S. No Client Owner/ Operating Co. Project Location Period Scope Of Work 1 Bijell-2 and Bijell-4 Well Test Surface Facility Iraq Apr, 2014 Detail Engineering of Wellhead and Pig Receiver Skids 2 PUO FPSO - Pagerungan Utara Development Project Indonesia Apr, 2014 Modification works for FPSO Topside Facilities 3 SK316 Development Project Malaysia Mar, 2014 Piping & Structural works for TEG Regeneration Package 4 B 2-Phase Facility Installation Project Yemen Mar, 2014 FEED & Detail Engineering of Water Treatment and Injection Package Upgrade 5 Nyhamna Nitrogen Generator Project Norway Mar, 2014 Engineering Support to Perform Area Engineering for the Nitrogen Generator 6 Development of Gas-Condensate Fields Adamtash, Gumbulak, Djarkuduk - Yangi Kizilcha Uzbekistan Feb, 2014 Detail Engineering of Di-Ethelyne Generation (DEG) Package 7 Huangyan Gas Complex Development Project China Feb, 2014 Process Engineering Support MEG Regeneration System 8 TEN FPSO Project Ghana Dec, 2013 Detail Engineering of Produced Water System 9 Bertam FPSO Development Project Malaysia Dec, 2013 Process Design Development for Equipment & Skid based Equipment 10 Western Isles Development Project FPSO Project UK Oct, 2013 Detail Engineering for Structural And Piping works for TEG Skid 11 Sagar Pragati Conversion Project India Sep, 2013 Detail Engineering of Compressor Package 12 Garagol Deniz West Development Project Turkmenistan Sep, 2013 Detail Engineering of MEG Regeneration and Salt Reclamation Package PROJECT TRACK RECORD Pt. Heat Exchanger Indonesia Kavin Engineering And Services Private Limited Page 1 of 17

PROJECT TRACK RECORD - kavinengg.com

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

1Bijell-2 and Bijell-4 Well Test Surface

FacilityIraq Apr, 2014

Detail Engineering of Wellhead and Pig

Receiver Skids

2PUO FPSO - Pagerungan Utara

Development ProjectIndonesia Apr, 2014 Modification works for FPSO Topside Facilities

3 SK316 Development Project Malaysia Mar, 2014Piping & Structural works for TEG

Regeneration Package

4 B 2-Phase Facility Installation Project Yemen Mar, 2014FEED & Detail Engineering of Water Treatment

and Injection Package Upgrade

5 Nyhamna Nitrogen Generator Project Norway Mar, 2014Engineering Support to Perform Area

Engineering for the Nitrogen Generator

6

Development of Gas-Condensate Fields

Adamtash, Gumbulak, Djarkuduk - Yangi

Kizilcha

Uzbekistan Feb, 2014Detail Engineering of Di-Ethelyne Generation

(DEG) Package

7Huangyan Gas Complex Development

ProjectChina Feb, 2014

Process Engineering Support MEG

Regeneration System

8 TEN FPSO Project Ghana Dec, 2013 Detail Engineering of Produced Water System

9 Bertam FPSO Development Project Malaysia Dec, 2013Process Design Development for Equipment &

Skid based Equipment

10Western Isles Development Project FPSO

ProjectUK Oct, 2013

Detail Engineering for Structural And Piping

works for TEG Skid

11 Sagar Pragati Conversion Project India Sep, 2013 Detail Engineering of Compressor Package

12 Garagol Deniz West Development Project Turkmenistan Sep, 2013Detail Engineering of MEG Regeneration and

Salt Reclamation Package

PROJECT TRACK RECORD

Pt. Heat Exchanger Indonesia

Kavin Engineering And Services Private Limited Page 1 of 17

Page 2: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

13Wellhead Compression Pilot Project Well

Bb-690 (LPG Plant)UAE Sep, 2013

Pre-Bid Engineering Services for Compressor

Package

14 Permas Production (PR-PA) Topsides Malaysia Sep, 2013Detail Engineering of Fuel Gas Conditioning

Unit

15 Cluster 7 FPSO Project India Sep, 2013Detailed Engineering of Gas dehydration & TEG

Regeneration Package

16P-74 FPSO Cessao Onerosa Area

Development ProjectBrazil Aug, 2013 Detailed Engineering of E-House

17BARDEGG-2 and BARONIA EOR

Development ProjectMalaysia Aug, 2013

Conceptual Selection Study for Water Injection

Packages

18Asset Integrity Management of Bukha, BSP

& Atlantis PlantsUAE July 2013

Asset Integrity Management Services; Plant

Performance Study; and Energy Audit of

RAKGAS Plants/Fields at Bukha, BSP & Atlantis

19Construction of Barekuri New Oil

Collection Station. India July, 2013

FEED,Basic Engineering & Project Management

Consultancy for Construction of New Oil

Collecting Station (OCS)

