far SideFire TreatedGauge or gageGlued Laminated BeamHeaded BoltHeaderHigh Strength BoltHollow Structural SectionHeightJoist HangerLive LoadLong Leg HorizontalLong Leg VerticalLag ScrewLight WeightLight Weight Insulating ConcMachine Bolt
mfrMImtl(n)NICNSntsNWOHOSBpcPJPPTrwdSCshtgsimSMSSPstfnrstgrdstlt&bt>hrdtntotoctof
tostowunow/w/owpWSWWFJKL#sqø
(a)(b)
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------
-------------------------------------------
--------------------------------------------
------------------------------------------------------
--------------------------------
-----------------------------------
-------------------------------------------------------------------------------------------
ManufacturerMalleable IronMetalNewNot in ContractNear SideNot to ScaleNormal WeightOpposite HandOriented Strand BoardPiecePartial Joint PenetrationPressure TreatedRedwoodSlip CriticalSheathingSimilarSheet Metal ScrewStructural PanelStiffenerStaggeredSteelTop & BottomTongue & GrooveThreadedToe NailTop ofTop of Concrete (slab uno)Top of Footing orTop of FramingTop of SteelTop of WallUnless Noted OtherwisewithwithoutWork PointWood ScrewWelded Wire FabricCenterlinePlateWide FlangeNumber or PoundsSquareRound or DiameterCont Wood in SectionWood Blocking in SectionEnd of Wood Piece"member" above"member" below
100SN003-1
ABBREVIATIONSABBREVIATIONSABBREVIATIONSABBREVIATIONS
STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS AND TESTING100SN004-1
Special inspections and testing shall be provided by an inspection agency,employed by the owner, and qualified by the building official to inspect the particulartype of construction. Tests and inspections, as required by sections 110, 1704, 1707,and 1708 of the 2010 CBC, shall be performed during construction on the types ofwork listed below:
Steel ConstructionConcrete ConstructionMasonry Construction-Level 1Masonry Construction-Level 2Wood ConstructionHigh-Load DiaphragmSoilsDriven Deep FoundationsCast In-place Deep FoundationsHelical Pile Foundations
InspectionsSection 1704.3 & Table 1704.3Section 1704.4 & Table 1704.4Section 1704.5 & Table 1704.5.1Section 1704.5 & Table 1704.5.3Section 1704.6Section 1704.6.1Section 1704.7 & Table 1704.7Section 1704.8 & Table 1704.8Section 1704.9 & Table 1704.9Section 1704.10
TestingSection 1708.3Section 1708.2
--------
Inspections may be continuous or periodic as allowed by the individual material orcomponent inspection sections and tables of section 1704.The special inspector shall submit inspection reports to the building official and thedesign professional in responsible charge. The reports shall indicate whether workinspected conformed to the Construction Documents. Any discrepancies shall beimmediately brought to the attention of the Contractor for correction.If discrepancies are not corrected, they shall be brought to the attention of thebuilding official and the design professional in responsible charge.All Special Inspection Agencies / Individuals and Shop Fabricators shall beapproved by the building official prior to commencement of work.Testing and inspection records shall be retained until completion of construction.The Contractor shall submit a written statement to the building official acknowledgingresponsibility for construction of the main lateral-force resisting system prior tocommencement of that work as required by section 1709 of the 2010 CBC.Special inspections for seismic and wind resistance shall be conducted for all itemslisted in section 1705.3 and 1705.4 as applicable. Special inspections for seismicresistance shall include all items in section 1707. Special inspections for windrequirements shall include all items in section 1706. Structural testing for seismicresistance shall be in accordance with section 1708.Masonry Construction Level 2 applies to structures classified as occupancycategory IV only.All soils and foundation excavation inspections shall be by the GeotechnicalEngineer of Record.For testing and inspection requirements for non-structural materials and components,see construction documents and comply with chapter 17 of the 2010 CBC
1.
2.
3.
4.
5.6.
7.
8.
9.
10.
DEMOLITION NOTES100SN008-1
Safety Notes:It is the Contractor's responsibility to comply with the pertinent sections, asthey apply to this project, of the "Construction Safety Orders" issued bythe State of California latest edition and all OSHA requirements.The Architect, Structural Engineer and Owner do not accept anyresponsibility for the Contractor's failure to comply with these requirements.The Contractor shall be responsible for adequate design and construction ofall formwork, bracing, and shoring required. Shoring indications (location,direction, duration, etc.) are only shown on the Structural drwgs when requiredto implement the design intent of the final work product. Determinationwhether shoring is required for temporary or intermediate conditions duringcoonstruction is wholly the resposibility of the contractor.
Shore or brace beams, columns and walls as required to maintain the stableintegrity of the existing structure prior to demolition. It is the Contractor's soleresponsibility to design and provide competent shoring and bracing for all loadsimposed during and after demolition through completion of new construction.Contractor is to prepare a demolition and shoring plan depicting locations andmethod of shoring and demolition sequencing.All dimensions given to existing structure are approximate. Verify by fieldmeasurements the dimensions of the existing structure. Where actual conditionsdeviate from details shown on the drawings, notify the Structural Engineer forinstructions before proceeding with work.Any conflicting items not specifically shown (such as underground pipes, conduits,etc.) shall be brought to the attention of the Structural Engineer prior to furtherdemolition.Demolition and removal of existing construction shall be made in such a manneras to minimize or avoid damage to adjacent construction.A complete set of original drawings of the existing structure is to be kept onthe jobsite. Contractor shall obtain these drawings from the Owner where available.Extent of demolition is to be as indicated on plans, sections and details. Verifystorage and reuse of existing materials with Architectural drawings. Demolitionis to include removal and disposal of demolished construction. SeeSpecifications for additional demolition instructions.Provide a 10% contingency allocation based on bid for all work shown on thestructural drawings for supplemental structural work to be implemented at thediscretion of the Structural Engineer. This allocation is to fund constructionshown on "Supplemental Instructions" as issued by the Structural Engineer andonly after his review of the cost. Any unused portion of the allocation is torevert to the Owner at the completion of the project.Contractor shall retain the services of a Structural Engineer registered in theState of California to provide selective demolition and replacement of existingconstruction in areas necessary for clearance of pile driving equipment.Plan shall be submitted to the Structural Engineer for review.
2.
3.
4.
5.
6.
8.
9
10.
A)
C)
B)
7.
These notes also apply to conditions where partial or selective demolitionis required as part of the work.
1.
ELEVATOR GUIDE RAILS AND SUPPORTS100SN013-1
1. Guide rails, guide rail supports and brackets for elevator cab orcounterweight shall be designed to meet the force force and displacementrequirements of ASCE7-05 13.6.10.
2. Provide Shop Drawings and engineering calculations for the guide rails, guiderail supports and supporting brackets signed by a California Civil Engineer, forreview by the Architect and/or Structural Engineer, and for approval by theenforcement agency prior to fabrication.
3. All loading conditions resulting in eccentricities or torsion to beams and/orcolumns shall be resolved by the installation of stiffeners and diagonal strutsdesigned and installed by the supplier.
4. Seismic forces shall be accounted for and braced back to the structure. Foradditional requirements see California Code of Regulations Title 24 part 2 andpart 7.
5. See Architectural drawings for opening/pit dimensions, locations and details.
STRUCTURAL STEEL500SN001-1
Fabrication, erection and materials shall conform with the AISC Specification forStructural Steel Buildings, the AISC Seismic Provisions for Structural SteelBuildings, and the International Building Code, latest editions.Structural Steel wide flange shapes shall conform with ASTM A992. All otherStructural Steel rolled shapes (channels, angles, etc) and plates shall conformwith ASTM A36, uno.Steel Pipe shall conform to ASTM A53, Types E or S, Grade B.All Hollow Structural Sections (HSS) shall conform to ASTM A500, Grade B.All structural steel shall receive a minimum of one shop coat of red primer paint.Do not paint areas to be field welded, fireproofed, galvanized, to receiveslip-critical high strength bolts, or to be embedded in concrete. Provideadditional painting as noted in the specifications.All structural steel shall be erected plumb and true to line. Temporary bracingshall be installed and shall be left in place until other means are provided toadequately brace the structure. Contractor responsible for reviewing all baseplate and support conditions during erection and bracing as required. See AISCand OSHA requirements.Place non-shrink grout under all base plates before adding vertical load.Structural steel below grade shall have 3 inches minimum of concrete cover.Bolted connections shall consist of unfinished bolts conforming to ASTM A307unless noted otherwise. Where high strength bolts are indicated, boltsconforming to ASTM A325 or ASTM A490 as needed shall be provided.Anchor rods cast in concrete or masonry shall be headed bolts with cutthread, full diameter body style conforming to ASTM F1554 gr. 36, 55 (weldableper S1 Supplementary Requirements), or 105 as indicated on drawings. All boltedconnections and base plates shall have standard cut washers unless notedotherwise. Washers for base plates shall conform to ASTM F844 unless notedotherwise, and shall be placed at top and bottom of plate.
