36
PROJECT SAFETY PLAN to Rio Tinto Iron Ore for RISK MANAGEMENT PROGRAM (RMP) – MACHINE INSPECTION SERVICES Document No: AE-HSE-XF-0004_A Revision: A Date: 14 November 2017 Aspec holds a strong commitment to ensure the health, safety and well-being of all employees and persons affected by its operations. In accordance, Aspec will develop a safety plan for each project outlining the safety management system to manage the risks involved for the specific tasks and duties for that project. The work environment will be assessed in terms of hazards and risks and appropriate controls put in place to manage the risks involved. All personnel involved in the operation must read and understand the safety plan. To ensure that they will comply with the safety plan, and that they accept the safety management system of the operation, they will sign on the relevant page of the plan. Form S3.1

PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

  • Upload
    ledat

  • View
    232

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

PROJECT SAFETY PLAN to Rio Tinto Iron Ore for RISK MANAGEMENT PROGRAM (RMP) – MACHINE INSPECTION SERVICES

Document No: AE-HSE-XF-0004_A

Revision: A

Date: 14 November 2017

Aspec holds a strong commitment to ensure the health, safety and well-being of all employees and persons affected by its operations. In accordance, Aspec will develop a safety plan for each project outlining the safety management system to manage the risks involved for the specific tasks and duties for that project. The work environment will be assessed in terms of hazards and risks and appropriate controls put in place to manage the risks involved.

All personnel involved in the operation must read and understand the safety plan. To ensure that they will comply with the safety plan, and that they accept the safety management system of the operation, they will sign on the relevant page of the plan.

Form S3.1

Page 2: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

Introduction

BACKGROUND

Rio Tinto Iron Ore (RTIO) has engaged ASPEC Engineering Pty Ltd (ASPEC) to conduct Risk Management Program (RMP) inspections of reclaimers, stackers and ship loaders across RTIO Pilbara locations for the period 1 January 2017 – 1 January 2020 via Umbrella Supply Contract no. CW2106050.

This Project Safety and Execution Plan covers all RMP inspections conducted under the above named agreement. The inspections included are as follows:

• 6M – Six (6) monthly inspection • RBI – Risk Based Inspections (conducted yearly) • EI – Engineering Inspections (conducted every 2 years) • PIR – Plant Integrity Review inspections (conducted every 6 years)

There are four main risk profiles addressed in this plan: • Inspections via walkways only (6M) • Inspections that include EWP use and confined space (RBI, EI and PIR) • Travel to RTIO port sites, <1 hr from an airport and within mobile phone coverage at all times • Travel to RTIO mine sites, >1 hr from an airport with periods of no mobile phone coverage

Inspections are carried out on RTIO assets at both port and mine sites. There is a separate risk profile associated with travel to the various mine sites due to their isolated locations. Travel to both port and mine is covered under this plan.

ASPEC has a general workplace health and safety policy and other safety management tools available in the members area of the website (http://members.aspec.com.au/members-area.html). All employees should be familiarised with these policies during inductions. Any safety concerns that arise should be raised with ASPEC management so that solutions can be found and risks can be effectively managed. PLANNING The main planning activities required are:

• Machine inspection specific proposals submitted as required

• Travel and accommodation request submitted to RTIO Contractor Management Supervisor (CMS) or RTIO shut admin team

• Check qualifications and training are current with RTIO CMS or RTIO shut admin team. All qualifications are recorded against the persons RTIO SAP number. Qualifications can also be checked online using RTIO scodle system (www.rtiocompliance.scodle.com).

• Plan travel to and from site considering working hours, travelling in daylight hours and adequate sleep.

• Setting up the inspection template for the machine on the iPad

• EWP - Aspec to supply for Cape Lambert EI, RBI and PIR inspections. RTIO to supply at all other sites

SAFETY DOCUMENTATION The main safety documentation required for each job is: Form S3.1 PAGE 2 OF 28

Page 3: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

• JHA – completed to identify hazards and controls to ensure safety for all tasks

• RTIO “take 5” to be completed before starting tasks each day and for any project specific tasks not covered in the above JHA.

• Working At Heights Permit – To be arranged and provided by RTIO. Only trained, authorised and competent persons to conduct this work.

• Confined Space Entry Permit – To be arranged and provided by RTIO. Only trained, authorised and competent persons to conduct this work.

• RTIO Critical Risk Controls (CRMs) to be completed as discussed at the kick off meeting with the RTIO CMS

INSPECTION ACCESS Structures will be inspected from existing walkways, access ways, scaffold and Elevated Work Platforms (EWPs), as well as internal confined spaces. Inspections requiring the use of an EWP and confined space inspections are as follows:

• RBI – Risk Based Inspections • EI – Engineering Inspections • PIR – Plant Integrity Review inspections

6M inspections do not require an EWP or entry into confined spaces. Where access is restricted due to other activities or in an inaccessible location, this limitation shall be noted on the Incomplete Inspection form so that RTIO can reinspect this area at another time. ISOLATIONS Inspectors must not work on any equipment without having a positive isolation in place in accordance with RTIO isolation policies and training. ASPEC employees must consider all equipment to be live and able to start unless they have followed the RTIO isolation procedures. During RTIO shutdowns, the isolation points and permits are usually located away from the machine at the permit hut. Each person must lock onto the relevant work permits specified in their work pack. The work permit lists the drive systems that have been isolated. It may be necessary to lock onto more than one permit. The RTIO isolation officer must counter-sign on the permits. When leaving site, locks must be removed and the permits signed off. ASPEC employees should discuss this process with their supervisor or RTIO CMS if it is unclear. DRIVING IN REMOTE AREAS One of the main risks is driving in remote areas. Please include the following in your risk assessments and planning:

