Building Trust via Technical Outreach at a Complex Project: PG&E’s Chromium-6 Groundwater Remediation Program at Hinkley, CA 21 st International Petroleum Environmental Conference Presented by Dr. Ian A. Webster Project Navigator, Ltd. Brea, CA October 14-16, 2014 Houston, TX www. ProjectNavigator.com | www.SafetyMoment.org PROJECT NAVIGATOR, LTD.

PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Building Trust via Technical Outreach at a Complex Project: PG&E’s Chromium-6 Groundwater Remediation Program at Hinkley, CA21st International Petroleum Environmental Conference

Presented by

Dr. Ian A. WebsterProject Navigator, Ltd.Brea, CA

October 14-16, 2014Houston, TX

www. ProjectNavigator.com | www.SafetyMoment.org

PROJECT NAVIGATOR, LTD.

Page 2: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Explaining Solutions at a Technically Complex Project Where There is Very Low Trust.

2

PG&E’s Chromium-6 Groundwater Remediation Program in Hinkley, CA

Page 3: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Getting Situated: Drive 180 Miles North from Los Angeles into the California Mojave Desert…

3

Page 4: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

…Travel Half Way to Las Vegas…

4

Page 5: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

…and You Arrive in the Community of Hinkley…

5

Page 6: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Proposed Further Investigation

Proposed Further Investigation

…Where PG&E Continues to Investigate and Remediate a Chromium-6 Plume…

6

Page 7: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Unfortunately the Project has Notoriety.

7

Page 8: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Today, Well Beyond the Massive Settlements of the 90’s and 00’s, the Community is Very Active…

8

Page 9: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

…Plus Voicing Opinions of Other Perceived Impacts.

9

Page 10: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

PG&E has for many years acknowledged with genuine regret its responsibility for its chromium contamination in the Hinkley community.

PG&E is committed to working cooperatively with the Water Board to expeditiously clean up groundwater contamination resulting from PG&E’s historical operations at the Hinkley Compressor Station.

Recently, PG&E Has Decided to Act More Proactively…

”~ PG&E, 2012

10

Page 11: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

…and Key in the New Approach Was the Retention of an IRP Manager.

• IRP = Independent Review Panel Manager

• Mission is unbiased technical input, based on my professional judgment

11

Page 12: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

IRP Manager• Review and Interpretation• Professional Judgment• Relationships and Trust Development• Visualization of Data• Presentations• Communications

Water Board review and comment

Lahontan Water Board

MB’s of files, 1000’s pp of information

PG&E’s Hinkley Groundwater Remediation Team

CAC and Hinkley Community•32 Monthly Community Meetings•3 Community Open Houses•120 Weekly CAC Meetings•100 Major Reports Reviewed•Monthly Community Mailers•4 Community Workshops•200 days of office hours in Hinkley•Hired experts:

– EIR– Toxicologist– Facilitator

•1000's of Questions Answered•www.HinkleyGroundwater.com

The IRP Manager Reviews, Comments and Communicates with the Community…Builds Trust.

12

Page 13: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

PG&E Provided Office Space in the Community…

13

Page 14: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

4,000 ppb

N14

1Plume Investigation

2South End Treatment

3North End Treatment

4Systems for the School

5Background Study 2014-2018

6 “Mn Issue”

14

…and We Went About Explaining Below-Ground-Science to a Skeptical “Client-Base”.

14

Page 15: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Including: 1. In Situ Treatment for Highest Cr6 Levels, and…

Unsaturated Zone

Upper Aquifer

Lower Aquifer Confining Clay Layer “Blue Clay”

Lower Aquifer Sedimentary Deposits and Weathered Bedrock

Consolidated Bedrock

Cr+6 – impacted groundwater

Groundwater

Control Room

Pump PumpEthanol Tank

Water Tank

Injection Wells

Core of plumeCr+6

Cr+6 Cr+6

Cr+6

Cr+6

1. Ethanol is diluted with water and injected into the core of the Cr+6Plume

2. Ethanol enhances the biodegradation process in the subsurface

3. Cr+6 and Cr+3 conversion occurs though direct microbial reduction and for indirect chemical reduction by reduced Iron, Sulfur, and other metals

4. Cr+3 is removed from groundwater though precipitation of relatively insulated chromium hydroxide and iron-chromium hydroxide

Ethanol

Ethanol + ¤ +Cr+6 Cr+3

¤¤¤

¤¤

¤

MicrobesMicrobes

Microbes

Cr+6

Cr+6

Cr+6Cr+6

15

Page 16: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

…2. Agricultural Treatment for Low Chromium-6 Concentrations.

16

Page 17: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

But, Enter a Key Initiative: For 400 Homes Within the “1-Mile Affected Area,” PG&E Offers a Water Treatment System…or Home Purchase.