"Slip-critical" bolted connections:
Provide 1/2" diameter stitch bolts and ring fills, spaced at not more than2'-0" on center for all double angle members.At wood to steel parallel contact, bolt with 1/2" diameter bolts at maximum24"cc.Holes for unfinished bolts shall be of the same nominal diameter of the boltplus 1/16". Use standard AISC gage and pitch for bolts except as notedotherwise.Welding shall be done by the electric arc process in accordance with AmericanWelding Society Standards, using only certified welders. All groove welds shallhave complete penetration unless noted otherwise. All exposed welds shall beground smooth. All electrodes for welding shall comply with AWS code, E70series minimum.Weld lengths called for on plans are the net effective lengths required.Minimum fillet welds: 3/16" @ t < 1/2"
1/4" @ t < 3/4"5/16" @ t > 3/4"
Welding Procedure Specifications (WPS) for shop and field prequalified weld jointsand weld joints qualified by test shall be prepared for review prior to fabrication.All welding procedure items such as base metals, welding processes, filler metalsand joint details that meet the requirements of AWS D1.1 Section 5.1 shall beconsidered as prequalified. Any change or substitution that is beyond the rangeor tolerance or requirements for prequalification shall be qualified by test perAWS D1.1 Section 5 part B. Qualification testing is required when the depth ofa partial penetration or complete penetration weld is 2" or greater.For nondestructive testing of welded connections excluding primary members ofmoment resisting frames:
1. Base metal thicker than 1 inch when subject to through thickness weld shrinkage strains.2. All complete joint penetration groove or butt welds.3. All partial joint penetration groove welds when used in column splices.
1.
2.
3.4.5.
6.
7.8.9.
10.
11.
12.
13.
14.
15.16.
17.
18.
The special inspector must be present during installation and tighteningoperation of "slip-critical" connections.
Welded connections shall be tested by nondestructive methods forcompliance with AISC J2, and job specifications. Ultrasonic Testing shallbe in accordance with AWS D1.1, ASTM E164 and ASME Section V.Radiography shall be in accordance with AWS D1.1, ASTM E94 and E99,and ASME Section V. This testing shall be part of the special inspectionrequirements of IBC Section 1704.3 performed by an approved independenttesting laboratory as follows:
Any material discontinuities shall be accepted or rejected on the basis ofdefect rating in accordance with the (larger reflector) criteria of AISC J2.
a)
b)
b)
a) "Slip-critical" connections (A325SC design values with special inspection)are required at all braced frame connections, at all connections alongchord lines and drag lines (as noted on plans), and uno, at all bolts inoversized or slotted holes.
METAL STAIRWAYS550SN001-1
Supplier shall provide complete design drawings and calculations for all metalstairways. Stairways shall be designed for Dead Load + 100 psf Live Load, andSeismic Loads.Supplier shall design, supply, and install all connection materials which shallinclude but are not necessarily limited to embedded items, bearing plates,stiffeners, diagonal struts, support angles, channels and tubes. All loadingconditions resulting in eccentricities or torsion to beams and/or columns shall beresolved by the installation of stiffeners and diagonal struts, designed, supplied andinstalled by the supplier.Seismic forces shall be accounted for and braced back to the main structure.Slip details shall be incorporated at ground level for story drift. Positive ties usingrebar shall be provided to resist seismic forces at floor levels with concrete fill.See Architectural drawings for stairway dimensions and details.Submit Shop Drawings and calculations signed by a Civil Engineer, registered inthe state in which the project is located, for review by the Architect and/orStructural Engineer, and approval by the enforcement agency prior to fabrication.Provide rebar at all concrete fill on treads and landings per specs.See specifications for additional design criteria.
1.
2.
3.
4.5.
6.7.
FOUNDATIONS200SN001-1
All foundation work shall be done in accordance with the requirements of theSoils Report #Foundations shall bear onSee notes and details on sheetAll filling, backfilling and compaction shall be done under the observation of arepresentative of the Soils Engineer and must be compacted to the minimumdensity specified in accordance with the procedure outlined in the soils report.Building pad construction shall conform to the requirements of the soils report.The extent and depth of overexcavation and placement of engineered fill shall ata minimum be as shown on the plans. Final depth and extent of excavationand fill shall be determined at time of construction by a representative of theSoils Engineer. Foundation depths indicated on plans are for estimatingpurposes only.Bottoms of all foundations shall be level. Changes in bottom of foundationelevation shall be made according to Stepped Footing Detail on the TypicalDetail Sheet.Foundation concrete may be placed directly into neatexcavations provided the excavations are stable (asdetermined by a representative of the SoilsEngineer). Otherwise, foundations shall be fullyformed. Use minimum planking shown to protectagainst sloughing, as required. Planking does notreplace formwork required to stabilize excavation.The surface of all horizontal construction joints shall be cleaned & roughenedby exposing clean aggregate solidly embedded in mortar matrix.Notify the Structural Engineer 48 hours before casting foundations.A representative of the Soils Engineer shall advise the Building Official inwriting that:
a. The building pad was prepared in accordance with the soils report.b. The utility trenches have been properly backfilled and compacted and;c. The foundation excavation depth and material are adequate to achieve design bearing capacity; and forming comply with the soils report and
approved plan.
1.
2.
3.
4.
5.
6.
7.
8.9.
2x12 2x121x8
footing
width
plan
INCH POUNDBAR SIZE
DIAMETER (In.)
METRICBAR SIZE
DIAMETER
(mm)
#3
#4
#5
#6
#7
#8
#9
#10
#11
#14
#18
0.375
0.500
0.625
0.750
0.875
1.000
1.128
1.270
1.410
1.693
2.257
#10
#13
#16
#19
#22
#25
#29
#32
#36
#43
#57
9.5
12.7
15.9
19.1
22.2
25.4
28.7
32.3
35.8
43.0
57.3
Standard Rebar Sizes Inch and Metric Equivalents 300SN003-1
SpliceClass Location
Reinf #3
Other
TopB
15
19
Notes:
2.
3.
#4 #5 #6 #7 #8 #9 #10 #11
37
29
47
36
56
43
81
63
93
72
105
81
118
91
131
101
Other
Top
13
17
25
32
SpliceLocationClass
Reinf #3 #4
54
70
37
48
31
40
62
80
70
91
79
102
87
113
#7#6#5 #8 #9 #10 #11
ACI 318-052006 IBC2007 CBC(All lengths shown are in inches.)
Top reinforcement is horizontal reinforcement located such that more than12 inches of fresh concrete is cast in the member below the splice.When lightweight concrete is used, multiply lap lengths by 1.30.Where clear spacing of bars being spliced is less than 2 bar dia. ORwhere clear cover of bars being spliced is less than 1 bar dia.,multiply lap lengths by 1.50, uno.
4.
Schedule applies to normal weight concrete with uncoated, Grade 60 reinforcingsteel for #4 bars and larger (values for #3 bars based on Grade 40).
1.
Where notes #3 AND #4 occur, multiply lap lengths by 2.00, uno.5.Where Class A lap splice is noted in detail, divide lengths above by 1.30.6.