• Take the satellite phone if travelling to the mine sites because there is limited mobile phone coverage

• Avoid driving in the dark. Note that kangaroos are more active on the roads around dawn and dusk. • Take water in the car. Consideration should be given to where water can be obtained before flying to

unfamiliar remote locations. • Check the condition of the car and tyres before leaving the hire company depot. • Complete a Journey Management Plan for any travel that satisfies one or more of the below:

o Travel more than 100km from a township, site or camp o Drive for a total duration of more than 2 hours

Form S3.1 PAGE 3 OF 28

Page 4: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

o Drive where there will be intermittent or no mobile communication services o Take a route that your or any occupant is unfamiliar with o Travel outside of daylight hours

• Register your journey with the RTIO Journey Management phone service. Emergency resources are available through this service if they are needed.

o Journey Management Contact Details “Pilbara Service Centre”, phone number 1800 912,777.

• Provide your travel details to your ASPEC supervisor by email and verbally. • Download the ‘Emergency +’ app prior to departure. The app provides GPS coordinates to use in an

emergency, as well as useful contact numbers.

Section 1 – Description of Work and Responsibilities

Date: 1 January 2017 to 1 January 2020

Aspec Engineering Supervisor: Mark Biggs

Client Company: RTIO

Client Supervisor: Tarun Sharma

Sites:

Port: • Cape Lambert A • Cape Lambert B • Parker Point

Mine: • Brockman 4 • Hope Downs 1 • Hope Downs 4 • NBWT • West Angelas • Yandi

Brief description of work: The major tasks to be completed on site include: • Regular RMP inspections of reclaimers, stackers and ship loaders across RTIO Pilbara Operations. • Inspection of elevated structures in an Elevated Work Platform (EWP), and confined spaces i.e. working

at heights & confined spaces

Personnel and Responsibilities:

Name Company Responsibility Tarun Sharma RTIO Client representative

Mark Biggs Aspec Engineering Inspection Engineer

Mike Dark Aspec Engineering Inspection Engineer

Matt Warren Aspec Engineering Inspection Engineer

Anthony Nguyen Aspec Engineering Inspection Engineer

Tatsuya Uno Aspec Engineering Inspection Engineer

Form S3.1 PAGE 4 OF 28

Page 5: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 2 – List of Tasks

Task Description By Whom

Structural Inspections from walkways

Refer to client Process Resource Tools (PRTs) and Job Hazard Analysis (JHA)

ASPEC

Elevated Structures Inspection

Refer to client Process Resource Tool (PRTs), Job Hazard Analysis (JHA) and Working at Heights Permit

ASPEC

Confined Space Inspection Refer to client Process Resource Tool (PRTs), Job Hazard Analysis (JHA) and Confined Space Permit

ASPEC

Refer to reference JHAs in Appendix C

Form S3.1 PAGE 5 OF 28

Page 6: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM
Page 7: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 4 – General Safety Procedures

Aspec Site Safety Work Preparation

All Aspec personnel associated with the work shall have undergone an Aspec Safety Induction, General Site Induction, and Site Specific Induction by the client representative prior to commencement of any site works. Aspec employees should be informed of all relevant client standard procedures, in particular the emergency procedures.

Aspec employees should have a detailed toolbox talk with the client representative on the nature of the work and the specific hazards, risks, and controls involved. A work permit and or JHA should be completed as required by the client.

Before the commencement of work each day, a meeting of all personnel will be held and a toolbox talk of the tasks and hazards, risks and controls specific to the situation discussed. Aspec employees should each fill out a Take Five risk assessment form, before they begin work.

Aspec Site Rules

Regardless of the client safety requirements, personnel under the direction of Aspec shall as a minimum observe the following requirements at all times on site:

• Wear an approved safety helmet, safety boots, eye protection goggles or glasses, appropriate safety clothes including long trousers and long sleeves (high visibility clothing/vest is mandatory) and gloves. Additional PPE should be worn if performing other high risk activities (working at heights & confined spaces). Depending on weather conditions other measures shall be taken as appropriate eg sunscreen cream.

• At no time shall personnel venture onto any area of the machine where walkways, platforms or proposed work areas are not protected by guard rails or other structure that will obstruct accidental fall from heights.

• Personnel shall not tamper with or attempt to work the controls of any associated plant. When the need arises to control such equipment in the execution of the work, this will be undertaken only by the client’s personnel at the specific request of the Aspec Supervisor.

• Should any individual feel unsafe or uncomfortable with the working conditions during the execution of the work, he or she shall immediately STOP WORK or WITHDRAW FROM THE SITUATION/LOCATION and consult the Aspec or Client Supervisor to organise an improved/alternative approach before resuming work.

• Aspec personnel are not routinely used to manual handling of heavy tools and equipment. Any Aspec person involved in the manual handling of the pieces of equipment heavier than ~20 kg (or less at the employees discretion) shall ensure that all reasonable precautions are taken and that all lifts are performed with good manual handling technique e.g. bending knees with straight back, two person lift or using mechanical aids. Where possible the use of mechanical lifting devices shall be employed.

• In the event of loss of any personal protective clothing during the execution of work (eg. helmet or glasses), the individual involved shall immediately proceed to have such articles replaced (assuring first that the works/equipment left unattended while replacing such articles do not pose a safety hazard).

• Care must be taken when doing work that tools and equipment do not create trip hazards.