20 Mereenie LPG Plant Australia July, 2013Conceptual Study for the Development of LPG

Extraction Plant

21 Garraf Development Facility Iraq June, 2013Mechanical Design of Pressure Vesssel for Fuel

Gas Conditioning Unit (FGCU)

22 Garraf Commercial Production Facility Iraq June, 2013Detail Engineering Mini Sub Station Skid for

Fuel Gas Conditioning Unit

23 FPSO Cidade de Saquarema TUPI 8 FPSO Brazil June, 2013Detail Engineering of Chemical Injection

Package

24 FPSO Cidade de Marica TUPI 7 FPSO Brazil June, 2013Detail Engineering of Chemical Injection

Package

Kavin Engineering And Services Private Limited Page 2 of 17

Page 3: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

25 FPSO Cidade de Marica TUPI 7 FPSO Brazil May, 2013Detail Engineering of Produced Water

Treatment System

26 FPSO Cidade de Saquarema TUPI 8 FPSO Brazil May, 2013Detail Engineering of Produced Water

Treatment System

27 Engineering Consulting Services - Apr, 2013Engineering & Design Services to support

Construction Services Engineering

28 Burnett Ranch CO2 Project Texas Apr, 2013 Detail Engineering of CO2 Facility

29 Shell Stones Disconnectable FPSO Mexico Apr, 2013Detailed Engineering of Gas Dehydration & TEG

Regeneration Package

30 FPSO Cidade de Itaguai Brazil Apr, 2013Detail Engineering of Chemical Injection

System

31Sagar Laxmi (Mobile Production Unit -

MOPU) Modification ProjectIndia Mar, 2013

Detailed Engineering for Review and

Modification of Complete MOPU Topside

Facility

32 Lagogas 3 Compression Module Project Venezuela Mar, 2013 Detail Engineering of Fire Water Pump System

33 Lagogas 3 Compression Module Project Venezuela Mar, 2013 Detail Engineering of Chemical Injection Skids

34Booster Compressor Project at Dabhol

PlantIndia Feb, 2013 Detail Engineering of BOG Booster Compressor

35 Bibiyana Expansion Project Bangladesh Feb, 2013Piping & Structural works for TEG

Regeneration Package

36 Ain Sifni Field Development Project Kurdistan Feb, 2013Pre-FEED Engineering Services for Oil Field

Development

Kavin Engineering And Services Private Limited Page 3 of 17

Page 4: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

37Construction of Flare Systems at Mori GCS

& Gopavaram GGSIndia Feb, 2013

Consultancy Services for Basic Engineering

Package & Detailed Cost Estimates; RFQ

Preperation; Tendering; Vendor Evaluation &

SelectionVendor for Const. of Flare Systems

38 PY-1 Gas Field Development Project India Jan, 2013 Structural Analysis of Platforms Main Deck

39BPA and BPB Offshore Platforms & Hazira

PlantIndia Dec, 2012

De-Bottlenecking Study of BPA/BPB Offshore

Platforms; SBHT Lines and Process Facilities at

Hazira Plant

