DESIGN GUIDANCE PROPOSAL 8015 MARY AVE NW, SEATTLE WA 3035451-EG| FEBRUARY 6, 2020 1 PROJECT TEAM OWNER: Modern Homes LLC ARCHITECT: Cleave Architecture and Design LANDSCAPE: Root of Design

PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

1

PROJECT TEAM

OWNER: Modern Homes LLC

ARCHITECT: Cleave Architecture and Design

LANDSCAPE: Root of Design

Page 2: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

2TA

BLE

OF

CON

TEN

TS COVER SHEET TABLE OF CONTENTS PROJECT INFORMATION

ZONING INFORMATIONTRANSPORTATION

NEIGHBORHOODNEIGHBORHOOD

SURVEYPROPOSED SITE PLAN

AMENITY PLANLANDSCAPE PLAN

FLOOR PLANS- FIRSTFLOOR PLANS- SECOND

FLOOR PLANS- THIRDFLOOR PLANS- ROOF

ELEVATIONSELEVATIONS

ELEVATIONSELEVATIONS

BUILDING MATERIALSPRIVACY- WINDOW STUDIES

ARBORIST REPORTEXCEPTIONAL TREE ENCROACHMENT

MHA DIAGRAMSMHA AREA CALCULATIONS

COMMUNITY OUTREACH SUMMARY

1

23

45

67

89

1011

1213

1415

1617

1819

2021

2223

2425

26

L O YA LH E I G H T S

W H I T T I E RH E I G H T S

N W 8 5 T H S T

N W 8 3 R D S T

N W 8 0 T H S T

15

TH A

VE N

W

8TH

AV

E NW

24

TH A

VE N

W

S I T E

Page 3: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

3

PRO

JECT

INFO

RMAT

IONPROJECT INFORMATION

ADDRESS: 8015 Mary Ave NW

SDCI #: 3035451-EG

OWNER: Modern Homes LLC

APPLICANT: Cleave Architecture and Design

CONTACT: JustinKliewer

PROJECT PROGRAM

LOT SIZE: 7566.87 sfBUILDINGTYPE: TownhouseAPPROXFAR: +/-10591sf(10593.6sfallowable)UNIT COUNT: 8UNIT SIZES: 1420 - 1482 sf gross each unitABOVE-GROUND STORIES: 3 PARKINGSTALLS: 2surfacespaces(0required)

PROJECT DESCRIPTIONTheproposedprojectwilldemolishtheexistingstructureandconstructtwo4-unittownhouses.Theprojectwillprovide2surfaceparkingspacesaccessedfromtheexistingalley.

PROJECT DESIGN CONCEPTThedesignconceptistomaximizesitepotentialtoprovidemarketratehomesforfee-simpleownership.Thesitedesignprovidesastreetfacingentryfortheeastunits.Thebuildingisarrangedinafoursquarepatterntomaximizenaturaldaylightandventilationtolivingspaces.Thestaircorehasbeenlocatedatthecenterofeachbuildingtoreducetheperceivedheightbypullingtheroofstairenclosureawayfromthebuildingperimeter.TheneighborhoodhasbeenrezonedfromsinglefamilytoLow-Riseandwilltransitionfromsmallerscalehousingtolargercontemporarytownhousesoverthenextseveralyears.

HIGHEST PRIORITY DESIGN GUIDELINES

CS1 A: Energy UseTheprojectwillbeBuiltGreenCertified B:SunlightandNaturalVentilationThefoursquarebuildingdesignmaximizesglazingatlivingspacestoprovidenaturaldaylightandventilation.

CS2 A:LocationintheCityandNeighborhood D:Height,BulkandScaleCS3 A:EmphasizePositiveNeighborhoodAttributesTheprojecthasbeenredesignedtoincludepitchedroofsatthestreetfrontandsidelotlines,alongwithmodulationofthebuildingfootprinttorespondtotheexistingresidentialcharacter.Additionaldetailingintheformofcorbelroofsupportsalsoreferencetraditionalbuildingstyles.