• Cabling or electrical connection shall not be left unsupported or left to hang under self-weight. In particular, power cables connected to 240V supply outlets shall be restrained to ensure there is no possibility of accidental pull-out (under self-weight, wind action, etc.) during the work.

• All equipment that requires 240V power shall be checked and tagged by approved personnel before coming to site.

• All chemicals to be brought on-site should be pre-approved and have an approved Chemical Safety Data Sheet.

Form S3.1 PAGE 7 OF 28

Page 8: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 5 – Specific Requirements

List tools and equipment that are being brought onto site

As per procedures and JHA attached

List any activities performed that have the potential to impact on the environment

Elevated structures inspection. Potential for hydraulic or fuel leaks.

Form S3.1 PAGE 8 OF 28

Page 9: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 6 – Main Risk Profiles – Hazard Management

Risk Profile 1 – Travel to and from site – Port Travel that is generally within one (1) hour of the fly-in airport, through populated / regularly trafficked areas with continuous, or near continuous mobile phone coverage.

Description Hazards Risk Rating Recommended Controls

Travel to and from site - Port

Vehicles collide

Vehicle- pedestrian collision

Vehicle- stationary object collision

Moderate Employees must be fit for work and not too tired to drive.

Travel in pairs where possible and share driving

Pre-vehicle inspection is completed

Do not use mobile phones whilst driving

Ensure appropriate RTIO Journey Management Plan (JMP) is completed

Risk Profile 2 – Travel to and from site – Mine Travel that is often greater than one (1) hour from the fly-in airport, through isolated areas with extended periods of no mobile phone coverage.

Travel to and from site - Mine

Vehicles collide

Vehicle- pedestrian collision

Vehicle- stationary object collision

Travelling in isolated areas

Fatigue due to extended travel

Moderate Employees must be fit for work and not too tired to drive.

Travel in pairs where possible and share driving

Pre-vehicle inspection is completed

Do not use mobile phones whilst driving

Ensure satellite phone is taken for any jobs that require remote driving

Keep up-to-date site contact information, including shut supervisor details on hand

Ensure appropriate RTIO JMP is completed, and regularly check-in during travel when possible

Time when travel occurs to minimise fatigue, e.g., travel the day before, stay overnight before travelling away from site

Risk Profile 3 – Inspections via walkways only 6M RMP inspections conducted from walkways only

Use of scaffolding to access specific locations for inspection

Slips/ trips/ falls Moderate Scaffolding certification checks – ensure current scafftag before use

Remain in designated areas

Form S3.1 PAGE 9 OF 28

Page 10: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

Risk Profile 4 – Inspections via EWP and confined space RBI, EI and PIR inspections

Description Hazards Risk Rating Recommended Controls

Use of scaffolding to access specific locations for inspection

Slips/ trips/ falls Moderate Scaffolding certification checks – ensure current scafftag before use

Remain in designated areas

Use of EWP for inspection

Fall from height Moderate Ensure staff have correct and current training for the operation of EWPs.

Appropriate harness and inertia reel to be worn at all times.

Maintain three-point contact

Follow work permit instructions. Ensure a rescue plan is in place and resources are available. Know the site emergency radio and phone contacts.

Collisions Moderate Ensure staff have correct and current training for the operation of EWPs.

Spotter to be used at all times

Inspection conducted within confined space

Gases / Low oxygen

Low light

Ergonomics / awkward positioning

Moderate Ventilate the space

Gas test and wear a gas monitor

Ensure appropriate PPE is worn, including a head torch and light.

Maintain three-point contact

Follow work permit instructions. Ensure a rescue plan is in place and resources are available. Know the site emergency radio and phone contacts.

Form S3.1 PAGE 10 OF 28

Page 11: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 7 – Principal Hazard Management – All Risk Profiles

Description Hazards Risk Rating Recommended Controls

Access to site Personnel trips to ground level

Low Ensure employees have completed site familiarisations/ inductions

Use hand rails

Remain on access platforms at all times

Wear correct footwear

Employees fit for work

Access to site Collisions Low Pre-shift toolbox talk with RTIO supervisor

Meeting with client representatives to obtain brief on all hazards in area

Wear High-Vis clothing

Stick to footpaths

Employees fit for work

New employees are supervised

Awareness of vehicle/ site rules

Machine operation Low Personnel fit isolation personal locks to isolation point(s) at all times as per client isolation training and procedures (as directed by client supervisor and isolation officers)

General site safety Sunburn

Heat exhaustion

Low Ensure water supply on site

Ensure employees fit for work

Wear sunscreen

Schedule appropriate rest breaks

Have a vehicle nearby with airconditioning to cool off during breaks when there is hot weather.

Electrocution Moderate Power tool should be tagged and tested

Power leads should be elevated

All necessary pre work briefs should be undertaken

Only certified and competent staff should operate electrical equipment.

Form S3.1 PAGE 11 OF 28

Page 12: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

Description Hazards Risk Rating Recommended Controls

Falling objects Moderate Wear safety helmets

Follow footpaths

Use drop zones around work above heights

Tether equipment used at heights

Stay out of barricaded areas unless authorised and signed onto work area JHA’s etc

Shutdown Safety Maintenance activities Moderate Pre-shift toolbox talk

Meeting with client representatives to obtain brief on all hazards in area

Make contact with other workers in the area being accessed to identify hazards associated with their work activity

Modified Structures Moderate Personnel fit isolation personal locks and sign onto permits at the shutdown permit hut at all times (as directed by RTIO supervisor and Isolation officers)

Be aware of potential for modified walkways/handrail protection during maintenance activities

Make contact with other workers in the area being accessed to identify hazards associated with their work activity

