20
EXTENTION AT SE D N OF VALIDITY PERIOD OF ENVIRONMENTA CLEARANCE FOR “NAVODAYA ” GROUP HOUSING ECTOR-92 & 95, VILLAGE - WAZIRPUR AT DISTRICT-GURGAON, HARYANA FORM 1, FORM 1A Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA Consultant: Ind Tech House Consult (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini Delhi – 110 085 Tel: +91 11 2757 1410, 6460 7252 Fax: +91 11 2757 2241 Email: [email protected] AL

Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

QM022

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR

“NAVODAYA ”GROUP HOUSING

AT SECTOR-92 & 95, VILLAGE - WAZIRPURAT

DISTRICT-GURGAON, HARYANAFORM 1, FORM 1A

Project Proponent:

M/S RAHEJA DEVELOPERS LTD.

EIA Consultant:

Ind Tech House Consult(An ISO 9001:2008 Certified Organization)

G-8/6, Ground Floor, Sector 11, RohiniDelhi – 110 085

Tel: +91 11 2757 1410, 6460 7252Fax: +91 11 2757 2241

Email: [email protected] 2013

QM022

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR

“NAVODAYA ”GROUP HOUSING

AT SECTOR-92 & 95, VILLAGE - WAZIRPURAT

DISTRICT-GURGAON, HARYANAFORM 1, FORM 1A

Project Proponent:

M/S RAHEJA DEVELOPERS LTD.

EIA Consultant:

Ind Tech House Consult(An ISO 9001:2008 Certified Organization)

G-8/6, Ground Floor, Sector 11, RohiniDelhi – 110 085

Tel: +91 11 2757 1410, 6460 7252Fax: +91 11 2757 2241

Email: [email protected] 2013

QM022

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR

“NAVODAYA ”GROUP HOUSING

AT SECTOR-92 & 95, VILLAGE - WAZIRPURAT

DISTRICT-GURGAON, HARYANAFORM 1, FORM 1A

Project Proponent:

M/S RAHEJA DEVELOPERS LTD.

EIA Consultant:

Ind Tech House Consult(An ISO 9001:2008 Certified Organization)

G-8/6, Ground Floor, Sector 11, RohiniDelhi – 110 085

Tel: +91 11 2757 1410, 6460 7252Fax: +91 11 2757 2241

Email: [email protected] 2013

Page 2: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

QM022

Prepared by:

Ind Tech House Consult(An ISO 9001:2008 Certified Organization)

G-8/6, Ground Floor, Sector 11, RohiniDelhi – 110 085

Tel: +91 11 2757 1410, 6460 7252Fax: +91 11 2757 2241

Email: [email protected]

Form 1, Form 1A ForEXTENTION OF VALIDITY PERIOD OF ENVIRONMENTAL

CLEARANCE FOR“NAVODAYA” GROUP HOUSING AT SECTOR- 92 & 95, VILLAGE -

WAZIRPURAt

DISTRICT-GURGAON, HARYANA

QM022

Prepared by:

Ind Tech House Consult(An ISO 9001:2008 Certified Organization)

G-8/6, Ground Floor, Sector 11, RohiniDelhi – 110 085

Tel: +91 11 2757 1410, 6460 7252Fax: +91 11 2757 2241

Email: [email protected]

Form 1, Form 1A ForEXTENTION OF VALIDITY PERIOD OF ENVIRONMENTAL

CLEARANCE FOR“NAVODAYA” GROUP HOUSING AT SECTOR- 92 & 95, VILLAGE -

WAZIRPURAt

DISTRICT-GURGAON, HARYANA

QM022

Prepared by:

Ind Tech House Consult(An ISO 9001:2008 Certified Organization)

G-8/6, Ground Floor, Sector 11, RohiniDelhi – 110 085

Tel: +91 11 2757 1410, 6460 7252Fax: +91 11 2757 2241

Email: [email protected]

Form 1, Form 1A ForEXTENTION OF VALIDITY PERIOD OF ENVIRONMENTAL

CLEARANCE FOR“NAVODAYA” GROUP HOUSING AT SECTOR- 92 & 95, VILLAGE -

WAZIRPURAt

DISTRICT-GURGAON, HARYANA

Page 3: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

TABLE OF CONTENTS

S. No. Contents Page No.

I Form 1 1-17II Form 1 A 18-40iii AnnexureA Descriptive

A-1 Site Location MapA-2 500 Mt Radius MapA-3 10 Km Radius MapA-4 EC LetterA-5 Site Layout Plan

Page 4: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

1 IND TECH HOUSE CONSULT

Application for Prior Environmental Clearance (EC)

FORM 1(See Paragraph – 6 Notification dated14th September 2006)

as amended to EIA Notification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009.