B
B
#11#10#9#8#5 #6 #7
121
93
109
84
97
75
86
66
43
33
52
40
75
58
#4#3ReinfClass LocationSplice
35
27
18
14
Top
Other
B
#11#10#9#8#5 #6 #7#4ReinfClass LocationSplice
Top
Other 22
29
49
63
33
43
28
36
55
72
63
81
70
91
78
101
#3
15
12
fc' = 3000 psi conc
fc' = 4000 psi conc
REINFORCEMENT LAP SPLICE SCHEDULE
fc' = 3500 psi conc
fc' = 5000 psi conc
300SN002-1
CONCRETE300SN001-1
Structural concrete shall attain 28 day compressive strength as required innote #29. Maximum slump shall not exceed 4 inches.Concrete mix designs shall be prepared by a registered Civil Engineer, reviewed byOwner's testing laboratory and submitted to the Structural Engineer for review.Cementitious materials:Cement shall conform to ASTM C-150 type I or II.Fly ash shall conform to ASTM C-618. Max. quantity of flyash shall be as given inspecs (15% max uno).Concrete aggregates shall conform to ASTM C-33 for normal weight concreteand ASTM C-330 for lightweight concrete.Non-shrink grout or drypack shall consist of a premixed nonmetallic formula.Reinforcing steel shall conform to ASTM A-615 Grade 60 for #4 and larger, andASTM A-615 Grade 40 for #3 and smaller, except reinforcing steel to be weldedshall conform to ASTM A-706. Contractor shall submit rebar mill certificates.All preheating and welding of reinforcing bars shall be done in accordance withAWS D1.4 latest edition and shall be continuously inspected by a qualifiedlaboratory. Contractor shall furnish WPS for all rebar welding to the laboratory.Reinforcing steel shall be fabricated according to "Manual of Standard Practicefor Reinforced Concrete Construction".Wire fabric shall conform to ASTM A-185.Dimensions shown for location of reinforcing are to the face of bars listed anddenote clear coverage. Non-prestressed, cast-in-place concrete coverage shallbe as follows, uno:
Concrete deposited directly against ground (except slabs)--- 3"Concrete exposed to ground or weather but placed in forms:
#5 and smaller---------------------------- 1-1/2"#6 and larger----------------------------- 2"
Beams & Columns (ties)------------------------ 1-1/2"Beams & Columns (main reinforcing)---------------- 2"Cast-In-Place Walls (exterior face & soil side)--------- see aboveCast-In-Place Walls (interior face-#11 & smaller)------- 3/4"Tilt-Up Walls------------------------------- see detailsSlabs (on forms)---------------------------- 3/4"Slabs (on ground)------------------- 2" clear from top uno
Splices in continuous reinforcement shall be lapped uno, see schedule this sheet.Splices in adjacent bars shall be greater than 5'-0" apart. Splice continuousbars in soil-bearing grade beams, structural slabs on grade and mat foundationsas follows uno: top bars at centerline of support; bottom bars at mid-span.Splice continuous bars in elevated slabs and beams, etc. as follows uno: topbars at mid-span; bottom bars at centerline of support. All bars size #14 andlarger shall be continuous for full length shown or spliced with mechanicalcouplers as noted in details. Splices in WWF shall be 1-1/2 meshes wide.The minimum clear spacing between parallel bars in a layer shall not be lessthan the larger of bar diameter, 1", or 33% greater than the maximum aggregatesize (nominal), whichever is greatest. This requirement also applies to theclear spacing between different layers of parallel bars and to the clear distancebetween a contact lap splice and adjacent splices or bars.All hooks shall be standard hooks unless otherwise shown or noted. At walls,provide hooks at ends of all reinforcing at ends, corners and intersections, uno.Construction joints shall be made rough and all laitance removed from thesurface. Concrete may be roughened by chipping the entire surface, sandblasting, or raking the surface to provide 1/4" deep deformations.Remove all debris from forms before casting any concrete.Reinforcing, dowels, bolts, anchors, sleeves, etc. to be embedded in concreteshall be securely positioned before placing concrete.Anchor bolts (AB's) cast in concrete or masonry for wall sill and ledger\applications shall be headed bolts with cut threads conforming to ASTM A307,uno. Refer to "Wood" notes for additional requirements for bolts in contactwith pressure treated or fire retardant material. Refer to 'Structural Steel'note for requirements for anchor rods (AR's) cast in concrete for columnbase plate and steel embed applications.Walls shall be cast in horizontal layers of 2'-0" maximum depth.Concrete in walls, piers or columns shall set at least 2 hours before placingconcrete in beams, spandrels, or slabs supported thereon.Horizontal wall bars in multi-curtain cast in place walls shall be staggered.Dowel all vertical reinforcing in walls and columns from foundation with samesize bar.Consolidate concrete placed in forms by mechanical vibrating equipmentsupplemented by hand-spading, rodding or tamping. Use equipment andprocedures for consolidation of concrete in accordance with the recommendedpractices of ACI 309 to suit the type of concrete and project conditions.Concrete shall not be dropped through reinforcing steel (as in walls) so as tocause segregation of aggregates. In such cases hoppers and chutes or trunksof variable lengths shall be used so that the free unconfined fall of concreteshall not exceed 6 feet.Drill through steel columns, beams and plates to pass continuous reinforcing.No wood spreaders allowed. No wood stakes allowed in areas to be concreted.Additional reinforcing in precast or tilt-up panels required for lifting stressesshall be supplied by Contractor.Provide #5 x 4'-0" diagonal reinforcing at top and bottom of slab at allre-entrant corners typical. This applies to slab on grade, concrete over metaldeck, and elevated structural slab conditions.All saw cutting shall be done after initial set has occurred to avoid tearing ordamage by the saw blade, but before initial shrinkage has occurred.Notify Structural Engineer a minimum of 48 hours before placing any concrete.
CONCRETE STRENGTHS & MIX PROPERTIES: Max Aggr.
1.
2.
3.
4.
5.6.
7.
8.
9.10.
11.
12.
13.
14.
15.
26.
27.
28.
29.
21.
22.
23.24.25.
16.
17.
18.19.
20.
ItemA. FoundationsB. Slab on gradeC. Columns, beams,
walls, elevated slabsD. NW Conc fill over deckE. Site and miscellaneousF. LW Conc fill over deck
f'c at 28 days3000 psi6000 psi4000 psi
3500 psi2500 psi3000 psi
Size1-1/2"1"1"
3/4"1"3/4"
WeightNWNWNW
NWNWLW
Ratio0.580.350.50
0.520.600.56
Max w/cm*
* w/cm = Water : Cementitious material ratio
DRILLED-IN ANCHORS305SN001-1
Anchors shall be installed in accordance with the requirements given in theICC report.Unless noted otherwise anchors have been designed for special inspection.Provide Special Inspection as indicated in the ICC report.When installing drilled-in anchors in existing concrete or masonry, use care andcaution to avoid cutting or damaging existing reinforcing bars. Do not installanchors in prestressed concrete elements.
For concrete construction, epoxy anchors shall be Hilti HIT-RE 500-SD perESR-2322, Hilti HIT-HY 150 MAX-SD per ESR-3013 or Simpson SET-XP per ESR-2508 for thr'd rod & rebar. Expansion anchors shall be Hilti KB-TZ per ESR-1917or Simpson Strong-Bolt 2 per ESR-3037. Screw anchors shall be Hilti KWIKHUS-EZ (KH-EZ) per ESR-3027 or Simpson Titen HD per ESR-2713.
Anchors installed from the bottom into metal deck with concrete shall beinstalled in the center of the low flute of the decking unless noted otherwisein ICC report. The decking shall have a minimum thickness of 20 gauge.The minimum thickness of the concrete above the high flute of the metal deckshall be as indicated in the ICC report. See ICC report for additionalrequirements, including minimum dimensions for flute width and depth.The inspection of the anchors shall be done by a qualified inspection agencyand a report of the inspection results shall be submitted to the governingagency and Architect/Structural Engineer.
4.
5.
6.
1.
7.
8.
For masonry construction, epoxy anchors shall be Hilti HIT HY 150 MAX perESR-1967 or Simpson SET per ESR-1772 for thrd'd rod & rebar. Expansionanchors shall be Hilti Kwik Bolt 3 (KB3) per ESR-1385 or Simpson Wedge-All perESR-1396. Screw anchors shall be Hilti HUS-H per ESR-2369 or Simpson TitenHD per ESR-1056.
2.
Anchor type, size & embedment shall be indicated in drawings. Post-installedanchors for repair shall be evaluated on a case by case basis. NotifyStructural Engineer for repairs.
3.
POWDER ACTUATED FASTENERS (SHOT PINS)100TN016-1
These notes govern all conditions called out on the plans as 'shot pins' unlessspecifically noted otherwise.All shot pins shall be X-U Universal Knurled Shank Fasteners with shank diameterof 0.157" as manufactured by Hilti Incorporated in accordance with ICC ESR-2269and the current edition of the Hilti 'Product Technical Guide'
Shot pins driven into steel base material shall maintain a minimum edge distanceat all steel elements of 1/2" and minimum fastener spacing shall be 1". Lengthof pin shall be as required to penetrate thru steel member u.n.o. At 3/4" thicksteel, penetration need not exceed 1/2".Shot pins driven into concrete base material shall maintain a minimum edge distanceat all concrete elements of 3" and minimum fastener spacing shall be 4". Pinsshall have 1 1/4" penetration u.n.o. Minimum concrete thickness shall be 3 timesthe penetration depth. Concrete shall attain full design strength prior to installingshot pins.Shot pins driven into 3 1/4" minimum light weight concrete fill over 3"x 20 gaminimum metal deck may be installed from the top or from the bottom in eitherthe high or low flute. Pins installed from the top shall be spaced as noted abovefor typical concrete elements. Pins installed from the bottom in the high flutesshall be installed within 1" of flute center. Pins installed from the bottom in the lowflutes shall be installed within 1" of the flute center and shall be no closer than 1 1/8" tothe edge of the low flute. Pins installed from the bottom shall be spaced no closerthan 5 1/2" parallel to the flutes. Pins shall have 1" penetration into concrete u.n.o.Concrete shall attain full design strength prior to installing shot pins.Shot pins may be driven into 8" nominal minimum thickness fully grouted normal-weight cmu with type S mortar and minimum f'm = 1500 psi at time of installation.Shot pins may be installed into the face shells, horizontal mortar joints or verticallycentered in the the top of grouted cells. Shot pins shall not be installed in verticalmortar joints or within 1" of vertical mortar joints. No more than one shot pin mayoccur in an individual masonry unit cell and must be installed a minimum of 4"from the edge of the wall. Shot pins in mortar joints must be a minimum of 8"from the end of the wall and shall have a minimum spacing of 8".
1.
2.
4.
5.
6.
7.
3. All shot pins shall include P8 steel washers.
The operator, tool, and fastener shall be pre-qualified by the project inspector ofrecord. Shot pin installers shall be certified by Hilti and have a current Hilti issuedoperators license. Shot pin installation shall meet all OSHA requirements.
8.
Shot pins used to attach hanger wires for suspended ceilings shall be testedin accordance with DSA IR 25-2
9.
TYPICAL PREFABRICATED METAL BUILDING NOTES500SN002-1
Design and fabrication shall conform to the 2010 California Building Code (CBC),and the latest editions of AISC "Specifications for the Design, Fabrication, andErection of Structural Steel Buildings", and AISC "Specification for the Designof Cold-Formed Steel Structural Members".Metal Building Manufacturer (MBM) shall be AISC category 'MB' certified.Drawings, calculations and engineering data on structural sections for all componentsshall be submitted to the Architect and/or Structural Engineer for review priorto fabrication. See specifications section 13-34-19 for loading information.Drawings and calculations shall be signed by a Civil Engineer registered in thestate in which the project is located.Building manufacturer shall provide plan drawing showing column locations andanchor bolt locations prior to fabrication. Anchor bolt sizes, numbers, andlocations are to be designed and detailed by MBM. MBM shall furnish requiredanchor bolts and setting templates.Contractor shall verify all dimensions with Architectural drawings and MBM columnlayout prior to foundation construction.All hardware required for connecting building components shall be designed,detailed and provided by building manufacturer.Contractor shall provide temporary erection bracing as required.Building designer shall account for the weight of all mechanical equipment in thedesign of all building components which support such units.Foundation design is based on preliminary evaluation of metal building reactions.Final building reactions are to be submitted to the Structural Engineer forvalidation of foundations prior to construction.