Form S3.1 PAGE 12 OF 28

Page 13: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 8 – Site Access Information SITE LOCATIONS / DIRECTIONS Refer to maps in Appendix A and instructions below. PORT LOCATIONS Cape Lambert Fly to Karratha Airport (KTA) direct from Perth. Drive approximately 45 minutes to Cape Lambert. Directions to Cape Lambert Shut Maintenance Office:

• Depart the airport and turn left onto Dampier Highway towards Karratha for approximately 6kms. • Turn right onto Madigan Road, continue for approximately 6kms. • Turn left onto North West Coastal Highway, travel for 40kms towards Roebourne. • At Roebourne, turn left onto Point Samson-Roebourne Road and continue for 14kms. • Turn left onto Cape Lambert Road and continue approximately 3kms past Wickham to the Cape

Lambert Gatehouse. • The Cape Lambert Shut Maintenance Office is in the workshop building approximately 600m past

the Gatehouse on the left. Directions to Wickham Camp (accommodation for CL inspections):

• Follow the above directions onto Cape Lambert Road, driving towards Wickham. • At Wickham, turn right onto Wickham Drive and continue for 1km, Wickham Camp will be on the left.

The camp is operated by RTIO and has signage near the driveway.

Dampier / Parker Point Fly to Karratha Airport (KTA) direct from Perth. Drive approximately 10 minutes to Parker Point / Dampier. Directions to Parker Point Shut Maintenance Office:

• Depart the airport and turn right onto Dampier Highway, continue for approximately 6.5kms. • Turn right before the train lines entering Dampier onto the road going up Kangaroo Hill for

approximately 1.5kms to the Gatehouse Continue past the Gatehouse for approximately 600m and take the second left. The Parker Point Shut Maintenance Office is after approximately 400m on the left in the Number 1 Workshop building.

Directions to Searipple Village (accommodation for PP inspections)

• Depart the airport and turn left onto Dampier Highway towards Karratha. • Continue on Dampier Highway for 12.5kms, through three (3) roundabouts. • Turn left onto Searipple Road, and follow to the right for 3.3kms. • Turn left at Mystery Road to the entrance to Searipple Village. Searipple is privately owned but used

extensively by RTIO contractors. MINE LOCATIONS Brockman 4 Fly to Paraburdoo Airport (PBO) direct from Perth. Drive approximately 2.5hours to Brockman 4 site. Directions to Greater Brockman Villages (Nammuldi, West Pilbara Village, and Brockman 4 Ops Village):

• Depart the airport and turn left onto Tom Price – Paraburdoo Road. Continue on Tom Price – Paraburdoo Road for 70kms.

Form S3.1 PAGE 13 OF 28

Page 14: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

• At Tom Price, turn left onto Mine Road, continue 500m to turn left to stay on Mine Road. Make sure you don’t continue straight past the service station.

• Continue 500m to turn right onto Nameless Valley Road, continue for 19kms. • Turn right on Nanutarra – Wittenoom Rd and continue for 500m. • Turn left onto White Quartz Rd, continue for approximately 35kms to the gatehouse. NOTE: A

security access card is required to pass through the gatehouse. If the swipe card has not been activated, contact the relevant shut supervisor or maintenance planner to allow access.

• Turn right after the gatehouse, continue past the Boolgeeda Camp turnoff and arrive at the Greater Brockman Villages site.

Directions from Village to Brockman 4 Mine site:

• Proceed back to the gatehouse on White Quartz Rd (approx. 4km) • Cross White Quartz Rd at the gatehouse (as if turning left off White Quartz Rd), continue 6km to

Brockman 4 Mine Operations.

Nammuldi / Brockman 2 Fly to Paraburdoo Airport (PBO) direct from Perth. Drive approximately 3 hours to Nammuldi Mine site. Directions to Nammuldi Camp (part of Greater Brockman Villages):

• Follow the above directions to Greater Brockman Villages. While there is a slightly more direct alternate route, the preference is to follow the above to Brockman 4, and continue on to Nammuldi Mine site from there. Accommodation for Nammuldi inspections will be at this location.

Directions from Village to Nammuldi Mine site: • Proceed back towards the gatehouse for approx. 3km • Turn right onto unsealed road (sign posted) • After 500m turn left onto unsealed road (sign posted) • Continue 1km and turn right onto unsealed road. • Continue approximately 26km following RTIO provided maps to Nammuldi Administration. **

Potential to use My Maps route from Mike Dark in Google Maps to track travel – road is not well sign-posted **

Hope Downs 1 Fly to Newman Airport (ZNE) direct from Perth. Drive approximately 1 hour, 40 minutes to Hope Downs 1 Mine. Directions to Hope Downs 1 Village:

• Depart the airport and turn right onto Great Northern Highway towards Newman township. Continue on Great Northern Highway for 100kms.

• Turn right onto Hope Downs Access Road (sign posted). • Continue approximately 9kms, then turn left as directed to Hope Downs 1 Village.

Directions from village to Hope Downs 1 Mine site: • Proceed from village back to Hope Downs Access Road (750m) • Turn left and continue approximately 23kms to Hope Downs Mine site.

Hope Downs 4 Fly to Newman Airport (ZNE) direct from Perth. Drive approximately 40 minutes to Hope Downs 4 Mine. Directions to Hope Downs 4 Village:

• Depart the airport and turn right onto Great Northern Highway towards Newman township. Continue on Great Northern Highway for 41kms.

Form S3.1 PAGE 14 OF 28

Page 15: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

• Turn right onto Hope Downs Access Road • Continue approximately 3kms to Hope Downs 4 Village on the right.