Basic Information

SN Item Details1. Name of the project/s Proposed “Navodaya” Group Housing” in Sector-92 &

95,Gurgaon, Haryana2. S. No. in the schedule 8(a)3. Proposed capacity/area/length

/tonnage to be handled/ commandarea/lease area/ number of wells to bedrilled

Gross plot area : 68796.45 sq mTotal Built up area: 174657.29 sq mNo. of Building Blocks :2

4. New/Expansion/Modernization Extension of validity period5. Existing capacity/area etc. Project under construction

6. Category of the project i.e. ‘A’ or ‘B’ B7. Does it attract the general condition?

If yes, please specify.No

8. Does it attract the specific condition?If yes, please specify.

No

9. Location Sector- 92 & 95, Gurgaon, Haryana.

Plot/Survey/Khasra No.

Village Panwal, khusrupur

TehsilDistrict GurgaonState Haryana

10. Nearest railway station/airport alongwith distance in kms.

IGI airport is at 19.6 km North East

11. Nearest town, city, districtHeadquarters along with distance inKm

Gurgaon 11.25 Km, North East

12. Village Panchayats, Zilla Parishad,Municipal Corporation, Local body(complete postal address withtelephone nos. to be given)

Municipal Corporation Gurgaon

13. Name of the applicant M/s Raheja Developers Ltd

Page 5: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

2 IND TECH HOUSE CONSULT

14. Registered Address W4D, 204/5, Keshav Kunj, Carriapa Marg, WesternAvenue, Sainik Farms, New Delhi-110062.

15. Address for correspondence: W4D, 204/5, Keshav Kunj, Carriapa Marg, WesternAvenue, Sainik Farms, New Delhi-110062.

Name Mr. J.P. SharmaDesignation (Owner/Partner/CEO) Coordination HeadAddress A 210, Ground Floor, Sushant Lok - III, Sector - 57,

Gurgaon- HaryanaPin Code 110062

E-mail [email protected], [email protected]

Telephone No. 011 40611111Fax No. 011 40611110

16. Details of Alternative Sites examined,if any. Location of these sites shouldbe shown on a topo sheet.

Not applicable, as site is approved for residentialcolony as per zoning plan approved by TCP HUDAHaryana.

17. Interlinked Projects Not Applicable18. Whether separate application of

interlinked project has beensubmitted?

Not Applicable

19. If yes, date of submission Not Applicable20. If no, reason. Not Applicable21. Whether the proposal involves

approval/ clearance under: if yes,details of the same and their status tobe given.(a)The forest (Conservation) Act,

1980?(b)The wildlife (Protection) Act, 1972?(c)The C.R.Z. Notification, 1991?

NA

22. Whether there is any Governmentorder/policy relevant/ relating to thesite?

No

23. Forest land involved (hectares) No

24. Whether there is any litigation pendingagainst the project and/or land inwhich the project is proposed to beset up?

(a) Name of the Court(b) Case No.(c) Orders/directions of the Court,

if any and its relevance withthe proposed project.

No

Page 6: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

3 IND TECH HOUSE CONSULT

(I) Activity

Construction, operation or decommissioning of the Project involving actions, which willcause physical changes in the locality (topography, land use, changes in water bodies, etc.)

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

1.1 Permanent or temporary changein land use, land cover ortopography including increase inintensity of land use (withrespect to local land use plan)

No Proposed development is as per master plan ofHUDA.

1.2 Clearance of existing land,vegetation and buildings?

No Since the project site was vacant, no clearance ofexisting land vegetation & buildings was requiredas the land was free from any vegetation &structure.

