    PROJECT REPORT

    ON

    PURCHASE ORDER SYSTEM

    Submitted to the

    Kurukshetra University, Kuruksehtra

    In partial fulfilment of the requirement for

    The Degree of

    Bachelor of Commerce

    (Computer Application)

    Session 2013-2014

    Under supervision of: Submitted by:

    Ms. Amangeet kaur Anju

    Lect,. B.Com. III(C.A.)

    Deptt. of Comp.Sc. & App.

    Department of Computer Applicationsukand Lal NationalCollege

    1

  • 8/12/2019 Project Repor Purchase Order System

    2/53

    Yamuna Nagar

    CERTIFICATE

    2

  • 8/12/2019 Project Repor Purchase Order System

    3/53

    CONTENTS

    Certificate

    Acknowledgement

    Preface

    3

  • 8/12/2019 Project Repor Purchase Order System

    4/53

    Introduction to Problem area

    Existing System

    Limitation of the existing system

    Proposed System

    Advantages of Proposed System

    System Analysis & Designing

    Input Design

    Output Design

    Coding

    Output

    Limitations of Project

    Further Scope

    References

    4

  • 8/12/2019 Project Repor Purchase Order System

    5/53

    ACKNOWLEDGEMENT

    5

  • 8/12/2019 Project Repor Purchase Order System

    6/53

    ACKNOWLEDGEMENT

    This is time to extent my sincere gratitude to those

    people who directly or indirectly helped me in implementing this

    proect !eyond all expectation"

    # would li$e to con%ey my heartily inde!tedness to &r"

    Neeti &aryal ' (s" )mangeet *aur +,ecturer- &eptt" of

    .omputer /cience ' )pplications whose a!le guidance0 regular

    counselling0 $een interest0 constant encouragement and his will to

    help us"

    # also li$e to con%ey my sincere and special than$s to

    &r" /helesh *apoor0 Principal0 (u$and ,al National .ollege0

    Yamuna Nagar for pro%iding me such facilities and infrastructurereuired for completion of this proect"

    # am also grateful to my Parents and friends who ga%e

    me full support and their precious to me to me and my pro!lem0

    faced during my proect wor$"

    Anju

    B.Com. III (CA)

  • 8/12/2019 Project Repor Purchase Order System

    7/53

    PREFACE

  • 8/12/2019 Project Repor Purchase Order System

    8/53

    PREFACE

    Computers are revolutionalising every aspect of life. The

    offices where one work, The departmental stores where are shop,

    schools and colleges we attend, The banks where we transact

    money and devcies we used in our homes are being radically

    attended by computers.

    Computers usage is growing leaps & bounds in business,

    industry government & institutions of students like colleges and

    universities although a lot of work in this directions has been

    done and gap between demand and supply of computer

    professionals.

    So realising this fact & acc. to time demand when computers

    are necessary and important achievement. I have chosen B.Com

    with Computer Applications at my esteemed institutions Mukand

    Lal National College, Yamuna Nagar.

    This degree course arises at providing the students

    knowledge about various applications of computes.

  • 8/12/2019 Project Repor Purchase Order System

    9/53

    INTRODUCTION

    TO

    PROBLEM AREA

  • 8/12/2019 Project Repor Purchase Order System

    10/53

    INTRODUCTION TO PROBLEM AREA

    /tudying the manual system of Purchase 6rder /ystem and

    %arious information reuirements0 it has !een proposed to de%elop

    the computeri7e system for transaction" )s computer is capa!le of

    processing large amount of data at a %ery high speed with high

    degree of accuracy" The data can !e stored in small space for

    years together without any trou!le and can !e retrie%ed whene%er

    reuired in few seconds" #n the proposed system0 data will !e

    entered into the computer online" #n the 8Purchase 6rder /ystem8

    data is mainly stored in the main menu file" This file is further

    di%ided in the purchases" &aily sale0 other expenses and uit" #n

    purchasing goods a menu is there in which files of add item

    monthly record are placed" Then lastly there is uit entry"

    Through the uit entry we can come out from the main menu"

    19

  • 8/12/2019 Project Repor Purchase Order System

    11/53

    EXISTING SYSTEM

    11

  • 8/12/2019 Project Repor Purchase Order System

    12/53

    EXISTING SYSTEM

    In the manual systems of the entries regarding the raw

    material are passed in different books. On the arrival of the

    goods the first entries made at the gate and for this a separate

    registered is maintained.

