Sammi Machinery Co.,Ltd 1260‐2, Yeonkeum‐ri, Sangnam‐myeon, Miryang‐si, Kyungnam, S. Korea(627‐912) TEL : +82‐55‐354‐7503 FAX : +82‐55‐354‐7533 E‐mail : [email protected] Website : www.sammiw.com
Project Reference I
Project Name : PHASE-1 JURONG ROCK CAVERN PROJECT:
Project MR No : JRC-C05-P-14-GEN-28032_R2
Contractor : Hyundai Engineering & Construction Co., Ltd , KOREA
End User : JTC CORPORATION, SINGAPORE
Order Number : - PO-JRC1-2860P-4600039892
Size : NPS 46”, 40”, 24”, 20”, 8”
ASME Class : #150 & #300
Quantity : 40 PCS
Year : 2012
<Product Information>
Nominal Diameters = 46"(DN 1150)
Class :ASME class 150
End Connection : ASME B16.47 Series A
Design Pressure : 18.5 barg
Hydro Test-
Seat ; 20.35 barg
Shell : 27.75 barg
Application : Crude oil, Condensate.
Project Reference II
End User : CPC Corporation-Darlin Refinery/Taiwan
Fluid : Gasoline / Naphtha / Crude
Type : Cover-up type of Line Blind
Operation : Manual & AOV (Air motor Operated Valve)
Size : NPS 24”, 16”, 6”
ASME Class : #150 & #300
Quantity : 10 PCS
Year : 2013
Zero Leakage Design (Tight Shut-off)
Project Reference III
Project Name : SNCG Methanol to Olefin Project
Contractor : HQCEC
End user : Shenhua Ningxia Coal Industry Group Co., Ltd.
Order Number : SHWZGWDL130067
Size : NPS 36”, 24”, 18”, 16” 14” 6” 3”
ASME Class : #150, #300, #600
Quantity : 28 PCS
Year : 2013
<Product Information>
Nominal Diameters = 36"(DN 900)
Class :ASME class 600
End Connection : ASME B16.47 Series B
Design Pressure : 20 barg
Design Temperature : 525 Deg.C
Hydro Test-
Seat : 76.3 barg
Shell : 104.1 barg
Application : Regeneration Gas
Project Reference IV
Project Name : Sabah Ammonia Urea(SAMUR) Project
Contractor : Mitsubishi Heavy Industries., Ltd.
End User : Petronas Chemicals Fertiliser Sabah SDN BHD
Order Number : 563420-P5086
Size : NPS 18”
ASME Class : #300, #600
Quantity : 4PCS
Year : 2013
Project Reference V
Project Name : Total Gabon-DPN Project
Purchaser : Parelis S.A.S
End User : Total Gabon-DPN
Order Number : CF-7493
Size : NPS 16”
ASME Class : #150
Year : 2013
Project Reference VI
Project Name : Oiltanking Malta Project
Purchaser : PandID B.V.
End User : Oiltanking Malta
Order Number : 81898
Size : NPS 14” / ASME Class : #150
Quantity : 9PCS / Year : 2013
Project Reference VII
Project Name : Oiltanking Terneuzen Project
Purchaser : PandID B.V.
End User : Oiltanking Terneuzen - Netherlands
Order Number : 81794
Size : NPS 12” / ASME Class : #150
Quantity : 16 PCS
Year : 2013
Project Reference VIII
Project Name : Arcellor Mittal Project
Purchaser : Parelis S.A.S
End User : Arcellor Mittal - France
Order Number : CF-7549 & CF7550
Size : NPS 6”, 8”, 16” / ISO PN10 & PN20
Quantity : 26 PCS
Year : 2013
Project Reference IX (FPSO)
Project Name : FPSO CIDADE DE PARATY
EPC : SINGLE BUOY MOORINGS INC, Netherland
End user : Petrobras, Brazil
Order Number : 01.39490.0587 REV.00
Size : NPS 16 and 10
ASME Class : #150
Quantity : 20 PCS
Year : 2011
Project Reference X (FPSO)
Project No : HI39480
Project Name : FPSO Baleia Azul
EPC : SINGLE BUOY MOORINGS INC, U.S.A
End user : Petrobras, Brazil
Order Number : -01.39480.0373 REV 01
Size : NPS 14 / Quantity : 22 PCS
Year : 2011
Sammi Machinery Co.,Ltd
1260‐2, Yeonkeum‐ri, Sangnam‐myeon, Miryang‐si, Kyungnam, S. Korea(627‐912) TEL : +82‐55‐354‐7503 FAX : +82‐55‐354‐7533 E‐mail : [email protected] Website : www.sammiw.com
Project Reference XI (FPSO)
Project name : PEMEX Ayatsil B project
EPC : MC Dermott International INC
End user : PEMEX, Mexico
Order Number : - 1369-BM128916 01
Size : NPS 8” & 10”
Class : #600
Quantity : 4 PCS
Year : 2013
Sammi Machinery Co.,Ltd 1260‐2, Yeonkeum‐ri, Sangnam‐myeon, Miryang‐si, Kyungnam, S. Korea(627‐912) TEL : +82‐55‐354‐7503 FAX : +82‐55‐354‐7533 E‐mail : [email protected] Website : www.sammiw.com
Project Reference XII (FPSO)
Project name : PEMEX PEP CASA DE BOMBAS 4T PROJECT
EPC : Elecnor S.A.
End user : PEMEX, Mexico
Order Number : -13.4026
Size : NPS 12” & 16”
Class : #600
Quantity : 8 PCS
Year : 2013
Project Reference XIII
Project Name : GEPS-GTTL Building Receiving
Purchaser : SR Technologies
End user : General Electric (GE)
Year : 2012
Size : NPS 10 (DN 250)
Class : ASME Class 900
Design Pressure : 31 bar
Design Temperature : 594 deg.C
Hydro Test Pressure at ambient
Shell : 183 bar
Seat : 134 bar
Project Reference X IV
Project No : K03-3110 A002 Ruwais_EU3
EPC : Linde Engineering, Germany
End user : Borouge, U.A.E
Order Number : 003 2RL0140
Size : NPS 16, 14 and 10
Year : 2011
Project Reference X V
Project Name : ENOC FUJAIRAH DISTRIBUTION & TRADING TERMINAL (EFDTT)
EPC : AUDEX PTE LTD, Singapore
End user : HORIZON EMIRATES TERMINALS LLC,
EMIRATES NATIONAL OIL COMPANY LTD(ENOC) E& PM DEPARTMENT, U.A.E
Project Job No : 181012
Order Number : - 12P000172
Size : NPS 24, 20
Year : 2012
Project Reference X VI
Project Name : PHASE 6 EXPANSION –EPC OF OFFSHORE FACILITIES
EPC : Albanna Engineering, U.A.E
Project Mgr : EMIRATES NATIONAL OIL COMPANY (ENOC), U.A.E
End user : VOPAK HORIZON FUJAIRAH LIMITED, U.A.E
Size : NPS 16”
Year : 2011
Project Reference X VII
End user : GULF PETROCHEM, U.A.E
Purchase : GULFTECH, U.A.E
Size : NPS 16” & 12”
ASME Class : #150
Quantity : 12 pcs
Year : 2013
Project Reference X VIII
End-User : CPC Corporation-Darlin Plant/Taiwan
Purchaser : Jinyun, Taiwan
Size : NPS 34”
Class : ASME 150
Fluid : Naphtha, Diesel
Type : Compact Sliding
Year : 2010