1.3 Creation of new land uses? No. No new land use is proposed.The land is for residential development as perapproved zoning by TCP, Haryana.

1.4 Pre-construction investigationse.g. bore houses, soil testing?

Yes Geotechnical Soil investigation has been carriedout. Detailed geo-technical investigation of theproposed site is attached as Annexure

1.5 Construction works? Yes The major construction works are givenbelow:

Site DevelopmentRoad Development Internal roads

Utilities/Services Water Supply Sewerage Drainage Rain Water Harvesting Structures and Pits Power supply and back up facility,

Buildings Residential blocks Parking Provisions

1.6 Demolition works? No Demolition work is not involved in the project, asthe site has no existing building or constructedarea.

Page 7: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

4 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

1.7 Temporary sites used forconstruction works or housing ofconstruction workers?

Yes Mostly, local labors have been employed.However temporary labour camps are alsoestablished for labourers and a dormitory for thesite supervisors during the construction stage. Allthe construction activities including storage of rawmaterials are confined to the storage spacesearmarked on project site only.

1.8 Above ground buildings,structures or earthworksincluding linear structures, cutand fill or excavations

Yes The earthwork was involved for foundation andlaying of underground services etc. Excavated soilis being/was used for site leveling, backfilling/filling and road construction. Top 200 mmlayer of soil has been separately stored and willused for landscaping/horticulture developmentwork.

1.9 Underground works includingmining or tunneling?

Yes Underground works includes excavation of earthfor construction of foundation, water storage tankand STP.

1.10Reclamation works? No Not involved.

1.11 Dredging? No Not involved.1.12 Offshore structures? No Not involved.1.13 Production and manufacturing

processes?No This is a construction of group housing colony.

Hence, no production or manufacturing activitieswill be involved.

1.14 Facilities for storage of goods ormaterials?

Yes Temporary storage facilities will be created duringconstruction phase for storage of constructionmaterials.

1.15 Facilities for treatment ordisposal of solid or liquideffluents?

Yes Solid WasteConstruction Stage :Solid waste (concrete, brick bats), generatedduring construction stage, is being used forterracing, filling. Excavated earth will be used forroad and landscaping.

In addition to that there will be generation of smallquantity of municipal waste from constructionlabors. It will be ensured that the generatedwaste will be sent to nearest designated wastestorage bins / handed over to authorized agency.

Operation Stage:Municipal Solid waste generation from the facility

Page 8: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

5 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

will be approximately 1.745 TPD.

Solid waste generated from different blocks andother areas will be collected daily on door to doorbasis by the dedicated and trained housekeepingstaff. Twin bin systems will also be provided forsegregation at sources. Recyclable wastes will besold to vendors and non- recyclable wastes will bedisposed through authorized agency to municipalwaste disposal site.

Biodegradable waste will be treated in organicwaste converter and used as manure forhorticulture development.

MSW including horticulture waste will be handledas per the Municipal Solid Waste Management &Handling Rules, 2000.

Sewage sludgeSewage sludge will be generated which will beuse as manure for plants and surplus manure willbe sold to the farmers/nursery.

Waste water will also generate from constructionactivities, cleaning, curing washing etc. whichcontain suspended materials.

Hazardous waste: Waste lube oil will begenerated and sold to authorized recyclers.

E Waste :The e-waste, generated from the proposed projectwill be stored at a designated place within site andwill be sent to authorized recyclers or e-wasteprocessing plants for treatment as per e-wastewaste management & handling rules, 2011.

Liquid EffluentConstruction Stage:During the construction stage domestic liquid

Page 9: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

6 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

effluent generation will be limited to small quantityfrom labor camp proposed at site.

Wastewater generated from construction sitecontains suspended materials, and washings fromvarious areas. Construction wastewater shall becollected in a separate basin and shall be reusedafter primary treatment in the constructionactivities.

Mobile toilets and potable water facilities havebeen provided at site during construction phasefor labour and staff.