PL2 SAFETYThetheprimarylivingspaceshavebeenlocatedatthestreetlevelstreetfacadewithlargeamountsofglazingtoprovide“eyesonthestreet”andpedestrianengagementalongMaryAveNW.

PL3 A: ENTRIESTheeasternmostunitentriesareorientedtowardsMaryAveNW,whilethecentralentriesareorientedtowardsalandscapedcourtyardbetweenthebuildings.Thewesternunitentrieshavebeenlocated on the north and south to avoid facing directly onto the alley. Thisalsoactivatesallsidesofthesiteforadditionalvisibility,assitesecuritywasaconcernfortheexistingneighbors.

PL3 B: RESIDENTIAL EDGESThestairpenthouseshavebeenlocatedatthecenterofeachbuildingtoreducetheperceivedmassatthebuildingperimeter.Theeastbuildinghasbeenshiftedawayfromtheexistingexceptionaltreesatthe northeast corner of the site.

PL4 B: PLANNING AHEAD FOR BICYCLISTSAspacehasbeenprovidedatthewestadjacenttothevehicleparkingwithcoveredstoragefor8bicycles.Twoshorttermspacesareprovidedintheplantingstripratherthanon-sitesotheyareavailableforpublicuse.

DC2 A: Massing B:ArchitecturalandFacadeComposition C: Secondary Architectural Features D:ScaleandTextureThebuildingheighthasbeenlimitedto29’-6”attopofroof,33’-0”attopofdeckparapetand39’-0”attopofroofstair.Theallowableheightsare40’,44’,and50’respectively.Asnotedtheroofstairshavelocatedawayfromthebuildingperimeter.Thebuildinghasbeendesignedwithsymmetricalfacadeswithaprojectiontodifferentiatestreetfacingunitsandaprojectingcanopytocreateapedestrianscaledentryporch.woodcladdingattheporchintroducesasoftpedestrianscaledfinish.

DC3 OpenSpaceAcommongroundlevellandscapedareawillbeprovidedattherearofthesitetotakeadvantageoftheexistingexceptionaltree.Additionaloccupiableoutdoorspacewillbeprovidedbyprivateroofdecks.Thespacebetweenbuildingswillbelandscapedtocreateapleasantcirculationspace.

DC4 A: EXTERIOR ELEMENTS AND FINISHESTreatmentoftheproposedfacadesconsistsof3colorsandwoodcladding.Thecontrastingscaleofthewoodboardsandtheplankandpanelsidingprovidesvisualinterestwhileallowingvisualdistinctionatbuildingmassing.Theprimaryelementislapsiding,toreflectthehistoriccharacteroftheneighborhood.Thestreetfacingentriesarevisuallydistinguishedbyaprojectingcanopyandwoodsidingwhileadditionalvisualinterestisprovidedbyprojectingvolumeswithpitchedroofsatthestreetfacingunits.

Page 4: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

4

Map URBAN VILLAGE

Urban Centers / Villages

Residential Urban Village

6/24/2019, 9:11:27 AM

No warrant ies of any sort , including accuracy, fitness, or merchantability accompany this product.

0 0.08 0.160.04 mi

0 0.1 0.20.05 km

1:4,800

SDCI & Seattle IT GIS

8021 Zoning

Parcels

Zoning

Override 1

Override 2

Override 3

6/24/2019, 9:09:41 AM

No warrant ies of any sort , including accuracy, fitness, or merchantability accompany this product.

0 0.02 0.040.01 mi

0 0.03 0.060.015 km

1:1,200

SDCI & Seattle IT GIS

SITE

ZON

ING

INFO

RMAT

ION ZONING

ThesiteislocatedinaLow-Rise2multi-familyzonewithintheCrownHillUrbanVillageoverlay.

