POWER PLANTS IN BANGLADESH
REPRESENTED BY:Contact information:
Mr Christopher Hess-WęgrzeckiM: +48 790 644 717 (English&German) E: [email protected]: hess-chris www.hessbusinessconsulting.info
General InformationThe Corporation is implementing a three 108 MW HFO(Heavy Fuel Oil) Fired Power Plants in Bangladesh based on proven Germany's technology (MAN Generators). The Corporation has guaranteed Purchase Agreement for 15 years at fixed rate signed by the Government. Moreover, the Purchase Agreement between the Government and the Corporation commit the Government to pay a monthly capacity payment even in no power purchase. Capacity payment is adequate to service debt.
Working CapitalRevolving loan of $ 20 M will be needed during operational period as working capital finance from commercial lenders to purchase imported fuel. The fuel payment will be made by Government every 45 days.
Loan SecurityProject's assets and land can be mortgaged. The Government's payment can be made directly to Lender or associated financial institution with Lender.
Structure of Investment Outlays
Owner's Equity:-Land and Land Development $ 15.31 M-Local Assets $ 13 M Debt Financing:- Cost of Imported Plant, Installation & Errection (EPC Cost) $ 67.87 M including IDCP (Intrest During Construction Period)--------------------------------------------------------------------------------------- Total Project Cost $ 96.18 M
Analysis of Project Profitability
Average Operating Profit to Revenue 14.5%Return on Investment (Project ROI) 17.4%Internal Rate of Return (IRR) 16.5%Net Present Value (NPV) $100.6 MProfitability Index (PI) 2.05Payback Period 6.202 YearsAverage 15 years DSCR 2.64
Tax Free-ZoneThe Corporation is to be established under Economic Zone and it is tax exempted up to 10 (Ten) years from the date of commencement of commercial operation.
There is no cost of CO2 emissions as it is below normal range.
Working Capital Finance Requirement
Revolving loan of USD 20.00 million will be needed during operational period as workingcapital finance from commercial lenders.
14.460%6.202 Years
16.467%USD 100.664
17.435%2.058
Average Operating Profit to RevenuePayback PeriodInternal Rate of Return (IRR)Net Present Value (NPV) in millionsReturn on Investment (Project ROI)Profitability Index (PI)Average 15 years DSCR 2.645
Ratio
Projected Balance Sheet in USD million
Year‐0 Year‐1 Year‐2 Year‐3 Year‐4 Year‐5 Year‐6 Year‐7 Year‐8 Year‐9 Year‐10 Year‐11 Year‐12 Year‐13 Year‐14 Year‐15
13.718 15.090 16.599 18.259 20.084 22.093 24.302 26.732 29.406 32.346 35.581 39.139 43.053 47.358 52.094 57.303
1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594 1.594
AssetsNon ‐ Current Assets Land CostLand Development Cost Ammortization
‐ (0.072) (0.145) (0.217) (0.290) (0.362) (0.435) (0.507) (0.580) (0.652) (0.725) (0.797) (0.870) (0.942) (1.015) (1.087)
1.594 1.522 1.449 1.377 1.305 1.232 1.160 1.087 1.015 0.942 0.870 0.797 0.725 0.652 0.580 0.507
79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470 79.470
‐
(2.940) (5.879) (8.819) (11.758) (14.698) (17.637) (20.577) (23.516) (26.456) (29.395) (32.335) (35.274) (38.214) (41.154) (44.093)
Property, Plant & Equipment : At Cost Accumulated Depreciation
Net Property, Plant & Equipment 79.470 76.530 73.591 70.651 67.712 64.772 61.833 58.893 55.954 53.014 50.075 47.135 44.195 41.256 38.316 35.377
Net Fixed Assets 94.782 93.142 91.639 90.287 89.101 88.097 87.294 86.713 86.374 86.302 86.525 87.071 87.973 89.266 90.990 93.187
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
Intangible Assets Unallocated Expenditure Total Intangible Assets