40 Bukha Plant Processing Facility UAE Dec, 2012Engineering Services for BUKHA Condensate

Facility - Production Enhancement

41 Bagdis Project Afghanistan Dec, 2012Engineering Services for 1MW & Back-up

Generators

42Medal Ypergas Yucal Placer Expansion

ProjectVenezuela Dec, 2012 Detail Engineering of Acid Gas Removal System

43 Pentane Phase I Project UAE Dec, 2012

FEED And Detail Engineering of Produce

Pentane from Atlantis and Bukha process gas

train from RAKGAS plant

44 Kwale Mineral Sands Project Kenya Nov, 2012

Detailed Engineering Drawings, Fabrication

Drawings, MTO and Cutting Plan for API 650

Tanks

45 FPSO TUPI 5 (MV24) Brazil Sep, 2012 Detailed Engineering of E-House

46PS-2 & PS-3 Helideck (Fire Fighting Foam

System Project)Qatar Aug, 2012

SACS Analysis Works for Structural Integrity of

Platform

47 SALEH Phase II UAE Aug, 2012Detailed Engineering of Plant Processing

Capacity at Atlantis, Bukha and Saleh fields

48 Garraf Field Development Project Iraq July, 2012 Nozzle Load Analysis (5 Nos.)

Kavin Engineering And Services Private Limited Page 4 of 17

Page 5: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

49 Garraf Field Development Project Iraq June, 2012Project Management Consultancy Services for

Installation of Temporary Power Plant

50 Sagar Samrat MOPU Project India May, 2012 Design Review of Compressor Package

51 Cantarell Field Development Project Mexico May, 2012 FEED for Dehydration and Desalting Unit

52PY34-1/35-1/35-2 Offshore Gas Field

Development ProjectChina Apr, 2012 Detailed Engineering of TEG Package

53 FPSO Raroa New Zealand Apr, 2012Detailed Engineering of Sulphate Reduction

Unit

54 FPSO TUPI 4 Brazil Apr, 2012Detailed Engineering of Chemical Injection

Package

55 FSO Ta'Kuntah Mexico Apr, 2012Feasibility Study/ FEED for conversion of FSO

Ta'Kuntah to FPSO.

56Construction/Installation of Stand By Flare

Gas Recovery Compressor for Uran ProjectIndia Apr, 2012

Consultancy Services for Basic Engineering

Package (BEP) & Detailed Cost Estimates; RFQ

Preperation; Tendering; Vendor Evaluation &

SelectionVendor for Construction of Flare Gas

Recovery Compressor Package

57 Assil & Karam Gas Development Project Egypt Mar, 2012 Detail Engineering of Amine Package

58 FPSO Cidade de Ilhabela Brazil Mar, 2012 Detail Engineering of Produced Water Package

59 FPSO Xikomba Angola Mar, 2012Engineering Services for Topside Sand

Removal Package

Kavin Engineering And Services Private Limited Page 5 of 17

Page 6: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

60Dayung Compression & Grissik Central Gas

Plant Debottleneck ProjectIndonesia Mar, 2012 Detail Engineering of CO2 Membrane Package