    The goods are passed to the store and the entry of the bills is

    made in the incoming register. A slip is issued by the stores to

    confirm the arrival of the goods from the responsible authority,

    after confirmation the entry is made in stores receipt register.

    These good are sold out as the demand of the purchaser. These

    purchase of raw products is maintained in registers. The register

    making takes much more time and also these are calculation

    which may be some time not accurate . also there can not be done

    any comparative study.

    12

  • 8/12/2019 Project Repor Purchase Order System

    13/53

    ,#(#T)T#6N 6: ;

  • 8/12/2019 Project Repor Purchase Order System

    14/53

    LIMITATION OF EXISTING SYSTEM

    1) The system is complicated one and involves a lot of

    hardworking.

    2) It is time consuming one because the calculations and

    the operation of reports are manual

    3) The system is unreliable and inaccurate

    4) The maintenance of minimum stock level is difficult.

    5) System saves the stationary which cost heavily now a

    days.

    6) Mistakes can be in this system because calculation are

    manual.

    14

  • 8/12/2019 Project Repor Purchase Order System

    15/53

    PROPOSED SYSTEM

    15

  • 8/12/2019 Project Repor Purchase Order System

    16/53

    PROPOSED SYSTEM

    The problem of the manual data processing led to the

    introduction of computerized method. The system basically

    follows the same procedure. The entry is made at gate in

    register. The goods being passed on to the stores and then the

    bill are recorded in the store incoming register. The store

    passes a slip to computer department. The slip contains

    ifnormation regarding value of goods, quality and item code

    regarding the goods.

    The computer department passes the copy daily bill register

    to stores to confirm the entry and incoming goods later. When

    the goods are issued to the workshop slip is passed to the

    computer department and the respective entries are made onto

    the computer. The department passes the copy of daily issue

    register to confirm the issue of all items during the day.

    1

  • 8/12/2019 Project Repor Purchase Order System

    17/53

    ADVANTAGES OF PROPOSED SYSTEM

    1

  • 8/12/2019 Project Repor Purchase Order System

    18/53

    ADVANTAGES OF PROPOSED SYSTEM

    1. Large amount of data can be stored with the help of

    powerful storage media like floppies, disks etc.

    2. Purchasing involves lesser economy

    3. This system is useful to enter and store the data

    4. Redundancy of information has been controlled.

    5. System saves the stationary which costs heavily nowadays

    6. In this system, load is greatly reduced in case of invite

    quotation, finalization of quotation and preparing of

    transaction orders and reminders etc.

    1

  • 8/12/2019 Project Repor Purchase Order System

    19/53

    SYSTEM ANALYSIS

    AND

    DESIGNING

    1

  • 8/12/2019 Project Repor Purchase Order System

    20/53

    SYSTEM ANALYSIS

    Purchase is defined as any idle in coming resource of an

    enterprise. It is physical work of goods kept for the purpose of

    future affairs. It is generally used to indicate raw material, semi-

    finished goods and finished goods stocked in order to meet

    expected future demand, Inventory is not meant for immediate

    use. For enterprises an Inventory of materials become essential

    in order.

    1 To purchase smooth and efficient running of the business.

    2 To provide adequate of price discounts bulk purchase

    3 To take advantage of batching and longer production runs

    4 To serve as a buffer in case of delayed delivers of raw

    materials and rejections or against uncertain lead time

    5 To provide feasibility to allow changes in production plan in

    view of change in demand etc.

