26
STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 1 of 5) Project Name: Date Prepared: CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 Climate Zone: Conditioned Floor Area : Unconditioned Floor Area : General Information Building Type: Nonresidential High-Rise Residential Hotel/Motel Schools Relocatable Public Schools Conditioned Spaces Unconditioned Spaces Phase of Construction: New Construction Addition Alteration Method of Compliance: Complete Building Area Category Tailored LIGHTING COMPLIANCE DOCUMENTS (select yes for each document included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission. YES NO FORM TITLE NRCC-LIT-01-E Certificate of Compliance. All Pages required on plans for all submittals. NRCC-LIT-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals. NRCC-LIT-03-E Indoor Lighting Power Allowance NRCC-LIT-04-E Tailored Method Worksheets NRCC-LIT-05-E Line Voltage Track Lighting Worksheets Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces 1. Installed Lighting NRCC-LTI-01-E, page 4 Watts Installed Lighting NRCC-LTI-01-E, page 4 Watts + + 2. PORTABLE ONLY FOR OFFICES NRCC-LTI-01-E, page 3 + 3. Minus Lighting Control Credits NRCC-LTI-02-E, page 2 - Minus Lighting Control Credits NRCC-LTI-02-E, page 2 - 4. Adjusted Installed Lighting Power (row 1 plus row 2 minus row 3) = Adjusted Installed Lighting Power (row 1 minus row 3) = SELMA HYUNDAI 9-11-2015 13 5635 SF 1855 SF X X X X X X X X X 5997 0 0 5997 0 X 1354 1354

Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 1 of 5) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

Climate Zone: Conditioned Floor Area :

Unconditioned Floor Area :

General Information Building Type: �� Nonresidential �� High-Rise Residential �� Hotel/Motel �� Schools �� Relocatable Public Schools �� Conditioned Spaces �� Unconditioned Spaces

Phase of Construction: �� New Construction �� Addition �� Alteration

Method of Compliance: �� Complete Building �� Area Category �� Tailored

LIGHTING COMPLIANCE DOCUMENTS (select yes for each document included)

For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.

YES NO FORM TITLE

NRCC-LIT-01-E Certificate of Compliance. All Pages required on plans for all submittals.

NRCC-LIT-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals.

NRCC-LIT-03-E Indoor Lighting Power Allowance

NRCC-LIT-04-E Tailored Method Worksheets

NRCC-LIT-05-E Line Voltage Track Lighting Worksheets

Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance

Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces

1. Installed Lighting

NRCC-LTI-01-E, page 4

Watts Installed Lighting

NRCC-LTI-01-E, page 4

Watts

+ +

2. PORTABLE ONLY FOR OFFICES

NRCC-LTI-01-E, page 3 +

3. Minus Lighting Control Credits

NRCC-LTI-02-E, page 2 -

Minus Lighting Control Credits NRCC-LTI-02-E, page 2

-

4. Adjusted Installed Lighting Power

(row 1 plus row 2 minus row 3) =

Adjusted Installed Lighting Power (row 1 minus row 3)

=

SELMA HYUNDAI 9-11-2015

135635 SF

1855 SF

XX

X

X

X

X

X

X

X

5997

0

0

5997

0

X

1354

1354

Page 2: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 2 of 5) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

5. Complies ONLY if Installed ≤ Allowed Complies ONLY if Installed ≤ Allowed

6. Allowed Lighting Power

Conditioned NRCC-LTI-03-E, page 1

Allowed Lighting Power

Unconditioned NRCC-LTI-03-E, page 1

Declaration of Required Installation Certificates – Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.)

YES NO Form/Title

NRCI-LTI-01-E - Must be submitted for all buildings � Field Inspector

NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance.

� Field Inspector

NRCI-LTI-03-E - Must be submitted for a line-voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to energize only line-voltage track lighting, to be recognized for compliance.

� Field Inspector

NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a multipurpose room, or a theater to be recognized for compliance.

� Field Inspector

NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. � Field Inspector

NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance.

� Field Inspector

Declaration of Required Certificates of Acceptance – Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.)

YES NO Form/Title

NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. � Field Inspector

NRCA-LTI-03-A - Must be submitted for automatic daylight controls. � Field Inspector

NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. � Field Inspector

SELMA HYUNDAI 9-11-2015

5982 1784

X

X

X

X

X

X

X

X

X

Page 3: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 3 of 5) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: � CONDITIONED SPACE � UNCONDITIONED SPACE

A. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST � The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. � When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. � When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines � Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line-voltage track lighting is installed.

B. Installed Portable Luminaires in Offices – Exception to Section 140.6(a)

� This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form.

� This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office

� Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems.

Office Portable Luminaire Schedule

Office Installed Portable Luminaire Watts Per Square Foot

Accountable Watts

Office Location Field

Inspector A B C D E F G H I J

Complete Luminaire Description (i.e., LED, under cabinet, furniture mounted

direct/indirect) Watts per Luminaire

Num

ber of

Luminaires

Installed portable luminaire

watts in this office

(B x C )

Square feet

of this office Watts

per square

foot (D

If F ≤ 0.3, enter zero;

if F > 0.3,

(F-0.3)

E x G Identify Office area in which

these portable luminaires are installed

Pass

Fail

� �

� � � �

� �

� �

Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: Enter sum total of all pages into NRCC-

LTI-01-E; Page 1

SELMA HYUNDAI 9-11-2015

X

X

0

X

Page 4: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 4 of 5) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: � CONDITIONED SPACE � UNCONDITIONED SPACE

C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST

Luminaire Schedule Installed Watts Location Field Inspector 1 A B C D E F G H

Nam

e o

r

Item

Tag

Complete Luminaire Description (i.e, 3 lamp fluorescent troffer,

F32T8, one dimmable electronic ballast)

Watts per

Luminaire

How wattage was determined

Num

ber

Luminaires

Total Installed

Watts in this area

(C x E )

Primary Function area in which these luminaires are installed Pass Fail

CEC Default

from N

A8

According to

§130.0(c)

� � � �

� � � �

� � � � � � � �

� � � �

� � � � � � � �

� � � �

� � � �

INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into NRCC-LTI-01-E; Page 2

SELMA HYUNDAI 9-11-2015

A

B

C

D

F

2X4 recess troffer LED dimming ballast

4ft wraparound LED ballast

recess down LED dimming ballast

high bay LED dimming ballast

12 ft track light via 3A current limit

30

3

15

20

2

x

x

x

1080

29

18

192

360

5997

office

storage

toilet

showroom

showroom

5997

X

x

X

36

29

18

192

360

Page 5: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 5 of 5) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete.

Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA/ HERS Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance

(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of

Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance

documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the

enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

SELMA HYUNDAI 9-11-2015

JOHN CHONG, PE

JOHN CHONG, PE

JOHN CHONG ENGINEERING

JOHN CHONG ENGINEERING

2027 E. DECATURE AVE.

2027 E, DECATURE AVE. E 14419

FRESNO, CA 93720

FRESNO, CA 93720 (559) 325-9988

(559) 325-9988

9-11-2015

9-11-2015

Page 6: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 4 of 5) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: � CONDITIONED SPACE � UNCONDITIONED SPACE

C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST

Luminaire Schedule Installed Watts Location Field Inspector 1 A B C D E F G H

Nam

e o

r

Item

Tag

Complete Luminaire Description (i.e, 3 lamp fluorescent troffer,

F32T8, one dimmable electronic ballast)

Watts per

Luminaire

How wattage was determined

Num

ber

Luminaires

Total Installed

Watts in this area

(C x E )

Primary Function area in which these luminaires are installed Pass Fail

CEC Default

from N

A8

According to

§130.0(c)

� � � �

� � � �

� � � � � � � �

� � � �

� � � � � � � �

� � � �

� � � �

INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into NRCC-LTI-01-E; Page 2

SELMA HYUNDAI 9-11-2015

B

D

E

4 ft wraparound LED ballast

high bay dimmable LED ballast

8 ft strip LED ballast

2

4

6

x

x

x

29

192

88

58

768

528

1354

warehouse

1354

X

Page 7: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 1 of 3) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project.

Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.)

YES NO Control Requirements

Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with Section 110.9.

Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b).

One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b).

A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b).

All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with Section 130.1.

All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a).

General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4.

The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the multi-level lighting control requirements in accordance with Section 130.1(b).

All installed indoor lighting shall be equipped with controls that meet the applicable Shut-OFF control requirements in Section 130.1(c).

Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans.

Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e).

Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut-OFF controls, and demand responsive controls.

SELMA HYUNDAI 9-11-2015

X

X

X

X

X

X

X

X

X

X

X

X

Page 8: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: � CONDITIONED SPACES � UNCONDITIONED SPACES

MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST

Lighting Control Schedule Standards Complying With 1

(� all that apply, or enter ‘E’ if Exempted)

PAF Credit Calculation 2 � if A

cceptance

Test Required

Field Inspector

Watts of

Controlled Lighting

PAF

Control Credit (K x L)

A B C D E F G H I J K L M N O

Location in Building

Type/ Description of Lighting Control (i.e.: occupancy sensor,

automatic time switch, dimmer, automatic daylight,

etc…)

# of

Units

§130.1(a)

§130.0(b)

§130.1(c)

§130.1(d)

§130.1(e)

§140.6(a)2

§140.6(d)

Pass

Fail

� �

� � � �

� �

� �

� � � �

Control Credit PAGE TOTAL (Sum of Column M):

IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):

Enter Control Credit total into NRCC-LTI-01-E; Page 1.

1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.

SELMA HYUNDAI 9-11-2015

X

all rooms

mech roomOccupancy sensor

Lighting control panel

17

1

x

x

n/a

n/a

n/a

x

xx

x

Page 9: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 3 of 3) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA/ HERS Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance

(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of

Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance

documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the

enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

SELMA HYUNDAI 9-11-2015

JOHN CHONG, PE

JOHN CHONG, PE

JOHN CHONG ENGINEERING

JOHN CHONG ENGINEERING

2027 E DECATUR AVE.

2027 E. DECATUR AVE E 14419

Fresno CA 93720

Fresno CA 93720 (559) 325-9988

(559) 325-9988

9-11-2015

9-11-2015

Page 10: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STAT

E O

F C

ALIF

OR

NIA

IND

OO

R L

IGH

TIN

G P

OW

ER A

LLO

WA

NC

E C

EC-N

RC

C-L

TI-0

3-E

(Rev

ised

06/

14)

CAL

IFO

RN

IA E

NER

GY

CO

MM

ISSI

ON

CERT

IFIC

ATE

OF

COM

PLIA

NCE

N

RCC-

LTI-0

3-E

Cert

ifica

te o

f Com

plia

nce

- Ind

oor

Ligh

ting

Pow

er A

llow

ance

(P

age

1 of

4)

Proj

ect N

ame:

D

ate

Prep

ared

:

CA B

uild

ing

Ener

gy E

ffic

ienc

y St

anda

rds

- 201

3 N

onre

side

ntia

l Com

plia

nce

Ju

ne 2

014

ALL

OW

ED L

IGH

TIN

G P

OW

ER

A s

epar

ate

page

mus

t be

fille

d ou

t for

Con

ditio

ned

and

Unc

ondi

tione

d Sp

aces

. Th

is p

age

is o

nly

for:

CON

DIT

ION

ED s

pace

s

U

NCO

ND

ITIO

NED

spa

ces

A.

SU

MM

ARY

TO

TALS

OF

LIG

HTI

NG

PO

WER

ALL

OW

AN

CES

If u

sing

Com

plet

e Bu

ildin

g M

etho

d fo

r com

plia

nce,

use

onl

y th

e to

tal i

n co

lum

n (a

) as

tota

l allo

wed

bui

ldin

g w

atts

.