Operation Stage:Approximately 129 KLD of domestic waste waterwill be generated from the proposed residentialcolony. This effluent will be treated in SewageTreatment Plant with capacity of 150 KLD. Thetreated water from STP will be reused for flushing,horticulture, D.G. Cooling and maintenanceactivities.Scheme of treatment is attached as Annexure

1.16 Facilities for long term housingof operational workers?

No Not applicable

1.17 New road, rail or sea trafficduring construction oroperation?

No Not applicable

1.18 New road, rail, air waterborne orother transport infrastructureincluding new or altered routesand stations, ports, airports etc?

No Not applicable

1.19 Closure or diversion of existingtransport routes or infrastructureleading to changes in trafficmovements?

No Not applicable

1.20 New or diverted transmissionlines or pipelines?

No Not applicable

1.21 Impoundment, damming,culverting, realignment or otherchanges to the hydrology ofwatercourses or aquifers?

No Not applicable.

1.22 Stream crossings? No Not applicable

Page 10: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

7 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

1.23 Abstraction or transfers of waterform ground or surface waters?

No There is no ground water extraction for theconstruction of project for construction: Water isbeing sourced through Tanker supplies and usedafter testing and confirmation of fitness forconstruction.During operation phase, water will be supplied byHUDA.

1.24 Changes in water bodies or theland surface affecting drainageor run-off.

Yes Surface drainage may affect due to construction ofthe project.By considering run off prior to development & runoff after development there is some increment instorm water runoff. However runoff generatedfrom the project site during monsoon season willbe used to recharge ground aquifer. Network ofdrainage system developed in the site will beused to collect roof as well as surface runoff.

1.25 Transport of personnel ormaterials for construction,operation or decommissioning.

Yes During construction phase transport of personnelas well as construction materials would berequired. The personnel would preferably beengaged from nearby areas. Precaution will betaken to reduce the impact of vehicular movementby trying to avoid the vehicular trips during peakhours.Operation phase parking in stilt and on groundsurface.

1.26 Long-term dismantling ordecommissioning or restorationworks?

No Not applicable

1.27 Ongoing activity duringdecommissioning which couldhave an impact on theenvironment?

No Not applicable

1.28 Influx of people to an area ineither temporarily orpermanently?

Yes Construction phase –Temporary influx of people from the nearby areasis expected.

Operation phase – Persons in residentialcomplex + floating population

1.29 Introduction of alien species? No Not applicable1.30 Loss of native species or genetic

diversity?No Not applicable

1.31 Any other actions? No None

Page 11: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

8 IND TECH HOUSE CONSULT

2. Use of Natural resources for construction or operation of the Project (such as land, water,materials or energy, especially any resources which are non-renewable or in short supply):

SN Information/checklistconfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

2.1 Land especially undeveloped oragricultural land (ha)

Yes The proposed project site and its surroundingareas have been designated for residentialdevelopment.

2.2 Water (expected source &competing users) unit:

Yes Water requirement during construction phase isbeing met by treated waste water supply fromnearest STP.

During operation phase fresh water demand will bemet from HUDA water supply department. Treatedwater demand for flushing, gardening and DG Setcooling shall be met from treated water from STPinstalled at Site.

95 KLD of treated water will be recycled back andutilised for horticulture, cooling of D.G., Flushingwithin site premises.

2.3 Minerals (MT) No Not applicable2.4 Construction material – stone,

aggregates, sand / soil(expected source – MT)

Y

Yes

Construction materials such as Cement, Steel,Bricks, Stone aggregates, and Sand would berequired for the project. These will be preferablyprocured from reputed licensed local vendors.

2.5 Forests and timber (source –MT)

No Limited use of timber will be done and it will berestricted to selected locations.

2.6 Energy including electricity andfuels (source, competing users)Unit: fuel (MT), energy (MW)

Yes Power for the proposed project will be supplied byDakshin Haryana Bijli Vitran Nigam. Maximum powerDemand for the proposed project is 5580 KW. DGsets of adequate capacity will be used as powerback up for residential colony during power failure.

2.7 Any other natural resources(use appropriate standard units)

No _ _

3. Use, storage, transport, handling or production of substances or materials, which could beharmful to human health or the environment or raise concerns about actual or perceivedrisks to human health.

