Upload
nuwa
View
43
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Project Overview. COMPETENCY. VISION & MISSION. MAINTENANCE MECHANIC TECHNOLOGY. SUBJECT. OBJECTIVE. IMPLEMENTATION. ”PBE” PROCESS. Instructions: Delete sample document icon and replace with working document icons as follows: Create document in Word. Return to PowerPoint. - PowerPoint PPT Presentation
Citation preview
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Project OverviewProject Overview
MAINTENANCE MAINTENANCE MECHANIC MECHANIC TECHNOLOGYTECHNOLOGY
VISION & MISSIONVISION & MISSION
OBJECTIVEOBJECTIVE
””PBE” PROCESS PBE” PROCESS
COMPETENCYCOMPETENCY
SUBJECTSUBJECT
IMPLEMENTATIONIMPLEMENTATION
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
Vision & MissionVision & MissionInstructions:
Delete sample document icon and replace with working document icons as follows:
• Create document in Word.• Return to PowerPoint.
• From Insert Menu, select Object… • Click “Create from File” • Locate File name in “File” box• Make sure “Display as Icon” is checked.• Click OK
• Select icon• From Slide Show Menu, Select Action
Settings.• Click “Object Action” and select “Edit”• Click OK
VISIONTO BECAME THE SPEARHEAD OF EDUCATION AND IMPLEMENTATION OF MAINTENANCE BASIC SKILL TECHNOLOGY
MISSIONTO DEVELOP HUMAN RESOURCES WHO ARE ABLE TO MAINTAIN, REPAIR AND BUILT MACHINE TOOLS, GENERAL MACHINE AND SUPPORTING EQUIPMENT; AND ABLE TO ASSIMILATE WITH NEW CONCEPT & TECHNOLOGY IN MAINTENANCE
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ObjectiveObjective
TO TEACH STUDENT IN MAINTENANCE BASIC SKILL CONCEPT AND PROCEDURE IN ORDER TO HAVE APPROPRIATE COMPETENCY WITH INDUSTRY AND HAVE PROFESSIONAL SKILL
TO MAINTAIN, REPAIR AND BUILT MACHINE BASED ON STANDARD ACCEPTANCE TEST
TO LEARN, DEVELOPING AND ARRANGE IMPLEMENTATION OF NEW CONCEPT IN MAINTENANCE SUCH AS CONDITION BASED MONITORING, MAINTENANCE CONTROL SYSTEM, CNC TECHNOLOGY, ETC
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
””PBE” ProcessPBE” Process
INPUTMAINTENANCE
MECHANIC TECHNOLOGY
OUTPUT
•STUDENT
•PRODUCT
•MODULAR TRAINING
•ENGINEERING
•CONSULTATION
•COMPETENCY
•PROFESSIONAL SKILL
•PRODUCT QUALITY
•CUSTOMER SATISFACTION
•CURRICULUM
•LECTURE
•TEACHING AID
•MODULE
•MACHINE
•TOOLS &
MEASURING INSTRUMENT
•SUPPORTING DATA
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
CompetencyCompetency
HOW TO DETERMINE COMPETENCYIN MAINTENANCE MECHANIC TECHNOLOGY ?