If u

sing

Are

a Ca

tego

ry M

etho

d, T

ailo

red

Met

hod,

or a

com

bina

tion

of A

rea

Cate

gory

and

Tai

lore

d M

etho

d fo

r com

plia

nce,

use

onl

y th

e to

tal i

n co

lum

n (b

) as

the

tota

l al

low

ed b

uild

ing

wat

ts

(a)

(b

) 1.

Com

plet

e Bu

ildin

g M

etho

d A

llow

ed W

atts

. Doc

umen

ted

in s

ectio

n B

of N

RCC-

LTI-0

3-E

(bel

ow o

n th

is p

age)

2. A

rea

Cate

gory

Met

hod

Allo

wed

Wat

ts. D

ocum

ente

d in

sec

tion

C-1

of N

RCC-

LTI-0

3-E

(bel

ow o

n th

is p

age)

3. T

ailo

red

Met

hod

Allo

wed

Wat

ts. D

ocum

ente

d in

sec

tion

A o

f NRC

C-LT

I-04-

E

TOTA

L A

LLO

WED

BU

ILD

ING

WA

TTS.

Ent

er n

umbe

r in

to c

orre

ct c

ell o

n N

RCC-

LTI-0

1, P

age

2, R

ow 1

Chec

k he

re if

bui

ldin

g co

ntai

ns b

oth

cond

ition

ed a

nd u

ncon

ditio

ned

area

s.

B.

COM

PLET

E BU

ILD

ING

MET

HO

D L

IGH

TIN

G P

OW

ER A

LLO

WA

NCE

A

B

C

D

TYPE

OF

BUIL

DIN

G (F

rom

§14

0.6

Tabl

e 14

0.6-

B)

W

ATT

S PE

R (f

t2 )

COM

PLET

E BL

DG

. ARE

A

A

LLO

WED

W

ATT

S

X =

Tota

l Are

a:

Tota

l Wat

ts. E

nter

Tot

al W

atts

into

sec

tion

A, r

ow 1

(Abo

ve o

n th

is p

age)

C -1

A

REA

CA

TEG

ORY

MET

HO

D T

OTA

L LI

GH

TIN

G P

OW

ER A

LLO

WA

NCE

S (C

-2 p

lus

C-3)

W

atts

To

tal f

rom

sec

tion

C-2

.

Tota

l fro

m s

ectio

n C-

3 .

Tota

l Wat

ts. E

nter

Tot

al W

atts

into

sec

tion

A, r

ow 2

(Abo

ve o

n th

is p

age)

.

SELM

A H

YUN

DA

I9-1

1-2

015

X X

5982

0

5982

5982

0

5982

Page 11: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STAT

E O

F C

ALIF

OR

NIA

IND

OO

R L

IGH

TIN

G P

OW

ER A

LLO

WA

NC

E C

EC-N

RC

C-L

TI-0

3-E

(Rev

ised

06/

14)

CAL

IFO

RN

IA E

NER

GY

CO

MM

ISSI

ON

CERT

IFIC

ATE

OF

COM

PLIA

NCE

N

RCC-

LTI-0

3-E

Cert

ifica

te o

f Com

plia

nce

- Ind

oor

Ligh

ting

Pow

er A

llow

ance

(P

age

2 of

4)

Proj

ect N

ame:

D

ate

Prep

ared

:

CA B

uild

ing

Ener

gy E

ffic

ienc

y St

anda

rds

- 201

3 N

onre

side

ntia

l Com

plia

nce

Ju

ne 2

014

A s

epar

ate

page

mus

t be

fille

d ou

t for

Con

ditio

ned

and

Unc

ondi

tione

d Sp

aces

. Th

is p

age

is o

nly

for:

CO

ND

ITIO

NED

spa

ces

UN

CON

DIT

ION

ED s

pace

s

C -2

ARE

A C

ATE

GO

RY M

ETH

OD

GEN

ERA

L LI

GH

TIN

G P

OW

ER A

LLO

WA

NCE

D

o no

t inc

lude

por

tabl

e lig

htin

g fo

r off

ices

. Por

tabl

e lig

htin

g fo

r off

ices

sha

ll be

doc

umen

ted

only

in s

ectio

n B

of N

RCC-

LTI-0

1-E.

Sep

arat

ely

list l

ight

ing

for

each

pri

mar

y fu

nctio

n ar

ea a

s de

fined

in §

100.

1 of

the

Stan

dard

s.

A

B

C

D

ARE

A C

ATE

GO

RY (F

rom

§14

0.6

Tabl

e 14

0.6-

C)

W

ATT

S PE

R (f

t2 ) X

ARE

A (f

t2 )

A

LLO

WED

W

ATT

S Lo

cati

on in

Bui

ldin

g Pr

imar

y Fu

ncti

on A

rea

per

Tabl

e 14

0.6-

C

=

TOTA

LS

Ente

r su

m to

tal A

rea

Cate

gory

allo

wed

wat

ts in

to s

ectio

n C-

1 of

NRC

C-LT

I-03-

E (t

his

com

plia

nce

form

)

WA

TTS

SELM

A H

YUN

DA

I9-1

1-2

015

X

show

room

ca

shie

r se

rvic

e w

riter

ki

d's

play

w

aitin

g

reta

il

wom

en

men

fil

es

jani

tor

stor

age

sa

les

man

ager

G

M o

ffice

co

nfer

enec

e

hall

F&

I offi

ce

F&I o

ffice

in

tern

et o

ffice

2700

10

0

320

70

22

0

380

15

0

150

50

40

40

30

0

160

40

0

100

11

0

110

23

0 5630

5982

5982

show

room

of

fice

offic

e w

aitin

g w

aitin

g

reta

il

toile

t to

ilet

stor

age

ja

nito

r st

orag

e

offic

e of

fice

co

nfer

ence

co

rrido

r of

fice

of

fice

of

fice

3240

10

0

240

70

22

0

456

90

90

30

24

24

22

5

160

56

0

60

110

11

0

173

1.20

1.

