Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
PROJECTED COMPLETION DATE:12/19
LOCATION:Located west of the City of Santa Barbara.
Summary: The San Marcos Pass Project is critical due to its unique combination of fuel, topography and unique weather patterns. The project lies within the 1990 Painted Cave Fire footprint where 660 homes were destroyed during an especially significant sundowner wind event. The roadside maintenance and installation of fuel breaks, identified in the San Marcos Pass/Eastern Goleta Valley Mountainous Area Community Wildfire Protection Plan, are designed to improve access, evacuation routes, and community defensible space. The identified projects would reduce declining chaparral along the two fuel breaks and annual grasses and chaparral along the roadsides.
What communities or habitats will project protect? Goleta, Mission Canyon, Santa Barbara.
PROJECT NAME: SAN MARCOS PASSPROJECT NAME: PAINTED CAVE COMMUNITY DEFENSIBLE SPACE SIZE: 3,096 AC
RES
Program area: Fire PlanProject status: ActiveCEQA type: Categorical Exemption
San Marcos Pass Fuel ReductionCalMapper T Number:YYCASBCT400020 CalMapper ID: 3012-2015-FPL-001
44 Acres
5.59 Acres
24.49 Acres
8.05 Acres
San Marcos Pass Planned Treatment: 66.65 Acres
San Marcos Pass Fuel Reduction Treatment: 82.13 Acres
San Marcos Pass Fuel Reduction Project Boundary
25.15 Acres
41.51 Acres