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
Total Non‐Current Assets 94.782 93.142 91.639 90.287 89.101 88.097 87.294 86.713 86.374 86.302 86.525 87.071 87.973 89.266 90.990 93.187
Current Assets
Accounts Receivable ‐
6.409 6.580 6.756 6.939 7.126 7.320 7.518 7.723 7.933 8.150 8.374 8.604 8.839 9.081 9.336
Margin for PSD 0.209 ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐Cash & Bank Balances
‐ 12.194 23.207 28.501 33.697 37.321 46.343 48.634 60.634 61.140 69.429 89.701 100.801 115.970 136.141 153.360
Total Current Assets 0.209 18.602 29.787 35.257 40.636 44.447 53.663 56.152 68.357 69.073 77.578 98.075 109.404 124.809 145.222 162.696
Total Assets 94.992 111.744 121.426 125.544 129.737 132.545 140.957 142.865 154.731 155.376 164.103 185.146 197.377 214.075 236.212 255.883
Equity and Liabilities
27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120 27.120
‐
1.372 2.881 4.541 6.367 8.375 10.584 13.014 15.688 18.628 21.863 25.421 29.335 33.640 38.376 43.585
‐
9.714 17.080 24.935 33.512 42.824 52.915 63.800 75.526 88.112 101.572 115.888 130.733 145.898 161.382 177.240
Shareholders' Equity Share Capital
Revaluation Reserve of Land Retained Earnings
Total Equity 27.120 38.206 47.081 56.596 66.998 78.319 90.619 103.934 118.334 133.860 150.555 168.429 187.188 206.658 226.878 247.946
10.625 10.090 9.114 8.078 6.979 5.812 4.574 3.260 1.865 0.384 (0.000) ‐
‐
‐
‐
‐ 57.246 58.105 59.474 54.137 48.473 42.462 36.081 29.310 22.122 14.494 6.397 (0.000)
‐ ‐
‐
‐
LiabilitiesNon ‐ Current Liabilities Foreign Loan ‐ 01
Foreign Loan ‐ 02
Total Non‐Current Liabilities 67.871 68.195 68.588 62.216 55.452 48.274 40.655 32.569 23.987 14.878 6.397 (0.000) ‐
‐
‐
‐
‐
5.344 5.758 6.733 7.286 5.952 9.683 6.361 12.410 6.638 7.151 16.717 10.189 7.416 9.333 7.937
Current Liabilities Accounts Payable & Accruals Total Current Liabilities
‐ 5.344 5.758 6.733 7.286 5.952 9.683 6.361 12.410 6.638 7.151 16.717 10.189 7.416 9.333 7.937
Total Liabilities 67.871 73.539 74.345 68.948 62.738 54.226 50.338 38.930 36.396 21.516 13.548 16.717 10.189 7.416 9.333 7.937
Total Equity and Liabilities 94.992 111.744 121.426 125.544 129.737 132.545 140.957 142.865 154.731 155.376 164.103 185.146 197.377 214.075 236.212 255.883
ParticularsAmount in USD (m)
Projected Income Statement in USD million
Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 Year-10 Year-11 Year-12 Year-13 Year-14 Year-15 TotalParticulars
Operating Revenuea) Capacity Charge 14.201 14.621 15.056 15.521 15.988 16.487 16.989 17.525 18.065 18.624 19.221 19.824 20.432 21.062 21.773 265.389
b) Fuel Charges (Energy Charges) 60.646 62.162 63.716 65.309 66.942 68.616 70.331 72.089 73.891 75.739 77.632 79.573 81.562 83.601 85.691 1,087.503
c) O&M Charges (Energy Charges) 2.057 2.178 2.305 2.440 2.583 2.734 2.894 3.064 3.243 3.433 3.634 3.846 4.071 4.310 4.562 47.353
76.904 78.961 81.078 83.271 85.513 87.837 90.214 92.678 95.199 97.795 100.487 103.243 106.065 108.973 112.026 1,400.245Total Tariff
Other Income (If any) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total inflow 76.904 78.961 81.078 83.271 85.513 87.837 90.214 92.678 95.199 97.795 100.487 103.243 106.065 108.973 112.026 1,400.245
(59.243) (60.724) (62.242) (63.799) (65.393) (67.028) (68.704) (70.422) (72.182) (73.987) (75.836) (77.732) (79.676) (81.667) (83.709) (1,062.346)
(0.617) (0.650) (0.686) (0.723) (0.763) (0.806) (0.852) (0.900) (0.952) (1.006) (1.065) (1.127) (1.194) (1.264) (1.340) (13.945)
Operating ExpensesFuel Cost
Fixed O&M Expenses
Variable O&M Expenses (2.825) (3.059) (3.309) (3.577) (3.865) (4.172) (4.502) (4.854) (5.231) (5.634) (6.065) (6.526) (7.019) (7.545) (8.108) (76.292)