COMPETENCY IN MAINTENANCE MECHANIC TECHNOLOGY BASED ON INDUSTRY NEEDED AND DEMAND
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
321
CompetencyCompetencyINDUSTRY
NEEDED
PRODUCTION ORDER
TRAININGORDER
ENGINEERINGORDER
CONSULTATIONORDER
DATA FROMAPPRENTICES
LEVEL OF STUDENTCOMPETENCY
PERIOD OF TIME
MINIMUMINDUSTRY NEEDED
1. LOWER THAN INDUSTRY NEEDED2. AGREE WITH INDUSTRY NEEDED3. HIGHER THAN INDUSTRY NEEDED
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
MECHANICAL DRIVE ALIGNMENT (12 %)
CompetencyCompetency
TRAININGORDER
SEAL MOUNTING & DISMOUNTING (1.2 %)
BEARING MOUNTING & DISMOUNTING (13.2 %)
LUBRICANT & LUBRICATION (10.8 %)
HAND SCRAPING (1.8 %)
MAINTENANCE MANAGEMENT (12 %)
MACHINE TOOLS GEOMETRICAL CHECK (7.8 %)
MECHANICAL COMPONENT REPAIR (9 %)
ARC, GAS & SPECIAL WELDING (21.6 %)
BASED ONMODULAR TRAININGDURING 10 YEARS (UNTIL FEBRUARY 2001) :•167 PACKET OF TRAINING•14 SUBJECT OF MODULAR TRAINING
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
CompetencyCompetency
PRODUCTORDER
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
CompetencyCompetency
ENGINEERINGORDER
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
CompetencyCompetency
ENGINEERINGORDER
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Subject in ”PBE” ImplementationSubject in ”PBE” Implementation
MAINTENANCE MAINTENANCE MECHANIC MECHANIC TECHNOLOGYTECHNOLOGY
MECHANICAL DRIVE ALIGNMENT (1 WEEK)MECHANICAL DRIVE ALIGNMENT (1 WEEK)
BEARING MOUNTING & DISMOUNTING (1 WEEK)BEARING MOUNTING & DISMOUNTING (1 WEEK)
HAND SCRAPING (1 WEEK)HAND SCRAPING (1 WEEK)
PUMP & COMPRESSOR INSTALLATION (1 WEEK)PUMP & COMPRESSOR INSTALLATION (1 WEEK)
LUBRICATE & LUBRICATION (0.5 WEEK)LUBRICATE & LUBRICATION (0.5 WEEK)
MAINTENANCE WORK / OVERHAUL (4 WEEKS)MAINTENANCE WORK / OVERHAUL (4 WEEKS)
PREVENTIVE MAINTENANCE / ME & FO (8 WEEKS)PREVENTIVE MAINTENANCE / ME & FO (8 WEEKS)
MACHINE ASSEMBLY & DISASSEMBLY (1 WEEK)MACHINE ASSEMBLY & DISASSEMBLY (1 WEEK)
MILLING & TURNING (6 WEEKS)MILLING & TURNING (6 WEEKS)
MACHINE MAKING (4 WEEKS)MACHINE MAKING (4 WEEKS)
VIBRATION ANALYSIS (0.5 WEEK)VIBRATION ANALYSIS (0.5 WEEK)
SPARE PART COMPONENT MAKING (4 WEEKS)SPARE PART COMPONENT MAKING (4 WEEKS)
PRODUCTION PLANNING & CONTROL (2 WEEKS)PRODUCTION PLANNING & CONTROL (2 WEEKS)
ALL AROUND PRODUCTION (3 WEEKS)ALL AROUND PRODUCTION (3 WEEKS)
FABRICATION (3 WEEKS)FABRICATION (3 WEEKS)
ELECTRICAL INSTALLATION (2 WEEKS)ELECTRICAL INSTALLATION (2 WEEKS)
SUBJECT FOR ALL STUDENT IN ONE YEAR (42 WEEKS)
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
CompetencyCompetencyInstructions:
Delete sample document icon and replace with working document icons as follows:
• Create document in Word.• Return to PowerPoint.
• From Insert Menu, select Object… • Click “Create from File” • Locate File name in “File” box• Make sure “Display as Icon” is checked.• Click OK
• Select icon• From Slide Show Menu, Select Action
Settings.• Click “Object Action” and select “Edit”• Click OK
DATA FROM APPRENTICES
MAINTENANCE SUBJECT SKILL APPLICATION (60.9 %)
PREVENTIVE MAINTENANCE PLANNING SYSTEM(26.1 %)
CONSTRUCTION DESIGN(7.2 %)
SPARE PART MAKING & MANAGEMENT (5.8 %)
BASED ON APPRENTICESDURING 1994 - 1997 :•67 JOURNAL OF APPRENTICES•20 - 50 KIND OF INDUSTRY
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
CompetencyCompetencySUPPORTING
DATAF
AB
RIC
AT
ION
(8
8.2%
)
BASED ONKIND OF ORDERDURING 1997 - 2000 R
EP
AIR
, O
VE
RH
AU
L &
M
AK
ING
M
AC
HIN
ES
(11.