    6 To make possible economic in transportation etc.

    7 To absorb fluctuations in market.

    Inventory means lock up of capital of an enterprise.

    Maintenance of inventory also cost money by way of expenses or

    29

  • 8/12/2019 Project Repor Purchase Order System

    21/53

    stores, equipments, personal, insurance etc. This calls for the

    inventories in the most profitable manner.

    Broadly speaking Purchase Order System refers to the

    function of directions goods through the entire manufacturing

    cycle from the requisition of raw materials to the minimum

    investment and the best possible customer service.

    PURCHASE ORDER SYSTEM:

    Basically two types of Purchase Order System can be for seen.

    1 FIXED

    2 PROBALISTIC

    A) ABC ANALYSIS:

    When there may items are classified on the basis of their

    value, usage rate and critically.

    B) MIN-MAX SYSTEM:

    For each type of Inventory minimum level is set that

    demands safety to prevent out of stock conditions. The minimum

    21

  • 8/12/2019 Project Repor Purchase Order System

    22/53

    level also gave the ordering proving. An order of sufficient size is

    placed to bring the inventory the max front when the minimum

    level is reached.

    C) TWO BIN SYSTEM:

    In this system, the stock of each items is separated into two

    files, in the first a sufficient supply is kept to meet the current

    demand during lead time necessary to fill the order.

    INVENTORY RISKS:

    Can be traced to three basic factors i.e. Price decline,

    deterioration and obsolescence.

    1 Price Decline:

    May result from any increase in the market supply of

    product, introduction of a new competitive produce, or price

    cutting by competitors. Price may also decline when the supply

    22

  • 8/12/2019 Project Repor Purchase Order System

    23/53

    remains same and there is decrease in the general market

    demand.

    2 Product Deterioration:

    May result due to holding of a product too long or when

    stocked under improper physical conditions.

    3 Obsolescence:

    Changing customer taste, particularly in high style

    merchandise may render finished goods and even raw material

    absolute. The considering all this we see that inventories are

    risky assets to be manage and therefore calls for a very efficient

    control.

    23

  • 8/12/2019 Project Repor Purchase Order System

    24/53

    SYSTEM DESIGNING

    &esigning a software is most important phase of software phase of software

    de%elopment" #t reuires careful planning0 logical thin$ing on the part of

    system designer" /ystem design for proposed system comes under following

    phases>

    1" #nput &esign

    2" 6utput &esign

    3" :ile &esign

    4" #nput &esign>

    #nput designing is a part of o%erall system designing which reuires

    careful attention as collection of input data is most expensi%e part of the

    system" #nputs are used to detect errors to some extent in !etween the

    programming procedures" # ha%e included following inputs in my proect of

    8Trading .o" Transaction8 ?hen proect is executed following main menu

    is printed"

    Main Mnu

    P PR6&@.T ()/T;R

    6 6R&;R P,).;(;NT

    A A;N&6R ()/T;R

    # #//@; ()/T;R

    B R;P6RT ()/T;R

    ; ;

  • 8/12/2019 Project Repor Purchase Order System

    25/53

    INPUT DESIGN O! SALES MENU

    " Goo# Co#$

    #t is the num!er gi%en to product for identification" This num!er

    should !e falling within 10203 num!ers which are specified"

    % Goo# Nam$

    #t tells the name of the =ood which is sold to the customer" ?ithout

    $nowing the name of =ood one canCt sell that =ood"

    & Cu'om Nam * A##''$

    #t is reuired for issuing the !ill" #t tells whom the =ood is sold"

    + Uni Pi,$

    #t tells the price of the =ood" #t tells how much the =ood costs and

    gi%es its unit price"

    OUTPUT DESIGN$

    6utputs are reuired to produce result of processing to the user" 6utput will

    !e in the form of a screen where different options will !e displayed" #n

    output designing there is report menu" #T is fourth option of main menu" #t

    gi%es the output design of the system" #t has !een further di%ided to three

    options gi%en !elow"