Total Expenses (62.685) (64.433) (66.237) (68.099) (70.022) (72.007) (74.057) (76.176) (78.365) (80.627) (82.967) (85.386) (87.888) (90.477) (93.156) (1,152.583)
14.219 14.528 14.841 15.171 15.492 15.830 16.157 16.502 16.834 17.168 17.520 17.857 18.177 18.496 18.870 247.662
(3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (3.012) (45.180)
EBITD
Less : Depreciation
EBIT / Operating Income 11.207 11.516 11.829 12.159 12.480 12.818 13.145 13.490 13.822 14.156 14.508 14.845 15.165 15.484 15.858 202.482
(0.634) (0.584) (0.524) (0.460) (0.393) (0.321) (0.245) (0.165) (0.079) (0.006) ‐ ‐ ‐ ‐ ‐ (3.411)
(0.859) (3.566) (3.450) (3.122) (2.775) (2.406) (2.014) (1.599) (1.158) (0.690) (0.193) ‐ ‐ ‐ ‐ (21.831)
Less : Interest (Foreign Loan ‐ 01)
Less : Interest (Foreign Loan ‐ 02)
Total Interest (1.493) (4.149) (3.974) (3.583) (3.168) (2.727) (2.260) (1.763) (1.237) (0.695) (0.193) ‐ ‐ ‐ ‐ (25.242)
EBT 9.714 7.367 7.855 8.577 9.312 10.091 10.885 11.726 12.585 13.460 14.316 14.845 15.165 15.484 15.858 177.240
Less : Income Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
EAT 9.714 7.367 7.855 8.577 9.312 10.091 10.885 11.726 12.585 13.460 14.316 14.845 15.165 15.484 15.858 177.240
‐ 9.714 17.080 24.935 33.512 42.824 52.915 63.800 75.526 88.112 101.572 115.888 130.733 145.898 161.382 ‐Last Year's Retained Earnings
Retained Earnings 9.714 17.080 24.935 33.512 42.824 52.915 63.800 75.526 88.112 101.572 115.888 130.733 145.898 161.382 177.240 177.240
Projected Cash Flow Statement in USD Million`
Year‐0 Year‐1 Year‐2 Year‐3 Year‐4 Year‐5 Year‐6 Year‐7 Year‐8 Year‐9 Year‐10 Year‐11 Year‐12 Year‐13 Year‐14 Year‐15 Total
‐
Cash Flow from Operating Activities
Received from PDB
Less : Payment for O & M Expenses ‐
70.495 78.790 80.901 83.088 85.326 87.643 90.016 92.472 94.989 97.579 100.263 103.014 105.830 108.731 111.772 1,390.910
(57.341) (64.020) (65.262) (67.546) (71.356) (68.275) (77.379) (70.127) (84.136) (80.114) (73.401) (91.914) (90.661) (88.560) (94.552) (1,144.646)
Cash Flow from Operating Activities ‐ 13.154 14.770 15.639 15.542 13.970 19.368 12.637 22.345 10.853 17.465 26.862 11.100 15.169 20.171 17.219 246.264
(66.470) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ (66.470)
(12.536) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ (12.536)
(0.209) 0.209 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Cash Flow from Investing Activities
Payment to EPC Contractor
Payment for Local Fixed Assets
Margin Performance Security Deposit
Cash Flow from Investing Activities (79.215) 0.209 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ (79.006)
11.808 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11.808
10.161 (1.170) (1.560) (1.560) (1.560) (1.560) (1.560) (1.560) (1.560) (1.560) (0.390) ‐ ‐ ‐ ‐ ‐ (3.875)
Cash Flow from Financing Activities
Sponsors' Equity
Foreign Loan Installment ‐ 01
Foreign Loan Installment ‐ 02 57.246 ‐ ‐ ‐ ‐ (21.831)
79.215
‐ (2.197) (8.786) (8.786) (8.786) (8.786) (8.786) (8.786) (8.786) (8.786) (6.590)
(1.170) (3.756) (10.346) (10.346) (10.346) (10.346) (10.346) (10.346) (10.346) (9.176) (6.590) ‐ ‐ ‐ ‐ (13.898)
‐ 12.194 11.014 5.293 5.196 3.625 9.022 2.291 11.999 0.507 8.288 20.272 11.100 15.169 20.171 17.219 153.360
‐ ‐ 12.194 23.207 28.501 33.697 37.321 46.343 48.634 60.634 61.140 69.429 89.701 100.801 115.970 136.141 ‐
Net Cash Flow
Beginning Cash Balance
Ending Cash Balance ‐ 12.194 23.207 28.501 33.697 37.321 46.343 48.634 60.634 61.140 69.429 89.701 100.801 115.970 136.141 153.360 153.360
ParticularsAmonut in USD (mn)
Details of Local Expenditure
Company formation, Consultancy, Permits, Financing Fees etc.