8 %
)
FA
BR
ICA
TIO
N
(70%
)
RE
PA
IR,
OV
ER
HA
UL
&
MA
KIN
G
MA
CH
INE
S(3
0 %
)
FA
BR
ICA
TIO
N
(31.
6%)
RE
PA
IR,
OV
ER
HA
UL
&
MA
KIN
G
MA
CH
INE
S(6
8.4
%)
FA
BR
ICA
TIO
N
(4.8
%)
RE
PA
IR,
OV
ER
HA
UL
&
MA
KIN
G
MA
CH
INE
S(9
5.2
%)
1997 1998 1999 2000
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
SubjectSubjectGENERAL SUBJECT
BASIC ENGINEERING SUBJECT
NO SUBJECT
T P T P T P T P T P T P
1 RELLIGION 1 1
2 PANCASILA (STATE OF PHILOSOPHY) 2 2
3 NATIONAL RELIANCE
SUB TOTAL 2 0 2 0 1 0 1 0 0 0 0 0
4TH SEM. 5TH SEM. 6TH SEM.
GENERAL SUBJECT
1ST SEM. 2ND SEM. 3TH SEM.
NO SUBJECT
T P T P T P T P T P T P
4 MATHEMATICS 2 2
5 PHYSICS 1 1 1
6 SAFETY MEASURED 1 1
7 BASIC MATERIAL SCIENCE 1 1 1
8 BASIC MANUFACTURING PROCESSES 1 1 1 1
9 TECHNICAL DRAWING 1 1 1 1
10 COMPUTER PROGRAMMING 1 1
11 ENGLISH 1 1
12 BASIC ELECTRICAL CIRCUIT 1 1
13 REPORT WRITING 1 1
14 QUALITY MANAGEMENT 1 1
15 SUPERVISION 1 1
16 PROJECT WORK 2 2
SUB TOTAL 8 3 7 3 2 1 2 0 2 0 5 3
4TH SEM. 5THSEM. 6TH SEM.
BASIC ENGINEERING SUBJECT
1ST SEM. 2ND SEM. 3TH SEM.
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
SubjectSubject
ENGINEERINGSUBJECT
NO SUBJECT
T P T P T P T P T P T P
17 MACHINE ELEMENT 1 1 1 1
18 MATERIAL HANDLING & INSPECTION 1 1 1
19 WELDING AND SHEET METAL 1 1
20 ADVANCED MANUFACTURING PROCESSES 3 3 1 1 1 2
21 INTRODUCTION TO MANUFACTURING SYSTEM 1 1
22 PNEUMATICS AND HYDRAULICS 1 1 1
23 ADVANCED MATERIAL SCIENCE 1 1
24 ENGINEERING MECHANICS 1 1
25 STRENGTH OF MATERIALS 1 1
26 TECHNICAL MATHEMATICS 1 1
27 CAD - CAM - CNC 1 2
28 PRODUCTION PLANNING 1 1 1
29 CTS - NC - CNC 1 1
30 PRODUCTION AND INDUSTRIAL PRACTISE 3 2
31 PRODUCTION WORK 2 3
32 PLC (PROGRAMMABLE LOGIC CONTROLLER) 1 1
33 APPLIED ELECTRICITY 1 1
34 MECHANIC CONSTRUCTION 1 1
35 MAINTENANCE MANAGEMENT 2 1
36 MACHINE MAINTENANCE 1 2 1 2
37 MACHINE REPAIR 1 2 1 2
38 MACHINE BUILDING 1 1
39 SPARE PART MAKING 1 1SUB TOTAL 2 5 3 5 9 7 9 8 9 8 7 6
TOTAL SCUS 12 8 12 8 12 8 12 8 11 8 12 9
5TH SEM. 6THSEM.