Directions from village to Hope Downs 4 Mine site: • From the village, continue north on Hope Downs Access Road for approximately 7kms to Hope

Downs 4 Mine site.

West Angelas Fly to Newman Airport (ZNE) direct from Perth. Drive approximately 1 hour, 40 minutes to West Angelas Mine. Directions:

• Depart the airport and turn right onto Great Northern Highway towards Newman township. Continue on Great Northern Highway for 106kms.

• At 106kms, turn left onto West Angelas Access Road at ‘West Angelas Mine’ sign. • Continue on the unsealed access road for 28kms to West Angelas Mine site.

Yandicoogina Fly to Newman Airport (ZNE) direct from Perth. Drive approximately 2.5 hours to Yandi Mine. Directions:

• Depart the airport and turn right onto Great Northern Highway towards Newman township. Continue on Great Northern Highway for 144kms.

• At 144kms, turn right onto Yandi Access Road at ‘Yandi Mine’ sign. • Continue for approximately 60kms to Yandi Mine site.

SITE CONTACTS Refer to Appendix B for a RTIO spreadsheet of contacts by site.

Form S3.1 PAGE 15 OF 28

Page 16: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 9 – Inspection Scope of Work LOCATION

RTIO Pilbara Operations

Port Mine

Cape Lambert A Brockman 4

Cape Lambert B Hope Downs 1

Parker Point Hope Downs 4

NBWT

West Angelas

Yandi

REFERENCE DOCUMENTS Inspections will be carried out in accordance with the following RTIO and Australian standard specifications and engineering procedures; RTIO Standard Specifications and Engineering Procedures Note that there are Process Resource Tools (PRTs) that are listed on the Purchase Orders and available in the RMP contract folder on ASPECs server. The PRTs refer to these specifications and summarise the scope requirements.

Specification / Procedure No. Title

RMP01 Pilbara Iron Risk Management Plan for Stackers, Reclaimers, Shiploaders and Transfer Cars

RMP03 Conducting a Risk Management Plan Hazard Study

RMP04 Plant Integrity Review of Rail Mounted Machines

RMP05 Engineering Inspection of Rail Mounted Machines

RMP06 Auditing the Pilbara Iron Risk Management Plan

RMP07 PLC Software Audit of Rail Mounted Machines

RMP09 Pilbara Iron Risk Management Plan Accountabilities

Form S3.1 PAGE 16 OF 28

Page 17: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

Australian Standards Standard No. Title

AS4324.1-1995 Mobile Equipment for Continuous Handling of Bulk Materials

AS1170.2 SAA Loading Code – Part 2: Wind Loads

AS3990 Mechanical Equipment – Steelwork

AS4100 Steel Structures (fatigue only)

AS1418 Cranes (including hoists and winches) – Part 1: General

Form S3.1 PAGE 17 OF 28

Page 18: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

SECTION 10 - Approval

The above plan has been prepared and approved as follows:

Name Company Signature

Mark Biggs Aspec Engineering

Frank Gatto Aspec Engineering

Form S3.1 PAGE 18 OF 28

Page 19: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

APPENDIX A – SITE ACCESS MAPS

Form S3.1 PAGE 19 OF 28

Page 20: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

CAPE LAMBERT

Form S3.1 PAGE 20 OF 28

Page 21: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

PARKER POINT

Form S3.1 PAGE 21 OF 28

Page 22: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

BROCKMAN 4 and BROCKMAN 2 / NAMMULDI Tom Price Regional Route Map Map to Greater Brockman Villages

Form S3.1 PAGE 22 OF 28

Page 23: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

22222222222222

Quartz

7,5

20,0

00 m

N

7,5

10,0

00 m

N

7,5

00,0

00 m

N

7,4

90,0

00 m

N

7,4

80,0

00 m

N

7,4

70,0

00 m

N

7,4

60,0

00 m

N

7,4

50,0

00 m

N

7,4

40,0

00 m

N

7,4

30,0

00

mN

7

,43

0,0

00 m

N

7,4

40

,00

0 m

N

7,4

50

,00

0 m

N

7,4

60

,00

0 m

N

7,4

70

,00

0 m

N

7,4

80

,00

0 m

N

7,4

90

,00

0 m

N

7,5

00

,00

0 m

N

7,5

10

,00

0 m

N

7,5

20

,00

0 m

N

520,000 mE 530,000 mE 540,000 mE 550,000 mE 560,000 mE 570,000 mE 580,000 mE 590,000 mE

Nammuldi

Brockman 2 Mine

Map to Greater

Brockman Villages

(Nammuldi, West Pilbara & Brockman 4 Villages)

Drawn: H Priest Date: Dec 2009

Plan No: PDE0071533 Proj: MGA94 Zone 50

Bolgeeda Airport

((

Boolgeeda CampA((

((

((

A(( Greater Brockman Villages

Brockman Syncline Marra Mamba

Brockman 4 Mine((

((

Beasley River Limonite

B1

B1 Detritals

Section 10

Mt Samson Detritals

SEE INSET

(( (

TTTTOOOOMMMM PPPPRRRRIIIICCCCEEEE TOM PRICE

Section 17

B26

((

Tom Price

IIIINNNSSSEEETTT INSET

Panhandle

TTOOMM PPPPPPPPRRRRRRRRIIIIIIIICCCCCCCCEEEEETOM P IC

SSSSSSSS◆ SShhhhhhhhooooooooopppppppppppppppppppiiiiiiiiinnnnnnnnngggggggggCCCCCCCCCCeeeeeeeeeennnnnnnntttttttttrrrrrrrrreeeeeeeee S g C tre