0.50 0.01
0.13 0.002
1.60 0.021
2.60 0.033
0.03 0.000
0.10 0.001
0.91 0.012
0.10 0.001
0.25 0.003
0.25 0.003
0.25 0.003
0.25 0.003
0.08 0.001
0.15 0.002
0.13 0.002
Legal & Consultancy fees regarding Company formation & others
NOC from Environment
IEE (Initial Environmental Examination Report)
EIA (Environmental Impact Assessment Report)
Local Government (Union Parishads / Paurashava)
RAJUK Permission
BERC License
Dhaka WASA for Deep Tube well
NBR Permission for exemption from Duties and VAT on Imported Plant
NBR Permission for exemption from taxation on its income including all withholding taxes related di Statutory notification that the Lenders will be exempted from taxation on their income in Banglades Approval for construction of shoreline work, jetty, intake and outfall structures of once through coo NOC to build an exhaust stack and bypass stack at the site.
Approval of installations for boilers at the Facility
storage of petroleum products at or proximate to the Facility
Permission for fire safety and protection 0.12 0.002
7.43 0.10
Pre ‐ Operative Expenses
0.75 0.01
2.25 0.03
0.90 0.01
7.50 0.10
0.23 0.00
0.75 0.01
0.75 0.01
3.00 0.04
1.50 0.02
0.45 0.006
4.50 0.06
0.15 0.002
30.20 0.39
78.75 1.01
24.20 0.31
2.25 0.03
0.90 0.01
Entertainment
Motor Car Lease Rent ( 2 Cars)
Fuel & lubricant cost and R&M of vehicles (2 Cars)
Salary & Related Cost
Conveyance bill
Photocopy, printing and stationeries
Gift & donations including Calender etc
Electricity (site for EPC support) & site office
Security bill and expenses
Repairs & maintenance ‐ office
Tours and Travellings including Hotel (Local and Oversease)
Postage & courier including Comunication Expenses
PG commission & VAT
LC Commission and VAT
Marine & EAR insurance
Office rent
Repairs & maintenance ‐ site office
Micsellenious exp 3.00 0.04
162.03 2.08
BDT (mn) USD (mn)
BDT (mn) USD (mn)
Project Management , Feasibility Study, Financing Fees etc.
5.00 0.064
5.00 0.064
0.50 0.006
0.50 0.006
0.10 0.001
0.25 0.003
Project Management Consultanct (PMC) and Owners' Engineering (O.E)
Legal, Custom Clearance, Loan arrangement & financing fees etc.
Feasibility Study, Financial Model, Project Profile, Information Memorandum etc.