CODE REFERENCESMC 23.45.510 - FAR

7567sfx1.4=10,593.6sfallowed,+/-10,591sfproposedSMC 23.45.512 - Density limits

No Density Limit is LR2 ZonesSMC 23.45.514 - Structure Height

40’maximumroof,44’parapet,50’stairpenthouseSeebuildingelevationsformaxheight

SMC23.45.518-SetbacksandSeparations7’-0”avg/5’-0”minfrontreq.:7’-0”minproposed5’-0”sidereq.:5’-0”minproposed7’-0”avg/5’-0”minrearreq.:31’-1.5”proposed

SMC23.45.522-AmenitySpace7567sfx.25=1891.75sf(945.875atgroundlevel)required950sfmingroundlevel+950minroofdeck=1900sfproposed

SMC 23.45.527 - Facade LengthFacadelength-upto65%within15’oflotline126’x.65=81.11’allowed80’-11.5”proposed

SMC23.54.015-Parking(TableB)0parkingspacesrequired-CrownHillResidentialUrbanVillage7parkingspacesproposed

S I T E

C R O W N H I L L

U R B A N V I L L A G E

Page 5: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

5SDCI GIS Web Map

8/13/2019, 11:26:16 AM

No warrant ies of any sort , including accuracy, fitness, or merchantability accompany this product.

0 0.15 0.30.075 mi

0 0.25 0.50.125 km

1:9,600

SDCI & Seattle IT GIS

TRAN

SPO

RTAT

IONPUBLIC TRANSPORTATION

Theprojectislocatedinanareawithaccesstoseveralpublictransitrouteswithina1/4mileradius.The40,45andRapidRideDLinearebothwithin1320feetoftheprojectsite,andbothprovidetransitschedulesmeetingtheFrequentTransitrequirements.Thesiteisalsowithineasywalkingdistancetotheshopsandrestaurantsinthe15thAveNeighborhoodCommercialCorridor.

D

D

1/4 MILE RADIUS

4045 4545

40

40

18X 28X

18X

15X

Page 6: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

6N

EIGH

BORH

OO

D NEIGHBORHOOD DESCRIPTION

ThesiteislocatedintheWhittierHeightsneighborhood,andisprimarilycomprisedofonestorytraditionalstylesinglefamilyresidences.TheparcelsonbothsidesofthestreetonthisblockwererecentlyrezonedtoLR2asatransitionbetweentheNC2zonetothewestandthenewRSLzonetotheeastandsouth.Themajorarterialstreetsare15thAveNWandNW80thStreet.Thereareseveralrestaurantsandshopsineasywalkingdistance,alongwithmultipletransitoptionsincludingtheRapidRideDline.Recentdevelopmentintheareaincludesseverallargemodernapartmentbuildingsacrossthealleyon15thAveNW,whilemultiplenewtownhouseprojectswithintheblockonMaryAveNWareintheearlypermitphase.

1

11

2

12

3

13

4

14

5

15

6

16

EXISTINGSITE ELEVATION

MARY AVE NW FACING WEST

MARY AVE NW FACING EAST

TOWNHOUSE IN REVIEWTOWNHOUSE IN REVIEWTOWNHOUSE IN REVIEWPROPOSED

TOWNHOUSE IN ADR

TOWNHOUSE IN REVIEW

Page 7: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

7

Untitled Map Write a description for your map.

Image Landsat / Copernicus

Image Landsat / Copernicus

Image Landsat / Copernicus

SFR

SFR

SFRCHURCH

SFR

SFR

SFRSFR

SFR

SFR

SFR

SFR

SFR

1

7

17

8

18

9

19

10

12

13

14

15

16

17

18

19

20

1110

9

8

7

6

2

4

5

SITE

NEI

GHBO

RHO

OD

TOWNHOUSE IN REVIEW

FUTURETOWNHOUSE

FUTURETOWNHOUSE

FUTURETOWNHOUSE

FUTURETOWNHOUSE

FUTURETOWNHOUSE

FUTURETOWNHOUSE

3

Page 8: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

8SI

TE S

URV

EY

TOPO

GRAP

HIC

& BO

UNDA

RY S

URVE

Y

TOPOGRAPHIC & BOUNDARY SURVEY

BASIS OF BEARINGS

LEGAL DESCRIPTION

VERTICAL DATUM

SURVEYOR'S NOTES

LEGEND

VICINITY MAPN.T.S.

