Upload
isabel-sharp
View
214
Download
0
Tags:
Embed Size (px)
Citation preview
Projects
Ce
Sodding Grass Nr 7
Nr. 7 Fertilizing and Rehabilitation of Fairway
Rehabilitation of dam edges
Cleaning up of forest area Nr 5 Tee
New Gardens At Driving Range
Tree Planting ongoing on Golf Course
Poa Grass Sprayed With Velocity
Anthracnose on Greens Poa Only affected
Reconstruction of Ladies Tees
From Left to Right Nr 16 and Nr 4 Ladies Tees
Nr 9 Rock Feature
Bunker Reconstruction Nr 18
Nr. 18 Green Bunker
Bunker Reconstruction
Nr 18 Green Bunker
Bunker Reconstruction
USGA SPEC SAND 200mm Deep
Mashie
Mashie Veld grass Gardens
Nr 11 Rock Feature Cleanup
Nr. 3 After Construction
Stress on Greens
Spraying oars recommended
Result of Spraying Oars
Stress significantly better
Nr 15 Construction and Irrigation
Irrigation
Thank You