00

0.75

1.

00

1.00

1.

20

0.60

0.

60

0.60

0.

60

0.60

0.

75

1.00

1.

40

0.60

1.

00

1.00

0.

75

Page 12: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STAT

E O

F C

ALIF

OR

NIA

IND

OO

R L

IGH

TIN

G P

OW

ER A

LLO

WA

NC

E C

EC-N

RC

C-L

TI-0

3-E

(Rev

ised

06/

14)

CAL

IFO

RN

IA E

NER

GY

CO

MM

ISSI

ON

CERT

IFIC

ATE

OF

COM

PLIA

NCE

N

RCC-

LTI-0

3-E

Cert

ifica

te o

f Com

plia

nce

- Ind

oor

Ligh

ting

Pow

er A

llow

ance

(P

age

3 of

4)

Proj

ect N

ame:

D

ate

Prep

ared

:

CA B

uild

ing

Ener

gy E

ffic

ienc

y St

anda

rds

- 201

3 N

onre

side

ntia

l Com

plia

nce

Ju

ne 2

014

A s

epar

ate

page

mus

t be

fille

d ou

t for

Con

ditio

ned

and

Unc

ondi

tione

d Sp

aces

. Th

is p

age

is o

nly

for:

CO

ND

ITIO

NED

spa

ces

UN

CON

DIT

ION

ED s

pace

s C-

3 A

REA

CA

TEG

ORY

MET

HO

D

Add

itio

nal L

ight

ing

Wat

tage

Allo

wan

ce (f

rom

Tab

le 1

40.6

-C F

ootn

otes

) A

B

C 2

D

E

F

G

Prim

ary

Func

tion

Sq

Ft o

r lin

ear

ft 1

Add

ition

al

Wat

ts

Allo

wed

Wat

tage

A

llow

ance

(B

x C

)

Des

crip

tion(

s) a

nd Q

uant

ity o

f Spe

cial

Lu

min

aire

Type

s in

eac

h Pr

imar

y Fu

nctio

n A

rea

Tota

l Des

ign

Wat

ts 3

A

LLO

WED

W

ATT

S

Smal

ler

of

D o

r F

TOTA

LS –

Ent

er in

to T

OTA

L A

REA

CA

TEG

ORY

MET

HO

D A

DD

ITIO

NA

L A

LLO

WA

NCE

S –

Sect

ion

C-1

.

1. U

se li

near

feet

onl

y fo

r ad

ditio

nal a

llow

ance

for

whi

te b

oard

or

chal

k bo

ard.

All

othe

r add

ition

al A

rea

Cate

gory

allo

wan

ces

shal

l use

wat

ts p

er s

quar

e fo

ot.

2 . A

dditi

onal

wat

ts a

re a

vaila

ble

only

whe

n al

low

ed a

ccor

ding

to th

e fo

otno

tes

on b

otto

m o

f Tab

le 1

46-C

, whi

ch in

clud

e: S

peci

aliz

ed ta

sk w

ork;

Orn

amen

tal l

ight

ing;

Pr

ecis

ion

com

mer

cial

and

indu

stri

al w

ork;

Per

line

ar fo

ot o

f whi

te b

oard

or

chal

k bo

ard;

Acc

ent,

dis

play

and

feat

ure

light

ing;

and

Vid

eoco

nfer

enci

ng S

tudi

o lig

htin

g..

3. L

umin

aire

cla

ssifi

catio

n an

d w

atta

ge s

hall

be d

eter

min

ed in

acc

orda

nce

with

§13

0.0(

c) o

f the

Sta

ndar

ds.

SELM

A H

YUN

DA

I9-1

1-2

015

X

0

Page 13: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STAT

E O

F C

ALIF

OR

NIA

IND

OO

R L

IGH

TIN

G P

OW

ER A

LLO

WA

NC

E C

EC-N

RC

C-L

TI-0

3-E

(Rev

ised

06/

14)

CAL

IFO

RN

IA E

NER

GY

CO

MM

ISSI

ON

CERT

IFIC

ATE

OF

COM

PLIA

NCE

N

RCC-

LTI-0

3-E

Cert

ifica

te o

f Com

plia

nce

- Ind

oor

Ligh

ting

Pow

er A

llow

ance

(P

age

4 of

4)

Proj

ect N

ame:

D

ate

Prep

ared

:

CA B

uild

ing

Ener

gy E

ffic

ienc

y St

anda

rds

- 201

3 N

onre

side

ntia

l Com

plia

nce

Ju

ne 2

014

DO

CUM

ENTA

TIO

N A

UTH

OR'

S D

ECLA

RATI

ON

STA

TEM

ENT

1.

I cer

tify

that

this

Cer

tific

ate

of C

ompl

ianc

e do

cum

enta

tion

is a

ccur

ate

and

com

plet

e.

Doc

umen

tatio

n A

utho

r N

ame:

D

ocum

enta

tion

Aut

hor S

igna

ture

:

Com

pany

: Si

gnat

ure

Dat

e:

Add

ress

: CE

A/

HER

S Ce

rtifi

catio

n Id

entif

icat

ion

(if a

pplic

able

):

City

/Sta

te/Z

ip:

Phon

e:

RESP

ON

SIBL

E PE

RSO

N'S

DEC

LARA

TIO

N S

TATE

MEN

T

I cer

tify

the

follo

win

g un

der

pena

lty o

f per

jury

, und

er th

e la

ws

of th

e St

ate

of C

alifo

rnia

: 1.

Th

e in

form

atio

n pr

ovid

ed o

n th

is C

ertif

icat

e of

Com

plia

nce

is tr

ue a

nd c

orre

ct.

2.

I am

elig

ible

und

er D

ivis

ion

3 of

the

Busi

ness

and

Pro

fess

ions

Cod

e to

acc

ept r

espo

nsib

ility

for

the

build

ing

desi

gn o

r sy

stem

des

ign

iden

tifie

d on

this

Cer

tific

ate

of C

ompl

ianc

e (r

espo

nsib

le d

esig

ner)

. 3.