((

SSSSSSSS◆ hhhhhheeeeeeeellllllllllll PPPPPPPPShell PPeeeeeeeettttttttttrrrrrrrrrroooooooooolllllllllSSSSSSSSSSP l ttttttttttaaaaaaaaattttttttttiiiiiiiiiioooooooooonnnnnnnnnStatio n

(( 44444....555

((

LEGEND

Mine access route

Distance kms

LOCATION MAP Dampier

Port Hedland

+

Western Range

PPPPPPAAAAARRRRRRAAAAABBBBBUUUUURRRRRDDDDDDOOOOOOOOOO (

Paraburdoo

Airport

((

Resource location

◆ Town

A Camp

+

Mesa J

+Cape Lambert

Paraburdoo

Eastern Range

SCALE

5 0 5 10

Nammuldi

Brockman 2

Mount Tom Price

Marandoo

MAC

BHPIO Yandi

Yandicoogina

Hope Downs Channar West Angelas

Kilometers

1:300 000 @ A3

Paraburdoo

Eastern Range Mount Whaleback

Jimblebar

Channar

520,000 mE 530,000 mE 540,000 mE 550,000 mE 560,000 mE 570,000 mE 580,000 mE 590,000 mE

Page 24: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

590,000 mE570,000 mE530,000 mE 550,000 mE7,

490,

000

mN

7,51

0,00

0 m

N510,000 mE

7,53

0,00

0 m

N

Homestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead CampHomestead Camp

Brockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 CampBrockman 2 Camp

Boolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda CampBoolgeeda Camp

BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)BME Camp (Jundamunah)

SilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrassSilvergrass

NammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldi

Brockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman Syncline Marra MambaBrockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4

Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1Brockman 1

Mt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt Sylvia

Mt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret SouthMt Margaret South

Beasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteBeasley River LimoniteMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson DetritalsMt Samson Detritals

Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10Section 10B1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 DetritalsB1 Detritals

B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1

Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17Section 17

WalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalinaWalkalina

PowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerlinePowerline

P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22P22

P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21P21

P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23P23

P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30P30

P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18P18

P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26P26

P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20P20

P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24P24

P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25P25

P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P9P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6P6 P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7P7

P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8P8

P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5P5

P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12P12

P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11P11

P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13P13

P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3P3

P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16P16

P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1

P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2P2

Brockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 VillageBrockman 4 Village

Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2

Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3Brockman 3

HomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomesteadHomestead

Tom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom Price

B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26B26

VivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivashVivash

P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4P4

P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10P10

P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15P15

P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17P17

P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0P0

P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19P19

LEGEND

1:250 000 @ A3

SCALE

TOM PRICEREGIONAL

ROUTE MAPPlan No: PDE0068466_TPProj: MGA94 Zone 50

Drawn: H. PriestDate: Nov 2009

TOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICETOM PRICEWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriWindawarriMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampMarandoo FIFO CampTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelTom Price HotelHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron LodgeHamersley Iron Lodge

0 5 10Kilometres

HighwayMajor RoadMinor RoadRail AccessTrackExploration TrackTown RoadMine AccessMine RoadHaul Road

P0Km AccumulativeDistance

Tom Price service stationDescription

Tom Price - Boolgeeda Camp

Main access road

NamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNamelessNameless Valley

ValleyValleyValleyValleyValleyValley

ValleyValleyValleyValleyValleyValleyValley

ValleyValleyValleyValleyValleyValleyValley

ValleyValleyValleyValleyValleyValley

ValleyValleyValleyValleyValleyValleyValley

ValleyValleyValleyValleyValleyValleyValley

ValleyValleyValleyValleyValleyValleyValley

Valley

RdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRd

P1 0.4 0.4P0 - P1 Turn left towards Tom Price MineP2 0.5 0.9P1 - P2 Turn right onto Nameless Valley RdP3 19.3 20.2P2 - P3 Turn right onto Nanutarra - Wittenoom RdP4 0.5 20.7P3 - P4 Turn left onto White Quartz RdP5 35.5 56.2P4 - P5 Drive past Brockman 3 turnoffP6 4.8 61.0P5 - P6 Turn right after gatehouseP7 1.0 62.0P6 - P7 Turn left onto unsealed road (sign posted)P8 0.5 62.5P7 - P8 Turn left onto unsealed road (sign posted)P9 1.0 63.5P8 - P9 Turn right onto unsealed roadP10 3.5 67.0P9 - P10 Turn left onto unsealed road opposite airstripP11 2.1 69.1P10 - P11 Arrive at Boolgeeda Camp

P13 6.0 67.0P6

P6 - P13

Km AccumulativeDistance

Arrive at Brockman 4 mine operationsTurn left after gatehouse (sealed road)

DescriptionTom Price - Brockman 4 Mine Ops

61.0

P12 3.1 65.1P7

P7 - P12

Km AccumulativeDistance

Arrive at Brockman 4 VillageDrive past Boolgeeda Camp turnoff (sealed road)

DescriptionTom Price - Brockman 4 Village

62.0

P10 2.1 2.1P11

P11 - P10

Km AccumulativeDistance

Turn left onto unsealed roadBoolgeeda Camp

DescriptionBoolgeeda Camp - Brockman 2

Brockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine OperationsBrockman 4 Mine Operations

P30 22.2 24.3P10 - P30 Arrive at Brockman 2, call for escort (ch 43) if not inducted

