2014 2013 2012 2015 2016 2017 2018/19 PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder selected over Concrete Box Girder and Truss Alternatives FINAL DESIGN PRELIMINARY DESIGN CONCEPTUAL DESIGN Environmental Review Process Visual Quality Process • Begins in 2017 • Completed in 2019 CONSTRUCTION CONSTRUCTION 2 LANE BRIDGE SELECTED (2 Lane & 4 Lane studied) REPLACEMENT SELECTED (Rehabilitate & Replacement studied) WISCONSIN APPROACH Jug-Handle Recommended MINNESOTA APPROACH Buttonhook Recommended WE ARE HERE Red Wing Bridge Project US 63 River Bridge & Approach Roadways

PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

2014

2013

2012

2015

2016

2017

2018

/19

PRO

JEC

T TI

MEL

INE

& M

ILES

TON

ES

LOCA

TION

DET

ERMI

NED

Exist

ing cr

ossin

g site

, im

media

tely u

pstre

am

BRID

GE T

YPE

DETE

RMIN

ED

Stee

l Box

Gird

er se

lected

over

Con

crete

Box G

irder

and T

russ

Alte

rnati

ves

FINA

L DE

SIGN

PREL

IMIN

ARY

DESI

GNCO

NCEP

TUAL

DES

IGN

• En

viron

menta

l Re

view

Proc

ess

• Vi

sual

Quali

ty Pr

oces

s

• Beg

ins in

2017

• Com

pleted

in 20

19

CONS

TRUC

TION

CONS

TRUC

TION

2 LAN

E BR

IDGE

SE

LECT

ED

(2 La

ne &

4 La

ne st

udied

)

REPL

ACEM

ENT

SELE

CTED

(Reh

abilit

ate &

Rep

lacem

ent s

tudied

)

WIS

CONS

IN A

PPRO

ACH

Jug-

Hand

le Re

comm

ende

dMI

NNES

OTA A

PPRO

ACH

Butto

nhoo

k Rec

omme

nded

WE

AR

E

HE

RE

Re

d W

ing

Bri

dg

e P

roje

ct

US

63 R

iver

Brid

ge &

App

roac

h Ro

adw

ays

Page 2: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

Pre

pare

d by

Gem

ini R

esea

rch

02-2

014

Re

d W

ing

Bri

dg

e P

roje

ct

US

63 R

iver

Brid

ge &

App

roac

h Ro

adw

ays

Prop

ertie

s in

the

Are

a of

Pot

entia

l Eff e

ct (A

PE) L

iste

d on

or E

ligib

le fo

r the

Nat

iona

l Reg

iste

r

Page 3: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

Oth

er P

roje

cts

in th

e A

rea

11 22 33 44

2014

Mill

& O

verla

y20

16 L

evee

Roa

d R

econ

stru

ctio

n

2015

Mill

& O

verla

yS

egm

ent 2

2015

-16

Hw

y 61

R

econ

stru

ctio

n

2015

Mill

& O

verla

yS

egm

ent 1

1122

344

55

55

2014

Mill

& O

verla

y20

15 M

ill &

Ove

rlay,

Segm

ent 1

2015

Mill

& O

verla

y, Se

gmen

t 220

16 L

evee

Roa

d Re

cons

truc

tion

2015

-16

Hw

y 61

Rec

onstr

uctio

n

2018

-19

Hw

y 61

& S

prin

g Cr

eek

Rd In

ters

ectio

n Re

cons

truc

tion

2017

-19

US

63 R

iver

Brid

ge &

App

roac

h Ro

adw

ays

2014

Hw

y 61

& N

ymph

ara L

ane B

ridge

Rep

lace

men

t20

15 S

outh

boun

d H

wy

61 L

eft T

urn

Lane

s (Se

vasto

pol R

d)20

15 S

outh

boun

d H

wy

61 L

eft T

urn

Lane

s (W

acou

ta R

d)

Has

tings

Hag

er C

ity

Red

W

ing

Can

non

Falls

Pre

scot

t

Ells

wor

th

Re

d W

ing

Bri

dg

e P

roje

ct

US

63 R

iver

Brid

ge &

App

roac

h Ro

adw

ays

Page 4: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

Renderings of River Bridge and Pier Design

Daytime view of the new Mississippi River bridge. Red Wing and Barn Bluff are on the right; Wisconsin is on the left.