Th

e en

ergy

feat

ures

and

per

form

ance

spe

cific

atio

ns, m

ater

ials

, com

pone

nts,

and

man

ufac

ture

d de

vice

s fo

r th

e bu

ildin

g de

sign

or s

yste

m d

esig

n id

entif

ied

on th

is C

ertif

icat

e of

Co

mpl

ianc

e co

nfor

m to

the

requ

irem

ents

of T

itle

24, P

art 1

and

Par

t 6 o

f the

Cal

iforn

ia C

ode

of R

egul

atio

ns.

4.

The

build

ing

desi

gn fe

atur

es o

r sy

stem

des

ign

feat

ures

iden

tifie

d on

this

Cer

tific

ate

of C

ompl

ianc

e ar

e co

nsis

tent

with

the

info

rmat

ion

prov

ided

on

othe

r ap

plic

able

com

plia

nce

docu

men

ts, w

orks

heet

s, c

alcu

latio

ns, p

lans

and

spe

cific

atio

ns s

ubm

itted

to th

e en

forc

emen

t age

ncy

for

appr

oval

with

this

bui

ldin

g pe

rmit

appl

icat

ion.

5.

I w

ill e

nsur

e th

at a

com

plet

ed s

igne

d co

py o

f thi

s Ce

rtifi

cate

of C

ompl

ianc

e sh

all b

e m

ade

avai

labl

e w

ith th

e bu

ildin

g pe

rmit

(s) i

ssue

d fo

r th

e bu

ildin

g, a

nd m

ade

avai

labl

e to

the

enfo

rcem

ent a

genc

y fo

r al

l app

licab

le in

spec

tions

. I u

nder

stan

d th

at a

com

plet

ed s

igne

d co

py o

f thi

s Ce

rtifi

cate

of C

ompl

ianc

e is

req

uire

d to

be

incl

uded

with

the

docu

men

tatio

n th

e bu

ilder

pro

vide

s to

the

build

ing

owne

r at

occ

upan

cy.

Re

spon

sibl

e D

esig

ner N

ame:

Re

spon

sibl

e D

esig

ner S

igna

ture

:

Com

pany

: D

ate

Sign

ed:

Add

ress

: Li

cens

e:

City

/Sta

te/Z

ip:

Phon

e:

SELM

A H

YUN

DA

I9-1

1-2

015

John C

hong,

PE

John C

hong E

ngin

eeri

ng

2027 E

. D

ecat

ur

Ave

Fre

sno,

CA

93720

9-1

1-2

015

(559)

325-9

988

John C

hong,

PE

John C

hong E

ngin

eeri

ng

2027 E

. D

ecat

ure

Ave

Fre

sno,

CA

93720

9-1

1-2

015

E 1

4419

(559)

325-9

988

Page 14: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STAT

E O

F C

ALIF

OR

NIA

IND

OO

R L

IGH

TIN

G P

OW

ER A

LLO

WA

NC

E C

EC-N

RC

C-L

TI-0

3-E

(Rev

ised

06/

14)

CAL

IFO

RN

IA E

NER

GY

CO

MM

ISSI

ON

CERT

IFIC

ATE

OF

COM

PLIA

NCE

N

RCC-

LTI-0

3-E

Cert

ifica

te o

f Com

plia

nce

- Ind

oor

Ligh

ting

Pow

er A

llow

ance

(P

age

1 of

4)

Proj

ect N

ame:

D

ate

Prep

ared

:

CA B

uild

ing

Ener

gy E

ffic

ienc

y St

anda

rds

- 201

3 N

onre

side

ntia

l Com

plia

nce

Ju

ne 2

014

ALL

OW

ED L

IGH

TIN

G P

OW

ER

A s

epar

ate

page

mus

t be

fille

d ou

t for

Con

ditio

ned

and

Unc

ondi

tione

d Sp

aces

. Th

is p

age

is o

nly

for:

CON

DIT

ION

ED s

pace

s

U

NCO

ND

ITIO

NED

spa

ces

A.

SU

MM

ARY

TO

TALS

OF

LIG

HTI

NG

PO

WER

ALL

OW

AN

CES

If u

sing

Com

plet

e Bu

ildin

g M

etho

d fo

r com

plia

nce,

use

onl

y th

e to

tal i

n co

lum

n (a

) as

tota

l allo

wed

bui

ldin

g w

atts

.

If u

sing

Are

a Ca

tego

ry M

etho

d, T

ailo

red

Met

hod,

or a

com

bina

tion

of A

rea

Cate

gory

and

Tai

lore

d M

etho

d fo

r com

plia

nce,

use

onl

y th

e to

tal i

n co

lum

n (b

) as

the

tota

l al

low

ed b

uild

ing

wat

ts

(a)

(b

) 1.

Com

plet

e Bu

ildin

g M

etho

d A

llow

ed W

atts

. Doc

umen

ted

in s

ectio

n B

of N

RCC-

LTI-0

3-E

(bel

ow o

n th

is p

age)

2. A

rea

Cate

gory

Met

hod

Allo

wed

Wat

ts. D

ocum

ente

d in

sec

tion

C-1

of N

RCC-

LTI-0

3-E

(bel

ow o

n th

is p

age)

3. T

ailo

red

Met

hod

Allo

wed

Wat

ts. D

ocum

ente

d in

sec

tion

A o

f NRC

C-LT

I-04-

E

TOTA

L A

LLO

WED

BU

ILD

ING

WA

TTS.

Ent

er n

umbe

r in

to c

orre

ct c

ell o

n N

RCC-

LTI-0

1, P

age

2, R

ow 1

Chec

k he

re if

bui

ldin

g co

ntai

ns b

oth

cond

ition

ed a

nd u

ncon

ditio

ned

area

s.

B.

