PHOTO PRIMARY SCHOOL
Project Status Report
Project Name: Photo Primary School
Focus Area: Eradication of Inappropriate StructuresProduct/Process: Progress Reports
Prepared By:
Document Owner(s) Firm
Jose Manuel Pompa Technical Advisor IDT Limpopo Region
This Report covers the period !rom "#$%&$"&%& to &'$%%$"&%&
(ature of the Report Site Inspection)
Date &' * %% $ "&%&
Page 1 of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 2/10
PHOTO PRIMARY SCHOOL
1 PRO!"#$ S$A$%S R"POR$ P%RPOS"
The purpose of this report is to provide and update of progress on the
construction of New Photo Primary School at Caprivi Village,
Makhuduthamakga in the Sekhukhune District of impopo!
& S#OP" OF $'" PRO!"#$
The Pro"ect entitle the construction of the new school according with the
Standards from o#$, in terms of provide the follows facilities%
&' Classrooms in ( classrooms )locks!
*dmin! #lock!
& Multipurpose Classrooms
Computer Centre, Science a)!
+ *)lution #locks!
Multipurpose all with Nutrition Centre!
-rade . *rea!
-ate ouse!
Covered /alkways!
Net)all Courts 0 Soccer!
#ON$RA#$S *NFOR+A$*ON,
PRO!"#$ N%+B"R &-
#.*"N$ .oB"
*+P."N$A$*ON A"N$ *D$
PR*N#*PA. A"N$ +asc0io .am2rec0ts Arc0itects
#ON$RA#$OR 3or0a 40an De5eopers cc
#ON$RA#$ A+O%N$ R 67- 8&,71
DA$" $'" PRO!"#$ B"AN 197&1
#O+P."$*ON DA$" 19-&11
$*+" ".APS"D 1-;
Page & of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 3/10
PHOTO PRIMARY SCHOOL
< PRO!"#$ S$A$%S R"POR$ $ODA= A$ 711&1
Project’s Details.
The overall Pro"ect go a )it )ehind according the schedule due to delays
in the setting out of site )ecause incorrect co1ordinates from the land
surveyor!
The earthworks for the new platforms have )een started on 2cto)er &3 and
must )e finished on Novem)er 45!
The e6cavation stage for the foundations in those )locks 7+ )locks8 which
don9t need earthworks have )een finished and the reinforcement should )e
start as following step!
The drilling of the )orehole for the water supply have )een finali:ed and the
Civil $ngineer is )usy checking the technical information a)out the
availa)ility in terms of ;uality of water, capacity in supply, etc!
Project Summary:
+ The )orehole has )een drilled!7see pictures No! < y &8
+ The e6cavation of ' classrooms )locks and & multipurpose classes
have )een finished and are ready for the ne6t step! 7see pictures
No!4 = >8
+ The earthworks are in progress! 7see pictures No! ? y<58
+ The #ulk power application have )een done and the Contractor must
pay during ne6t week .<'?&(!55
Challenges / Issues:
• The @#CC Contract with all the necessary documentation have no
)een signed!
• The date when the pro"ect to )e completed is in risk )ecause after
<>A of the time elapsed the pro"ect is almost starting!
• The Master programme was presented )ut still lacks the detailed
construction programme!
• The rain during the latest days put in risk the ;uality on the
foundations!
Page of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 4/10
PHOTO PRIMARY SCHOOL
!
Solutions
• The @#CC Contract must )e given to BDT on <51<<1&5<5 to )e
signed!
• $6tension of Practical Completion must )e issued )y the contractor
through a letter to P*, due to the delays during the setting out )ut t!
$ven must )e evaluated the cost implication!
• The contractor should present a new strategy to recover the days
)ehind the schedule in the earthworks!
• The construction programme with the detailed information a)out the
progress, )lock )y )lock should )e finished as soon as possi)le!
• The contractor should take in consideration )uild temporary trenches
to help evacuate the rain water within the trenches, specifically )y
the north1western :one!!
Page < of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 5/10
PHOTO PRIMARY SCHOOL
Page 8 of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 6/10
PHOTO PRIMARY SCHOOL
Fi>ure No, 1 Driin> t0e new Bore0oe,
Fi>ure No, & Driin> Bore0oe
Page 9 of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 7/10
PHOTO PRIMARY SCHOOL
Fi>ure No, #assroom Boc? 1
Fi>ure No,< #assroom Boc? &
Page 6 of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 8/10
PHOTO PRIMARY SCHOOL
Fi>ure No,8 #assroom Boc?
Fi>ure No, 9 #assroom Boc? <
Page - of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 9/10
PHOTO PRIMARY SCHOOL
Fi>ure No, 6 +uti Purpose #ass 1
Fi>ure No, - +uti Purpose #ass &
Page 7 of 1
8/9/2019 Project Status Report at Photo School on 09-11-2010
http://slidepdf.com/reader/full/project-status-report-at-photo-school-on-09-11-2010 10/10
PHOTO PRIMARY SCHOOL
Fi>ure No,7 "art0wor?s 0a5e started
Fi>ure No, 1 +ac0inery @or "art0wor?s,