Page 12: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

9 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information data

3.1 Use of substances ormaterials, which arehazardous (as per MSIHCrules) to human health or theenvironment (flora, fauna, andwater supplies)

No Not applicable.

3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insect or waterborne diseases)

No Not applicable.

3.3 Affect the welfare of peoplee.g. by changing livingconditions?

No Not Applicable.

3.4 Vulnerable groups of peoplewho could be affected by theproject e.g. hospital patients,children, the elderly etc.,

No Not applicable.

3.5 Any other causes No Not applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information data

4.1 Spoil, overburden or minewastes

No Top soil generated during earth excavation isstacked, covered, preserved for reuse as top layerfor horticulture development. Remaining soil isbeing used for site leveling, back filling and roadconstruction.

4.2 Municipal wastes (domesticand or commercialwastes)

Yes Municipal solid waste during operation phase will be1.745 TPDThe solid waste includes paper, card board, plasticcans etc. and kitchen wastes from houses.Recyclable wastes like card boards and plastic canswill be sold to vendors.

Page 13: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

10 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information data

4.3 Hazardous wastes (as perHazardous WasteManagement Rules)

Yes Waste oil on annual basis from DG sets will be theonly hazardous waste generated from the project.This waste oil will be carefully stored in HDPEdrums in isolated covered space and sold torecyclers authorized by CPCB/SPCB.Suitable care will be taken so as to prevent spills/leaks of used oil from storage.

4.4 Other industrial processwastes

No Not applicable

4.5 Surplus product No Not applicable4.6 Sewage sludge or other

sludge from effluenttreatment

Yes Dried sludge from the STP will be used as manurefor horticulture development. Surplus manure will besold to end users: farmers/Nursery.

4.7 Construction or demolitionwastes

Yes Demolition work was not involved.Construction Work: Excavated soil has been usedfor back filling. Other construction waste like bricks,is being used in sundary/roadworks/manholes etc.cardboards will be sent to authorize recycler. Theinert waste will be sent to land fill site.

4.8 Redundant machinery orequipment

No Not applicable

4.9 Contaminated soils or othermaterials

No Not applicable

4.10 Agricultural wastes No Not applicable4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information data

5.1 Emissions from combustionof fossil fuels fromstationary or mobile sources

Yes Emission will be from Stationary Sources: DG sets Mobile Sources: Vehicular emissions

CPCB approved DG sets with acoustic canopy willbe used only during power failure.

5.2 Emissions from productionprocesses

No Not applicable

Page 14: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

11 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information data

5.3 Emissions from materialshandling including storageor transport

No Fugitive dust emission due to handling andloading - unloading activities has been envisagedduring construction. Frequent water sprinkling isbeing done to minimize the fugitive emissions.

5.4 Emissions from constructionactivities including plant andequipment

YesMargin

al

During the construction phase, major emission is inthe form of fugitive dust, use of DG sets andtransportation of construction material.

5.5 Dust or odours fromhandling of materialsincluding constructionmaterials, sewage andwaste

Yes The project may causes rise in dust levels duringconstruction phase. Precautions have been taken toreduce dust generation during construction phase:•RMC use is being reduce the handling of cement,sand and concrete thus dust emission is minimized.•Tarpaulins is being used to cover trucks carryingdebris.Water sprinkling will be practiced at regular intervalsto reduce dust emissions.Dust is likely to be generated during operation phasedue to movement of vehicles and blowing of air. Butthe impact is negligible. Sewage generated fromproposed project will be treated in onsite STP.

5.6 Emissions from incinerationof waste

No Not applicable

5.7 Emissions from burning ofwaste in open air (e.g. slashmaterials, constructiondebris)

No Burning of any substances including biomass, slashmaterials and/ or construction debris will beprohibited

5.8 Emissions from any othersources

No Nil

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information data

6.1 From operation ofequipment e.g. engines,ventilation plant, crushers

Yes Noise is expected to be generated duringconstruction phase mainly from operation of heavymachinery, DG sets, and traffic. The indicated noiselevels from certain construction plants/equipment areindicated below: Concrete Mixer - 85 dBA Generator - 95 dBA Pumps - 90 - 95 dBA Trucks - 85 – 90 dBAFor control of noise following measures zone

Page 15: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

12 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information dataadopted:

• Properly maintained equipment with mufflers willbe used.

