Snowmass Town Park Master Plan August 17, 2020 | PROJECT PROCESS PROJECT PROCESS PROJECT STARTUP DESIGN ALTERNATIVES FINAL MASTER PLAN • TOWN & STAKEHOLDER INTERVIEWS • PROGRAM ASSESSMENT • CONCEPT GENERATION AND EVALUATION • FINAL PLAN • PHASING PLAN • BUDGET 08-17-20 TC Packet Page 198 of 207

PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | P R O J E C T P R O C E S S

PROJECT PROCESSPROJECT STARTUP

DESIGN ALTERNATIVES

FINAL MASTER PLAN

• TOWN & STAKEHOLDER INTERVIEWS• PROGRAM ASSESSMENT

• CONCEPT GENERATION AND EVALUATION

• FINAL PLAN• PHASING PLAN• BUDGET

08-17-20 TC Packet Page 198 of 207

Page 2: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | P R O J E C T G O A L S

PRIMARY MASTER PLAN GOALMore efficiently utilize the used and unused park space to create a

beautiful and engaging destination for all ages.

PRIORITY USER GROUPTown of Snowmass Village residents

08-17-20 TC Packet Page 199 of 207

Page 3: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | P R O J E C T G O A L S

SECONDARY MASTER PLAN GOALS

• Beautify the entry to Snowmass• Reduce conflict between events and rec

users• Incorporate centralized storage and

maintenance facility• Provide additional opportunities for field

sports programming • Provide additional parking• Enhance recreation opportunities

• Minimize pedestrian/bike/vehicular conflict

• Maintain space for rec/pool expansion• Maintain existing improvements• Maintain a quality rodeo facility

08-17-20 TC Packet Page 200 of 207

Page 4: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

BLACK SADDLE PARKING

0' 80' 160'

SCALE: 1"=80' NORTH

240’

Snowmass Town Park Master PlanAugust 17, 2020 | S P A C E U S A G E D I A G R A M

rodeo / parkingparking

grass fields

grass fields

grass fields

parking

active recreation

active recreationpassive / wetlandspassive / wetlands

active recreation

08-17-20 TC Packet Page 201 of 207

Page 5: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | P R O G R A M S U M M A R Y

• Wetland recreation area with diverse access experiences• Improved recreation pond with beach, wading/swimming, fishing,

and gathering areas• Additional programmable field space• Stream-side play/exploration• Bike skills trail• Additional restroom facilities• Additional rentable events space• Additional summer and winter parking• Indoor, consolidated parks maintenance facility

IMPROVEMENTS SUMMARY

08-17-20 TC Packet Page 202 of 207

Page 6: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | T O W N P A R K M A S T E R P L A N

coffey place neighborhood; under construction

existing softball field with soccer overlay;

enhanced dugouts and bleachers

existing trail underpass

realigned pathexisting transit center

slow-pitch softball field

existing soccer field, realigned

existing gazebo, added elec & waterbike skills trail, beginner

bike skills trail, beginner

bike skills trail, intermediate

bike skills trail, intermediate

existing irrigation shed

2-room bathroom

existing Black Saddle parking

rodeo ticketing/entrancemain Town Park entrance

bike skills trail: intermediate343 existing parking spaces

existing rec center

existing skate park, volleyball courts, basketball, and tennis courts to remain

existing rec center pool

*see wetlands enlargement

access to Seven Star

wetland and pond parking (15 new spaces) + rodeo trailer parking during rodeo

new fields or flex lawn space (~1.5ac)small shade structures

stream-side play area

bus staging

pavilion/gazebo, elec & water tie-ins

enhanced park entrance

stock pens, timers, announcers, etc. elec & water tie-ins

3-room bathroom and vending machine,to service soccer, ponds, and rodeo

rodeo arena (130’x240’)

defined roundabout entrance

realigned multi-use trail

welcome signage/landscaping

iconic rodeo sign and stock pen vehicular access91 new parking spaces

food tent (40’x100’), open to public on non-rodeo days during summer

all existing stands to be utilized, except largest (to be replaced by grandstands over storage)

