Project Preparation in Energy Sector in Nepal Presented at Regional Meeting on Sustainable Energy for Asia-Pacific Least Development Countries by Mahesh P. Acharya SESSION IV : PROJECT PREPARATION SKILLS 22-23 March 2017 Kathmandu

Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Project Preparation in Energy Sector in Nepal

Presented at Regional Meeting on Sustainable Energy for Asia-Pacific Least Development

Countries by

Mahesh P. Acharya

SESSION IV : PROJECT PREPARATION SKILLS

22-23 March 2017 Kathmandu

Page 2: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Contents

• Energy sector overview

• Investment requirements

• Challenges of low level of investment in energy sector

• Project preparation in energy sector

2

Page 3: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Energy Sector Overview

Key energy indicator of Nepal:

• Electricity consumption per capita: 132 kWh

• Population with electricity access: 76%

• Total installed capacity: ~1000 MW

• Energy consumption mix: • Traditional: 80%

• Petroleum products: 11.3%

• Electricity: 3.3%

• Coal: 2.8%

• Renewable energy: 2.6%

3

Page 4: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Energy Sector Targets

Plan Targets

Sustainable Development Goals, (2016-

2030)

• 10,000 MW of installed capacity of hydropower by

2030.

• Grid access increased to 99% of the population in

2030

• Per capital consumption of electricity of increased

to 680 kWh in 2030.

Concept Paper on National Energy Crisis

Reduction and Electricity Development

Decade, 2016

• 10,000 MW of demand by 2026 (optimistic case)

to be met by combination of ROR (~50%) and

reservoir plants (50%).

Sources: National Planning Commission, and Ministry of Energy

4

Page 5: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Planned vs Actual Capacity Addition

20 22

60 40.3 49

145

107

320.3

580

315

105

184

0 2.4 0.2 11 15

75.6

10.1 20.6

260.2

41.2 70 64

0

100

200

300

400

500

600

700

1956-61 1962-65 1965-70 1970-75 1975-80 1980-85 1985-90 1993-97 1997-2002 2002-07 2007-10 2011-14

First Five-Year Plan

SecondFive-Year

Plan

Third Five-Year Plan

FourthFive-year

Plan

Fifth Five-Year Plan

Sixth Five-Year Plan

SeventhFive-Year

Plan

EighthFive-Year

Plan

Ninth Five-Year Plan

Tenth Five-Year Plan

EleventhThree-Year

Plan

TwelfthThree-Year

Plan

Planned Capacity Addition(MW) Achieved Capacity Addition (MW)

5

Page 6: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Planned vs Actual Expenditure

6

Page 7: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Investment requirements in various sectors

Investment Requirements 2011-2020 (Nepal)

Sector Low High

Billion USD % of GDP Billion USD % of GDP

Transport 3.7 2.32 5.5 3.49

Power 5.3 3.34 7.0 4.46

WSS 1.7 1.08 2.6 1.62

Solid Waste 0.4 0.24 0.5 0.30

Telecom 0.4 0.27 0.6 0.40

Irrigation 1.6 0.99 2.3 1.48

Total 13 8.24 18 11.75

Source: Andres, L., D. Biller, and M. Herrera Dappe (2013). Infrastructure Gap in South Asia: Infrastructure Needs,

Prioritization, and Financing. Washington DC : World Bank. To achieve 10,000 MW in the next decade, investment to the tune of 20-25 billion will be required over that period.

7

Page 8: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Challenges of Low Level of Investment in Energy Sector

• Absence of focused sector plan, policies and strategies

• Inadequate regulatory frameworks

• Poor implementation capacity in the public sector utility.

– Inadequate attention to project preparation

– Lack of sufficient funds for project preparation

– Lack of sufficient capacity in project management

8

Page 9: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Challenges of Low Level of Investment in Energy Sector (cont…)

– Lack of knowledge sharing within a sector agency or across sectors, resulting in past knowledge not being transferred to the next project.

• Lack of private sector friendly investment environment to attract investment in large projects.

9

Page 10: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Project Preparation

• Funds allocated to project preparation is inadequate.

• Most preparatory works are done in a short time after the project has been committed or as part of project loans/financing.

• Inadequate project preparation may result in glossing over the project optimization, the likely social and safeguard issues, poor quality design, inaccurate cost estimates contributing to higher risks during project construction, resulting in time and cost over runs.

10

Page 11: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Project Preparation (cont..) Project readiness criteria:

– Project identification – Project prioritization – Feasibility study – Detailed engineering design – Identification of key environmental and social safeguard issues,

and preparation of the management plan – Land acquisition – Project risks assessment – Preparation of costs estimates – Preparation of economic and financial analyses – Assessment of the financial structure – Preparation of procurement documents

11

Page 12: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Project Bank

• A project bank consisting of projects meeting the project readiness criteria or filters to be prepared.

• The projects are then sequenced for development to meet the demand projection, subject to their meeting the economic and/or financial viability.

• The projects from the project bank may be taken up for implementation by public sector as well as for private sector.

12

Page 13: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Project Pipeline

• Well prepared projects is most likely to give more comfort to the multilateral or bilateral funding agencies, and private sector investors, as it will cut down the duration of project cycles.

• As all the project-related risks are identified in advance, it will be easier to prepare necessary strategy and action plan for their mitigation.

• Cost and time overrun will be minimized.

13

Page 14: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Monitoring and Evaluation

• In a well prepared project, realistic project milestones can be established, with higher likelihood of being achieved. As a result, this will

– help setting up realistic indicators as part of the project monitoring framework, and

– in turn help putting in place an effective project management system.

14

Page 15: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Capacity development in project preparation and implementation

• Setting up of specialized departments within the energy sector agencies responsible for project preparation and implementation.

• Such departments will be responsible for (i) project identification; (ii) feasibility study; (ii) engineering design; (iii) land acquisition and environmental and social safeguard related activities,

• Capacity in the following areas need to be enhanced: – Engineering – Environmental and social safeguard – Economic analysis and finance – Project Management .

15

Page 16: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Concussion

To enhance project implementation capacity the required steps to taken by the government are:

• Allocation of sufficient fund for project preparation

• Preparation of a project pipeline of well prepared projects, and

• Capacity development within the sector agencies.

16

Page 17: Project Preparation in Energy Sector in Nepalunohrlls.org/.../6.-ACHARYASession-IV_Mahesh-P-Acharya.pdf · 2017-03-23 · Telecom 0.4 0.27 0.6 0.40 Irrigation 1.6 0.99 2.3 1.48 Total

Thank You