REFERENCES

Mary

Ave N

W

STEEP SLOPE/BUFFER DISCLAIMER:

10/22/19

Page 9: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

9

SITE

PLA

N

N

TREE INVENTORY

Tree#1:JapaneseMaple3”DBH/6’CSDTree#2:JapaneseMaple2”DBH/5’CSDTree#3:UnidentifiedDeciduous3”DBH/5’CSDTree#4:DeodarCedar42”DBH/46’CSDEXCEPTIONALTREETree#5:PortugalLaurel14”DBH/32’CSDTree#6:FloweringCherry10”DBH/14’CSDTree#7:FloweringCherry8”DBH/14’CSD

DBH=DiameteratBrestHeightCSD=CrownSpreadDiameter

Page 10: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

10AM

ENIT

Y DI

AGRA

M

AMENITY DIAGRAM

N

Page 11: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

11

LAN

DSCA

PE P

LAN

Page 12: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

12FL

OO

R PL

ANS

- FIR

ST

FIRST FLOOR - EAST BUILDINGFIRST FLOOR - WEST BUILDING

N

Page 13: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

13

SECOND FLOOR - EAST BUILDINGSECOND FLOOR - WEST BUILDING

FLO

OR

PLAN

S - S

ECO

ND

AND

THIR

D

N

Page 14: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

14FLOORPLAN

S-R

OOFDE

CKANDSTAIR

THIRD FLOOR - WEST BUILDING THIRD FLOOR - EAST BUILDING

N

Page 15: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

15

ROOFDECK-EASTBUILDINGROOFDECK-WESTBUILDING

N

Page 16: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

16EL

EVAT

ION

S - E

AST

BUIL

DIN

G

EASTBUILDING-EASTELEVATION(MARYAVENW) EAST BUILDING - SOUTH ELEVATION

Page 17: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

17

ELEV

ATIO

NS

- EAS

T BU

ILDI

NG

EASTBUILDING-WESTELEVATION(COURTYARD) EAST BUILDING - NORTH ELEVATION

Page 18: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

18EL

EVAT

ION

S - W

EST

BUIL

DIN

G

WESTBUILDING-EASTELEVATION(COURTYARD) WEST BUILDING - SOUTH ELEVATION

Page 19: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

19

ELEV

ATIO

NS

- WES

T BU

ILDI

NG

WESTBUILDING-WESTELEVATION(ALLEY) WEST BUILDING - NORTH ELEVATION

Page 20: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

20BU

ILDI

NG

MAT

ERIA

LS

WOOD CLADDING

TRIM - COLOR 2

LAP SIDING COLOR 3

CEMENT BOARD - COLOR 1

WOOD SIDING

LARGE LAP SIDING- COLOR 3

SMALL LAP SIDING- COLOR 1

CEMENT BOARD- COLOR 1

WOODFENCE(NOTSHOWN)

STREET ORIENTED ENTRY

PERMEABLE PAVEMENT

SMALL LAP SIDING- COLOR 1

LAP SIDING - COLOR 3

COLOR 3 - BLUECOLOR2-DARKGRAY/BLACKAT DECORATIVE TRIM

COLOR 1 - WHITE WOOD CLADDING(CEDARORSIMREALWOOD)

WOOD FENCE PERMEABLE CONCRETE

SMALL LAP SIDING - COLOR 1

CEMENT BOARD - COLOR 1

CEMENT BOARD - COLOR 1

WOOD CLADDING

WOOD CLADDING

LARGE LAP SIDING - COLOR 3

LARGE LAP SIDING - COLOR 3

SMALL LAP SIDING - COLOR 1

SMALL LAP SIDING - COLOR 1

WOOD FENCE

WOOD CLADDINGENTRY CANOPY

Page 21: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

21

PRIV

ACY-

WIN

DOW

STU

DY

NORTH ELEVATION

SOUTH ELEVATION

Page 22: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

22AR

BORI

ST R

EPO

RT

Shoffner Consulting

6741 NE 182ND ST. UNIT C414 KENMORE, WA 98028 MOBILE:(206)755-9407 EMAIL: [email protected]

October 31, 2019

Pasha Afichuk Modern Homes 2710 S. 335th Pl. Federal Way, WA 98003

RE: Tree Inventory - 8015 Mary Ave. NW Seattle, WA.