61 TML Bunga RAYA-A (BR-A) Platform Thailand Mar, 2012 Detail Engineering of Sand Cleaning System

62 Jordbær FPSO Topside Norway Feb, 2012Detailed Engineering of LP Compressor

Package

63Modification Project at RAK Gas Khor

Khwair PlantUAE Feb, 2012

Detailed Engineering of Waste Water

Treatment System

64Field Engineering Services at Bhogat,

GujaratIndia Jan, 2012 Residual Engineering Services

65CBM Main Compression Station Raniganj,

Durgapur ProjectIndia Jan, 2012

Detailed Engineering Services For Two Stage

Compressor Train

66 Wheatstone Project Australia Jan, 2012

Structural Skid and Tank Design including Pipe

Stress Analysis for 2.5 MW Diesel Generator

System

67 Titan's Terminal 3 Project Malaysia Dec, 2010Detailed Engineering for development of

Naphtha and Benzene Tank Farm

68 KBB Project Malaysia Dec, 2011

Engineering, Procurement, Construction and

Commissioning support for Diesel Filter

Coalescer

69 FPSO TUPI -5 FPSO Brazil Dec, 2011 Detailed Engineering of Compressor Package

70 FPSO OSX3 Malaysia Oct, 2011 Detailed Engineering of TEG Package

71 Garraf Field Development Project Iraq Oct, 2011Detail Design and Engineering Consultancy

Works for setting up of Temporary Power Plant

Kavin Engineering And Services Private Limited Page 6 of 17

Page 7: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

72 Kikeh Phase II Sand Management SystemOffshore

MalaysiaSep, 2011

Detailed Drawings for Sand Management

System

73RAK GAS Facility Modification Project –

Saleh Phase 1 UAE July, 2011

Review & De-bottlenecking of Waste Water

Treatment Plant

74 ONGC - SHP/SHG/S1-5/II Platforms India July, 2011Engineering Works for Piping Modification

Works for Platforms

75 Barzan Onshore Project Qatar July, 2011 Pipe Stress Analysis of 150 Systems

76 TSP Offshore Crude Oil Treatment Project Africa June, 2011

Detail Engineering of Heat Exchanger, Storage

Vessels & Pumps, Oil Separators and

Electrostatic Theaters

77RAK GAS Facility Modification Project –

Saleh Phase 1Malaysia May, 2011 Corrosion Study of Inlet Compression System

78 Harvest Blackgold Oil Sand Project Canada May, 2011Detail Engineering of Free Water Knock-out

Vessel and Oil Treater Package

79RAK GAS Facility Modification Project –

Saleh Phase 2UAE Apr, 2011

Detailed Engineering of 2nd Stage Separator

System

80 Bokor Field Development Project Malaysia Mar, 2011Review of Structural Works for Gas and Diesel

Driven Generators

81RAK GAS Facility Modification Project –

Saleh Phase 1UAE Feb, 2011 Review of Compression System

82FPSO - Teekay Petrolarl Petrobras Tiro &

Sidon Brazil Jan, 2011 Detailed Engineering of Sulphate Removal Unit

83RAK GAS Facility Modification Project –

Saleh Phase 1UAE Jan, 2011 FEED for 2nd Stage Separator System

Kavin Engineering And Services Private Limited Page 7 of 17

Page 8: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

84 Papa Terra Field Development Project Brazil Dec, 2010 Design & Engineering of E-House

85 FPSO Petrojarl Cidade De Itajai Project Brazil Dec, 2010 Design & Engineering of E-House

86 FPSO TUPI - 3 Brazil Nov, 2010Detailed Engineering of Gas Dehydration

Package

87 Bien Dong 1 Project Vietnam Sep, 2010Detailed Engineering of Gas Dehydration and

TEG Regeneration Package

88 Yemen Block-5 Development Project Yemen Aug, 2010 FEED Study of Halewah Gas Plant

89PUO FPSO - Pagerungan Utara

Development ProjectIndonesia Aug, 2010

Detailed Engineering, Design Modification &

Project Management for FPSO Topside

Facilities

90De-Bottlenecking of Existing Kharir CPU

and Nexen FacilitiesYemen July, 2010

Design and Engineering of Inlet Separator

Package

91 Baleia Azul FPSO Brazil June, 2010Detailed Engineering of Gas Processing System

(Amine Sweetening, TEG and Fuel Gas Module)

92FPSO for Terang Sirasun Batur Field

Development ProjectIndonesia June, 2010

Design & Detailed Engineering of Complete

Topside Facilities

93 Koniambo Nickel Project New Caledonia May, 2010Detailed Engineering Support of Lime Handling

System

94White Tiger Oil Field BK-14 / BT-7

Wellhead Satellite Platform projectVietnam May, 2010

Operation & Maintenance Manual Preparation

of Wellhead Platform

95 Petrobras FPSO Cicade De Paulo MV-23 Brazil Mar, 2010Detail Engineering of Nitrogen Generator

Package

Kavin Engineering And Services Private Limited Page 8 of 17

Page 9: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

96 ONGC B193 Process Platform India Mar, 2010 Early Engineering of Process Platform

97 Duyong and Pulai - A Malaysia Feb, 2010Principal Design Consultant for Revamp of Gas

Dehydration Unit

98 ONGC B193 – 5 Wellhead Platform Project India Feb, 2010Design & Detailed Engineering Wellhead

Platforms (5 Nos.)