17

Page 18: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Result: 30 Ion Exchange-Reverse Osmosis Water Treatment Systems Installed, Thereby Decoupling Residents from the Plume, …But…

18

Page 19: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

…370 Owners Elect to Sell Their Property to PG&E.

19

Page 20: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

How to Technically Mediate in this Environment?…

20

Page 21: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Establish a Culture that “We’re All on a Learning Curve”…Community, PG&E & Water Board.

21

Und

erst

andi

ng

Time Invested

Page 22: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

A. Demonstrate “Data Transparency.”IRP Manager Receives All Data.

22

Page 23: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

B. Start the Technical Education Process with Community Leaders…A Charter Establishes the Community Advisory Committee (CAC).

23

Page 24: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

C. Encourage PG&E to Host Site Tours.

24

Page 25: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

D. Facilitate Meetings Between CAC, PG&E & Consulting Resources.

25

Page 26: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Attendance ranges from 80 to 120 people.

E. Host Monthly Technical Briefings at the Hinkley School.

26

Page 27: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

F. Operate www.HinkleyGroundwater.com

Screenshot of hinkleyground water.com

27

Page 28: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

G. Organize Community BBQs.

28

Page 29: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

So…Many Opportunities to Learn…However, Also Become “Confused/Distrustful” Because of Conflicting Opinions.

29

Page 30: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

As IRP Manager…A Strategic Adjustment.► Moved Away from Structured Talks. ► Greater Use of Physical Models.

30

Page 31: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

1. Scale Back to a “Higher Touch” Approach. Personalized Briefings. More Visuals; Less Formality. Use of Simulation Videos to Explain Groundwater and Cr6 Movement

31

Page 32: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

2. Simplify, Simplify, Simplify, the Message.

32

Page 33: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

3. Build Models for Each Technical Feature of the Project…

33

Page 34: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

…Including an Accurate 3-D Chromium-6 Plume for Use at Community Meetings.

34

Page 35: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

4. Use “Stations” with a Central Model.

35

Page 36: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

5. Use Project “Building Blocks” to Drive “Issue Stickiness”.

36

Page 37: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

6. Visualize Data.

Cr6 > 50 ppb37

Page 38: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

In Conclusion…Some Tips.

38

Page 39: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Use “Jobs-Like” Clarity.

39

Page 40: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Define Where Stakeholders are on the “S Curve” and Discuss their Perceptions.

40

Und

erst

andi

ng

Time Invested

Page 41: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Take-Aways

“Trust” is essential Slowly Replace “Lore” with “Facts” Explain the S-Curve Define Tipping Point(s) “Station-Style” Community Meetings Use 3-D Hard Models Accept “10-steps forward / 9-back” slow progress

41

Page 42: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Achievingprogressisalong,slow,clunky,diplomaticslog.

− Secretary of State John Kerry on an interview on CNN, February 5th, 2014

“”

42

Page 43: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

PG&E is Working Hard to Build Technical Trust and Recover from Negative Perceptions Generated by the Movie "Erin Brockovich... The IRP* Manager is Playing a Key Role.

43

NIGHTLINE: Hinkley Interview with PG&E Senior Vice President, Des Bell (Dec, 2011)

Erin Brockovich Movie Clip (2000)

* IRP = Independent Review Program (Manager).** The IRP Manager was selected by the Hinkley Community via a Community Advisory Committee (CAC). IRP Manager's role is to provide independent technical interpretation and advise the Community. The IRP Manager is funded by PG&E via an escrow account, further validating the IRP Manager's autonomy.

Different Perspectives

IRP Manager’s Technical Outreach Work has helped “Bridge the Gap” between Community and Media Perceptions and PG&E’s Commitment to a Solution

VS

The IRP Manager independently helps the Community understand PG&E's technical activities, and build "trust.” **

Page 44: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

Videos

44

NIGHTLINE: Hinkley Interview with Des Bell, PG&E

Erin Brockovich Movie Clip

Page 45: PROJECT NAVIGATOR, LTD. Building Trust via Technical ...€¦ · Groundwater Remediation Program at Hinkley, CA 21st International Petroleum Environmental Conference Presented by

IRP Manager• Review and Interpretation• Professional Judgment• Relationships and Trust Development• Visualization of Data• Presentations• Communications

Water Board review and comment

Lahontan Water Board

MB’s of files, 1000’s pp of information

PG&E’s Hinkley Groundwater Remediation Team

CAC and Hinkley Community• 24 Monthly Community Meetings• 3 Community Open Houses• 90 Weekly CAC Meetings• 35 Major Reports Reviewed• Monthly Community Mailers• 4 Community Workshops• 120 days of office hours in Hinkley• Hired experts:

– EIR– Toxicologist– Facilitator

• 1000's of Questions Answered• www.HinkleyGroundwater.com

The IRP Manager Reviews, Comments and Communicates with the Community…Builds Trust.

45