Pasha:

This report is provided to address the City of Seattle’s requirements for a tree inventory report for developing lots. I visited the property at 8015 Mary Ave. NW 54th St. NW in Seattle to gather information on the trees on the property and for those just off-site with driplines that extend onto the property. Please see the accompanying tree inventory map for reference to this report. As of the preparation of this report, the trees have not been picked for a survey. The locations of these are approximated.

1.0 Site Conditions The property is developed with a single family residence and is located in a single family residence neighborhood. The landscape consists of turfgrass and ornamental trees and shrubs. The topography is flat

2.0 Tree Inventory - Methods and Results I conducted level 2 basic visual evaluations of all the trees according to ISA standards and based upon many years conducting such evaluations on trees in the Pacific Northwest. I oberserved trees up close to inspect conditions of the trunk and from afar to inspect conditions in the crowns. All assessments were conducted according to the methods specified in the ISA Tree Risk Assessment Manual and on nearly 20 years experience conducting such evaluations.

The investigations involved the gathering of the following information:

• Tree species • Trunk diameter • Crown spread diameter • Location factors • Health and condition notes (general level of vigor, defects, disease or pest problems)

The City of Seattle tree regulations are specified in Director’s Rule 16-2008 and are used to determine which trees meet the minimum criteria to be classified as

1

exceptional and how exceptional trees are required to be protected through development.

The inventory included 7 trees, six on site and one just off-site with drip line that extend onto the property. The column CSD is the crown spread diameter. Following is information on the trees:

# Species Dbh CSD Condition and Status 1 Japanese maple (Acer japonicum) 3” 6’ Good condition and health. Does

not meet the threshold diameter to be classified as exceptional.

2 Japanese maple 2” 5’ Good condition and health. Does not meet the threshold diameter to be classified as exceptional.

3 Unidentified deciduous 3” 5’ Good condition and health. Does not meet the threshold diameter to be classified as exceptional.

4 Deodar cedar (Cedrus deodara) 42” 46’ Good condit ion and health. C lass i f i ed as excep t i ona l . Required to be retained and protected.

5 Portugal laurel (Prunus lusitanica) 14” 32’ Good condition and health. Does not meet the threshold diameter to be classified as exceptional.

6 Flowering cherry (Prunus serrulata) 10” 14’ Located off-site to the north. Good condition and health. Does not meet the threshold diameter to be classified as exceptional.

7 Flowering cherry 8” 14’ Good condition and health. Does not meet the threshold diameter to be classified as exceptional.

There is one tree on the property that meets the threshold diameter to be classified as exceptional. There are no trees just off-site to the north that meet the threshold diameter to be classified as exceptional.

3.0 Required Retention and Protection Measures Exceptional trees are required to be retained protected through construction. There are two protection zones for exceptional trees in Seattle. The inner root zone (IRZ) is the inner half of the dripline radius and no impacts are allowed within this zone. For tree #4 the IRZ is the inner 11.5 feet of the drip line radius. The outer root zone (ORZ) is the outer half of the dripline radius, outer 11.5 feet, and no more than 1/3 of the total area of the ORZ is allowed to be impacted. Any impacts proposed within the ORZ will need to be assessed prior to beginning work in order to determine the affect of the proposed impacts upon the tree(s). Protection fencing will be required with City of Seattle signage stating the protection measures and no encroachment specifications.