COM

PLET

E BU

ILD

ING

MET

HO

D L

IGH

TIN

G P

OW

ER A

LLO

WA

NCE

A

B

C

D

TYPE

OF

BUIL

DIN

G (F

rom

§14

0.6

Tabl

e 14

0.6-

B)

W

ATT

S PE

R (f

t2 )

COM

PLET

E BL

DG

. ARE

A

A

LLO

WED

W

ATT

S

X =

Tota

l Are

a:

Tota

l Wat

ts. E

nter

Tot

al W

atts

into

sec

tion

A, r

ow 1

(Abo

ve o

n th

is p

age)

C -1

A

REA

CA

TEG

ORY

MET

HO

D T

OTA

L LI

GH

TIN

G P

OW

ER A

LLO

WA

NCE

S (C

-2 p

lus

C-3)

W

atts

To

tal f

rom

sec

tion

C-2

.

Tota

l fro

m s

ectio

n C-

3 .

Tota

l Wat

ts. E

nter

Tot

al W

atts

into

sec

tion

A, r

ow 2

(Abo

ve o

n th

is p

age)

.

SELM

A H

YUN

DA

I9-1

1-2

015

X

X

1784

war

ehouse

1784 0

0 1784

17840

Page 15: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STAT

E O

F C

ALIF

OR

NIA

IND

OO

R L

IGH

TIN

G P

OW

ER A

LLO

WA

NC

E C

EC-N

RC

C-L

TI-0

3-E

(Rev

ised

06/

14)

CAL

IFO

RN

IA E

NER

GY

CO

MM

ISSI

ON

CERT

IFIC

ATE

OF

COM

PLIA

NCE

N

RCC-

LTI-0

3-E

Cert

ifica

te o

f Com

plia

nce

- Ind

oor

Ligh

ting

Pow

er A

llow

ance

(P

age

2 of

4)

Proj

ect N

ame:

D

ate

Prep

ared

:

CA B

uild

ing

Ener

gy E

ffic

ienc

y St

anda

rds

- 201

3 N

onre

side

ntia

l Com

plia

nce

Ju

ne 2

014

A s

epar

ate

page

mus

t be

fille

d ou

t for

Con

ditio

ned

and

Unc

ondi

tione

d Sp

aces

. Th

is p

age

is o

nly

for:

CO

ND

ITIO

NED

spa

ces

UN

CON

DIT

ION

ED s

pace

s

C -2

ARE

A C

ATE

GO

RY M

ETH

OD

GEN

ERA

L LI

GH

TIN

G P

OW

ER A

LLO

WA

NCE

D

o no

t inc

lude

por

tabl

e lig

htin

g fo

r off

ices

. Por

tabl

e lig

htin

g fo

r off

ices

sha

ll be

doc

umen

ted

only

in s

ectio

n B

of N

RCC-

LTI-0

1-E.

Sep

arat

ely

list l

ight

ing

for

each

pri

mar

y fu

nctio

n ar

ea a

s de

fined

in §

100.

1 of

the

Stan

dard

s.

A

B

C

D

ARE

A C

ATE

GO

RY (F

rom

§14

0.6

Tabl

e 14

0.6-

C)

W

ATT

S PE

R (f

t2 ) X

ARE

A (f

t2 )

A

LLO

WED

W

ATT

S Lo

cati

on in

Bui

ldin

g Pr

imar

y Fu

ncti

on A

rea

per

Tabl

e 14

0.6-

C

=

TOTA

LS

Ente

r su

m to

tal A

rea

Cate

gory

allo

wed

wat

ts in

to s

ectio

n C-

1 of

NRC

C-LT

I-03-

E (t

his

com

plia

nce

form

)

WA

TTS

SELM

A H

YUN

DA

I9-1

1-2

015

X

fluid

s/co

mp

m

ech

se

rvic

e

serv

ice

rece

ptio

n

mec

h

mec

h

wor

k sh

op

rece

ptio

n

0.60

0.

70

1.00

1.

00

110

90

94

5

710

66

63

945

71

0

1855

1784

17

84

Page 16: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

LINE-VOLTAGE TRACK LIGHTING WORKSHEET CEC-NRCC-LTI-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-05-E Indoor Lighting – Line-Voltage Track Lighting Worksheet (Page 1 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

� There are four different methods available for determining how many watts of line-voltage track or line-voltage busway has been installed. One or more methods may be used to determine how many watts of line-voltage track or line-voltage busway has been installed. Use this worksheet to separately calculate the input wattage for each system.

� Separately enter each row of this worksheet into the Luminaire Schedule in section C of NRCC-LTI-01-E � Method 1 is the only option available for determining wattage for track or busway rated for more than 20 amperes

� METHOD 1 – VOLT-AMPERE (VA) RATING OF THE BRANCH CIRCUIT(S)

A B

BRANCH CIRCUIT NAME OR ID VOLT-AMPERE (VA) RATING OF THE

BRANCH CIRCUIT

� METHOD 2 – USE THE HIGHER OF 45 WATTS PER LINEAR FOOT OF TRACK OR TOTAL RATED WATTAGE OF ALL LUMINAIRES

A B C D E F

Track or Name # Linear Feet of

Track (W/LF)

B x C (W)

TOTAL RATED WATTAGE OF ALL LUMINAIRES

LARGER OF (D or E)

45

45

45

� METHOD 3 – USE THE HIGHER OF: 12.5 WATTS / LINEAR FOOT OF TRACK – OR VA RATING OF INTEGRAL CURRENT LIMITER

� Only integral current limiters which are certified to the Energy Commission shall be recognized by the Standards. � This method shall not be recognized if an Installation Certificate is not submitted.