Evening view of the new Mississippi River bridge. Architectural and other required lighting elements, including channel navigation lights and roadway and trail lighting, will be designed to minimize light spill on light-sensitive resources.

Red Wing Bridge ProjectUS 63 River Bridge & Approach Roadways

Page 5: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

Renderings of River Bridge and Pier Design

Bird’s eye view of the overlook and spires. Overlooks are proposed on the upriver side of pier 1 and pier 2.

Plan view of road, trail, spires, and overlook.

Daytime rendering of pier 2, overlook, and spire. Evening rendering of pier 2, overlook, spire, and lighting.

Red Wing Bridge ProjectUS 63 River Bridge & Approach Roadways

Page 6: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

Combination Crash Rail

Spire

Illuminated lettering desired

LED Lights

Ornamental Rail

12 foot wide trail

Renderings of River Bridge and Pier Design

Daytime view of the new Mississippi River bridge and overlook.

Evening view of the new Mississippi River bridge and overlook.

Red Wing Bridge ProjectUS 63 River Bridge & Approach Roadways

Page 7: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

What is an EA/EAW?

An Environmental Assessment/Environmental Assessment Worksheet (EA/EAW) is prepared to disclose the potential social, economic, and environmental eff ects of a proposed project. The EA/EAW identifi es the project purpose and need, alternatives considered and evaluates the potential eff ects of the project. The document also discusses eff orts made to minimize impacts and identifi es mitigation commitments. Areas of Potential Environmental Impact Assessed in an EA/EAW?

• Land Use • Traffi c• Social & Community Eff ects• Right-of-Way & Relocation• Economics• Pedestrian/Bicycle Movements• Noise• Air Quality• Wetlands• Water Quality/Surface Water• Drainage

• Fish & Wildlife Habitat• Groundwater• Threatened/Endangered Species• Parks/Recreational Areas• Floodplains• Vegetation/Land Cover• Cumulative Potential Eff ects• Contaminated Properties• Environmental Justice• Visual Quality• Archeological/Historic Sites

Who Reviews And Approves The EA/EAW When It Is Completed?

The Minnesota Department of Transportation, Wisconsin Department of Transportation, and the Federal Highway Administration approved the US 63 River Bridge and Approach Roadways Project EA/EAW, which was published on June 22, 2015. A public and agency review/comment period is being held and all comments submitted by July 22, 2015 will be considered prior to a fi nal determination by MnDOT and FHWA.

Red Wing Bridge ProjectUS 63 River Bridge & Approach Roadways

Page 8: PROJECT TIMELINE & MILESTONES WE ARE HERE · PROJECT TIMELINE & MILESTONES LOCATION DETERMINED Existing crossing site, immediately upstream BRIDGE TYPE DETERMINED Steel Box Girder

Summary of Environmental Impacts for the Preferred Alternative

• Approximately 2.9 acres of permanent right-of-way and 1.2 acres of temporary easements are needed. There are 5 acquisitions and 2 relocations.

• 6.5 acres of wetland impacts.

• No substantial fl oodplain impacts (fl ood elevation and/or frequency) anticipated.

• Requires removal of Bridge 9103 (over US 61). No other cultural resource (archaeological or architectural) impacts.

• Noise levels on Minnesota side exceed residential noise standards and meet noise barrier criteria (noise barrier voting will occur this August).

• No substantial cumulative potential eff ects anticipated.

• No farmland impacts.

• No adverse Environmental Justice populations impacted.• Minor impacts to wildlife and sensitive habitats.

• Aesthetic treatment proposed for bridge structure (no adverse visual impacts anticipated).

• Temporary traffi c impacts anticipated during construction, but substantial improvement to traffi c operation in downtown Red wing anticipated following construction.

• Seven identifi ed sites of potential contamination are found within the construction limits.

Red Wing Bridge ProjectUS 63 River Bridge & Approach Roadways