Documents Preparatioin
PPA, IA Review & Nagotiation
Credit Rating Fees
Consultancy fees for share Premium 0.50 0.006
11.85 0.15
BDT (mn) USD (mn)
132.80 1.70
‐ ‐
‐ ‐
50.00 0.64
60.00 0.77
‐ ‐
1.20 0.02
136.80 1.75
Local Logistics & Transportation
Cast In Situ Piling
Pile / BG Foundation
Transmission Line Setup
Bay Extension
Jetty Construction
Utilities for site works
Mobilization of O&M for Comissioning
Fuel and others related oil for test run 195.54 2.51
743.59 9.53
Contingency
Contingency 30.00 0.385
30.00 0.38
Transmission line, Civil works, O&M mobilization and Initial start‐up cost etc.BDT (mn) USD (mn)
BDT (mn) USD (mn)
Operation and Maintenance Cost
Particulars Year‐1 Year‐2 Year‐3 Year‐4 Year‐5 Year‐6 Year‐7 Year‐8
8343 8343 8343 8343 8343 8343 8343 8343 8343 8343 8343 8343 8343 8343 8343
9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37
7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817 7.817
Fuel Payment Calculation ‐ From BPDB
Heat Rate (KJ/KWh) ‐ as per PPA
HFO Price (USD/GJ) ‐ as per LOI
Fuel Cost (USC/KWh)
TOTAL FUEL COST (USD millions) ‐ BPDB 60.65 62.16 63.72 65.31 66.94 68.62 70.33 72.09 73.89 75.74 77.63 79.57 81.56 83.60 85.69
HFO Cost Calculation ‐ Variable Cost
8150 8150 8150 8150 8150 8150 8150 8150 8150 8150 8150 8150 8150 8150 8150
9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37 9.37
7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637 7.637
Heat Rate (KJ/KWh) ‐ as per EPC Contract
HFO Price (USD/GJ) ‐ as per LOI
Actual HFO Cost (USC/KWh)
TOTAL HFO COST (USD millions) 59.24 60.72 62.24 63.80 65.39 67.03 68.70 70.42 72.18 73.99 75.84 77.73 79.68 81.67 83.71
Fixed O&M
0.305 0.324 0.345 0.368 0.392 0.417 0.444 0.473 0.504 0.537 0.572 0.609 0.648 0.690 0.735
0.204 0.217 0.231 0.246 0.262 0.279 0.297 0.317 0.337 0.359 0.382 0.407 0.434 0.462 0.492
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
‐Manpower Cost
‐General and Admin Expenses
‐Plant Insurance
‐Licence Renewal Fees (BERC License)
‐Civil Maintenance 0.002 0.002 0.003 0.003 0.003 0.003 0.003 0.004 0.004 0.004 0.004 0.005 0.005 0.005 0.006
Total Fixed O&M 0.617 0.650 0.686 0.723 0.763 0.806 0.852 0.900 0.952 1.006 1.065 1.127 1.194 1.264 1.340
Variable O&M Cost (USD)
‐Var Maintenance (Spare Parts)
Total Foreign Var. O&M USD millions
1,313,134 1,448,592 1,594,400 1,751,258 1,919,911 2,101,153 2,295,825 2,504,822 2,729,097 2,969,659 3,227,584 3,504,013 3,800,159 4,117,309 4,456,831
1.313 1.449 1.594 1.751 1.920 2.101 2.296 2.505 2.729 2.970 3.228 3.504 3.800 4.117 4.457
Variable O&M Cost ‐ Local
1,472,354 1,568,057 1,669,981 1,778,529 1,894,134 2,017,252 2,148,374 2,288,018 2,436,739 2,595,127 2,763,811 2,943,458 3,134,783 3,338,544 3,555,549
29,110 31,002 33,017 35,164 37,449 39,883 42,476 45,237 48,177 51,309 54,644 58,196 61,978 66,007 70,297
‐Lube Oil
‐Water Treatment
‐others 10,334 11,006 11,721 12,483 13,294 14,159 15,079 16,059 17,103 18,215 19,399 20,659 22,002 23,432 24,956
Total Variable (local purchase) Cost (USD)
Total Variable (local purchase) Cost (USD Million)
1,511,798 1,610,065 1,714,719 1,826,176 1,944,877 2,071,294 2,205,929 2,349,314 2,502,019 2,664,651 2,837,853 3,022,313 3,218,764 3,427,983 3,650,802
1.512 1.610 1.715 1.826 1.945 2.071 2.206 2.349 2.502 2.665 2.838 3.022 3.219 3.428 3.651