•High noise generating constructionactivities are carried out only during day time.Workers working near high noise constructionmachinery are supplied with ear muffs/ear plugs.

During operation noise from operation of DG sets isenvisaged. However, the generator sets installed willoperate at noise level less than 75 dB (A) as thegenerators will be placed either in acoustic chambersor a canopy.

6.2 From industrial or similarprocesses

No Not applicable

6.3 From construction ordemolition

Yes Noise Pollution Control: Noise pollution is due tooperation of machinery as well as transportationvehicles. As there is no habitation in nearby areahence there is negligible impact. However followingprecautions are being taken to control noisepollution :High noise generating construction activities arecarried out only during day time.Installation, use and maintenance of mufflers onequipment.Workers working near high noise constructionmachinery are supplied with ear muffs/ear plugs.

6.4 From blasting or piling No Blasting & piling work was not involved in the project.6.5 From construction or

operational trafficYes Construction Phase:

Welding is light and heat generating activity duringconstruction. Appropriate safety measures is beingtaken as per I.S. code and CPWD work manual.Materials for construction work. Precautions arebeing taken to reduce the impact of the vehicularmovement such as vehicular trips will not be atpeak traffic hours.Operation Phase:Car parking is provided in ground surface and inlevel basements.

Vehicular movement is restricted to roads andparking areas. Provision of soft green peripheralroad side plantation will help in reduction of noiselevel.

Page 16: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

13 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with sourceof information data

6.6 From lighting or coolingsystems

No Nil

6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or intosewers, surface waters, groundwater, coastal waters or the sea:

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) withsource of information data

7.1 From handling, storage, useor spillage of hazardousmaterials

Yes The waste oil generated during operation phasefrom the DG sets will be collected and separatelystored in HDPE drums over concrete floor withinthe premises before final disposal. Allprecautionary steps will be taken to avoid spillageIt will be directly transferred to authorizedrecyclers.

7.2 From discharge of sewage orother effluents to water or theland (expected mode andplace of discharge)

No Generated Sewage from the campus will betreated in the STP proposed onsite, and recycledwithin the proposed project facility for gardeningDG cooling, etc. surplus treated water will bedischarge(except during monsoons).

7.3 By deposition of pollutantsemitted to air into the land orinto water

No Dust generation during construction phase fromearthworks and movement of vehicles is atemporary phenomenon and will have short termimpact during construction phase.Appropriate fugitive dust control measures,including water sprinkling of exposed areas anddust covers for trucks, will be provided to minimizeany impacts.DG exhaust will be discharged at height stipulatedby CPCB.

7.4 From any other sources No Nil7.5 Is there a risk of long term

build up of pollutants in theenvironment from thesesources?

No No.

8. Risk of accidents during construction or operation of the Project, which could affect humanhealth or the environment

Page 17: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

14 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) withsource of information data

8.1 From explosions, spillages,fires etc from storage,handling, use or production ofhazardous substances

No During construction phase, no such risk isanticipated. However, the contractors shall complywith the safety procedures, norms and guidelinesas applicable) mentioned in the National BuildingCode of India and Bureau of Indian Standards.

During Operation Phase, all precautionary andsafety measures will be taken to minimize anyaccident hazard.

8.2 From any other causes No Nil8.3 Could the project be affected

by natural disasters causingenvironmental damage (e.g.Floods, earthquakes,landslides, cloudburst etc)?

Yes Gurgaon district has no history of natural disasterssuch as landslides, cloudburst etc.The site lies in Seismic Zone IV. The constructionwill be carried out as per the guidelines prescribedfor Seismic Zone IV.All the civil structures will be seismically resistantand designed in accordance with provisionsrecommended related IS codes:IS 4326: 1993IS 1893 (Part I),2002

9. Factors which should be considered (such as consequential development) which couldlead to environmental effects or the potential for cumulative impacts with other existing orplanned activities in the locality

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) withsource of information data

9.1 Lead to development ofsupporting. facilities, ancillarydevelopment or developmentstimulated by the project,which could have impact onthe environment e.g.:

Yes

The project will be equipped with dedicatedinternal road, parking, water distribution, firefighting, sewage collection network, lightingfacilities, solar lighting, and power backup facility.

