Project Title GB or BB name: XYZ

Project Title

  • Upload
    umeko

  • View
    18

  • Download
    0

Embed Size (px)

DESCRIPTION

Project Title. GB or BB name: XYZ. Define Phase. C. I. A. M. D. D. M. A. I. C. Deployment. D. M. A. I. C. Project Charter. D. M. A. I. C. Team. D. M. A. I. C. Gantt Chart. D. M. A. I. C. Framing Worksheet. D. M. A. I. C. Customer Requirements CTQ’s. D. - PowerPoint PPT Presentation

Citation preview

Page 1: Project Title

Project Title

GB or BB name: XYZ

Page 2: Project Title

Define Phase

D M A I C

Page 3: Project Title

Deployment D M A I C

Page 4: Project Title

Project Charter D M A I C

Project Logo or SOA

Date:

1.2. Department & Machine involved 1.4. Weekly Meeting on: (day & time)

Planning

Plan / DMA: ?? Do/ I: ??

Check / C: ?? Act / C: ??

7. Team and Stakeholder Signatures 6. Controller Verification of Savings

5. Quantitative Objectives of the Project (to be achieved with the full implementation of all countermeasures)

6. Potential Savings (000$/year)

3. Project Description: (methods/tools to be used)

4. Project KPIs

2.1. Team members involved (names) 2.2. Internal and / or External Customer

Project Title

1.1. Project Title1.3. Problem description (What problem / Why is it a problem)

Page 5: Project Title

Team D M A I C

Name Function Role In the team In charge of…

Page 6: Project Title

Gantt Chart D M A I C

Page 7: Project Title

Framing Worksheet5W+2H (Operational Definition) [Plant Name][Project Name][Brief Project Description][Date]

Description of Problem

IS IS NOT

WhoCustomer Name

Location

WhatProductProcessSystem

WhenFirst Seen

When else seen(dates, events)When seen in

product life cycleWhere

On objectGeographically

WhySupportive Data

HowProcess Conditions

How Many# of Defects

# of Parts# of Concerns

Trends

D M A I C

Page 8: Project Title

Customer Requirements CTQ’s

VOC

for example:

Key Issues Customer CTQs

Measurable Requirements

1st level

Customer CTQs if needed

2nd level

1 When I’m staying in a hotel I like a good bath

right temperature Temperature > 30 degrees

< 36 degrees

Fills up quickly time to fill < 5 mins

2

3

D M A I C

Page 9: Project Title

SIPOC

Suppliers Inputs PROCESS Outputs CustomersUse nouns Use verbs Use nouns

Start point

Arrival point

For example

D M A I C

Page 10: Project Title

Measure phase

MD A I C

D M A I C

Page 11: Project Title

Current process map

Include some initial map of your process

Process Mapping [Plant Name][Project Name][Brief Project Description][Date]

START

END

STEP 1

NO

YES

STEP 2

STEP 2B

TESTRESULTS

D M A I C

Page 12: Project Title

Ys behaviorD M A I C

I-MR Control Chart [Plant Name][Project Name][Brief Project Description][Date]

Quality Characteristic Individual value of T3 - 2010Sample Size, n 1

k 3

CL, 2.278

UCL, 3.805

LCL, 0.751

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

5.5

6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Ind

ivid

ua

l v

alu

e o

f T

3 -

20

10

Sample #

CL, 0.574

UCL, 1.877

LCL, 0.0000.000

0.500

1.000

1.500

2.000

2.500

3.000

3.500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Ra

ng

e

Sample #

Page 13: Project Title

Cause & effect diagram to find potential Xs

Brainstorming - Fishbone analysis [Plant Name][Project Name][Brief Project Description]

[Date]

5 5 5

1 1 1

6 6 6

2 2 27 7 7

3 3 3

8 8 8

4 4 4

1 1 1

5 5 5

2 2 2

6 6 6

3 3 3

7 7 7

4 4 4

8 8 8

trouble

MAN METHODS MACHINES

PROBLEM STATEMENT

MATERIAL MOTHER NATURE MEASURES

what, who, where, when, how much, how

Methods

Measures

Machines

MaterialsMother Nature

Man

DEFECT

D M A I C

Page 14: Project Title

Data collectionD M A I C

Check Sheet [Plant Name][Project Name][Brief Project Description][Date]

Name:

Date:

Shift:

Defect

Stones

Blisters

Blank Tears

Baffle Match

Pressure Break

Totals

Shop 11 Shop 12

5

Shop 22 Shop 31 Shop 32Shop 21 Totals

5

Check sheet Pareto

Spaghetti Diagram (Flow analysis) [Plant Name][Project Name][Brief Project Description][Date]

Page 15: Project Title

Data collection planD M A I C

What How Who WhereMeasure Operational

definitionType of

measure – Y or Xs

Type of Data

Measurement tools

Sampling scheme and Frequency

Who is collecting the data

On which document - form

Page 16: Project Title

Measurement System Analysis

Potential source(s) of measurement variation checklist Yes/No Evidence

Is my measurement system repeatable? _______Will I get the same results if I make the measurement more than once?