A B C D E F

Track or Name # Linear Feet of

Track (W/LF) B x C (W)

VA Rating of Integral Current Limiter

Larger of (D or E)

12.5

12.5

12.5

� METHOD 4 - DEDICATED TRACK LIGHTING SUPPLIMENTARY OVERCURRENT PROTECTION PANEL � This method shall not be recognized if an Installation Certificate is not submitted. � This method shall be used only for line-voltage track lighting, and shall not be recognized for any other lighting systems. If any other lighting

systems or devices are installed, the supplementary overcurrent protection panel shall not be recognized for compliance with the Standards

A B C D

NAME OR ID Voltage of the Branch Circuit

Sum of the Ampere Rating of all Devices installed in the Panel

Wattage = Sum of the Ampere Ratings of all of the Devices Times The Branch Circuit Voltage (B x C)

9-11-2015SELMA HYUNDAI

x

x

x

360 F 24 300 360

Page 17: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

LINE-VOLTAGE TRACK LIGHTING WORKSHEET CEC-NRCC-LTI-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-LTI-05-E Indoor Lighting – Line-Voltage Track Lighting Worksheet (Page 2 of 2) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete.

Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA/ HERS Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT

I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design

identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system

design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.

4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.

5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

JOHN CHONG JOHN CHONG ENGINEERING 2027 E. DECATURE AVE FRESNO CA 93720

JOHN CHONG JOHN CHONG ENGINEERING 2027 E. DECATURE AVE FRESNO CA 93720

SELMA HYUNDAI 9-11-2015

(559) 325-9988

(559) 325-9988

E 14419

E 14419

9-11-2015

9-11-2015

Page 18: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 1 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

Project Address: Climate Zone: Conditioned Floor Area :

Unconditioned Floor Area :

General Information

Building Type: � Nonresidential � High-Rise Residential � Hotel/Motel

� Schools � Relocatable Public Schools � Conditioned Spaces � Unconditioned Spaces

Phase of Construction: � New Construction � Addition � Alteration

A. Electrical Service Metering

� Each newly installed electrical service (in both existing and newly constructed buildings) is required to be metered, as set out in Table 130.5-A, which is reproduced below.

� Fill out a separate line for each electrical service that is connected to the building.

Electrical Service Schedule

Electrical Service Rating

Metering Capabilities (check all that are present) Field

Inspector

A B C D E F G

Designation/location in building/description kVA

Instantaneous

(at the time)

kW dem

and

Historical peak

demand (kW

)

Resettable

kWh

kWh per rate

period

Pass

Fail

9-11-2015SELMA HYUNDAI

2525 HIGHLAND AVE, SELMA, CALIFORNIA 135630 SF

1855 SF

X

X

X

x

X

Page 19: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 2 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

� � � � � �

Table 130.5-A - MINIMUM REQUIREMENTS FOR METERING OF ELECTRICAL LOAD

Meter Rating (kVA) 50 kVA or less

More than 50kVA and less than or

equal to 250 kVA

More than 250 kVA and less than or

equal to 1000kVA

Services rated more than 1000kVA

Instantaneous (at the time) kW demand

Required Required Required Required

Historical peak demand (kW)

Not required Not required Required Required

Resettable kWh Required Required Required Required

kWh per rate period Not required Not required Not required Required

360KVA 1000A Main Switchboard

9-11-2015SELMA HYUNDAI

X X X

Page 20: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 3 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

B. Disaggregation of Electrical Circuits

� Each newly installed switchboard, panel, and motor control center (in both existing and newly constructed buildings) is required to be disaggregated according to the requirements of Table 130.5-B, shown on the next page.

� Individual branch circuits, taps or disconnects that require overcurrent protection devices rated 60A or greater are exempt.

� As an alternative, current transformers can be added for individual branch circuits and loads throughout the building, and a permanent measurement system can be installed. In this case, disaggregated wiring would not be required as long as the metering system allows the equivalent disaggregated measurements.

� Fill out a separate line for each switchboard, motor control center, panelboard and subpanel.

Switchboard, motor control center, panelboard or subpanel

Electrical Service that supplies that switchboard or panel Electrical Service Rating

Field Inspector

Pass

Fail

SELMA HYUNDAI 9-11-2015

X

X

Page 21: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 4 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

A B C D

Designation/location in building/description Designation/location in

building/description kVA � �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

OR

Current transformers have been attached to individual branch circuits and loads throughout the building, and a permanent

measurement system is installed that allows an equivalent degree of disaggregated measurement as required by the Standards.. � �

SELMA HYUNDAI 9-11-2015

Panel AC

Panel A

Panel B

Main switchboard outdoor

Main switchboard outdoor

Panel A

144 KVA

144 KVA

36 KVA Panel C

Panel D

Panel L

Panel A

Panel A

Panel AC

36 KVA

72 KVA

36 KVA

Page 22: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 5 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

B. Disaggregation of Electrical Circuits (continued)

Table 130.5-B - MINIMUM REQUIREMENTS FOR SEPARATION OF ELECTRICAL LOAD

Table 130.5 – B sets the upper limit on how many load(s) of each type can be supplied by each feeder. A feeder may not supply loads of more than one type unless the service is rated at 50 kVA or less. For instance, on the fifth row of the table, one feeder on a service >50 kVA could be used to supply all the plug loads on a floor of a building, provided that there are no areas in which more than 25kVA of plug load is supplied to a space less

than 5000sf

Load Type Services rated 50 kVA or less

Services rated more than 50kVA and less than or

equal to 250 kVA

Services rated more than 250 kVA and less than or

equal to 1000kVA Services rated more

than 1000kVA

Lighting including exit and egress lighting and exterior lighting

Not required All lighting in aggregate All lighting disaggregated

by floor, type or area

All lighting disaggregated by floor,

type or area

HVAC systems and components including chillers, fans, heaters, furnaces, package units, cooling towers, and circulation pumps associated with HVAC

Not required All HVAC in aggregate All HVAC in aggregate and each HVAC load rated at least 50 kVA

All HVAC in aggregate and each HVAC load rated at least 50kVA

Domestic and service water system pumps and related systems and components

Not required All loads in aggregate All loads in aggregate All loads in aggregate

Plug load including appliances rated less than 25 kVA

Not required

All plug load in aggregate Groups of plug loads

exceeding 25 kVA connected load in an area

less than 5000 sf

All plug load separated by floor, type or area

Groups of plug loads exceeding 25 kVA

connected load in an area less than 5000 sf

All plug loads separated by floor, type or area.