99 Rancador Field Development Project Indonesia Feb, 2010Detailed Engineering of E-House Cable

Interconnection

100 TSJOC SRKP Phase 1 Development Project Vietnam Jan, 2010Commissioning Services for Water Injection

System for FPSO

101 TGT Field Development Project Vietnam Jan, 2010Bid Support for Design & Engineering of

Compressor Module

102 ONGC D1 – Development Project India Dec, 2009Bid Engineering Support for FPSO Topside

Engineering

103Doha North Sewage Treatment Works Civil

Project 682/1Qatar Nov, 2009

Design & Engineering Support for Chemical

Wash Package

104 Compressor Testing Facility Project India Nov, 2009Detail and Design Engineering of Compressor

Testing Facility

105MHNRP – Well Head Platform 6WPP

Project India Aug, 2009

Bid Engineering Support for Well Cum Process

Platforms

106 ONGC B – 193 Project India Aug, 2009

Bid Engineering Support for Well Head

Platform and Process cum Well Head Platform

Topsides

107 Tangga Barat Cluster Development Project Malaysia Sep, 2009 Detail Engineering of Fuel Gas Package

Kavin Engineering And Services Private Limited Page 9 of 17

Page 10: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

108 Platong II Project Malaysia July, 2009Detail Engineering of Fuel Gas and Seal Gas

Package

109 Al-Burj Full Field Water Injection Project Oman July, 2009Reliability and Availability Study of Water

Injection Plant

110 Dragon Tortoise Gas Utilization Project Vietnam June, 2009 FEED Study for Compressor System

111Dulang – B Compressed Gas Capacity

Enhancement ProjectMalaysia May, 2009

Detail Engineering of Fuel Gas and Seal Gas

Conditioning System

112 Tangga Barat Project Malaysia May, 2009Detail Engineering of Chemical Injection

Package

113Dulang – B Compressed Gas Enhancement

ProjectMalaysia Jan, 2009

Design And Engineering of Gas Dehydration

Module

114FPSO P – 57 Jubarte Field Development

ProjectBrazil Jan, 2009

Design And Engineering of Gas Dehydration

and TEG Regeneration Package

115 FPSO Tupi Pilot Brazil Apr, 2009Design And Engineering of CO2 Membrane

Module

116 FPSO Capixaba Relocation Brazil Apr, 2009Design And Engineering of Amine Sweetening

Unit

117 FPSO - Jubilee Field Unit Ghana Mar, 2009Design And Engineering of Gas Processing

Module

118 FPSO - Jubilee Field Unit Ghana Mar, 2009Design And Engineering of Oil Separation

Module

119 FPS - Gumusut Kakp Semi Malaysia Jan, 2009Design And Engineering of Glycol Regeneration

Package

Kavin Engineering And Services Private Limited Page 10 of 17

Page 11: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

120 Safah & Wadi Latham Field BK9 Qatar Apr, 2009 Process Design of Gas Compressors

121PY – 1 Gas Field Development Project – Sun

Wellhead PlatformIndia Feb, 2009

Preparation of O & M Manual for Offshore

Facilities

122 MHN – Process Platform India Nov, 2008Bid Engineering Support for Process Platform

Cum Living Quarters

123 FPSO - OML 120 OYO Field Development Nigeria Sep, 2008Design and Engineering of Compressor Module

(Reciprocating Compressors)

124 COSMOS South Field Development Project Tunisia Aug, 2008 FEED for FPSO Topside Process Facilities

125 FPSO - OYO Nigeria Aug, 2008 Design and Detail Engineering of E-House

126Medium Term Surface Facility Expansion

Project - Fahud AreaOman July, 2008 Process Design for Pipelines

127North Pipeline Replacement Project – Yibal

AreaOman July, 2008 Process Design for Pipelines

128North Pipeline Replacement Project -

Lekhwair AreaOman July, 2008 Process Design for Pipelines

129 Raydan Final Expansion Project Middle East July, 2008Designing & Engineering of Produced Water

Tank

130 FPSO Espoir Ivoirien West Africa June, 2008Design And Engineering of Process Separation

Module

131 FPSO Espoir Ivoirien West Africa June, 2008Design And Engineering of Gas Dehydration

Module

Kavin Engineering And Services Private Limited Page 11 of 17

Page 12: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

132 FPSO East Challenge India May, 2008Bid Engineering Support for FPSO Topside

Facilities

133 FPSO East Fortune India May, 2008 Design Verification of FPSO Topside Facilities

134 Angsi Phase IV Development Project Malaysia Feb, 2008Detailed Engineering of Flow Line Compact

Manifold

135 FPSO - Cascade and Chinook Gulf of Mexico Jan, 2008Design And Engineering of Gas Dehydration

and TEG Regeneration Package

136 FPSO - Van Gogh Australia Oct, 2007Design And Engineering of Complete Topside

Process Facilities

137 TSJOC SRKP Phase 1 Development Project Vietnam Aug, 2007Design & Detailed Engineering of FPSO

Complete Topside Process Facilities

138 FPSO - Cidade de Sao Mateus Brazil Aug, 2007

Detailed Engineering of Flare and Drain

Module, Water Injection, and Gas Dehydration

/ Fuel Gas Module

139 FPSO : Shell BC -10 Malaysia July, 2007Detail Engineering of Gas Dehydration and TEG

Regeneration Package

140 FPSO : P – 57 Brazil July, 2007Bid Engineering Support for Design &

Engineering of Topside Facilities

141 RasGas Offshore Expansion Project PH - 2 Qatar Apr, 2007Design And Engineering of Condensate and

Water Strainers ( Basket Strainers )