1.
2.3.
4.
5.
6.
7.
8.9.
10.
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:1
4 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S1.1
General Notes
End Hooks & Bends
Ties & Stirrups
90° 45°
180°
135°D
D
4d
2 1/2" min
12d
d
90°6
d3"m
in
DD
DD
6d
fo
r #
5 a
nd
sm
alle
r12
d f
or
#6
, 7
, a
nd
8
Minimum Bend DiameterD=6d for #3 thru #8D=8d for #9 thru #11D=10d for #14 thru #18
Note: All hooks shall be 90° or 180° standard hooks unless otherwise shown or noted.
300SD001-12
Standard RebarHooks and Bends
Minimum Bend DiameterD=4d for #3 thru #5D=6d for #6 thru #8
d
1st pour 2nd pour
laptyp uno
2x6 bev keyfull width at12'' max verticalspacing & 6" edgedistance
typ longitreinf
vert reinfwhere occurs
2"
foo
tin
gs
tem
wa
ll
cu
rbw
he
reo
cc
urs
2"
Option: Use metal K-lathin lieu of keys for full depthof foundation at unexposedfoundations only.
add tie orvertical easide of joint
typ
1"
200SD012-24
Typical Foundation
Construction Joint
Double Layer Bars
Single Layer Bars
corner bars may be usedin lieu of single bend
lapstd 90° hook
std hk90°
typ at splice
See concrete notesfor addl requirements
lap
lap
std
90
° h
oo
k
lap
lap
std 90° hook std 90° hook
std
90
° h
oo
k
std 90° hook
Note: Provide std hook at ends of allinterior rebar - typical
Note:
200SD011-32
Corner Reinforcing atConcrete Ftgs
std hk90°
2'-0"
9"min
2'-0"min
D
D/3
D/3
D/3
3"
min
6"
min 2'-
0"
ma
x
as
dir
ec
ted
by
So
ils E
ng
ine
er
9"
pipe
caulk wherenecessary
lean-mixconc fill
all horiz pipes to clearsleeve by 1'' all around.wrap risers w/bldg paperas req'd to prevent bond
utility pipes to belocated in middle1/3 of ftg
min trench
no digging fortrench parallelto footing belowthese lines
roughen to1/4'' amplitudeas necessary
see note@ right
@ rightsee note
multiple utility pipeswhere occur, showndashed. See notes.
utility pipe riserin ftg, where occurs,see note below
No
te:
ste
p f
oo
tin
g d
ow
nto
ma
inta
in p
ipe
in
mid
dle
1/3
of
tota
ld
ep
th o
f fo
oti
ng
acceptance of the Soils Engineer.
if spaced as noted above.
center with a minimum of 3" of concrete between.
original footing depth.
require lean-mix concrete encasement subject tothan 2'-0" below bottom of footings do not
9. Utility pipes perpendicular to footings and more
above shall be reviewed on a case-by-case basis.10. Conditions not conforming to the parameters noted
1. Reinforcing shall not be interrupted, cut ordisplaced by placement of utility pipe.
the footing width. Multiple risers may occur
8. Utility pipes risers may occur in continuous wallfootings provided they are no larger than (footingwidth/6) and occur w/in the middle 1/2 of
spaced a minimum of 4 pipe/conduit diameters oninstalled as shown above, provided they are
7. Multiple utility pipes (two or more) may be
6. Utility pipes are not allowed parallel in footing.
or within 2 to 1 bearing zone around spread footing.
pipe w/ 1" Styrofoam insulation in lieu of sleeve.5. If pipe is in place prior to casting concrete, wrap
4. No pipes shall be placed below spread ftgs
3. Step ftg if pipe occurs in lower third of
2. Lean mix concrete fill to be placed before ftg is cast (mono-pour ftg conc optional). Make same width as ftg and full width of pipe trench.
Notes:
200SD003-32
Concrete Footings at
Utility Pipes
sleeve
21
rebar
rebar
steel K perdetails,2/3d min, typ
Notes:
1. Reinforcing to be welded, except ASTM A706, shall conform tothe material property requirements of ANSI/AWS D1.4, newestedition.
2. All preheating and welding shall be done in accordance withANSI/AWS D1.4, newest edition.
3. All welding shall be continuously inspected by a qualified laboratory.
d
e
e
e = min throat = .2d min
e
1/8"min
300SD002-32
Rebar Welding
6d
see atleft forsize
(n) footingper plan
longitudinalbars persections
transverse barsper sections
longit bars drilled & groutedper schedule. If dowels, lapw/ main bars 56d
(e) footing
shear key belowas occurs
Elevation
6"
300SD004-16
Detail
Grouted Rebar Schedule
Bar
Size
Hole
Dia
Embed
LengthTension Test Load
#3 5/8" 3" 3,300#
#4 3/4'' 6" 8,400#
#5 7/8'' 10" 13,000#
#6 1" 14" 18,500#
#7 1 1/4'' 20" 25,000#
#8 1 3/8'' 30" 33,000#
#9 1 1/2'' 38" 42,000#
Notes:
All grout shall be non-shrink, non-metallic, non-epoxy
with 7 day compressive strength of 5000 psi.
300SD003-1
#4 cont t&b
#3 @ 18"ccstd hk
va
rie
s
optional CJ,roughen to1/4'' amplitude
va
rie
ss
ee
Arc
h'l
(8"
ma
x)
310SD006-12
Curb at Slab on Grade
.
see plan forsubgrade
see Arch'l(6" uno,8" max)
slab on gradeper plan
#5cont
#3 hairpinsto matchreinfspacing
Walls Terminating w/o Slab Walls Terminating at Slab
#5 contmin
alternate hooks
dowels tomatch vertsw/ std hook
135
°ty
p
elevated concslab, reinf notshown for clarity
2"
0"
clr
typ
min
2"
clr
320SD001-16
Reinforcing at Top of Wall
sc
he
du
le,
typ
lap
sp
lice
pe
r
optional CJ, roughento 1/4" amplitude min
std hook on verts,dowels w/ std hookmay be used in lieuof std hook on vertsat Contractor's option
Double Layer of Reinforcing Single Layer of Reinforcing
std hook(12" min)
lap splicewhere occursper
std
ho
ok
(12"
min
)
lap
lap
std hook(12" min)
std hook(12" min)
std
ho
ok
(12"
min
)
2-add'l verts tomatch wall reinf(#4 vert min), typ
add'l vert tomatch wall reinf(#4 vert min), typ
2-add'lverts
Note:1. See 'Concrete' notes for add'l requirements.
2. At contractor's option, corner bars may be usedin lieu of hooked horiz bars.
320SD002-32
Concrete Wall Corner Reinforcing
std hook(12" min)
300SN002std hook
(12" min)
lap splicewhere occursper
300SN002
lap splice
Corner Option 1 Corner Option 22-add'lverts
add'lverts
add'lvert
lap spliceper
300SN002
waterproofingper Arch'l PVC waterstop
CJ, roughenjoint to 1/4"amplitude min
320SD004-12
Waterstop at ConstructionJoint in Wall
.
320SD003
CJ
conc retaining/basement wallper plan
Opening ReinforcingIn Concrete Walls
where 2'-0" extensioncannot be attained,extend as far aspossible and usestd hook
#4x4'-0" diagea corner
2'-0"
#3 U-bar at eahoriz or vert bar.Alternatively, hookhoriz & verts
jam
b b
ars
pe
r ele
v
2"clr
2" clr tohairpins,typ
16"
6'-0"
max uno typ
320SD007-32
2-#5 horiz t&b
Section
2-#5 verts ea side,ftg dowels to match
Elevation
extend duct opngtrim bars or add 2-#5
add 2-#5x3'-0" between andoutside of sleeves
Note: No added reinf req'd for single pipe sleeves< 5"Ø and > 12" away from opngs.
std hook where2'-6" extensioncannot beobtained
ductopng
min min min
add 2-#5
pipesleeve(10"Ø max),max 3 pergroup
6" 2'-6"6"6"
320SD006-12
Pipe Sleeves Through Wall
Partial Elevation
2" min
clr typ
5'-0" minto next group
.