2

Page 23: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

23

EXCE

PTIO

NAL

TRE

E DR

IPLI

NE

ENCR

OAC

HMEN

T

Page 24: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

24M

HA D

IAGR

AM

SECOND FLOOR ROOF STAIR

FIRST FLOOR THIRD FLOOR

Page 25: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA

3035451-EG| FEBRUARY 6, 2020

25

MHA

CAL

CULA

TIO

NS

MHA AREA TOTALS:

A 839.653B 859.625C 839.653D 453.691E 104.406F 253.996G 104.406H 839.653I 859.625J 839.653K 453.691L 104.406M 253.996N 104.406O 839.653P 859.625Q 839.653R 859.625S 316.939T 316.939

TOTAL 10943.294

MHA-R PAYMENT OPTION SUMMARY TABLE

1 ZONE LR2 (M1)

2MHA DESIGNATION PER MAP A OUTSIDE OF DOWNTOWN, SM-SLU, AND SM-U 85 ZONES MEDIUM

3 ASSOCIATED PUDA WITH MHA-R REQUIREMENTS? NO

4TOTAL NUMBER OF RESIDENTIAL AND LIVE-WORK UNITS IN THE STRUCTURE/DEVELOPMENT 2 TOWNHOUSES

5 GROSS FLOOR AREA - RESIDENTIAL UNITS 10943.2946 GROSS FLOOR AREA - LIVE WORK UNITS 0

7GROSS FLOOR AREA IN RESIDENTIAL OR LIVE WORK USE EXCLUDED FROM MHA-R PAYMENT 0

8 FLOOR ARE FOR MHA-R CALCULATION 10943.294

9PAYMENT CALCULATION AMOUNT PER CODE (ADJUSTED FOR CHANGE IN CPI) OR PUDA $21.83

10 MHA-R PAYMENT PROVIDED $238,892.11

Page 26: PROJECT TEAM - Seattle.gov Home€¦ · PROJECT DESCRIPTION The proposed project will demolish the existing structure and construct two 4-unit townhouses. The project will provide

DESIGN GUIDANCE PROPOSAL8015 MARY AVE NW, SEATTLE WA3035451-EG| FEBRUARY 6, 2020

26CO

MM

UN

ITY

OU

TREA

CH S

UM

MAR

Y

8015 & 8027 Mary Ave NW Projects Required Early Outreach Documentation

Combined Early Outreach for:

- SDCI# 3035451-EG: 8015 Mary Ave NW, Seattle, WA 98117 - SDCI# 3035463-EG: 8027 Mary Ave NW, Seattle, WA 98117

OUTREACH PLAN REQUIRED DOCUMENTATION: The outreach plan for this project included posters, a project hotline and a community meeting: 1 – Printed outreach: Posters posted in local vicinity (high impact method)

- Date posted: 10/23/19 (minimum 14 days prior to community meeting) - Posted in businesses where possible, but otherwise posted on telephone poles - See Addendum A for documentation materials

2 – Electronic / Digital outreach: Project hotline phone number (high impact method) – 360-670-0486

- Date set up: 10/23/19 (minimum 21 days, will be closed down on 11/14/19) - Advertised on poster and ECODR Calendar - See Addendum B for documentation materials

3 – In-Person Outreach: Community Meeting (high impact method)

- Date of meeting: 11/7/19, 6:45-7:45pm, at the Ballard Public Library - Advertised on poster and ECODR Calendar - See Addendum C for documentation materials

SUMMARY OF COMMUNITY FEEDBACK: “A brief summary of what was heard from the community when conducting outreach” There was only a little bit of feedback; no feedback through the project hotline or email, and most of the conversation at the community meeting was more Q&A than feedback (community meeting notes are scanned at the end of this document). The couple of minor feedback comments were:

- They liked the pitched roof façade better than flat roof façade - Encouraged the general facades of these two projects along with the third project that is between these two

projects (which the same architect and builder are developing) to have consistency, although not be exactly the same – something that feels consistent with eachother and the rest of the “character” of the neighborhood

- Talked a bit about construction traffic and how the alley is pretty busy