Is my measurement system reproducible? _______ Will someone else be able to complete the same measurement & get the same results?

Is my measurement system accurate? _______Will the results from the study match the actual value or expert data?

The appropriate analysis tool to quantify the amount of variation due to the measurement system is

_______ Very simple assessment_______ Discrete data analysis tool (for repeatability, reproducibility & accuracy)_______ Gage R&R - ANOVA method_______ Gage R&R - Short method

Only if issues on Measuring system

Is the Measurement System adequate ______ Yes/No

D M A I C

Page 17: Project Title

Measurement System Analysis – Gage R&RD M A I C

Page 18: Project Title

Baseline process sigma

Number of units processed N = __________

Total number of defects made (include defects made and later fixed) D = __________

Number of defect opportunities per unit (equate to CTQs) O = __________

Calculate # defects per million opportunities DPMO = 1,000,000 x ( )

= 1,000,000 x

= __________

Look up process sigma in Sigma = __________ sigma conversion table

DN x O

( )

( ) ( )

(method 1)D M A I C

Page 19: Project Title

Baseline process sigma (method 2 – using Jmp)D M A I C

short term sigma = 0.74long term sigma value = 2.35

Stable or unstable ?

Page 20: Project Title

Analyse phase

MD A I C

D M A I C

Page 21: Project Title

Cause & effect diagram for Experience Door without data collection plan

D M A I C

Brainstorming - Fishbone analysis [Plant Name][Project Name][Brief Project Description]

[Date]

5 5 5

1 1 1

6 6 6

2 2 27 7 7

3 3 3

8 8 8

4 4 4

1 1 1

5 5 5

2 2 2

6 6 6

3 3 3

7 7 7

4 4 4

8 8 8

trouble

MAN METHODS MACHINES

PROBLEM STATEMENT

MATERIAL MOTHER NATURE MEASURES

what, who, where, when, how much, how

Methods

Measures

Machines

MaterialsMother Nature

Man

DEFECT

Page 22: Project Title

5 Whys Analysis for Experience Door without data collection plan

Catalyst Consulting Ltd. 2006

D M A I C

Brainstorming - 5 whys[Project Name][Brief Project Description]

[Date]

what, who, where, when, how much, how

Cause Why 1 Why 2 Why 3 Why 4 Why 5

1

2

3

4

5

6

7

8

9

10

PLAN

PROBLEM STATEMENT: Seal Star issues causing rework and overmanning

Page 23: Project Title

Statistical Analysis

Catalyst Consulting Ltd. 2006

D M A I C

Box plotScatterplotSimple regressionFit Y by XAnovaScreeningPartitioning…

Page 24: Project Title

Y=f(Xi) – Statistical ModelD M A I C

Page 25: Project Title

Vital few Causes

Critical X

1

2

3

4

D M A I C

Page 26: Project Title

Improve phase

ID M A C

D M A I C

Page 27: Project Title

Proposed solution D M A I C

Page 28: Project Title

Proposed solution D M A I C

add additional slides to elaborate on actions using pictures and summary activities

Page 29: Project Title

Control phase

CD M A I

D M A I C

Page 30: Project Title

32

D M A I C

ONE POINT LESSON (OPL)

Facility:Date Created: OPL Number:Author:OPL Category: Approver:Area in Facility: Approver Title:

OPL Description:

OPL

Page 31: Project Title

Control PlanD M A I C

Quality process control plan [Plant Name][Project Name][Brief Project Description][Date]

Indicators By whom?

Quality process control plan

When?Out of control actionwho is in charge?Control range

Page 32: Project Title

Final process sigma

Number of units processed N = __________

Total number of defects made (include defects made and later fixed) D = __________

Number of defect opportunities per unit (equate to CTQs) O = __________

Calculate # defects per million

opportunities DPMO = 1,000,000 x ( )

= 1,000,000 x

= __________

Look up process sigma in sigma conversion table Sigma = __________

DN x O

( )

( ) ( )

(method 1)D M A I C

Page 33: Project Title

Final process sigma (method 2)D M A I C

BEFORE AFTER

Page 34: Project Title

ROSS Control – the final outcome

Baseline Final

Performance

Project Y ZST

ZLT

Financial benefits

Cost ££

Revenue £

Cash £

Implementation costs £

Net Benefit £

D M A I C