2
.' PROJECT TITLE: REPAIR/REPAINTING OF EXTERIOR PORTION FACADE PROJECT LOCATION: CRIC BUILDING BID PROPOSAL Floor Area: 1,904.90 sq.m. BREAKDOWN EXPENDITURE Amount ~ Qty I Unit I Description 1I0t I. Mobilization, Overhead, Insurance & Miscellaneous Unit Cost H. PAINTING -WORKS -FOR -EXTERIORS WALLING & -WINDOW-GRILL 20 tin Quick dry enamel 45 tin Flat Latex Boysen 50 tin Gloss Latex Boysen 50 kls. Patching Compound 15 pes. Roller brush #7 20 pes. Paint brush # 1 & 2 50 mts. Sandpaper # 1003M " 250 .pcs. Sandpaper # 240 & 120 20 kls Rugs (stopa) white 25 qtrs Aeri-color Raw sienna 30 qtrs Aeri--color Hansa yellow 35 qtrs Acri-color red 40 qtrs Aeri-eolor black 35 qtrs Aeri-color blue 30 gals Q,D.E. thalo blue 60 gals Red Oxide 20 tin Flat wall enamel 25 pes. Roller brush cotton #4 20 tin. Q_DT chocolate brown 20 gals Paint thinner 15 gals Stiekwell 40 gals Emerald green roofguard 20 pes. 1x1x8 solid wood (for roller brush handle) Material Cost LaberCost Total Cost Ill. REPAIR OF GUTTER, FACIA BOARD, CEILING EAVES & EXTENSION 1 STORAGE ROOM ROOFING 20 pes. Gutter 10 gals Vuleaseal 18 tubes Sealant 8 kls G,I. wire 2500 pes. Blind rivet 8 kls C.W, nail I" 8 kls C.W.naiI2" 8 kls C.W. nail 3" 12 pes. Plain sheet G.I.

PROJECT TITLE: REPAIR/REPAINTING OF EXTERIOR PORTION ...customs.gov.ph/.../2013/08/08-07-2013-Bid-Documents-CRIC-Building.pdf · project title: repair/repainting of exterior portion

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT TITLE: REPAIR/REPAINTING OF EXTERIOR PORTION ...customs.gov.ph/.../2013/08/08-07-2013-Bid-Documents-CRIC-Building.pdf · project title: repair/repainting of exterior portion

.' PROJECT TITLE: REPAIR/REPAINTING OF EXTERIOR PORTION FACADE

PROJECT LOCATION: CRIC BUILDING

BID PROPOSALFloor Area: 1,904.90 sq.m.

BREAKDOWN EXPENDITUREAmount~ Qty I Unit I Description

1I0tI. Mobilization, Overhead, Insurance & Miscellaneous

Unit Cost

H. PAINTING -WORKS -FOR -EXTERIORS WALLING & -WINDOW-GRILL20 tin Quick dry enamel45 tin Flat Latex Boysen50 tin Gloss Latex Boysen50 kls. Patching Compound15 pes. Roller brush #720 pes. Paint brush # 1 & 250 mts. Sandpaper # 1003M "

250 .pcs. Sandpaper # 240 & 12020 kls Rugs (stopa) white25 qtrs Aeri-color Raw sienna30 qtrs Aeri--color Hansa yellow35 qtrs Acri-color red40 qtrs Aeri-eolor black35 qtrs Aeri-color blue30 gals Q,D.E. thalo blue60 gals Red Oxide20 tin Flat wall enamel25 pes. Roller brush cotton #420 tin. Q_DT chocolate brown20 gals Paint thinner15 gals Stiekwell40 gals Emerald green roofguard20 pes. 1x1x8 solid wood (for roller brush handle)

Material CostLaberCostTotal Cost

Ill. REPAIR OF GUTTER, FACIA BOARD, CEILING EAVES &EXTENSION 1STORAGE ROOM ROOFING

20 pes. Gutter10 gals Vuleaseal18 tubes Sealant8 kls G,I. wire

2500 pes. Blind rivet8 kls C.W, nail I"8 kls C.W.naiI2"8 kls C.W. nail 3"12 pes. Plain sheet G.I.

Page 2: PROJECT TITLE: REPAIR/REPAINTING OF EXTERIOR PORTION ...customs.gov.ph/.../2013/08/08-07-2013-Bid-Documents-CRIC-Building.pdf · project title: repair/repainting of exterior portion

- , ...15 pCS. 2xl0x12 Solid Tanguile25 pCS. 1/2 Plywood20 pCS. 1/4 Plywood6 kls Concrete nail # 2"6 klsConcrete nail # 3"15 pCS. Plain sheet G.I.13 pcs. 2x2x12 Rough tanguile

Material CostLabor CostTotal Cost

IV. CHIPPING & DISMANTLING WORKS

V. FORMWORKS & SCAFFOLDING1 lot scaffolding67 pcs 2x3x12 Rough tanguile67 pcs 2x2x12 Rough tanguile15 pcs 1/2x4x8 Plywood10 kls. C.w nails # 210 kls. C.w nails # 4

Material CostLabor-CostTotal Cost

VI. PATCHING & PLASTERING OF CRACK WALL25 bags Cement100 sack Sand

Material CostLabor CostTotal Cost

GRAND TOTAL:

Amount in Words: _

Prepared & Submitted By:

Name of'theConrractorSignature

1 Lot

P======