TOTAL VAR. O&M COST (USD Million) 2.82 3.059 3.309 3.577 3.865 4.172 4.502 4.854 5.231 5.634 6.065 6.526 7.019 7.545 8.108
Assumption and Estimates
Technical Assumptions108 MW
108 MW
1000 MW
1000 kW
1,000,000 kW
6 Nos
18.55 MW
111.3 MW
0 Nos
0 MW
0 MW
111.3 MW
3.3 MW
108 MW
Net Capacity as per PPA (MW)
Available Capacity
1 GW
1 MW
1 GW
Number of Genset (Nos)
Net Capcity Per Engine (MW)
Actual Output of 13 Nos of Genset (a) (MW)
Number of Steam Turbine (Nos)
Net Capcity Per Steam Turbine (MW)
Actual Output of 2 Nos of Steam Turbine (b) (MW)
Total Actual OutPut (a+b) (MW)
Inhouse Consumption & System Loss (MW)
Net Capacity to be sold to BPDB (MW)
Initial Contract Period with BPDB 15 Years
Depreciation Assumptions
22 Years
15 Years
30.00%
0.00%
15 Years
0.00%
Estimated Useful life for Plant
Estimated Useful life for Euipment other than Plant
Salvage Value of Plant
Salvage Value of the Equipment Other than Plant
Estimated Useful life for Other Assets
Salvage Value of Other Assets
Depreciation Method Straight Line
Tarrf Calculation Data
8343
8150
9.8857
6.9308
9.37
Guaranteed Heat Rate (kJ/kWh) (PPA, Page ‐ 123)
Actual Heat Rate (KJ/KWh) (EPC Contract)
Levelized Tarrif Charge (US Cents / kWh) (Discount Factor ‐ 12%, USD 1 = BDT 7
Levelized Tarrif Charge (BDT / kWh) (Discount Factor ‐ 12%, USD 1 = BDT 70)
HFO Price (US Dollar / GJ) ( 1 USD = BDT 70) (LOI)
Plant Factor (As LOI) 80%
Legal Matters and Assumption
0.00%
0.00%
0.00%
Import Duties for Plant & Machineries
Advance Income Tax at Import Stage
Sales Tax (VAT on Sales)
Income Tax 0.00%
Financing Assumptions
6.00%
10.0 Years
1.0 Years
4
6.00%
10.0 Years
Local Financing ‐ 01:
Local Financing Cost
Total Local Financing Tenor
Grace Period for Local Financing
No. of Quarter in a year
Local Financing ‐ 02:
Local Financing Cost
Total Local Financing Tenor
Grace Period 1.0 Years
Other Assumptions
BDT 78.00
BDT 92.00
6.50%
2.50%
RoE (1 USD)
RoE (1 EURO)
Local Inflation
USD Inflation
Increase Land Value Per Year 10.00%
Assumption for NPV Calculation
Cost of Capital (Current Bank Deposit Rate) 6.00%
Other Assumptions
24
12
30
365
720
8760
1,000,000
14 Months
500
2,140,000
27,436
124
Total Hours in a day
Month in a Year
No. of days in a Month
No. of days in a year
Total Hours in a month
Total Hours in a year
1 Million
Number of Months to be taken for General & Admin Expenses including Bonus
Total Land in Decimals
Land Price per Decimals (BDT)
Land Price per Decimals (USD)
Land Development (BDT million)
Land Development (USD million) 1.594
ScenarioAnalysis
Base Case Scenario ‐ 01
Capacity utilization at 85%
Scenario ‐ 02
Capacity utilization at 90%
Variables
Capacity utilization 80.00% 85.00% 90.00%
Operational Data
Electricity Generation in GWh 756.86 804.17 851.47
Key figures (for the 15 years project period)
in USD million
1,400.25 1,471.17
1,197.76 1,268.93
202.48 202.25
1,542.10
1,340.09
202.01
Operating Revenue
Operating Expenses
Operating Income / EBIT (Earnings before Interests & Taxes)
EAT (Earnings after Tax) 177.24 177.00 176.77
100.66USD 100.61USD 100.56USD
16.467% 16.476% 16.484%
17.435% 17.418% 17.401%
Financial indicators/ratios of the project
NPV (Net Present Value) in BDT million
IRR (Internal Rate of Return)
ROI (Return on Investment)
PBP (Pay Back Period) 6.202 Years 6.190 Years 6.177 Years