ENGINEERING SUBJECT
1ST SEM. 2ND SEM. 3TH SEM. 4TH SEM.
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementation
IMPLEMENTATION OF MAINTENANCESUBJECT
MECHANICAL DRIVE ALIGNMENT
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationIMPLEMENTATION OF MAINTENANCE SUBJECT
BEARING MOUNTING &DISMOUNTING
HAND SCRAPING
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationIMPLEMENTATION OF MAINTENANCE SUBJECT
MACHINE ASSEMBLY & DISASSEMBLY(INCLUDING GEOMETRICAL INSPECTION)
HAND TOOLS
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationIMPLEMENTATION OF MAINTENANCE SUBJECT
PUMP & COMPRESSOR INSTALLATION
LUBRICANT & LUBRICATION
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementation IMPLEMENTATION OF MAINTENANCE SUBJECT
MILLING PRODUCTION
TURNING PRODUCTION
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationInstructions:
Delete sample document icon and replace with working document icons as follows:
• Create document in Word.• Return to PowerPoint.
• From Insert Menu, select Object… • Click “Create from File” • Locate File name in “File” box• Make sure “Display as Icon” is checked.• Click OK
• Select icon• From Slide Show Menu, Select Action
Settings.• Click “Object Action” and select “Edit”• Click OK
IMPLEMENTATION OF MAINTENANCE SUBJECT
PREVENTIVE MAINTENANCE
MAINTENANCE & REPAIR /OVERHAUL
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementation IMPLEMENTATION OF MAINTENANCE SUBJECT
MACHINE MAKING
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementation IMPLEMENTATION OF MAINTENANCE SUBJECT
FABRICATION(EXAMPLE: ARC WELDING PROCESS)
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementation IMPLEMENTATION OF MAINTENANCE SUBJECT
FABRICATION(EXAMPLE: SHEET METAL PROCESS)
HEAT TREATMENT
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationSCHEDULE FOR MAINTENANCE SUBJECT(1 YEAR = 42 WEEKS)FOR 26 STUDENT
COIN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
351 PSC MW FR PPC BU BA PR PM FK pms MF PSC HS FR MW BU bpm MF PM pms FK
COIN 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42351 PSC MW FR PPC BU BA PR PM FK pms MF PSC HS FR MW BU bpm MF PM pms FK
PSC BA
MW PR
FR PM
BU FK
PPC PPC
HS pms
bpm EI
5TH SEMESTER
6TH SEMESTER
: SPARE PART MAKING
: MAINTENANCE WORK
: BEARING & ALIGNMENT
: ALL AROUND PRODUCTION
: ELECTRICAL INSTALATION: MACHINE ASSEMBLY & DISASSEMBLY
:PREVENTIVE MAINTENANCE
: FABRICATION
: MAINTENANCE FOUNDRY
: HAND SCRAPING : MACHINE MAKING
: MILLING PRODUCTION
: TURNING PRODUCTION
: PRODUCT. PLANNING & CONT.