142 Oyong Early Oil Field Development Project Malaysia Feb, 2007System Design Review of FPSO Topside Process

Facilities

143 FPSO : Petrobras Opportunity Oil Brazil Jan, 2007Basic Design and Engineering of Topside

Facilities

Nortechs

FPSO

Nortechs

FPSO

Kavin Engineering And Services Private Limited Page 12 of 17

Page 13: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

144

PLI BS2 Compression Project Russia Dec, 2006 Preparation of Mechanical GA Drawings.

145 Kizomba C – FPSO Saxi Batuque Angola Dec, 2006Design And Engineering of Gas Dehydration

and TEG Regeneration Package

146 FPSO : FRADE Brazil Dec, 2006Design And Engineering of Gas Dehydration

and TEG Regeneration Package

147 FPSO : TUI Area Development New Zealand Nov, 2006 Engineering of Deluge Calculation and Drawing

148 Common Sulphur Project Qatar Oct, 2006 Structural Design of Utility Building

149 FPSO : Brotojoyo Indonesia Sep, 2006Start up and Commissioning of Process Topside

Facilities

150 OAG DAS Field Development Project UAE Sep, 2006Process Design Review of Gas Compression and

TEG Regeneration System.

151 FPSO : Petrobras Opportunity Oil Brazil Sep, 2006Bid Engineering Support for Topside Basic

Design and Engineering

152 FPSO : Kizomba – C MONDO Angola Sep, 2006Design And Engineering of Gas Dehydration

and TEG Regeneration Package

153 MERU Project Indonesia July, 2006Design, Review and Optimization of Marine

Energy Resource Unit (MERU)

154 Ujung Pangkah Development Project Indonesia July, 2006Detail Engineering of Gas Dehydration and TEG

Regeneration Package

155 FPSO : POLVO Brazil May, 2006Design, Review and Optimization of Crude Oil

Topping Plant(COTP)

Sakhlin Energy

Kavin Engineering And Services Private Limited Page 13 of 17

Page 14: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

156 TBA / TBC – Field Development Project China Apr, 2006Detail Engineering of FPSO Topside Process

Facilities

157 MOGA and Transit Line Project Sudan Mar, 2006Detail Engineering of Produced Water

Treatment System

158 F13 Platform Malaysia Mar, 2006Detail Engineering of Gas Dehydration and TEG

Regeneration Package

159 FSO : PRA-1 Brazil Feb, 2006 Detail Engineering of Fuel Gas Skid Package

160 SUMANDAK Processing Platform - B Malaysia Dec, 2005 FEED For Gas Processing Facility

161 HZ 19-2 Platform Development Project China Dec, 2005Commissioning of Instrument & Utility Air

System (System No. 51)