All groups of plug loads exceeding 25 kVA

connected load in an area less than 5000 sf

Elevators, escalators, moving walks, and transit systems

Not required All loads in aggregate All loads in aggregate All loads in aggregate

Other individual non-HVAC loads or appliances rated 25kVA or greater

Not required All Each Each

Industrial and commercial load centers 25 kVA or greater including theatrical lighting installations and commercial kitchens

Not required All Each Each

Renewable power source (net or total)

Each group Each group Each group Each group

Loads associated with renewable power source

Not required All loads in aggregate All loads in aggregate All loads in aggregate

Charging stations for electric vehicles

All loads in aggregate

All loads in aggregate All loads in aggregate All loads in aggregate

SELMA HYUNDAI 9-11-2015

Page 23: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 6 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

C. Voltage Drop

� Attach voltage drop worksheet to this form,

� Field inspector has discretion to approve the worksheets; the tables shown below in this section are advisory only

� Feeder conductors and branch circuits that are dedicated to emergency services are exempt from these requirements.

� An advisory table of typical power factors is shown below

Field Inspector

Pass

Fail

Feeders. Feeder conductors shall be sized for a maximum voltage drop of 2 percent at design load. � �

Branch Circuits. Branch circuit conductors shall be sized for a maximum voltage drop of 3 percent at design load. � �

SELMA HYUNDAI 9-11-2015

X

X

X

Page 24: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 7 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

Compliance Manual, Chapter 8, Table 8 2: Typical Power Factors for Voltage Drop Calculations

Load Type Default Power Factor

at 120 volts Default Power Factor

at 277 volts Clarifying Notes

Fluorescent lighting 0.95 0.95

Compact fluorescent lighting

0.9 (hardwired)

0.5 (GU-24)

0.9 (hardwired)

0.3 (GU-24) NPF magnetic ballasts use GU-24 values

LED lighting 0.7 0.5 May be higher if specifications call for high

power factor drivers

Incandescent lighting

1.0 1.0

HID lighting 0.9 0.9 May be lower if NPF ballasts are specified

HVAC packages 0.85 0.9

Other motors <5 HP 0.8 0.8

Other motors >5 HP 0.85 0.85

Kitchen equipment 0.9 N/A

Receptacles 0.6 N/A For dedicated receptacles, may be rated

according to the load

Electric heating including hot water

1.0 1.0

Other 0.85 0.85

SELMA HYUNDAI 9-11-2015

Page 25: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 8 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

D. Circuit Controls for 120-Volt Receptacles

� Controlled 120 volt receptacles shall be provided, as required by Section 130.5(d) of the Standards.

� In open office areas, controlled circuit receptacles are not required if, at time of final permit, workstations are installed, and each workstation is equipped with an occupant sensing control that is permanently mounted in each workstation, and which controls a hardwired, nonresidential-rated power strip. Plug-in strips and other plug-in devices that incorporate an occupant sensor shall not be used for this exception.

� Receptacles that are only for the following purposes are exempt:

-Receptacles specifically for refrigerators and water dispensers in kitchenettes. -Receptacles located a minimum of six feet above the floor that are specifically for clocks. -Receptacles for network copiers, fax machines, A/V and data equipment other than personal computers in copy rooms.

Field Inspector

Pass

Fail

1. At least one controlled receptacle is installed within 6 feet of each uncontrolled receptacle, or split-wired duplex receptacles are installed, that have one controlled and one uncontrolled receptacle. This applies in all of the following spaces:

Private offices, open office areas

Receptions and lobbies

Conference rooms

Kitchenettes in office spaces

Copy room

� �

2. Electric circuits serving controlled receptacles are equipped with automatic shut-OFF controls following the requirements prescribed in Section 130.1(c)1 through 5 (in many cases this will mean that the receptacles are connected to the same automatic shut-OFF system as the general lighting of the space).

� �

3. Controlled receptacles shall have a permanent marking to differentiate them from uncontrolled receptacles. � �

4. For open office areas, controlled circuits shall be provided and marked to support installation and configuration of office furniture with receptacles that comply with Section 130.1(a)130.5(d) 1, 2, and 3. � �

5. For hotel and motel guest rooms at least one-half of the 120-volt receptacles in each guest room are controlled receptacles that comply with Section 130.5(d)1, 2, and 3 (see numbers 1,2 and 3 above). Electric circuits serving controlled receptacles have captive card key controls, occupancy sensing controls, or automatic controls such that, no longer than 30 minutes after the guest room has been vacated, power is switched off.

� �

6. Plug-in strips and other plug-in devices that incorporate an occupant sensor are not used to comply with any of these requirements. � �

SELMA HYUNDAI 9-11-2015

X

X

Page 26: Project Name: Date Prepared: SELMA HYUNDAI 9-11-2015lcnconstruction.com/lcnjobfiles/lcnfiles/Past... · CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls

STATE OF CALIFORNIA

Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION

CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E

Electrical Power Distribution (Page 9 of 9) Project Name: Date Prepared:

CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014

DOCUMENTATION AUTHOR’S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:

Company: Signature Date:

Address: CEA/ HERS Certification Identification (if applicable):

City/State/Zip: Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT

I certify the following under penalty of perjury, under the laws of the State of California:

1. The information provided on this Certificate of Compliance is true and correct.

2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer).

3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.

4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.

5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name: Responsible Designer Signature:

Company : Date Signed:

Address: License:

City/State/Zip: Phone:

SELMA HYUNDAI 9-11-2015

John Chong, PE

John Chong Engineering

2027 E. Decatur Ave

Fresno CA 93720 (559) 325-9988

John Chong, PE

John Chong Engineering

2027 E. Decatur Ave

Fresno CA 93720 (559) 325-9988

E 14419

9-11-2015

9-11-2015