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationLOAD INSTRUCTOR (1 YEAR = 42 WEEKS)FOR 26 STUDENT
19 MG/ 4
(INCO)
18 MG (S1)
PT
(TK1)
PEM
(6MED)
PEM
(6MED)
PR
(STM)
PR
(STM)
PT
(TK1)
MG
(INCO)
MG (S1)
MG (S1)
MG
(INCO)
MG
(INCO)
25 26
WEEK CALENDAR PROGRAM
34 35 36 37 38 39 4022 23 24 41 42
PT
(TK1)
16 PT
(TK1)MG (S1)
15 MG
(INCO)
PT
(TK1)
PT
(TK1)
14 MG
(INCO)
PT
(TK1)
PT
(TK1)MG (S1)
13 MG
(INCO)
PT
(TK1)
PT
(TK1)MG (S1)
PT
(TK1)MG (S1)
12 MG
(INCO)
PEM
(6MEC)
MG
(INCO)
PEM
(6MED)
MG (S1) MG (S1)MG
(INCO)
MG
(INCO)
PT
(TK1)
PT
(TK1)
11 PEM
(6MEC)
PEM
(6MED)
MG (S1)
MG
(INCO)
MG
(INCO)
MG
(INCO)
MG
(INCO)
PT
(TK1)
PT
(TK1)
10 PEM
(6MEC)
PT
(TK1)
PT
(TK1)
PEM
(6MED)
PT
(TK1)
PT
(TK1)
9 PEM
(6MEC)
PT
(TK1)
PT
(TK1)
PEM
(6MED)MG (S1) MG (S1)
PT
(TK1)
PT
(TK1)
8 PT
(TK1)
PSC
(6MED)
PEM
(6MED)
PEM
(6MEC)
PEM
(6MEC)
PR
(STM)
PR
(STM)
PSC
(6MED)
PEM
(6MED)
7 PT
(TK1)
PR
(STM)
MG
(INCO)
PSC
(6MED)
PEM
(6MED)
PEM
(6MEC)MG (S1)
PEM
(6MEC)
PEM
(6MED)
PR
(STM)
PR
(STM)
PSC
(6MED)
PEM
(6MED)
MG
(INCO)
PEM
(6MEC)
PEM
(6MED)
PT
(TK1)
PT
(TK1)
MG (S1)
6 PT
(TK1)
PT
(TK1)
PSC
(6MED)
PT
(TK1)
PEM
(6MED)
PEM
(6MEC)
PSC
(6MED)
PEM
(6MED)
PT
(TK1)
PT
(TK1)
5 PT
(TK1)
PT
(TK1)MG (S1)
PSC
(6MED)
PT
(TK1)
PEM
(6MED)
PEM
(6MEC)
PEM
(6MEC)MG (S1) MG (S1)
PEM
(6MED)
PT
(TK1)
PT
(TK1)
PT
(TK1)
PSC
(6MED)
PT
(TK1)
4 PSC
(6MED)
PR
(STM)
PSC
(6MEC)
PSC
(6MEC)
PSC
(6MED)
PSC
(6MEC)
PSC
(6MEC)
PSC
(6MED)
MG (S1) MG (S1)
PR
(STM)
PR
(STM)
PSC
(6MED)
PEM
(6MED)
PSC
(6MED)
PEM
(6MEC)
PEM
(6MEC)
PEM
(6MEC)
PSC
(6MEC)MG (S1)
PSC
(6MEC)
PSC
(6MED)
PSC
(6MEC)
PSC
(6MEC)3 PSC
(6MED)
PT
(TK1)
PSC
(6MEC)
PEM
(6MED)
PSC
(6MED)
PEM
(6MEC)
PEM
(6MED)
PEM
(6MEC)
PEM
(6MEC)
PSC
(6MEC)
PT
(TK1)MG (S1)
PEM
(6MED)
2 PSC
(6MED)
PT
(TK1)
PSC
(6MEC)
PSC
(6MEC)
PSC
(6MED)
PSC
(6MEC)
PT
(TK1)
PT
(TK1)
PSC
(6MEC)
PT
(TK1)
PSC
(6MED)
PEM
(6MEC)
PEM
(6MEC)
PT
(TK1)
PSC
(6MEC)
PT
(TK1)
PEM
(6MED)
PSC
(6MED)
PEM
(6MEC)
PEM
(6MED)
1 PSC
(6MED)
PSC
(6MEC)
PT
(TK1)
PSC
(6MEC)
PSC
(6MEC)
PSC
(6MED)
PSC
(6MEC)
PT
(TK1)
PT
(TK1)
PSC
(6MEC)
PT
(TK1)
PSC
(6MED)
PEM
(6MEC)
PEM
(6MEC)
PT
(TK1)
PSC
(6MEC)
PT
(TK1)
PEM
(6MED)
PSC
(6MED)
PEM
(6MEC)
PEM
(6MED)TOTAL AVE.