320SD002
jamb steel
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:1
6 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S1.2
Typical ConcreteDetails
S1.2S1.2S1.2S1.2
1111
S1.2S1.2S1.2S1.2
5555
S1.2S1.2S1.2S1.2
3333
S1.2S1.2S1.2S1.2
4444S1.2S1.2S1.2S1.2
2222
S1.2S1.2S1.2S1.2
6666
S1.2S1.2S1.2S1.2
AAAA
S1.2S1.2S1.2S1.2
7777
S1.2S1.2S1.2S1.2
99999999
S1.2S1.2S1.2S1.2
10101010
S1.2S1.2S1.2S1.2
8888
S1.2S1.2S1.2S1.2
11111111
S1.2S1.2S1.2S1.2
12121212
275SD001-24
provide temporaryshoring until slababove has cured
HSS rail supportcol beyond
#5 conttyp
24" bend
8" conc wall w/#5 @ 12''cc ea waytyp
#5 @ 12"ccea way topand bottom
Note: verify dimensions with elevator manufacturer
clrtyp
verify w/ elev mfr
2"
clr
3"
clr
90° stdhook typ
2-#6x5'-0" eaway at piston
door guideangle permfr
sump pitsee
2"
1'-6
"
equalequal
Detail
551SD001
275SD002
or 551SD002
#4x5'-0"ea sidecenteredon sump
grating, seeplumbing
se
ep
lum
bin
gd
wg
s(2
4"
ma
x)
see plumbingdwgs
3-#4 eaway
12" 12"
2'-0" sq max
6"
6"6"
275SD002-12
Sump Basin Detail
see plans forslab section &sub gradeprofile
Note:See Arch'l dwgs for tread& riser dimensions, inserts,topping, special finishes,handrails, etc.
subgradeper plan
#4 nosingbar, typ
#5 t&b
#4 @ 18"cc EW
Steps on grade
see Arch'l dwgs 2'-0"
se
e A
rch
'l d
wg
s
3"
6"
310SD087-12
slab on gradeper plan
slab on gradeper plan
1' - 0"2' - 0"
1' -
0"
clr 3"
EQ EQ
#4@18"cc
18"
319SD011-96
Mech'l Equipment Mat
(n) 12" conc mat w/#5 t&b @ 12''cc EW,std hook on topbars at perimeter
J mech'l
unit support
FC
Jmat
unit support
J mech'l
unit support
J mech'l
unit support
J mech'l
FC6" verify
3'-0"
int ftg
2'-0"
ext ftg typ
12"
typ
un
it s
up
po
rt
J m
ec
h'l
J m
ec
h'l
un
it s
up
po
rt
FC
FC
verify
2'-0"2'-0"
ve
rify
2'-
0"
2'-
0"
319SD012
typ319SD013
Plan
330SD100-24
1"
clr
1" c
lr top barssee plan
bottom barsee plan
standard 90°hook inclineas reqd
J wall
J col beyond
(0.28L min)
(0.28L min) (0.28L min)
typ
typ
typ
see plan
typ
typ
Note: Added barsshall be distrubutedin 48" width overcolumn
standard 90°hook inclineas reqd
beam whereoccurs
conc walltyp exterior
bottom barsee plan
top barsee plan
(0.37L) staggeredtyp
(0.24L) (0.37L)
top bars seeplan
alternate topbars slab
- typ
drop panel- typ
sq coltyp interior
typ
J col
Middle Strip
Column Strip
Designer Note:Verify clearance withfire rating of slab
class Alap splice
lap spliceclass A
J wall
see plan
see plan
see plan
equalequal
1'-6"see plan
see plan
6"
6"
1" c
lr
1" c
lr
Reinforcing Details for Two Way Flat Slabs330SD101-24
3/4
" c
lr
3/4
" c
lr
top barssee plan
bottom barsee plan
standard 90°hook inclineas reqd
J column
J col beyond
(0.28L min)
(0.28L min) (0.28L min)
typ
typ
typ
see plan(0.24L)(3'-3" min)
typ
typ
Note:Added barswhere occursshall be distrubutedin 48" width overcolumn
standard 90°hook - inclineas reqd
beam whereoccurs
columnper plan
bottom barsee plan
top barsee plan
(0.37L)
top bars seeplan
alternate topbars slab per plan
col per plantyp interior
typ
J colJ column
Middle Strip
Column Strip
3/4
" c
lr
'L' - see plan
'L' - see plan
2 bottom bars min. topass within col core
standard 90°hook on 2 barsthru col
columnbeyond
class Alap splice
3/4
" c
lr
class Alap splice
see plan1'-0"staggeredtyp
see plan(0.37L)
6"
see plan
equal equal
6"
Reinforcing Details for Two Way Flat Slabsty
p
1-#4 t&btrim barstyp
1-#4x t&b typ
1-#4x4'-0" at eachlayer of reinf diagonals
90° std hook
24
"
se
e p
lan
330SD008-12
Slab Re-Entrant Corner
provide addlcont reinfea side toreplacereinf cut atopening
typical trimreinf at openingsin concrete slabs
#5x5'-0"diag at eacorner for eareinforcingmat
2-#5 ea side,typ
Note:For openings in slab < 12" provide #4x3'-0"around opening
max uno
typ
2'-
6"
min
OPEN
(12" to 2'-6" max)
2'-6"
330SD002-16
Slab OpeningReinforcing
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:1
8 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S1.3
Typical ConcreteDetails
S1.3S1.3S1.3S1.3
7777
S1.3S1.3S1.3S1.3
8888
S1.3S1.3S1.3S1.3
5555
S1.3S1.3S1.3S1.3
6666
S1.3S1.3S1.3S1.3
1111
S1.3S1.3S1.3S1.3
2222
S1.3S1.3S1.3S1.3
4444
S1.3S1.3S1.3S1.3
3333
276SD001-24
FC J colbeyond
provide 3" minconcrete coverat col beyond
perforated drainw/ gravel backfill
8" concrete wallw/ #5 @ 12"ccea way at J wall
ramp slabsee Arch'l
ftg padbeyondsee plan
eq 8" eq
12"
conc slabsee
CJ
10"
8- verts w/90° std hookat ftg
2"clr
#4 ties @6"cc w/ addl2-#4 ties @2"cc t&b
Plan at Column
Loading dock wall
Section
276SD003
-
-
3-#5 long
#5 @ 16"cc
bumper per Arch'l
slab on gradeper plan
-270SD001
eq6"
12"
10"
eq2-#5cont
12" bend-typ
#4 @ 18"cc
ramp slabsee Arch'l
6" conc wallw/ #5 @ 12"ccea way
va
rie
s(3
'-6
" m
ax
)6
"
2"clr
FC
guardrailsee Arch
elev varies
min
perforated drainw/ gravelbackfill
Note:pour slab priorto backfilling wall
Retaining wall at dock
2-#4 cont
276SD002-24
Section
270SD001
276SD003-24
FCverify w/ leveler mfr
FC
8"
#4 @ 16"cc
optional CJ
#4 verts @ 12"cc@ J wall w/std hooks
conc beyond
#5 @ 12"ccw/ 24" bend
6" aggregatebase
8" concretewall, see
galv. L3x3x 3/8" edge anglew/ 1/2"øx4" studs @ 12"cc- verify w/ mfr requirements
12"
12"
1'-6
"
ramp slabsee Arch'l
2'-6"
12"
CJ 8" conc slab w/#4 @ 12"cc EWat J slab
slope 1/8"/ft
Dock leveler
Section
-
276SD001
revealtyp
slab on gradeper plan
#4 cont
verify w/ leveler mfr
FC
8"
8" conc slab#4 @ 12"cc EWat J slab
12"
1'-6
"
12"
8"
FC
va
rie
s
slab on gradeper plan
Dock leveler276SD004-24
Section
276SD003
see
280SD002-24
Edge Frame Column
see plan
se
e p
lan
pla
n
se
e+
0'-
0"
FF
280SD003 280SD004
frame col by metal bldg mfr
metal panel & girt bymetal bldg mfr
slab on grade per plan
3"
clr footing reinf per plan
#5 cont thru ftg t&b
F1554 Gr. 36 headedanchor rods w/ dbl nuts &3"[x3/8" K washer,embed 3" clr from bott offtg. Diameter andlocation by metal bldg mfr
#4 dowels @ 24"cc30"
cont ftg beyond
exterior flatworkby others
FC
J AB group
PLAN
1'-0" min
min
4 d
ia
min
4 diamfr dwgssee bldg
280SD001-24
Slab Edge Section
3"
clr
.
+0'-0"FF
exterior flatworkby others
plan
see
mtl panel & girtsby mtl bldg mfr
col bynd by mtl bldg mfr
.
slab on gradeper plan
ftg beyondper plan
cont
cont
optional CJ
..
280SD003-24
J bolt pattern& J ftg
12"
12" cont t&b
Edge Frame Column Plan
J b
olt
pa
tte
rn a
nd
J f
tg
anchor boltssee
#5 hairpinlap to tiereinf
vert(4 total)
ties @ cc w/3 ties @ 2"cc@ top
8"
conc slab ongrade see plan
EQ
EQ
280SD002
3" clr
EQ EQ
conttie reinf
Note : Orienthairpin on a45° angle @corners, typ
280SD004-24
J bolt pattern& J ftg
12"
12"
#5 cont t&b
Edge Frame & Portal FrameColumn Plan
J b
olt
pa
tte
rn a
nd
J f
tg
anchor boltssee
#5 hairpinlap to tiereinf
2-#6 vert(4 total) typ
8"
conc slab ongrade see plan
EQ
EQ
280SD002
3" clr
EQ EQ
#5 barea dir.4
'-0
" #4 ties @ 8"ccw/ 3 ties @2"cc @ top, typ
conttie reinf
280SD005-8
Shear Thrust Angle
1' -
0"
1 1/
2"
min
1 1/
2"
min
to h
air
pin
2"
clr
column & base K perapproved metalbldg drawings
nut
notch L as req'dto pass hairpin
Note: Double anchor bolt paircondition. Provide add'l anglesas req'd for other conditions.