    #//@; ()/T;R

    ; #//@; ;NTRY

    ( #//@; (6:Y ;NTRY

    B #//@; B@;RY ;NTRY

    25

  • 8/12/2019 Project Repor Purchase Order System

    26/53

    < ;

    R;P6RT ()/T;R

    # #T;( R;P6RT

    / #//@; R;P6RT

    < ;

  • 8/12/2019 Project Repor Purchase Order System

    27/53

    char unitpE5HG

    char typeE3HG

    FitemG

    This structure defines the issue item details in respect to there data type"

    char pcodeE5H > #t defines the product code"

    char pnameE29H > #t defines the product name"

    char descE29H > #t defines the description of goods"

    char minE3H > #t determines the min ty"

    char tyE5H > .urrent ty"

    char maxE5H > (aximum ty"

    char unitpE5H > @nit Price

    char typeE3H > =oods type

    The !asic data types are same so maor data %aria!les are defined"

    2

  • 8/12/2019 Project Repor Purchase Order System

    28/53

    CODING

    2

  • 8/12/2019 Project Repor Purchase Order System

    29/53

    /* PURCAHSE ORDER SYSTEM */

    #include#include#include#include

    #include#include

  • 8/12/2019 Project Repor Purchase Order System

    30/53

    settetst$le631,1;7) outtet$63,1',1:PRO=ECT:7) outtet$6+',13;,1:O:7) outtet$63',1++,1:PURCHASE ORDER:7) outtet$6+,,1-,,1:SYSTEM:7) settetst$le631,1-7)

    outtet$6+',1;,,1:"ess n$ ?e$ to continue:7) !etch67) close!"h67) clsc67) init!"h69!d19!1: :7) settetst$le631,1;7) outtet$63,,1;,1:PURCHASE ORDER SYSTEM:7) settetst$le631,1-7) !etch67) @hile637 % clsc67) setcolo63'7)

    setillst$le631RED7) ectn!le6',1-,1'',1-',7) loodill6-,1',13'7) settetst$le631,1-7) outtet$63,,1',1 :**** PURCHASE ORDER SYSTEM ****:7) outtet$63B,13;,1: P PURCHASE PRODUCT:7) outtet$63B,13,1: O ORDER PACFG:7) outtet$63B,1+,,1: EDOR DATA:7) outtet$63B,1+-,1: R REPORT :7) outtet$63B,1+B,1: E EIFT:7) outtet$634'1+,1: ETER YOUR CHOFCE:7) ch8!etch67) ch8tou""e6ch7)

    s@itch6ch7 %cse JPJ "enu67)Ke?) cse JOJ oenu67)Ke?) cse JJ 2enu67)Ke?) cse JRJ enu67)Ke?) cse JEJ Ke?) 0 i 6ch88JEJ7 Ke?)0 0 2oid "enu67 %ch ch3) clsc67) @hile637 % int !d8DETECT1!8,) init!"h69!d19!1: :7) clsc67) setcolo6;7) setillst$le631RED7) ectn!le6',1-,1'',1-',7) setcolo6LHFTE7) loodill6-,1',1;7) settetst$le631,1-7) outtet$63;,1',1:PURCHASE PRODUCT:7) outtet$63B,13;,1:E DATA ETERY MODUE:7) outtet$63B,13,1:M DATA MODFFCATFO MODUE:7) outtet$63B,1+,,1: N DATA NUERY MODUE:7) outtet$63B,1+-,1:I NUFT:7)

    39

  • 8/12/2019 Project Repor Purchase Order System

    31/53

    outtet$634,1+B,1:ente $ou choice.....: 7) ch38!etch67) ch38tou""e6ch37)

    s@itch6ch37 %cse JEJ ent$67)Ke?)

    cse JMJ odi67)Ke?) cse JNJ ue$67)Ke?) cse JIJ Ke?) 0 i6ch388JIJ7 Ke?) 00

    2oid oenu67 %ch ch+)

    clsc67)