P18 30.7 74.2P19 0.5 74.7

P17 18.2 43.5P16 0.2 25.3P15 24.7 25.1P1 0.4 0.4P0

P18 - P19P17 - P18P16 - P17P15 - P16P1 - P15P0 - P1

Km AccumulativeDistance

Drive past Homestead - Silvergrass RdArrive at Brockman 2 Camp

Turn right on Brockan 2 Mine Access RdTurn right onto Rail Access RdTurn left onto Nanutarra - Wittenoom RdDrive past mine turnoffTom Price service station

DescriptionTom Price - Brockman 2 Camp

P23 6.8P22 25.6P26 23.8P25 3.0P24 9.6P17

P22 - P23P26 - P22P25 - P26P24 - P25P17 - P24

Km AccumulativeDistanceTom Price - Homestead Camp

105.579.956.153.143.5

112.3 Arrive at Homestead CampContinue along Mt Sylvia RdContinue past Robe Headwaters turnoffContinue onto Mt Sylvia RdTurn left onto Mt Sheila Rd before rail crossingContinue past Brockman 2 Mine Access Road

Description

85.7P21 10.375.4P20 1.274.2P18

P20 - P21P18 - P20

Km AccumulativeDistance

Turn left onto Homestead Camp RdTurn right onto unsealed roadHomestead - Silvergrass Rd turnoff

DescriptionBrockman 2 - Homestead Camp

WhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhiteWhite Quartz

QuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartzQuartz

RdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRd

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

Rail

AccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccess

RdRdRdRdRdRdRd

RdRdRdRdRdRdRd

RdRdRdRdRdRdRd

RdRdRdRdRdRd

RdRdRdRdRdRdRd

RdRdRdRdRdRdRd

RdRdRdRdRdRdRd

Rd

Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2 MineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineMineAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccessAccess

RdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Homestead - Silvergrass Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia Rd

Mt She

lia RdMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt SylviaMt Sylvia

RdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRd

To Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe HeadwatersTo Robe Headwaters

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Nanutarra - Wittenoom

Rd

Rd

Rd

Rd

Rd

Rd

Rd Rd

Rd

Rd

Rd

Rd

Rd

Rd Rd

Rd

Rd

Rd

Rd

Rd

Rd Rd

Rd

Rd

Rd

Rd

Rd Rd

Rd

Rd

Rd

Rd

Rd

Rd Rd

Rd

Rd

Rd

Rd

Rd

Rd Rd

Rd

Rd

Rd

Rd

Rd

RdRd

RailwayProject Area

Pit escort required, (ch 43)

Emergency Coordinator 9143 5006Wayne Baguley 9143 5081

Tom Price MineEmergency No.: 9143 3333Emergency Channel: 32

Marandoo MineEmergency No.: 9143 3820Emergency Channel: 36

EMERGENCY CONTACT NUMBERS

Brockman 2 MineEmergency No.: 9143 8555Emergency Channel: 43Nammuldi/Brockman 2 Evaluation Office: 6213 9773Boolgeeda Camp 6213 9920Homestead Camp 6213 9786Tom Price Police Station 9189 1344

To Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15kmTo Marandoo, 15km

To Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30kmTo Marandoo, 30km

Approx. travel time 48min

Approx. travel time 44min

Approx. travel time 65min

Approx. travel time 25min

Approx. travel time 33min

Approx. travel time 57min

Approx. travel time 46min

105.1P23 19.4P21 - P23 Arrive at Homestead Camp

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

Homestead

HomesteadCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

pCam

p

RdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRdRd

Page 25: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

HOPE DOWNS 1

Form S3.1 PAGE 23 OF 28

Page 26: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

HOPE DOWNS 4

Form S3.1 PAGE 24 OF 28

Page 27: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

WEST ANGELAS

Form S3.1 PAGE 25 OF 28

Page 28: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

YANDICOOGINA

Form S3.1 PAGE 26 OF 28

Page 29: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

APPENDIX B – LIST OF RTIO SITE CONTACTS

Form S3.1 PAGE 27 OF 28

Page 30: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

CONTACT ROLE EMAIL MOBILE

CLA

Clive Ingram AM&ES Superintendent [email protected] 0438 845 250

Troy Turcato AM&ES Engineer [email protected] 0437 846 110

Paul Dundon AM&ES LT Planner [email protected] 0438 909 151

Karl Chen AM&ES Controls Superintendent [email protected] 0419 557 194

Brett Wilson Site Maintenance Superintendent [email protected] 0428 109 174

Kim Boyes CLA Senior Planner [email protected] 0459 873 605

Nigel Crisp CLA Site Maintenance Engineer [email protected] 0459 323 553

CLB

Clive Ingram AM&ES Superintendent [email protected] 0438 845 250

Troy Turcato AM&ES Engineer [email protected] 0437 846 110

Paul Dundon AM&ES LT Planner [email protected] 0438 909 151

Karl Chen AM&ES Controls Superintendent [email protected] 0419 557 194

Andre Frichot Site Maintenance Superintendent [email protected] 0400 827 733

Oliver McAllister CLB Senior Planner [email protected] 0432 607 621

Charlie Kuan CLA Site Maintenance Engineer [email protected] 0467 719 853

ParkerPoint

Rhys Jones AM&ES Superintendent [email protected] 0400 872 554

Ralph Acker AM&ES Engineer [email protected] 0418 773 213

Troy Drewett AM&ES LT Planner [email protected] 0437 521 345

Karl Chen AM&ES Controls Superintendent [email protected] 0419 557 194

Alex Wright Site Maintenance Superintendent [email protected] 0417 897 809

Craig Bell Senior Planner [email protected] 0419 190 417

Robert Caporella Site Maintenance Engineer [email protected] 0419 641 926

Jesse Cunningham Fx4 Inload Planner [email protected] 08 9183 7210

EII

Rhys Jones AM&ES Superintendent [email protected] 0400 872 554

Ralph Acker AM&ES Engineer [email protected] 0418 773 213

Jessica Doxanakis AM&ES LT Planner [email protected] 0419 709 863

Karl Chen AM&ES Controls Superintendent [email protected] 0419 557 194

Brett Slater Site Maintenance Superintendent [email protected] 0437 809 379

Heath Cardier Senior Planner [email protected] 0429 705 077

George Williams Site Maintenance Engineer [email protected] 0437 681 965

Brockman4

Grant Watts AM&ES Superintendent [email protected] 0477 309 198

Michael Davies AM&ES Engineer [email protected] 0419 262 834

Marius Lindeque AM&ES LT Planner [email protected] 0477 703 848

Kumar Anubhav AM&ES Controls Superintendent [email protected] 0447 506 863

Jaco Dorfling Site Maintenance Superintendent [email protected] 0408 956 931

Stephen Kmit Senior Planner [email protected] 0408 828 192

Kevin McLaughlin Site Maintenance Engineer [email protected] 0487 494 133

Brockman2/NBWT

Grant Watts AM&ES Superintendent [email protected] 0477 309 198

Shaun Wortley AM&ES Engineer [email protected] 0437 029 717

Marius Lindeque AM&ES LT Planner [email protected] 0477 703 848

Kumar Anubhav AM&ES Controls Superintendent [email protected] 0447 506 863

Bradley Roberts Site Maintenance Superintendent [email protected] 0438 917 794

Richard Lambert Senior Planner [email protected] 0459 840 610

Hannah O'Neil Site Maintenance Engineer [email protected] 0484 589 447

Page 31: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

TP

Amelia McIntyre AM&ES Superintendent [email protected] 0418 924 154

Ben Howe AM&ES Engineer [email protected] 0428 709 098

Kevin Dawson AM&ES LT Planner [email protected] 0417 036 769

Alan Jones AM&ES LT Planner [email protected] 08 6279 6389

Kumar Anubhav AM&ES Controls Superintendent [email protected] 0447 506 863

Trystan Lewis Site Maintenance Superintendent [email protected] 0400 247 912

David Sturzaker Senior Planner [email protected] 0400 284 798

Prateek Singhal Site Maintenance Engineer [email protected]

MDO

Amelia McIntyre AM&ES Superintendent [email protected] 0418 924 154

Alan Jones AM&ES LT Planner [email protected] 08 6279 6389

Kumar Anubhav AM&ES Controls Superintendent [email protected] 0447 506 863

Ivan Grdosic Site Maintenance Superintendent [email protected] 0409 100 490

Stuart Grieve Senior Planner [email protected] 0439 947 025

Andrew Rapley Site Maintenance Engineer [email protected] 0477 348 903

PDO

Tavis Percival AM&ES Superintendent [email protected] 0419 963 067

Adrian Challis AM&ES LT Planner [email protected] 0488 918 240

Kumar Anubhav AM&ES Controls Superintendent [email protected] 0447 506 863

John Talbot Site Maintenance Superintendent [email protected] 0429 565 754

Phillip Mullan Senior Planner [email protected] 08 9437 0600

Walton Tan Site Maintenance Engineer [email protected] 0422 288 805

HD1&4

Clarissa Clarke AM&ES Superintendent [email protected] 0467 739 012

Jason Sanderson AM&ES Superintendent [email protected] 0428 523 093

Ryan Falconer AM&ES Engineer [email protected] 0437 426 279

Peter Hull AM&ES LT Planner [email protected] 0491 228 262

Kurt El-Sayed AM&ES Controls Superintendent [email protected] 0414 485 442

Andrew Smith Site Maintenance Superintendent [email protected] 0419 928 663

Brian Jackson Site Planner [email protected] 08 9147 5327

Ricky Jones Site Maintenance Engineer [email protected] 08 9147 5089

WA

David Calder AM&ES Superintendent [email protected] 0447 960 033

Stan Lou AM&ES Engineer [email protected] 0428 481 647

David John AM&ES LT Planner [email protected] 0417 623 389

Kurt El-Sayed AM&ES Controls Superintendent [email protected] 0414 485 442

Samuel Coade Site Maintenance Superintendent [email protected] 0429 363 411

John Howell Site Planner [email protected] 0408 949 276

Taufik Wahab Site Maintenance Engineer [email protected] 0412 076 860

YD

Jonathon Ingley AM&ES Superintendent [email protected] 0407 443 547

Ryan Slipper AM&ES Engineer [email protected] 0408 643 496

Aaron Pitts AM&ES LT Planner [email protected] 0439 441 475

Kurt El-Sayed AM&ES Controls Superintendent [email protected] 0414 485 442

James Kelly Site Maintenance Superintendent [email protected] 0423 513 045

Ben Falconer Site Planner [email protected] 0419 449 635

Steven Bartlett Site Maintenance Engineer [email protected] 0417 182 528

Page 32: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM

APPENDIX C – REFERENCE JOB HAZARD ANALYSIS (JHAs)

Form S3.1 PAGE 28 OF 28

Page 33: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM
Page 34: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM
Page 35: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM
Page 36: PROJECT SAFETY PLAN - ASPEC Engineeringmembers.aspec.com.au/uploads/1/6/3/0/16304516/ae-hse-xf-0004_a... · PROJECT SAFETY PLAN . to . Rio Tinto Iron Ore . for. RISK MANAGEMENT PROGRAM