39

Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,
Page 2: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,
Page 3: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 3

Project ScopeScope: Construct an unpaved road on northern Kupreanof Island between Kake and 12-mile Creek. The Kake Access Road would construct approximately 13.5 miles of new road, incorporate approximately 21.6 miles of existing unpaved road, and construct a new boat launch.

Page 4: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 4

The purpose of the proposed Kake Access Road project is to provide increased recreational and subsistence opportunities on Kupreanof Island within the U.S. Forest Service Petersburg Ranger District managed lands.

Project Purpose & Need

Page 5: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 5

Site Map

Page 6: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 6

• Improve access

• Enhance visitor experience

• Develop a constructible cost effective design

Project Goals

Page 7: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 7

• Identify construction obstacles and develop innovative solutions

• Create a high quality construction project

• Initiating construction as soon as practicable

Project Goals

Page 8: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 8

• Create a collaborative owner/contractor relationship

• Share and transfer knowledge

• Identify, mitigate, and minimize risk

• Support innovation

• Improve design constructability

• Optimize the project schedule

• Meet budget goals

CMGC Goals

Page 9: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 9

What innovations do you have for:

• Bridge installation• Drainage improvements • Finding efficiencies• Reducing future maintenance costs• Others?

Innovations

Page 10: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 10

• NTP for CMGC Project Stage 1 February 2020

• Review PS&E March 2020

• Final PS&E May 2020

• Negotiate Final Construction Cost May 2020

• NTP for CMGC Project Stage 2 June 2020

• Substantial Completion September 2022

Current Schedule

Page 11: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

CMGC use around the US

1/7/2020 Alaska DOT&PF 11

Page 12: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

DOT&PF’s CMGC Experience

1/7/2020 Alaska DOT&PF 12

1. Parks Hwy MP 237 Riley Creek Bridge

2. University Avenue Rehab

3. Parks Hwy MP 231

4. Tok Cutoff MP 38-50

5. Cordova Whitshed Road

6. Ketchikan Herring Cove Bridge

Page 13: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

CMGC Overview

• Introduce Innovation

• Promote Transparency

• Demonstrate Accountability

• Create Efficiencies

1/7/2020 Alaska DOT&PF 13

Page 14: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Project Development Team:

• Owner (DOT&PF)

• Designer (DOT&PF)

• Independent Cost Estimator (ICE)

• Contractor (CMGC)

CMGC Team Approach

1/7/2020 Alaska DOT&PF 14

Page 15: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

DOT&PF Design Greg Lockwood, P.E., Project Manager Joe Kemp, P.E., Design Engineer Tom Hughes, Designer Elmer Marx, P.E., Bridge Designer

DOT&PF Construction Garrett Paul, P.E., Construction Manager

DOT&PF Contracts Jeff Jenkins, Chief of Contracts

Project Development Team

1/7/2020 Alaska DOT&PF 15

Page 16: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 16

CMGC Assistance - Michael Baker International Derek Christianson, P.E., CMGC Lead

Karin McGillivray, CMGC Facilitation & Contractor Outreach Coordinator

Independent Cost Estimator (ICE) – Stanton Ed Jones, Lead Estimator

Gary Lindley, Civil Estimator

Project Development Team

Page 17: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 17

CMGC Contractor Who will be your Contract Manager?

Who will be your Project Manager?

Who will be your Project Superintendent?

Who will be your Cost Estimator?`

Project Development Team

Page 18: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 18

Procurement Comparison

Design-Bid Build Design Build CMGC

Owner Contractor Owner Contractor Owner Contractor

PreliminaryDesign ✔ ✔ ✔

Detailed Design ✔ ✔ ✔ ✔

RFP/Bid/GMP ✔ ✔ ✔ ✔ ✔ ✔

Construction ✔ ✔ ✔

CMGC requires

collaboration during

detailed design

Page 19: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

CMGC Development Stages

1/7/2020 Alaska DOT&PF 19

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Procurement RFP/CMGC Selection

Detailed Design

Contractor Input

Guaranteed Maximum Price

Stage 2: Construction

ServicesConstruction

Stage 1:Design

Services

Major Tasks & Milestones2019 2020 2021 2022

Page 20: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Project Development Stages

1/7/2020 Alaska DOT&PF 20

CM GC

Detailed Design Construction

Contractor Input

GMP

CMGC Procurement

Stage 1Preconstruction

Services

Stage 2Construction

Services

Page 21: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Collaboration

• Design innovations and efficiencies

• Identifying construction impacts

• Constructability reviews

• Cost estimates and project pricing

• Identifying and mitigating risks

• Permitting assistance

Stage 1: Preconstruction Services

1/7/2020 Alaska DOT&PF 21

Page 22: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Risk Mitigation:

• Identify, track and manage risk

• Eliminate or minimize risk

• Owner retains design control

Stage 1: Preconstruction Services

1/7/2020 Alaska DOT&PF 22

DBB DB CMGC

Risk

Contractor Risk

Owner Risk

Page 23: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Value Added:

