9
1 1 Federal Aviation Administration Regional Workshop - AAL October 19-20, 2011 Project Workflow and the AGIS Website Airports GIS Presented to | FAA Regions |Alaskan By | Gil Neumann, APP-400 | Thomas Wade, ASW-611 Date | October 19-20, 2011 2 Federal Aviation Administration Regional Workshop - AAL October 19-20, 2011 Agenda Workflow (4 min) Website (9 min) Best Practices/Lessons Learned (2 min)

Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

Embed Size (px)

Citation preview

Page 1: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

1

1 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Project Workflow and the AGISWebsite

Airports GIS

Presented to | FAA Regions |Alaskan

By | Gil Neumann, APP-400 | Thomas Wade, ASW-611

Date | October 19-20, 2011

2 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Agenda

Workflow (4 min)

Website (9 min)

Best Practices/LessonsLearned (2 min)

Page 2: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

2

3 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Airports GIS Workflow (with Imagery)

Develop

Project:

Table 2-1

Create A GIS

Project/Assign

Reps

Develop

Statement-of-

Work

Pre-Coord

w/FAA

Submit

SOW

SOW

Approval

Survey &

QC

Imagery

Geodetic

Control

Plan

Approval

Project Execution

and Data Submittal

Data

ApprovalData Approved &

Available for Use

Implementation Plans

No

No

No

Collect, Orthorectify

and Submit

Stereo Imagery

Imagery

Approval

No

Informal Review

-17

-16

-18

Learning Example: Visual #1

4 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Project Execution and Data Submission (with Imagery)

Conduct Aerial & Ground Survey

Prepare Stereo andOrthorectified Aerial

Photography

Develop Planimetrics, Cadastraland Conduct Airport Airspace

Analysis

Convert Planimetrics to GIS datawith correct topology Attribute Data

NGS PlanApproval

NGS StereoImageryApproval

Reference: AECOM HRL eALP Project

Submit Datato FAA via

Airports GIS

Learning Example: Visual #2

Page 3: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

3

5 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Airports GIS Project Flow

Project Creation – Airport

Assignment of Representatives – Airport

Upload Statement of Work – Airport (Consultant)

SOW Concurrence – FAA (HQ or Region)

Plan Submittal (s) – Consultant

Plan Approval (s) – NGS

Project Execution – Consultant Team

Deliverables – Consultant

Imagery/Data Verification/Validation – NGS

Data Use – FAA/Others/Airport (eALP Assembly)

Learning Example: Text

6 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Project Creation in Airports GIS (continued)

Responsibility of airport sponsor/operator

(can be delegated to State through LOA)

Note:Challenges

with ProposedFacilities

Page 4: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

4

7 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Project Creation Result

8 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Project Workflow | Step 2: SOW

Recommend off-line coordination and notification when uploaded

Page 5: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

5

9 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

My Survey Projects | Next Action: Concur?

No Alaskan SOW’s need reviewed!

10 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

My Survey Projects | Project Concurrence

Page 6: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

6

11 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Project Workflow | In Progress

12 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Project Workflow | Final Step

Page 7: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

7

13 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Survey Tab | Survey Viewer Sub-tab

14 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Expectations | Review, Verification, Validation, Acceptance

Task Expectation

Statement of Work 1 Week

Plans (-16, -17, -18) 2 Weeks

Stereo Imagery 1 Month

Data / GIS Schema 1 Month

NGS independently verifies/Validates safety-critical data(runway end coordinates, profile, NAVAIDS, obstacles, etc.)

Page 8: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

8

15 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Downloading Existing Data

Airports GIS‣ if accepted by

NGS (sponsordownload)

NGS/UDDF‣ if surveyed (NGS

website)

FAA/AVN‣ if approach

exists (FAA/AVNwebsite

NASR/5010

16 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

Lessons Learned

Geodetic Control Plans only required if establishingPACS/SACS; if establishing Geodetic Control:

‣ Create as a stand alone project

‣ Recommend Project Type - Airside Construction

Software may require unneeded plans

‣ If so, upload document indicating “Plan Not Required”

Sponsor (Consultant) must Click “Submit” afterselecting file for upload

Projects w/o Safety-Critical Data (TW, Apron, etc)

SOW’s at non-NPIAS are auto-approved

Page 9: Project Workflow and the AGIS Website · Project Workflow and the AGIS Website Airports GIS Presented to ... Create A GIS Project/Assign Reps Develop ... Assignment of Representatives

9

17 Federal AviationAdministration

Regional Workshop - AAL

October 19-20, 2011

G. Thomas Wade, P.E.

Senior Planner | ASW-610

[email protected]

Office: 817.222.5613

Gil Neumann

Senior Airport Planner | APP-400

[email protected]

Office: 202.267.5840