    @hile637 %int !d8DETECT1!8,) init!"h69!d19!1: :7) setcolo6;7) setillst$le631RED7) ectn!le6',1-,1'',1-',7) setcolo6LHFTE7) loodill6-,1',1;7) settetst$le631,1-7) outtet$63;,1',1: ORDER PACE:7) outtet$64,133,1:R DATA ETERY MODUE:7) outtet$64,13;,1:M DATA MODFFCATFO MODUE:7) outtet$64,13,1:G GOOD RECEFE ETRY MODUE:7)

    outtet$64,1+,,1:N DATA NUERY MODUE:7) outtet$64,1+-,1:A AMOUT PAYMET ETRY MODUE:7) outtet$64,1+B,1:I EIFT:7) outtet$64,1+,1:ente $ou choice.....: 7) ch+8!etch67) ch+8tou""e6ch+7)

    s@itch6ch+7%cse JRJ oent$67)Ke?)cse JMJ oodi67)Ke?)cse JNJ oue$67)

    Ke?)cse JGJ o!ood67)Ke?)cse JAJ oount67)

    Ke?)cse JIJ Ke?)

    0 i6ch+88JIJ7 Ke?) 0 0

    2oid 2enu67 % ch ch-) clsc67) @hile637

    31

  • 8/12/2019 Project Repor Purchase Order System

    32/53

    %int !d8DETECT1!8,) init!"h69!d19!1: :7) setcolo6;7) setillst$le631RED7) ectn!le6',1-,1'',1-',7)

    setcolo6LHFTE7) loodill6-,1',1;7) settetst$le631,1-7) outtet$63;,1',1: EDOR DATA:7) outtet$63B,133,1:E DATA ETERY MODUE:7) outtet$63B,13;,1:M DATA MODFFCATFO MODUE:7) outtet$63B,13,1:N DATA NUERY MODUE:7)

    outtet$63B,1+,,1:I EIFT:7) outtet$634,1+-,1:ente $ou choice.....: 7) ch-8!etch67) ch-8tou""e6ch-7)

    s@itch6ch-7 %cse JEJ 2ent$67)Ke?)cse JMJ 2odi67)Ke?)cse JNJ 2ue$67)Ke?)cse JIJ Ke?)

    0 i6ch-88JIJ7 Ke?) 0 0 2oid enu67 %ch ch;) clsc67)

    @hile637

    % int !d8DETECT1!8,) init!"h69!d19!1: :7) setcolo6;7) setillst$le631RED7) ectn!le6',1-,1'',1-',7) setcolo6LHFTE7) loodill6-,1',1;7) setcolo6LHFTE7) settetst$le631,1-7) outtet$63;,1',1: REPORT:7)

    outtet$63B,133,1:F FTEM REPORT:7) outtet$63B,13;,1: EDOR REPORT:7) outtet$63B,13,1:O ORDER REPORT:7) outtet$63B,1+,,1:G GOOD RECEFG REPORT:7) outtet$63B,1+-,1:A AMOUT PAYMET REPORT:7) outtet$63B,1+B,1:I EIFT:7) ch;8!etch67) ch;8tou""e6ch;7)

    s@itch6ch;7 %cse JFJie"67)Ke?)

    cse JJ2e"67)Ke?)cse JOJoe"67)Ke?)cse JGJ!e"67)Ke?)cse JAJ"e"67)Ke?)

