PROJECT UPDATEPUBLIC OPEN HOUSE #3
OCTOBER 174:30 PM – 6:30 PM
Dakota County Northern Service Center
AA PROCESS
2
Project Scoping
We are here
1
2
3
4
1. PROJECT SCOPING: PURPOSE AND NEED
PROJECT PURPOSEThe purpose of the Robert Street Transitway is to provide the necessary transit infrastructure and service to meet the long-term regional mobility and local accessibility needs between downtown St. Paul and areas within Dakota County.
PROJECT NEED Forecasted growth in travel demand Limited transit service and time-efficient transit options Needs of people who depend on transit Roadway congestion and shift toward multimodal investments Regional objectives for growth
3
1. PROJECT SCOPING: GOALS AND OBJECTIVES
GOALS Improve mobility and accessibility Enhance the effectiveness of transit service within the corridor Provide cost-effective and financially feasible transit solutions Support and enhance existing communities and planned development Support healthy communities and sound environmental practices
4
2. PRELIMINARY SCREENING
5
WHAT WAS INCLUDED IN PRELIMINARY SCREENING? Does the alignment meet the
project purpose? Does the alignment show
ridership potential? Does the alignment match a
transitway mode’s recommended facility type, system length, and physical needs?
2. PRELIMINARY SCREENING:
ALTERNATIVESPreliminary screening considered alignment and mode alternatives generated by fall 2012 open houses, the Robert Street Steering Committee, and the 2008 feasibility study.
Alternatives included: 33 unique alignment
segments 7 mode alternatives
2. PRELIMINARY SCREENING:
RESULTSAlternatives advanced through preliminary screening: Robert Street Arterial BRT Robert Street Streetcar TH 52 LRT/Dedicated Busway TH 52 Highway BRT Concord Arterial BRT Concord Streetcar
These alternatives: Met the project purpose Showed ridership potential Fit a transitway mode
A possible service extension to Rosemount was advanced for sensitivity analysis.
3. CONCEPTUAL DEFINITION AND PRELIMINARY EVALUATION
WHAT WAS INCLUDED IN THE CONCEPTUAL DEFINITION OF ALTERNATIVES? Alignments Service plans Cross sections Facilities Conceptual station design
8
3. PRELIMINARY EVALUATION
WHAT WAS INCLUDED IN PRELIMINARY EVALUATION?
9
Assess alternative’s ability to: ■ Provide cost-effective
and financially feasible transit solutions
1. Engineering Constraints
Assess alternative’s ability to: ■ Improve mobility and
accessibility■ Support healthy communities and sound environmental practices
2. Ridership Potential
Assess alternative’s ability to: Enhance effectiveness
of transit service within the corridor
Improve mobility and accessibility
3. Capital Improvement Needs
Proj
ect G
oal
3. PRELIMINARY EVALUATION:
RESULTSAlternatives advanced through preliminary evaluation: • Robert Street Streetcar• Robert Street Arterial BRT• TH 52 Highway BRT
These alternatives showed the best ability to satisfy project goals based on one or more factors including: Physical impacts Projected ridership Cost-effectiveness
A service extension to Rosemount was evaluated separately from preliminary evaluation. Further study of a traditional express bus service along TH 52 is recommended for analysis outside of this study.
4. ADVANCED DEFINITION AND FINAL EVALUATION
ADVANCED DEFINITION WILL INCLUDE: Runningway alignment Stations Service plans Traffic controls Operating facilities design
11
We are here
4. ADVANCED DEFINITION AND FINAL EVALUATION
ADVANCED DEFINITION WILL PROVIDE INFORMATION TO EVALUATE:• Cost estimates• Economic development and land use• Environmental and natural resources• Environmental justice• Mobility• Traffic operations• Travel demand
12
We are here
4. ADVANCED DEFINITION AND FINAL EVALUATION
INFORMED BY:• Purpose and Need local
• Adopted goals, objectives, and evaluation measures
• Metropolitan Council Regional Transitway Guidelines regional• Capital Investment Criteria – Section 10.8
• FTA New Starts national• Project Justification Criteria
13
We are here
NEXT STEPS TODAY
WHAT’S NEXT TODAY?We invite you to: Review materials Ask questions Sign-up for email list Fill out comment cards Provide feedback on preliminary alternatives
14
THANK YOU!
WWW.ROBERTSTREETTRANSIT.COM