15 12 9 22 11 11 11 3 9 3 133 16 5 13
27 28 29 30 31 32 33
7 202 9,62NUMBER OF STUDENTS
4 5
17
PR
(STM)
PT
(TK1)
PSC
(6MEC)
PSC
(6MEC)
PSC
(6MEC)
14 79
FOR EXAMPLE:A INSTRUCTOR
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationINSTRUCTOR AT MAINTENANCE MECHANICTECHNOLOGY
DUDDY ARISANDI, S.T.(HEAD OF MAINTENANCE MECHANIC TECHNOLOGY)
DADI KUSNADI(INSTRUCTOR)
ADE PURNAMA(INSTRUCTOR)
ANDI NOVIANDI(INSTRUCTOR)
MUHAMMAD SADIYO(INSTRUCTOR)
IYAN PURNAMA(INSTRUCTOR)
•ARC WELDING
•FABRICATION
(PAINTING)
•MACHINE
MAKING
•HEAT TREATMENT
•FABRICATION
(GAS WELDING &
SHEET METAL)
•MACHINE MAKING
•SPARE PART MAKING
•MACHINE MAKING
•PRODUCTION
•PREVENTIVE
MAINTENANCE
•PUMP INSTALLATION
•INDUSTRIAL
TRAINER
•OVERHAUL
•MACHINE MAKING
•BEARING MOUNTING & DISMOUNTING
•MECHANICAL DRIVE ALIGNMENT
•MACHINE ASSEMBLY & DISASSEMBLY
•TESTING MACHINE TOOLS
•HAND SCRAPING
•MACHINE MAKING
•INDUSTRIAL TRAINER
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationPRACTICAL EXAMPLE :
MECHANICAL DRIVE ALIGNMENT SUBJECT
STUDENT
INSTRUCTOR
MODULE
TEACHING AID
MEASURING TOOLS
SKILL,
QUALITY BASED ON INDUSTRYCOMPETENCY
Next
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
Previous
ImplementationImplementationPRACTICAL EXAMPLE :MECHANICAL DRIVE ALIGNMENT SUBJECT
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSI INDUSTRI VSPROGRAM STUDIPerawatan dan perbaikan Mesin
Astra Honda Motor (Jig & Fixture)
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSIProgram StudyPerawatan dan perbaikan Mesin
PT SIERAD Produce (Blade)
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSIProgram StudyPerawatan dan perbaikan Mesin
Siemen Cable Optic (Colouring machine)
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSIProgram StudyPerawatan dan perbaikan Mesin
MetaAbaca (Filipina)
Roller Auning (Home industry)
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSIProgram StudyPerawatan dan perbaikan Mesin
Paper excentric Machin (Siemen Cable Optic)
Pison Agung (Oil Industry)
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSIProgram StudyPerawatan dan perbaikan Mesin
Disc Brake (Nusa Toyotetsu Mfg)
Box Moulding
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSIProgram StudyPerawatan dan perbaikan Mesin
Measuring Fixture (Yamaha Motor) Plug Moulding (PT Indoniles)
PREPARE BY DUDDY ARISANDI, S.T. (JULY'01)
KONDISI DUNIA INDUSTRIKONDISI DUNIA INDUSTRI
KOMPETENSIProgram StudyPerawatan dan perbaikan Mesin
Predictive Maintenance (Polman-Bdg) Rip Saw (Polman-Bdg)
Piccolo (Polman-Bdg)