    32

  • 8/12/2019 Project Repor Purchase Order System

    33/53

    cse JIJKe?) 0 i6ch;88JIJ7 Ke?) 00

    sco6ch &(1 ch K&(1 int n7 % int i183) o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    34/53

    o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    35/53

    !oto$63,147)"int6: AME O PRODUCT :7)!oto$63,17)"int6: DESCRFPTFO :7)!oto$63,13,7)"int6: TYPE :7)!oto$63,13+7)"int6: PRFCE PER UFT :7)!oto$63,1337)"int6: NUATFTY :7) !oto$6-417)!ets6"code7)

    o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    36/53

    % ch ch8JYJ1es)ch "code&'()int i1n1count8,)FE *")"8o"en6:ite.dt:1::7)@hile6tou""e6ch788JYJ7

    %close!"h67) count8,) clsc67)e@ind6"7)!oto$63,1'7)"int6: *** DATA NUERY MODUE ***:7)!oto$63,17)"int6: CODE O PRODUCT :7)!oto$63,147)"int6: AME O PRODUCT :7)!oto$63,17)"int6: DESCRFPTFO :7)!oto$63,13,7)"int6: TYPE :7)!oto$63,13+7)"int6: PRFCE PER UFT :7)!oto$63,1337)"int6: NUATFTY :7)!oto$6-417)!ets6"code7)o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    37/53

    !oto$63,147)"int6: FTEM CODE :7) !oto$63,17)"int6: EDOR CODE :7) !oto$63,13,7)"int6: EDOR AME :7) !oto$63,1337)"int6: NUATFTY :7) !oto$6-417)!ets6ode.ocode7) !oto$6-4147)!ets6ode.icode7)

    !oto$6-417)!ets6ode.2code7) !oto$6-413,7)!ets6ode.2ne7) !oto$6-41337)!ets6ode.t$7) !oto$6+,13'7)"int6:Enties Coect Y/:7) es8!etch67) i6tou""e6es788JYJ7 %// clsc67)

    o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    38/53

    !oto$6-4147)o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    39/53

    n8stlen6ocode7) i6sco6ode.ocode1ocode1n78837 % count) !oto$6-4147)o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    40/53

    o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    41/53

    0 00 i6count88,7 % !oto$6-'1+,7)"int6:RECORD OT OUD:7)0 !oto$631+-7)"int6:Pess Y to continue:7)

    ch8!etche67) 0 close6"7) etun) 0

    2ue$67%ch ch8JYJ1es)ch 2code&'()int i1count8,)FE *")"8o"en6:2ende.dt:1::7)@hile6tou""e6ch788JYJ7

    %close!"h67)count8,)clsc67)e@ind6"7)!oto$63,1'7)"int6: *** DATA NUERY MODUE ***:7) !oto$63,17)"int6: EDOR CODE :7) !oto$63,147)"int6: EDOR AME :7) !oto$63,17)"int6: EDOR ADDRESS :7) !oto$63,13,7)"int6: CFTY :7) !oto$63,1337)"int6: COTACT O. :7) !oto$63,13+7)"int6: PARTFCUARS :7)!oto$6-417)!ets62code7)o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    42/53

    FE *")"8o"en6:ode3.dt:1::7)@hile6tou""e6ch788JYJ7% close!"h67) clsc67) !oto$6+,1'7)"int6: *** AMOUT PAYMET ETRY *** :7)

    !oto$63,17)"int6: ORDER CODE :7) !oto$63,147)"int6: FTEM CODE :7) !oto$63,17)"int6: EDOR CODE :7) !oto$63,13,7)"int6: NUATFTY :7) !oto$63,1337)"int6: AMOUT TO VE PAY :7) !oto$63,13+7)"int6: NUATFTY RE=ECTED :7) !oto$63,13-7)"int6: NUATFTY RECEFED :7) !oto$63,13;7)"int6: AMOUT TO VE PAFD :7) !oto$6;,17)!ets6ode.ocode7) !oto$6;,147)!ets6ode.icode7) !oto$6;,17)!ets6ode.2code7) !oto$6;,13,7)!ets6ode.t$7) !oto$6;,1337)!ets6ode.to"$7)

    !oto$6;,13+7)!ets6ode.t$57) !oto$6;,13-7)!ets6ode.t$7) !oto$6;,13;7)!ets6ode.to"id7) !oto$6+,137)"int6:Enties Coect Y/:7) es8!etch67) i6tou""e6es788JYJ7 % o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    43/53