grand stands over maintenance facility buildingtemporary fencing (south and east edges of rodeo)

bar tent (40’x40’)permanent, aesthetic fencing (north and west edges of rodeo)

merchandise booths

existing cell tower

pond access parking (13 new spaces) + emergency staging for rodeo

brush

cree

k rd

brush creek rd

clubh

ouse

dr

stallion cir

expanded existing playground; existing playground elements to

remain where feasiblehorse ranch dr

08-17-20 TC Packet Page 203 of 207

Page 7: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | T O W N P A R K M A S T E R P L A N

improved pond

existing access to seven star

passive lookout

coffey place neighborhood; under construction

north wetlands:passive

south wetlands:active

grate overlook deck and boardwalk; ADA path destination

existing bike pathexploration trails

passive trail to lookout

boulder beach area for quiet contemplation

bike skills trail

wedding deck

proposed path connection to seven star

existing bike path“amphitheater”

trail network; multi-season (sim. Northstar Preserve)

interactive boulder path/play

fishing points

boulder crossing @ spillway

ADA accessible pathwading area w/ boulder edge

wooden bridge

pond and wetlands access parking

overlook/lounge deck/fishing pier/event space with overhead element for shade/visibility

lawn area with trees

crusher fine path

flagstone and decorative aggregate water play feature

sand beach

dredge pond of cattails and fill lower “finger”

bike/pedestrian boardwalk

Scandinavian plank path + mini-ropes course

decomposed granite and boardwalk trail network

picnic table(s), typ.

Key Considerations:• Maintain/promote creek and wetland health• Transition from active to passive uses as you move away from the pond to

the eastern end of wetlands• Emphasize visual access from the road to the pond and wetlands• Capitalize on existing shade; create shade with proposed vegetation as

design develops• Create a variety of trail types for a multitude of users: ADA, paved bike,

mountain bike, passive ped trails, active ped/ ‘adventure’ trails• Provide easy access to important amenities: paddle board drop off, beach

access, bathrooms etc.• Create a variety of active and passive ways to experience the wetland,

including educational and interactive opportunities• Capitalize on existing views and strategically place elements so that their

view-shed is not compromised by development. Focus on the natural world and specific details

• Enhance and create connection to “wildness” • Capitalize on existing topography such as the existing bench on the

southern side of the wetlands and abundant flat space• Be mindful of maintenance requirements for all proposed design

elements• A very light construction footprint to preserve the wetlands to the

greatest extent possible while constructing paths and elements.

brus

h cre

ek ro

ad

1

1

2

2

4

4

6

6

9

9

33

55

8

8

7

7

1010

1413

13

11

15

12

16

11

12

08-17-20 TC Packet Page 204 of 207

Page 8: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | W I N T E R U S A G E

day skier parking at rodeo grounds (~197 spaces)

arena fencing and event fencing storage area

collapsible stands in storage modemerchandise booths stored

tent storage in maintenance building

nordic ski/snowshoe trail

ice rink

winter trails parking access

flush curb & blocked spaces for winter parking access

transit center

existing day skier overflow parking

08-17-20 TC Packet Page 205 of 207

Page 9: PROJECT PROCESS...More efficiently utilize the used and unused park space to create a beautiful and engaging destination for all ages. PRIORITY USER GROUP Town of Snowmass Village

Snowmass Town Park Master PlanAugust 17, 2020 | P R O G R A M S U M M A R Y

BY THE NUMBERS

Field Space:• 272,700 SF of playable field space (approx. 64,000 SF gain)• 2 possible simultaneous U-18 soccer fields (no change)• 2 possible simultaneous full-sized softball fields (1 additional field) • 6 possible simultaneous U-10 soccer fields (2 additional fields)

Park Structures:• 2 large gazebos with water and power (1 additional)• NEW 2 covered picnic structures• NEW 2 plumbed restroom facilities with 5 unisex “stalls” total (incl. 2

accessible).• NEW indoor parks maintenance facility (approx. 2,600 SF)

Parking:• 462 paved summer parking spaces (119 additional)• ~635 paved and unpaved winter parking spaces

08-17-20 TC Packet Page 206 of 207