162 Arthit Field Development Project Thailand Nov, 2005 Sand Jet Design for HP Production Separator

163 FPSO Kikeh-Murphy Sabah Oil Co. Ltd. Malaysia Nov, 2005Detail Engineering of Chemical Injection

Package

164 FPSO Kikeh-Murphy Sabah Oil Co. Ltd. Malaysia Nov, 2005Detail Engineering of Nitrogen Generator and

Nitrogen Intensifier Package

165 FPSO Kikeh-Murphy Sabah Oil Co. Ltd. Malaysia Nov, 2005Detail Engineering of Gas Dehydration and TEG

Regeneration Package

166 HZ21-1 Development Project China Aug, 2005 Commissioning Services

167Panyu 4-2/ 5-1 Well Head Platform

Modification ProjectChina Sep, 2005

Pre-Commissioning and Commissioning

Procedure & IOM for Nitrogen Generation

Package

Global Techno Systems

Kavin Engineering And Services Private Limited Page 14 of 17

Page 15: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

168 FPSO : Capixaba of IHCGUSTO Brazil July, 2005Calculation and Design Details of Sand Jet

System for Three Phase Separator

169 Rong Doi Gas Field Development Project Korea June, 2005Detail Engineering of Gas Dehydration and TEG

Regeneration Package

170 OVENG TLP ProjectEquatorial

GuineaMay, 2005

Engineering Services for Methanol Injection

System

171 OKUME TLP ProjectEquatorial

GuineaMay, 2005

Engineering Services for Methanol Injection

System

172 OVENG TLP ProjectEquatorial

GuineaMay, 2005

Engineering Services for Chemical Injection

System

173 OKUME TLP ProjectEquatorial

GuineaMay, 2005

Engineering Services for Chemical Injection

System

174 Capixaba FPSO of IHCGUSTO Brazil May, 2005Detail Engineering of Gas Dehydration and

TEG Regeneration Package

175

SUMANDAK Processing Platform – B Malaysia May, 2005

Conceptual Design of Sea Water Treatment and

Deaeration Systems

176 Yetagun Field Development Project Mayanmar Mar, 2005Pipeline Heater FEED Study for Offshore

Operation

177 BAK Processing Facility Block – 51 Yeman Mar, 2005Detail Engineering of Onshore Processing

Facility

178Bunga Raya (Br-E) Platform Topsides

ProjectMalaysia Dec, 2004

Basic and Detailed Engineering of Condensate

Stabilization and Flare Gas Recovery

179ONGC D1 Well cum Water Injection

Package PlatformIndia Sep, 2004 Engineering Support for Fine Filters Package

Kavin Engineering And Services Private Limited Page 15 of 17

Page 16: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

180FPSO : Hai Yang She You III

– De-bottlenecking ProjectChina June, 2004 Capacity Upgrade Studies of Topside Facilities

181 FPSO : BAOBAB West Africa May, 2004Basic and Detailed Engineering of Gas

Processing Module

182 FPSO : BAOBAB West Africa May, 2004Basic and Detailed Engineering of Separation

Package - 4 Skids

183 AMB Malaysia PCSB – Fuel Gas Package Project Malaysia May, 2004Bid Support for Engineering Services of Fuel

Gas Package

184 Espadarte Field Development Brazil Dec, 2003 Trouble Shooting of Gas Dehydration Facility

185Turbine Enclosure Structural General

Arrangement Dec, 2003

Structural General Arrangement for Turbing

Enclosure

186BOABAB Field Development – FPSO

Topside – Bid SupportWest Africa Nov, 2003

Bid Support for Detailed Engineering of TEG

Package

187OKUME & OVENG Field’s – FPSO Topsides

– Bid Support

Equatorial

GuineaOct, 2003

230,000 BPD with 60% water cut. Gas Flow

Rate 70 MMSCFD

188Salman Oil & Gas Field Development

ProjectIran July, 2003

Detail Engineering of Gas Dehydration and TEG

Regeneration Unit

189Gas Dehydration and TEG Regeneration

Facility Venezuela July, 2003

Design & Engineering of Gas Dehydration and

TEG Regeneration Facility

190 Rehmat Gas Processing Facilities Malaysia June, 2003 Bid Support

191 CO2 Removal Facility - Bid Support Thiland June, 2003Bid Engineering Support for CO2 Removal

Facility

Kavin Engineering And Services Private Limited Page 16 of 17

Page 17: PROJECT TRACK RECORD - kavinengg.com

S. No Client Owner/ Operating Co. Project Location Period Scope Of Work

PROJECT TRACK RECORD

192IBA / EXXON Mobil – Gas Dehydration and

TEG Regeneration System Malaysia May, 2003

Training – Operators and Engineers - on Gas

Dehydration & TEG Regeneration Systems

193 Kinarut Development Project Malaysia May, 2003 Detailed Engineering of TEG Package

194 MISC – FPSO Project Thailand May, 2003 Detail Engineering of Gas Dehydration Package

195 Prai Power TENAGA Nazar – Combine Cycle Gas

Turbine Project Malaysia Feb, 2003 Trouble Shooting of Diesel Handling Systems

196China Offshore Oil Nantias

West Corp.FPSO : PANYU China May, 2002

Design & Engineering of Oil Separation,

Produced Water & Vent System