15
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local development” (working title) March 12 th and 13 th 2008 Office of Vides Projekti, Riga/ Latvia

Project preparation workshop “Bringing a transnational project to life”

  • Upload
    bjorn

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

Project preparation workshop “Bringing a transnational project to life”. Project idea “Challenges and chances from Climate Change for regional and local development” (working title) March 12 th and 13 th 2008 Office of Vides Projekti, Riga/ Latvia. „Critical Birth Phase“. - PowerPoint PPT Presentation

Citation preview

Page 1: Project preparation workshop “Bringing a transnational project to life”

Project preparation workshop“Bringing a transnational project

to life”

Project idea  

“Challenges and chances from Climate Change

for regional and local development”(working title)

 

March 12th and 13th 2008

Office of Vides Projekti, Riga/ Latvia

Page 2: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • .... [„Critical Birth Phase“] .... • .... [Dennis Ehm, ARL] 2

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

„Critical Birth Phase“

Decision on project application

Dennis Ehm, ARL

Page 3: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 3

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Large process

• Calls

• Evaluation of project proposals (applications)

• Approval (or rejection)

• Contracting

Page 4: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 4

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Calls

• announced by the Monitoring Committee (MC)

• frequency 1-2 times/ year

• open for 1-3 months

• application package (partly specific for single calls)

• supporting elements for project generation and development

Page 5: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 5

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Evaluation of project proposals

(Proposal = application)

• Standardised process

• (Only) on basis of information in the application form

• Implemented by the Joint Technical Secretariat (JTS)

• Base for decisions by the MC

• Evaluation consists of

• Admissibility check

• Quality assessment

Page 6: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 6

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Admissibility check

Minimum technical requirements checked

• paper and electronically version identical• in English, within deadline (1st call: May 30th 2008

16:00h), signed, etc.• at least 3 financially contributing partner from at least

3 countries (2 of EU members)• Eligibility of lead applicant

Only projects which pass admissibility check are subject to a further quality evaluation!

Page 7: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 7

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Quality Assessment

Provide MC members with sufficient information on the quality of the proposal to facilitate their decision making process

By JTS carried out according to quality asessment criteria

Page 8: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 8

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Quality assessment criteria

Most important aspects to prepare the decision making!

•Relevance of the proposal•Coherence of the proposal and quality of approach•Durability, transferability and dissemination of the results•Partnership•Management•Budget

(all criteria are partly sub-divided in up to 5 aspects)Here it counts!

(PM, table 9.3.a.: p. 64-65)

Page 9: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 9

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Additional quality features

Not obligatory but “big points”

• pilot/ demonstration investments of transnational relevance

• actively participating partners from RU and BY• financial actors from the private sector• Lead Applicant experienced in EU financed projects• support in particular geographical focus of the

programme (East-West divide; North-South disparities)

(PM table 9.3.b.: p. 65)

Page 10: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 10

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Approval

– Monitoring Committee decision (members from all countries, mostly from national sub-committees)

– Decisions 1st Call ca. October 23rd/24th 2008– Basing on quality asessment reports from the quality

assessment by the JTS (for later calls also on further aspects)

– Three options for decisions on an application– approval– approval with certain requirements/ conditions– rejection

Page 11: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 11

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Supporting the approval

Approval decision is taken by Monitoring Committee!– members from all countries must be convinced– mostly actors of national sub-committees involved– members of national-subcommittees

– highly experienced in assessment of project proposals– shall know involvement of institutions in their country before

application– can support development of projects and finding of further

partners

national contact points – support project generation, preparation, partner finding, etc.

Page 12: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 12

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Contracting of projects

– Information of the Lead Partner (within two weeks) after MC decision by approval/ rejection letter

– if approved: Grand Contract between MA and LP– final commitment of grants and legal finacial implementation

framework– basing on a standardised template

– Implementation of project (only ERDF and Norwegian funding) may start at own risk before Grand Contract is signed

– official implementation phase starts in any case 3 months after MC decision (1st call ca. Jan 23rd 2009)

– Lead Partner seminar

Page 13: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 13

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Contracting between partners

– within 6 months after approval partners shall agree on detailed project-internal management and implementation plan

– partnership agreement– to be signed by each partner– basing on partner declaration and project application– specify responsibilities, rights and roles– specify joint procedures– payment procedures– common costs (e.g. coordination, publicity)– etc.

final

Page 14: Project preparation workshop “Bringing a transnational project to life”

March 12th 2008 • „Critical Birth Phase“ Dennis Ehm, ARL 14

Project preparation Workshop, March 12th/13th Riga

„Critical Birth Phase“

Getting started

Specific tasks until first progress report

• conclusion of partnership agreement

• drafting of the communication plan (WP 2 will be specified, partly changed after approval!)

• targets for output indicators on selected common results

• definition of indicators and targets for output indicators on selected priority specific results (and additonal results); programme workshops envisaged

• integration of project praparation costs

Page 15: Project preparation workshop “Bringing a transnational project to life”

Project preparation workshop“Bringing a transnational project

to life”

Project idea  

“Challenges and chances from Climate Change

for regional and local development”(working title)

 

March 12th and 13th 2008

Office of Vides Projekti, Riga/ Latvia