L3x3x1/2"x1'-0"holes to matchbase K
stair stringers by stair mfr.See Arch for shape & configHSS12x2x3/16" min or Í12x20.7min. No flat K stringerspermitted
#4t&b
thickened slabftg. Extend 1'-6"min beyond staireach side
18"min
slab ongradeper plan
3/16" min endand brng K
conn bystair mfr (*)
concrete filledpan treads bystair mfr (2" min)
(*) Connection to accommodate interstory drift
12"
min
Typical Stair Stringer toSlab-On-Grade Detail550SD001-12
3/16" min endand cap K typ
L beamper plan
metal deckw/ conc fill
Pc stair stringeras reqd
shear K by stairmfr 3/8" min
stair stringers by stairmfr. See Arch forshape and configHSS12x2x3/16" min or Í2x20.7min. No flat K stringerspermitted
concrete filledpan treads bystair mfr (2" min)
Typical Stair Stringerto Floor Detail550SD002-12
weld perstair mfr3/16" min
weld perstair mfr3/16" min
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:2
0 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S1.4
Typical ConcreteDetails
S1.4S1.4S1.4S1.4
1111
S1.4S1.4S1.4S1.4
2222
S1.4S1.4S1.4S1.4
3333
S1.4S1.4S1.4S1.4
4444
S1.4S1.4S1.4S1.4
6666
S1.4S1.4S1.4S1.4
5555S1.4S1.4S1.4S1.4
7777
S1.4S1.4S1.4S1.4
8888
S1.4S1.4S1.4S1.4
9999
S1.4S1.4S1.4S1.4
10101010
S1.4S1.4S1.4S1.4
11111111
Typical Pile Cap Notes
1. All pile caps to have top curtain of #6 @ 12"cc min EW, 3" clear from top of pilecap, typ. uno.
2. Contractor and job inspector shall notify Structural Engineer of any pile not installed in its proper location as shown on drawings, so that corrective measures may be taken if required. Piles not installed within tolerances per specifications, shall be corrected, as required, at no cost to owner.
3. Where wall pours across the top or into the sideof pile caps, provide dowels from pile cap same sizeand spacing as wall reinforcing. Project dowels 48 bardiameters minimum above pile cap.
4. Bottom mat reinforcing at pile caps to be 8" clearfrom bottom of cap w/ 180° standard hooks ea. end.Place longitudinal bars on bottom uno.
5. Minimum compressive strength of pile cap concrete isto be f'c = 5000 psi @ 28 days. See specs for type G concrete.
6. See for typical pile cap detail.
7. All pile caps shall be poured against undisturbednative soil or engineered fill per soils report.
8. No dobies allowed on top of piles.
5
S6.01
1' - 2"
typ
2"
clr
1' -
2"
"le
ng
th o
f p
ay
me
nt"
TB
D (
es
tim
ate
d)
1"
5 @
1"c
cre
inf
du
cti
le s
pir
al
W4
@ 3
" p
itc
h
5 @
1"c
c
1"
120
% F
lex
ura
l Le
ng
thre
ma
ind
er
18" typ
4'
- 3
" m
in
fro
m t
.o.
ca
p m
ax
3'
- 0
" m
in o
r 2"
clr
ýb
ott
om
of
pile
ca
p
t.o
. p
ile
tip elevation variestypical for estimating onlyActual depth to be field determinedby geotechnical engineer
#8 dowel typ @ J
..5
'- 0
"
TB
Db
ott
om
of
pile
ca
p
.T
BD
P.I
Pinned Pile Moment Diagram
point of fixity
M+
TBD in-kips
6"
ý5
'-0
"
dense gravel
TBD datumfor estimating
Prestressed Concrete Pile Notes:
1. This is a design/build element. Design criteria herein are based on theuse of 14"[ prestressed concrete piles. The pile length is expectedto be as noted. Actual length is subject to field verification by theGeotechnical Engineer.
2. Pile Requirements:
Use 1/2"ø ASTM 416-68 gr.270"lowlax" strands; f' = 268,000 psiA = 0.153 sq in
Initial tension: 28,900 #/strandEffect: Prestress: 960 p.s.l.
Concrete strength:f'c = 4,000 p.s.i. @ transferf'c = 6,000 p.s.i @ 28 days
3. Pile Design Criteria (CBC 1605.3.2)
Typical Piles
DL = 90k (D)DL+LL = 110k (D+L)DL+LL+Seismic = 146k (D+L+0.7E) or (D+L+0.6W)Uplift = 73k (0.6D-0.7E) or (0.6D-0.6W)Lateral = TBDk (0.7E)Ultimate = TBDkFlexural length includes 10 feet for maximum cutoff
High Load Piles
DL = 120k (D)DL+LL = 150k (D+L)DL+LL+Seismic = 204k (D+L+0.7E) or (D+L+0.6W)Uplift = 100k (0.6D-0.7E) or (0.6D-0.6W)Lateral = TBDk (0.7E)Ultimate = TBDkFlexural length includes 10 feet for maximum cutoff
4. Pile Design Criteria: (CBC 1605.2 & ASCE7 12.4.2.3Combine axial load & bending:a) 1.4Db) 1.2D+1.6L+0.5Lrc) 1.2D+1.6Lr+f L f = per CBC 1605.2d) (1.2+.2S )D + f L + Ee) (0.9-.2S )D - E @ tension piles
Pile manufacturer is to provide pile design calculations signed bya registered Professional Engineer in the state of California.Provide additional mild reinforcing as required to provide requiredcapacity. Spirals shown are a minimum and subject to manufacturer'sdesign.
5. Placement of piles shall conform to the soils report # bydated with continuous observation by a representative of that firm.Final pile depths to be determined in the field by the GeotechnicalEngineer.
6. Pile extension detail, if required, to be submitted to and approvedby Structural Engineer.
7. Provide driving follower to protect steel and strand extendedfrom pile.
8. Construction tolerance on placement of piles is 3" horizontally in anydirection and vertical alignment of no more than 2% out of plumb. Surveyall piles to verify tolerance.
s
1 1DS
DS
fle
xu
ral l
en
gth
14"[ Prestressed Concrete Pile221SD001
bottom reinf per pilecapdetails w/ 180° std hookea end, ea way typ
se
e p
ilec
ap
de
tail
for
thic
kn
es
s
columnper plan
8"
clr
#6 @ 12"cc EWtop, typ unofor tensionpile
3"
clr
6"
t.o
.
pile
pile cap perplan, seespecific pilecap details forsize & reinf
typ
un
o
conc slabon gradeper plan
see plantof
see plan
toc
se
ep
lan
Z-bars @perimeterof pile cap
2'-6"
1'-6
"m
in
piles per
Plan @ EdgePlan
#5 Z-bars@ 8"cc
columnper plan
pile cap
conc wall
pile cap
columnper plan
#5 Z-bars@ 12"cc
tie/grade bm reinforcing persections to terminate atblockout w/ std hook, typ
Ties to engage topmat of pile cap reinf.See tie/grade beamsections for tie sizeand spacing
stdhk
223SN001 221SD001
or
Typical Pile Cap Detail220SD001
J col
J c
ol
3'-0" thick
6-#9 ea waybottom
columnper plan
pile per
4'
- 6
"
4' - 6"
2' - 3" 2' - 3"
2'
- 3
"2'
- 3
"
1
clr
3"
One Pile Cap221SD002
1
S1.5
J c
ol
J col
4'-0" thick columnper plan
piles per
4'
- 6
"
7' - 9"
2' - 3" 2' - 3"
2
1' - 7 1/2" 1' - 7 1/2"
8-#4
6-#
11 b
ott
om
typ3" clr
2'
- 3
"2'
- 3
"
Two Pile Cap221SD003
1
S1.5
J c
ol
J col
piles per
4'-0" thick
5-#11 bottom3 ways, centeredover piles
#5 bottom easide of cap
rectangular cap@ contractor'soption
J columnper plan
ý
3
ýý
ýý
ý
ý ý ý
ý
ý
columnper plan
221SD001
Three Pile Cap221SD004
3"
clrtyp
2'-3" 2'-3"1'-10"1'-10"
1'-3 1/2" 1'-3 1/2"
2'-
3"
1'-1
"2'-
3"
2'-
1"
7'-
8"
ý2'-
10"
ý8'-2"
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:2
2 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S1.5
Typical Pile Details
S1.5S1.5S1.5S1.5
2222
S1.5S1.5S1.5S1.5
1111
S1.5S1.5S1.5S1.5
3333
S1.5S1.5S1.5S1.5
4444
S1.5S1.5S1.5S1.5
5555
S1.5S1.5S1.5S1.5
6666
772 S.F. = B OCC.SEE CBC SEC 304EDUCATION ABOVE 12THGRADE
494 S.F. = B OCC.CBC 2013 SECTION303.1.1.2.2
251 S.F. = B OCC.CBC 2013 SECTION303.1.2.1
POWER UNITSUBMERSIBLE
38" W. X 32 3/8" HMICROPROCESSOR CONTROL
SCHINDLERHYDRAULIC ELEVATORHOLELESS FRONTMOUNTED JACK2500 LBS
PPE
PPE
OFFICE
BREAK
ROOM
MEN'S
RESTROOM
MEN'S
SHOWER
STORAGERECEPTION
RESTROOM
FIRE
RISER
CONFERENCELOBBYSTAIR
OFFICE
TRAINING
ROOM
WOMEN'S
RESTROOM
ELECTRICAL RM.