    !oto$6+,1'7)"int6: *** GOOD RECEFG ETRY *** :7) !oto$63,17)"int6: ORDER CODE :7) !oto$63,147)"int6: FTEM CODE :7) !oto$63,17)"int6: EDOR CODE :7) !oto$63,13,7)"int6: NUATFTY :7) !oto$63,13+7)"int6: NUATFTY RE=ECTED :7)

    !oto$63,13-7)"int6: NUATFTY RECEFED :7) !oto$63,13;7)"int6: AMOUT TO VE PAFD :7) !oto$6-417)!ets6ode.ocode7) !oto$6-4147)!ets6ode.icode7) !oto$6-417)!ets6ode.2code7) !oto$6-413,7)!ets6ode.t$7) !oto$6-41337)!ets6ode.t$57) !oto$6;,13+7)!ets6ode.t$7) !oto$6;,13-7)!ets6ode.to"$7) !oto$6+,137)"int6:Enties Coect Y/:7) es8!etch67) i6tou""e6es788JYJ7 %

    o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    44/53

    @hile6ed69"oduct1siQeo6"oduct7131"7 8,7 % !oto$6317)o6i8,)i8toi6"oduct.in77 "int6:ol:7) else

    "int6:Kelo@:7)0 i6

  • 8/12/2019 Project Repor Purchase Order System

    45/53

    !oto$631B7)"int6::7)

    84)@hile6ed69ode1siQeo6ode7131"7 8,7

    % !oto$6317)o6i8,)i

  • 8/12/2019 Project Repor Purchase Order System

    46/53

    !oto$6-+17)"uts62ende.dde7) !oto$6;17)"uts62ende.cit$7) !oto$6'17)"uts62ende.contno7)

    i6

  • 8/12/2019 Project Repor Purchase Order System

    47/53

  • 8/12/2019 Project Repor Purchase Order System

    48/53

    else

    %!oto$6+1++7)"int6:"ess n$ ?e$ to continue:7)!etch67)

    clsc67)!oto$6-,1-7)"int6:**** PAYMET REPORT****:7)

    !oto$631;7)"int6::7)

    !oto$631'7)"int6:icode 2code t$ t$ t$5to"$ to"id:7)

    !oto$631B7)"int6::7)

    83,)

    0 0 )

    !oto$6317)"int6::7)

    !etche67) 0

    LIMITATIONS OF

    THE PROJECT

    4

  • 8/12/2019 Project Repor Purchase Order System

    49/53

    LIMITATIONS OF THE PROJECT

    1. It does not display the code list itself.

    2. It does not display the Good menu of purchase with amount.

    3. It does not provide sales menu respect to company name.

    4. It works on GIGO concept.

    5. No user security options such as password are given.

    6. Unable to share data on multi user plateform.

    4

  • 8/12/2019 Project Repor Purchase Order System

    50/53

    FURTHER SCOPE

    59

  • 8/12/2019 Project Repor Purchase Order System

    51/53

    FURTHER SCOPE

    A development never ever can be fully summarized or

    concluded. Still I will try my beset to conclude all the concepts

    regarding my project.

    1. It can be further connected with tax calculation still it

    provides major head of expenses and income to calculate net

    income.

    2. It can be further connected with detailed stock of goods.

    3. It can be further connected with vb and this can be

    converted into vb from C for the better designing.

    51

  • 8/12/2019 Project Repor Purchase Order System

    52/53

    REFERENCES

    52

  • 8/12/2019 Project Repor Purchase Order System

    53/53

    REFERENCES

    For the completion of this project, I have taken help from the

    following books:

    1. Programming with C by Dennice Ritche

    2 Let us C

    by Yashwant Kanitkar

    3 Business management by Dr. R.S. Gupta

    B.D. Sharma

    N.S. Bhalla