• Early impact identification Permitting ROW

• Risk management Change orders Claims

• Maximize innovation and efficiencies• Improved quality

Stage 1: Preconstruction Services

1/7/2020 Alaska DOT&PF 23

Page 24: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Schedule:

• Permitting assistance

• Construction sequencing

Stage 1: Preconstruction Services

1/7/2020 Alaska DOT&PF 24

Page 25: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Pricing:

• Engineer’s Estimate

• Contractor’s Estimate

• Independent Cost Estimate

Stage 1: Preconstruction Services

1/7/2020 Alaska DOT&PF 25

Page 26: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Negotiations:• Negotiate Guaranteed Maximum Price: If agreement is reached – proceed to

Construction If agreement is not reached – proceed

to advertise for Bids

Stage 1: Preconstruction Services

1/7/2020 Alaska DOT&PF 26

Page 27: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Guaranteed Maximum Price Acceptance

• Similar to DBB at this point

Stage 2: Construction

1/7/2020 Alaska DOT&PF 27

Page 28: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Innovation evaluation

• Risks encountered

• Change orders & claims

• GMP vs. final costs

• Changes to schedule

Post Construction Evaluation

1/7/2020 Alaska DOT&PF 28

Page 29: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 29

RFP to select CMGC began advertising December 17, 2019

4 weeks to prepare response Proposals due January 16, 2020 CMGC selection February 2020 Opportunities available for subcontractors

Request for ProposalRFP

Page 30: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

1/7/2020 Alaska DOT&PF 30

• Part A – Request for Proposal• Part B – Submittal Checklist• Part C – Evaluation Criteria• Part D – Proposal Form,

Certification of Eligibility• Pre-Audit Statement• Indemnification and Insurance• Proposed Statement of Services

Request for ProposalRFP

Page 31: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

Part C in this CMGC RFP has two sections that require responses in submitted proposals:

• Section I - Technical Proposal

• Section II – Preferences

• Section III – Price

Responses are not required for criteria with a Weight of “0”

Request for ProposalRFP

1/7/2020 Alaska DOT&PF 31

Page 32: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• 15 page maximum written narrative responding to weighted criteria

• Responses must be specific and directly related to the Contracting Agency’s Proposed Statement of Services (Appendix B of the RFP)

Part C - Section I TechnicalRFP

1/7/2020 Alaska DOT&PF 32

Page 33: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Section I Weighted Criteria:• Project Approach (15% weight)• Risk Management (5% weight)• Innovation (10% weight)• Partnering & Claims Mitigation (5% weight)• Proposed Staff (15% weight)• Management (5% weight)• Past Performance (15% weight)• Approach to Fee and Price (5% weight)

Part C - Section I TechnicalRFP

1/7/2020 Alaska DOT&PF 33

Page 34: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Section II Weighted Criteria:

• Alaska Bidder Preference (10% weight)

Part C - Section II PreferencesRFP

1/7/2020 Alaska DOT&PF 34

Page 35: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Labor Billing Rates (5% weight):• Contract Management - 10% of total labor effort• Project Management - 25% of total labor effort• Project Superintendent - 25% of total labor effort• Cost Estimating - 25% of total labor effort• Scheduling - 15% of total labor effort

Response will be scored as follows except the score will be zero if a rate for each listed function is not provided by an Offeror:

Part C - Section III PriceRFP

1/7/2020 Alaska DOT&PF 35

Page 36: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Construction Fee Proposal (10% weight):• Fee expressed as a percentage and consists of overhead, profit,

and any other applicable indirect costs• Profit does not need to be identified separately• Combine all three components to form a single fee percentage• Applied to all work directly performed by the prime contractor• A 5% fee (not the proposed fee) will be allowed for the Prime

Contractor on subcontractor work or subcontractor-supplied materials• Joint ventures or prime/subcontractor partnerships will be treated as

one entity and entitled to the proposed feeResponse will bescored as follows:

Part C - Section III PriceRFP

1/7/2020 Alaska DOT&PF 36

Page 37: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Q&A will be posted on the RFP website as supplemental information through an addendum to the RFP: May need to re-download Zip File to get

supplemental information

• Only those listed on the RFP holders list will be notified of addenda (Please Register)

Q&A and AddendaRFP

1/7/2020 Alaska DOT&PF 37

Page 38: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

• Project ManagerGreg Lockwood, P.E.Tel: 907-465-2393E-mail: [email protected]: 907-465-4238TDD: 1-800-770-8973

• Project Web site: http://dot.alaska.gov/sereg/projects/kake_acce55/

• Procurement Web Site: http://dot.alaska.gov/rfpmgr/lg.cfm

For more information

1/7/2020 Alaska DOT&PF 38

Page 39: Project Scope - Alaskadot.alaska.gov/sereg/projects/kake_acce55/assets...Jan 07, 2020  · 1/7/2020 Alaska DOT&PF 16. CMGC Assistance - Michael Baker International Derek Christianson,

How can we help you provide the best proposal

to DOT&PF?

Questions?

1/7/2020 Alaska DOT&PF 39