ELEV
MACH RM
ELEV
WOMEN'S
SHOWER
HALLWAY
UPS
SWITCH GEAR
ELECT
TRANS.
JAN.
REF
VEND
VEND
D.W.
SW
ITC
H G
EA
R
A.1
A.1 A
A
A.2
A.2
J
J
K
K
L
L
M
M
N
N
P
P
Q
Q
R
R
S
S
T
T
U
U
V
V
W.1
W.1
W
W
X
X
Y
Y
Z
Z
1 1
1.8 1.8
3.6
4.5 4.5
5.1
8 8
5.8 5.8
34' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 26' - 2" 31' - 2" 35' - 4 1/4"
370' - 0" 92' - 8 1/4"
180
' -
0"
6.6 6.6
3.5 3.5
7.2 7.2
.
.
frame frame
(n) concretainingwall
frame frame
Admin BuildingElev +0'-0"
frame frame frame frameJ col (e) bldg
2' - 3 1/2"
brace col tojack girder abv
grade beams@ perimeter -typ
J col
2' - 3 1/2"
face of admin
10 1/2"
Truck DockElev -4'-0"
concretescreen wall
exterior stair -see notes
grade beams@ perimeter -typ
exterior slabpile supported
grade beams@ perimeter -typ
Main FloorElev +0'-0" = 32.00
pile supported reinforcedconcrete slab - typ
Roll Off PitElev -4'-0"
brace colto jackgirder abv
4' - 0"
grade beams@ perimeter -typ
Bailer PitElev -4'-0"
Bailer PitElev -8'-0"
Bale StorageElev +0'-0"
A
S3.1
B
S3.1
C
S3.1
D
S3.1
A
S3.2
B
S3.2
C
S3.2
D
S3.2
E
S3.2
F
S3.2
2.9 2.9
27
' -
4 3
/4"
19'
- 7
1/4
"27
' -
0"
24
' -
0"
18'
- 6
"24
' -
6"
24
' -
0"
15'
- 0
"
72'
- 7
1/4
"27
' -
5 1/2
"21'
- 4
"4
3'
- 7
1/4
"
X.1
SSI Equip PitElev -10'-0"
pile supported truck slab
gradesupportedtransitionslab
pilesupportedtruck slab
25' - 3 1/2" 7' - 0 3/4" 24' - 1 1/4" 35' - 4 1/4"
91' - 9 3/4"
180
' -
0"
165
' -
0"
15'
- 0
"
27
' -
0"
24
' -
0"
18'
- 6
"24
' -
6"
27
' -
4 3
/4"
19'
- 7
1/4
"24
' -
0"
15'
- 0
"
Foundation Plan NotesFrame locations for N-S lateral loads shown on these plans are schematic fordesign intent. Final frame locations & configuration are to be determined by thePEMB desginer with the approval of the Architect.
Foundation design and design of anchor bolts and embedments shall be done by theSEOR based on loads provided by the PEMB designer
Anchor bolts are to be provided by the General Contractor. Anchors are to besecurely and accurately placed in forms. Erection drawings and templates for settinganchor bolts are to be provided by the PEMB designer. Prior to placing foundationconcrete, locations of anchor bolts are to be verified by a registered Civil Engineer orlicensed Surveyor engaged by the General Contractor. The party providing the surveyshall submit written verification that the installation is in accordance with the ContractDocuments and the anchor setting plan provided by the PEMB designer.
1.
2.
3.
1.
2.3.
4.
5.
6.
7.
8.9.
10. Foundation design is based on preliminary evaluation of metal building reactions.Final building reactions are to be submitted to the Structural Engineer for validationof foundations prior to construction.
Building designer shall account for the weight of all mechanical equipmentin the design of all building components which support such units.
Contractor shall provide temporary erection bracing as required.
All hardware required for connecting building components shall be designed,detailed and provided by building manufacturer.
Contractor shall verify all dimensions with Architectural drawings and MBMcolumn layout prior to foundation construction.
Building manufacturer shall provide plan drawing showing column locations andanchor bolt locations prior to fabrication. Anchor bolt sizes, numbers, andlocations are to be designed and detailed by MBM. MBM shall furnish requiredanchor bolts setting templates for setting of anchor bolts by General Contractor.
Drawings and calculations shall be signed by a Civil Engineer registered in thestate in which the project is located.
Drawings, calculations and engineering data on structural sections for allcomponents shall be submitted to the Architect and/or Structural Engineer forreview prior to fabrication. See specifications section 13-34-19 for loadinginformation.
Metal Building Manufacturer (MBM) shall be AISC category 'MB' certified.
Design and fabrication shall conform to the 2013 California Building Code (CBC),and the latest editions of AISC "Specifications for the Design, Fabrication, andErection of Structural Steel Buildings", and AISC "Specification for the Design ofCold-Formed Steel Structural Members".
TYPICAL PREFABRICATED METAL BUILDING NOTES
DL = Building Component Dead Load
CDL = Collateral Dead Load
LL = Live Load
IWPF Building
DL
CDL
LL
Roof
AdminBuilding
DL
CDL
LL
Roof
DL
CDL
LL
Floor
Auxiliary
per MBM
14 psf (8 psf+6 psf for photovoltaic panels)
20 psf (reducible)
per MBM
10 psf
20 psf (reducible) roof load
a. Roof Units and Monitor per plans
per MBM
10 psf
85 psf Office Areas
100 psf Corridors and Exitways
Partitions 15 psf Office Areas
PRE-ENGINEERED METAL BUILDING (PEMB) DESIGN LOADS PRE-ENGINEERED METAL BUILDING (PEMB) DESIGN NOTES
See specifications for additions requirements for thedesign of Pre-engineered Metal Buildings
Auxiliary a. Point Loads for stairs, see notes
for preliminary loads.
Collateral dead load and Auxiliary loads are preliminaryestimates to be verified in magnitude and location by thePEMB designer during final design.
b. Elevator Guiderail Supports,see notes for preliminary loads
A partition weight of 5 psf in to be included in theseismic weight for building seismic design for AdminBldg floor & Roof.
1.
2.
3.
4.
5.
6.
b. Elevator Guiderail Supports
Floor design shall be designed to limit floor vibrations.The floor system shall be considered satisfied if thepeak acceleration, ap, due to walking excitation doesnot exceed .05% of gravitiy, g.
Admin Building Stairs - design of stairs is not by PEMBsupplier. PEMB designer shall provide for the support ofthe stairs at the second floor. Assume the followingweights: a. DL = 35 psf (concrete filled pan treads, steel
stringers)b. Live load = 100 psfc. Seismic load = 8500 lbs lateral (1.0E)
Admin Building Elevators - design of elevators is not byPEMB supplier. PEMB designer shall provide for thelataral bracing of the elevator rails between the roof andsecond floor and between the 1st and second floor.Assume the following: a. Vertical tube steel supports behind each rail.
Assume (4 tubes) total.
b. Lateral force H = 1500 lbs any direction at any height
c. Limit deflection of tube supports to 1/4"
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:2
3 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S2.1
Foundation Plan
1/16" = 1'-0"Foundation Plan
A
A
A.2
A.2
J
J
K
K
L
L
M
M
N
N
P
P
Q
Q
R
R
S
S
T
T
U
U
V
V
W.1
W.1
W
W
X
X
Y
Y
Z
Z
1 1
1.8 1.8
3.6
3.6
4.5 4.5
5.1
5.1
8 8
5.8 5.8
6.6 6.6
5.5
5.5
3.5 3.5
7.2 7.2
A
S3.1
A
S3.2
B
S3.2
C
S3.2
D
S3.1
B
S3.1
D
S3.2
F
S3.2
E
S3.2
C
S3.1
frame frame frame frame
frame frame frameframe
(e) IWPF
seismic joint (n) IWPF bldg
IWPF bldg
seismic joint admin bldg
exterior stair -see notes
L bm frmg @bldg perimeter
frame
frame
down
Concrete over metaldeck - see notes
L bm or steel joistsfloor support atinterior framing
girder
fra
me
fra
me
low roof canopy w/cantilever bm support
interior stair -see notes
elevator -see notes
frameframe
Mezzanine /Catwalk byMBM
2.9 2.9
X.1
fra
me
fra
me
fra
me
(b)
(b)
(b)
(b)
Floor Framing Plan Notes
See notes on sheet S2.1 for Metal Building Notes and Loading.1.
2. Floor deck shall be 2" metal deck with 3 1/2ļ" NW concrete fill or an alternate deckthat satisfies the design loading criteria and provides a minimum 1 hr fire ratings.