Page 18: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

15 IND TECH HOUSE CONSULT

SN Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) withsource of information data

Supporting infrastructure(roads, power supply,waste or waste watertreatment, etc.)

Yes Appropriate infrastructure like, roads, powersupply and waste management facility will bedeveloped within the site so that chances ofoccurrence of any adverse impacts are minimized.

Waste water and solid waste will be treated at site. extractive industries No No

supply industries Yes Construction materials

other No No

9.2 Lead to after-use of the site,which could have an impacton the environment

No No

9.3 Set a precedent for laterdevelopments

Yes This is residential colony development; there willbe generation of employment during construction& operation phase.

9.4 Have cumulative effects dueto proximity to other existingor planned projects withsimilar effects

Yes Impacts on water availability, storm waterdrainage, availability of electricity, trafficcongestion etc.

(II) Environmental Sensitivity

SN Areas Name/Identity

Aerial distance (within 15 km) of proposedproject location boundary

1 Areas protected underinternational conventions,national or local legislationfor their ecological,landscape, cultural or otherrelated value

Yes Sultanpur Bird Sanctuary- 5.04 Km, NW

2 Areas which are important orsensitive for ecologicalreasons - Wetlands,watercourses or other waterbodies, coastal zone,biospheres, mountains,forests.

Yes Najafgarh Drain is approx. 10 km, NE.

Page 19: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERSLTD

EXTENTION OF VALIDITY PERIOD OF ENVIRONMENTALCLEARANCE FOR “NAVODAYA” GROUP HOUSING INSECTOR-92 & 95,GURGAON ,HARYANA

FORM 1

16 IND TECH HOUSE CONSULT

SN Areas Name/Identity

Aerial distance (within 15 km) of proposedproject location boundary

3 Areas used by protected,important or sensitivespecies of flora or fauna forbreeding, nesting, foraging,resting, over wintering,migration

No Does not fall within 15 Km radius.

4 Inland, coastal, marine orunderground waters

No Not located within 15 km of the proposedproject location.

5 State, National boundaries Yes Delhi- Haryana border is at 9.75 km, Northfrom the project site.

6 Routes or facilities used bythe public for access torecreation or other tourist,pilgrim areas

No The site does not fall under any route to anypilgrim, tourist or recreational area.

7 Defense installations No No defense installation within 15 km.

8 Densely populated or built-up area

Yes

9 Areas occupied by sensitiveman-made land uses(hospitals, schools, places ofworship, communityfacilities)

Yes Manmade community facilities such as,schools, places of worship are planned in butare not close to the site. These installationswill not have any impact due to construction ofproposed project.

10 Areas containing important,high quality or scarceresources (ground waterresources, surfaceresources, forestry,agriculture, fisheries,tourism, minerals)

No The project site does not fall in the notifiedareas for control and regulation of groundwater.

11 Areas already subjected topollution or environmentaldamage. (those whereexisting legal environmentalstandards are exceeded)

No Nothing specific

12 Areas susceptible to naturalhazard which could causethe project to presentenvironmental problems(earthquakes, subsidence,landslides, erosion, floodingor extreme or adverseclimatic conditions)

Yes The project is located at seismic zone IVaccording to Indian Standard Seismic ZoningMap. Structural design will be done for thisseismic zone as per code.There are no possibilities of the proposedproject site getting flooded as per availablerecords.Landslides not applicable as the project site &surrounding land is flat.

Page 20: Project Proponent: M/S RAHEJA DEVELOPERS LTD. EIA ...environmentclearance.nic.in/writereaddata/... · Avenue, Sainik Farms, New Delhi-110062. Name Mr. J.P. Sharma Designation (O wner/Partner/CEO)

RAHEJA DEVELOPERS LTD.

EXTENSION OF VALIDITY OF EXISTINGENVIRONMENTAL CLEARANCE OFRAHEJA NAVODAYA “GROUP HOUSINGPROJECT” AT SECTOR 92-95 GURGAONHARYANA