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:2
4 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S2.2
2nd Floor FramingPlan
1/16" = 1'-0"2nd Floor Framing Plan
ROOF MONITORS
dia
ph
rag
m s
tru
ts
Z p
url
ins
@ ±
5'-
0"c
c
A.1
A.1 A
A
A.2
A.2
J
J
K
K
L
L
M
M
N
N
P
P
Q
Q
R
R
S
S
T
T
U
U
V
V
W.1
W.1
W
W
X
X
Y
Y
Z
Z
1 1
1.8 1.8
3.6
4.5 4.5
5.1
8 8
5.8 5.8
6.6 6.6
5.5
3.5 3.5
7.2 7.2
A
S3.2
B
S3.2
C
S3.2
D
S3.2
D
S3.1
A
S3.1
B
S3.1
F
S3.2
E
S3.2
C
S3.1
frame frame
frameframe
collectorstrutmembers
frame frame
frameframeJack Girder
Jack Girder
Jack Girder
Jack Girder
Jack Girder
Jack Girder
Jack Girder
Ja
ck
Be
am
Ja
ck
Be
am
Ja
ck
Be
am
Ja
ck
Be
am
Ja
ck
Be
am
Ja
ck
Be
am
(e) Greenwaste IWPF Bldg
seismic joint (n) IWPF bldg
collector/strutmembers
diaphragmbracing
metal roofpanels
diaphragmbracing
fra
me
fra
me
fra
me
fra
me
fra
me
fra
me
fra
me
fra
me
fra
me
fra
me
fra
me
fra
me
admin bldg
seismic jointIWPF bldg
parapettow = +45'-0"
parapettow = +45'-0"
1/2:12
slo
pe
1/2:12
slo
pe
+35'-3"
eave
ht
+42'
-9"
eave
ht
+35'-10
1/2"
eave
ht
fra
me
metal roofpanels
frame
frame
roof mountedMech'l unit typ
Z purlins @ ±5'-0"cc typw/ add'l purlins @ Mech'lunits and roof monitors
diaphragmbracing &struts, typ
roof monitors (typ of 3)
typ parapettow = +32'-6"
roof screentow = +39'-6"
stair tower parapettow = +30'-6"
high parapetover elevatortow = +40'-0"
elevatoroverbuiltroof
+32'-6
"
eave
ht
3/4
:12
slo
pe
2.9 2.9Jack Girder
X.1
500 lb
1500 lb
1100 lb
1100 lb
1500 lb
1500 lb
500 lb
1100 lb 1100
lb1100 lb
fra
me
fra
me
fra
me
Roof Framing Plan Notes
Provide a sesimic separation joint between the new IWPF Building & the (e)Greenwaste IWPF Building. The width of joint is to be determined by the PEMBbased on the calculated drifts of each building.
Provide a seismic separation joint between the new IWPF Building new AdminBuilding with the width of joint determined from the calculated drifts of each building.Dimensions between buiilding shown on these plans will be modified as required toaccommodate required separation.
Roof mounted mechanical unit weights at the Admin Bldg are estimated on plan.Location size and weight are to be verified for actual units used. Provide supportat all sides and provide openings in framing for duct penetrations.
Roof monitors weights at the Admin Bldg are estimated at 1000 lbs. Location, size,and weight are to be verified with units selected for final design.
Roof diaphragm bracing shown on these plans is schematic for design intent. Finalbrace configuration is to be determined by the Pre-engineered Metal BldgManufacturer (PEMB) with the approval of the Architect.
See notes on sheet S2.1 for Metal Building Notes and Loading.1.2.
3.
4.
5.
6.
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:2
5 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S2.3
Roof Framing Plan
1/16" = 1'-0"Roof Framing Plan
2.91 3.51.8 4.5 5.8 6.6 87.2
27' - 0" 24' - 0" 18' - 6" 24' - 6" 27' - 4 3/4" 19' - 7 1/4" 24' - 0" 15' - 0"
180' - 0"
Z girts @ 5'-0" typ
metal roof panels
Z girts @ 5'-0" typ
diaphragm struts and bracing as neededprimary frame
metal wall panels
reinforced concrete slab on pile foundation
grade beam typ
concrete processing pits typ
min
cle
ar
29
'-8
"
parapet
parapet support @ column
exteriorskin - seearch'l
9 1/2"
f.o.col
e.o.slabface of girt
9 1/2"e.o.slabface of girt
f.o.col
81
2.91 3.51.8 4.5 5.8 6.6 87.2
24' - 0" 18' - 6" 24' - 6" 27' - 4 3/4" 19' - 7 1/4" 24' - 0" 15' - 0"
Z girts @ 5'-0" typ
metal roof panels
Z girts @ 5'-0" typ
diaphragm struts and bracing as needed
primary frame
metal wall panels
reinforced concrete slab on pile foundation
grade beam typ
concrete processing pits typ
parapet parapet support @ column
exteriorskin - seearch'l
pilesuportedtruck slab -whereindicated onplan
jack girder
girt support column to jack girder above
jack girderspanningbetweenadjacent frames
roll up door
jack beam on grid line
jack girder
girt support columnto jack girderabove
27' - 0"
9 1/2" typ
f.o.col
e.o.slabf.o.girt
7.2
parapet support @ column typparapet
primary moment frame
pile supportedslab on piles
grade beam at lower grade
A.1
AA.2
4' - 0"
seismic joint
(e) purlins
(e) frame beam
(e) columns
(e) pile supported slab
(e) piles(n) piles
(n) pile supported slab
(n) purlins
(n) frame beam
remove (e)metal panels& Z girts
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:2
6 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S3.1
Sections
SectionS3.1S3.1S3.1S3.1
1/8" = 1'-0"AAAA
Drafting 5
SectionS3.1S3.1S3.1S3.1
1/8" = 1'-0"BBBB
Drafting 6
SectionS3.1S3.1S3.1S3.1
1/8" = 1'-0"CCCC
Drafting 7
SectionS3.1S3.1S3.1S3.1
1/8" = 1'-0"DDDD
Drafting 8
3.6 5.1 5.8
roof screen
HVAC unitsroof monitors
Z purlins
steel frame beyond metal roofpanels
metal stud wallframing
metal deck & conc fill
steelbeams orjoists
steel columnbeyond
stud wallbracetyp
concreteslab onpiles
curtain wall
Stairs
conc screen wall
Truck Dock
concreteslab onpiles
grade beam
stairs
catwalk beyond
3.6 5.1 5.8
Z purlins
steel frame beyond metal roofpanels
metal stud wallframing
metal deck & conc fill
steelbeams orjoists
steel columnbeyond
stud wallbracetyp
concreteslab onpiles
cantilevered roof canopy
ZYXW
W
Z purlins
steel framebeyond
metal roofpanels
metal stud wallframing
metal deck & conc fill
steelbeams orjoists
steel columnbeyond
concreteslab onpiles
HVAC ubits - see planmeal stud roof monitors
metal stud wallframing
columns beyond per plan
Z purlins
metal roofpanels
grade beam
seismic joint
Z girts
roof screen
5.2
Z purlins
steel frame beyond
metal roofpanels
metal deck & conc fill
steelbeams orjoists
concreteslab onpiles
elev pit
wind beam
wind beam
metal stud wall
overbuildframing atelevator
W
W
Z purlins
steel frame beyond
concreteslab onpiles
metal roofpanels
grade beam
slab on grade
metal panels
Z girts
wind columns beyond
W
W
Z purlins
steel frame beyond
concreteslab onpiles
metal roofpanels
grade beam
metal panels
Z girts
wind columns beyond
concreteslab onpiles
truck dock
rollup door
Structural Engineers, Inc.Buehler & Buehler
tel 916.443.0303 fax 916.443.0313600 Q Street, Suite 200, Sacramento, CA 95811
Sacramento . Phoenix . San Francisco . Los Angeles
S
S
TA
T E O F C A L I F O R NI A
STRUCTURAL
R
EFORPDE
RE
TSI
GE
S I N
E NG
I NE
ER
OA L
A ISSUED FOR PEMB PRICING 10-30-15
PRE-ENGINEERED METAL BUILDING (PEMB)CRITERIA DRAWINGS FOR:
SAN LEANDRO, CALIFORNIA
2615 DAVIS STREET
WASTE MANAGEMENT
SAN LEANDROINTEGRATED WASTE PROCESSING
FACILITY (IWPF) & ADMINISTRATIVE
OFFICE BUILDING
ET Environmental Corporation, LLC7945 SW Mohawk Street
Tualatin, Oregon 97062-9193PH 503-885-8800 FAX 503-885-8810
GENERAL CONTRACTOR:
project number :
scale :
drawn by :
checked by :
plot date :
approved for the architect by :
approved for the owner by :
sheet no. :
12405.00
LJS
LJS
issue : description : date :
www.rmw.comFax 916.449.1414Tel 916.449.1400
Sacramento, CA 95811
1718 Third Street
Suite 101
LAWRENCE J.
SUMMERFIELD
No. 3605
10-30-15
VARIES
11/2
/2015 3
:51:2
8 P
MC
:\re
vit\U
nnum
bere
d L
EJ_W
M S
an L
enadro
IW
PF
_R
15_C
entr
al_
larr
ys@
bbse.c
om
.rvt
S3.2
Sections
SectionS3.2S3.2S3.2S3.2
1/8" = 1'-0"AAAA
Drafting 9
SectionS3.2S3.2S3.2S3.2
1/8" = 1'-0"BBBB
Drafting 10
SectionS3.2S3.2S3.2S3.2
1/8" = 1'-0"CCCC
Drafting 11
SectionS3.2S3.2S3.2S3.2
1/8" = 1'-0"DDDD
Drafting 12
SectionS3.2S3.2S3.2S3.2
1/8" = 1'-0"EEEE
Drafting 13
SectionS3.2S3.2S3.2S3.2
1/8" = 1'-0"FFFF
Drafting 14